N6660416R00940001.pdf
PDF 4 MB Posted
- Attached to
- Warhead Electronics System (WES) and SONAR Signal Transmitter Assemblies Federal contract opportunity
- Solicitation number
- N66604-15-R-0931
About this file
RFP AMENDMENT N666604-16-R-0094 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6660416R00940005.pdf | ||
| N6660416R00940004.pdf | ||
| N6660416R00940003.pdf | ||
| N6660416R009402.pdf | ||
| N6660416R0094.pdf | ||
| 254_WES.pdf | ||
| TDP_Mat_Req_15R0931.docx | DOCX document | |
| DRAFTSOW0931.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
SEE PAGE No. 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 48
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Nov-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N66604-16-R-0094
X 9B. DATED (SEE ITEM 11)
20-Oct-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Nov-2015
CODE
NAVAL UNDERSEA WARFARE CENTER
MICHAEL BROOMFIELD, CODE 0222
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841
N66604 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N66604-16-R-0094
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The standard size code 750 has been added.
The required response date/time has changed from 09-Dec-2015 02:00 PM to 15-Jan-
2016 02:00 PM.
The contract maximum amount $46,000,000.00 has been deleted.
The contract minimum amount $1,000,000.00 has been deleted.
The following have been added by full text:
GENERAL INFORMATION
The purpose of this amendment is to:
1. Extend the RFP closing date from 09 Dec 2015 to 15 Jan 2016
2. Revise Section A, Notes to Offerors
3. Incorporate three additional Optional PIO CLIN’s (0021, 0022 & 0023)
4. Revise the Extended Description of PIO CLINs by incorporating the following- "The PIO is for long lead items or components within scope of the SOW"
5. CLAUSE HQ C-1-0003 - Tailor by adding the following language. "If PIO Option CLIN 0006 is exercised, the contractor shall reduce the price of the production items to reflect the amount spent on long lead items under the PIO CLIN."
6. Incorporate Clause C25 ACCESS TO GOVERNMENT SITE
7. Incorporate a revised Statament of Work
8. Incorporate revised CDRLs
9. Respond to the following questions and make the noted changes to the RFP:
Transmitter / WES RFP
Question/Comment Response
The TDP does not have a revision indicated. What is the latest revision?
The TDP revision that applies to this solicitation is the date marked on the Technical Information for Solicitation Number N66604-15-R-0931 WES and Sonar Signal Transmitter Assemblies CD provided for the RFP which is
21-OCT-2015.
Paragraph 4.7.3, Self Generated Noise, applicable documents state "The self-generated audio noise requirements below shall be tested in a fully populated G&C section during ATE Comprehensive System Test Block 17.1-4 (ATE Software V3.6.1 or equivalent). NUWC-NPT Technical Memo 04-018, titled “Torpedo MK 48 Mod 6 ACOT Structure Borne and Airborne Noise Test Results”, and dated 23 March 2004, provides the details associated with the test setup and process."
Question: Regarding the Government's First Article Testing, how does the Government intend to determine if the Transmitter is the cause of any noise sources, since the specification directs the testing at the G&C level?
NUWC testing personnel and equipment have the ability to isolate failures to the individual FIR within the torpedo's G & C section.
The GFE list does not contain shipping containers that are required by the CIPS. Is the contractor responsible for procurring shipping containers, or will they be provided GFE? If the contractor is responsible, please provide drawings.
The Government will perform the environmental testing therefore the contractor does not require a shipping container for testing. The Government does not currently have shipping containers to provide as GFE, so the contractor should package using best commerial packages. The RFP is updated to include Clause HQ D-1-
0002 PACKAGING OF SUPPLIES
The SOW deliverable does not match the test reports to be prepared in the same paragraph. Does the Government desire the vibration screening results as a separate report? Should it be combined with the thermal testing report?
The temperature cycling and random vibration test reports should be included as separate sections within the Production Inspection Reliability Test report.
What is the timing of the delivery of CDRLs 0003 through 0010? The RFP includes the text "Initial delivery to begin no later than 10 months after Production Option 1 Exercised" in the far right column in all of these CDRL rows.
The RFP has been updated;
For CLINs 3 through 10, initial delivery to begin 12 months after each option is exercised.
Additionally, the RFP has been updated to allow a minimum lot size of 5 per month replacing the 16 month end date.
The RFP does not provide estimated award dates for the options. For planning purposes, can the Government provide estimated award dates for the options?
The first production option will be exercised subsequent to successful completion of First Article testing.
Subsequent options are anticipated to be exercised annually.
Paragraph 4.2 states "the contractor shall recommend last time buys and lifetime buys." Will the contractor be allowed to make last time buys and lifetime buys at contract award?
When the Government receives the contractor's recommendation as required by the Parts Management Plan, the Government will evaluate the recommendation and advise.
How will DMS be addressed throughout the life of the contract? The contractor's Parts Management Plan should address periodic DMS evaluations (per applicable document 3.1.6) with life-of-contract recommendations.
Personnel Qualification Sheets and Personnel Data Forms are only mentioned in Section L30 and nowhere else. Please describe their purpose and required content.
Reference removed from Solicitation.
For a contractor currently delivering identical components to the Government, it would be in the Government's interest to allow the option to propose a waiver of First Article Requirements for those components as defined under clause HQ C-2-0026 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA)(SEP 1990) and clause HQ M-2-
0011 WAIVER OF FIRST ARTICLE REQUIREMENTS (CONTRACTOR
TESTING). Request the RFP be ammended to add the First Article Waiver request clauses.
The RFP has been ammended to add the First Article Waiver Request Clauses HQ C-2-0062 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (SEP 1990) and clause
HQ M-2-0011 WAIVER OF FIRST ARTICLE REQUIREMENTS
(CONTRACTOR TESTING).
Request deletion of FAR 52.215-20 in accordance with FAR 15.403 section (c)(1).
Additional cost or pricing data may be required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (SEE PROVISION 252.215-7008 ONLY
ONE OFFER)
The transmitter specification in the TDP, 8595319 Rev B 25 Sep 2015, includes many requirements that are verified by analyses. Does the Government desire the contractor to quote performing all of the tests, inspections and analyses that are identified in Table III (VCRI) of this specification or referenced within the body of the document? If so, will this contract be a “build to print” or a “build to specification”?
If the contractor builds the hardware to the drawing package and it does not pass some of the specification requirements due to a design issue (not a manufacturing or quality issue), will the design change be funded as an ECP?
Yes, the Government expects the contractor to perform all tests as detailed in the Statement of Work and identified in Table III of 8595319. The contract is build-to-print. The First Article portion of this contract is Cost Plus Fixed Fee to address design changes related to design issues identified during this phase. Yes, If a design change has a cost impact it will be funded as an ECP.
Request addition of DFARS 252.219-7004 Small Business and Small Disadvantaged Business Subcontracting Plan (Test Program).
Clause 252.219-7004 Small Business and Small Disadvantaged Business Subcontracting Plan (Test Program) added to RFP.
A template or description for the personal qualification sheets and the personal data forms were not included in the RFP. Please provide.
Reference removed from RFP.
Request the government modify the RFP to allow combining First Article and option years long lead material buys in order to meet schedule and reduce the likelihood of future DMS.
The RFP contains PIO CLIN 0011, 0021, 0022 & 0023 which can be exercised to procure long lead material buys at any time subsequent to contract award. The RFP has been updated to include additional PIO CLINs (0021, 022 & 0023) for option years.
In order to meet schedule, we request the Government modify the RFP to add a separate long lead material CLIN for each production option to be awarded in advance of the production CLIN.
The RFP contains PIO CLIN 0011, 0021, 0022 & 0023 which can be exercised to procure long lead material buys at any time subsequent to contract award. The RFP has been updated to include additional PIO CLINs (0021, 0022 & 0023) for option years.
Is the government willing to relax the "no later than" delivery start date and allow more deliveries per month to meet the delivery end date?
The RFP has been updated;
For CLINs 3 through 10, initial delivery to begin 12 months after each option is exercised.
Additionally, the RFP has been updated to allow a minimum lot size of 5 per month replacing the 16 month end date.
The government-directed sole source of supply for the Transmitter has a 9 month delivery schedule. We request the government modify the RFP to allow industry to specify delivery start/end dates to accommodate long lead materials.
The RFP has been updated;
For CLINs 3 through 10, initial delivery to begin 12 months after each option is exercised.
Additionally, the RFP wll be updated to allow a minimum lot size of 5 per month replacing the 16 month end date.
Are cover pages, tables of contents, resumes, integrated master schedule, the labor category matrix, and the Pass/Fail Requirements excluded from the Technical Volume page limit to be submitted in response to this Solicitation.
Yes. The RFP section L30X B.1.v has been updated to exclude cover pages, tables of contents, resumes, integrated master schedule, the WBS, the labor category matrix, and the Pass/Fail Requirements from the page count limit.
The RFP on page 44 states in HQ C-2-0026 (b) that the “(b) The First Article shall conform in every respect to the requirements of this contract and shall be fully tested by the Contractor to determine compliance with said requirements.” For the First Article environmental qualification tests (not manufacturing screening), will the Government perform all of the required testing as specified in the CIPFS?
As specified in section 4.7.3 of the Statement of Work (SOW) on page 26 of the solicitation, the following First Article tests will be conducted by the Government:
1. Environmental Conditions (SOW Applicable Documents
3.1.3 and 3.1.5)
2. Self-Generated Noise (SOW Applicable Documents
3.1.3 and 3.1.5)
3. Electromagnetic Interference (EMI)Environmental Conditions (SOW Applicable Documents 3.1.3 and 3.1.5)
The RFP states that the contractor shall provide a Contractor Work Breakdown Structure (WBS) with the proposal. Request that the Government modify the RFP to allow contractors to submit the WBS in a non-page limited appendix that does not count against the page limit of the Technical Volume.
Yes. The RFP section L30X B.1.v has been updated to exclude cover pages, tables of contents, resumes, integrated master schedule, the WBS, the labor category matrix, and the Pass/Fail Requirements from the page count limit.
The Presentation dated 21 October 2015 entitled “Explanation for the Technical WES and SONAR Signal Transmitter Assemblies”, page 4 states: “Section 5.1.5 FIR Level Production Inspection Reliability Test (PIRT)-Changed to non-applicable for the WES”. Review of the WES specification ECPs RFC: 48/NUE15082, Rev: R3 and RFC:
48/NUE15115, Rev: - found no incorporation of this presentation change. Does the aforementioned presentation take precedence and mean that specification 6934828, paragraph 3.3.2.1.3 entitled “Production Inspection Reliability Test (PIRT)” is not required?
The presentation incorrectly stated that “Section 5.1.5 FIR Level Production Inspection Reliability Test (PIRT)- Changed to non-applicable for the WES”. Specification 6934828, paragraph 3.3.2.1.3 entitled “Production Inspection Reliability Test (PIRT)” is required.
The transmitter specification, 8595319, paragraphs 3.4 and 4.4, both entitled “Manufacturing Screening”, reference document 8595331, entitled “Manufacturing Quality Assurance Specification, Torpedo Functional Item Replacement”. The 8595331 document is for all MK 48 and MK 54 Torpedo FIRS and provides for guidance in creating a manufacturing screen in accordance with MIL-HDBK-344 to meet a specific PE requirement. The 8595331 document also provides for a Proof of Life test after the manufacturing screen is developed (paragraph 3.3). On the other hand, the WES specification, 6934828, paragraph 3.3.2.1 entitled “Manufacturing Screen”, does not reference 8595331 but provides the exact parameters for CCAs as well as the WES level for manufacturing screening. So the questions are as follows from the above:
a) Does the solicitation, section C11 Statement of Work (SOW) paragraph 4.7.2 entitled “First Article Production Screening and Proof of Life Testing” pertain just to the Transmitter for the Proof of Life requirement? That is, the WES has a specific manufacturing test established and it is assumed this test regimen has been vetted already.
b) Should the WES specification be modified to cite use of specification 8595331 like the Transmitter to match the solicitation SOW paragraph 4.7.2?
A) Yes, the Proof of Life Testing only pertains to the Transmitter.
B) No, for this solicitation WES testing should be conducted in accordance with specification 6934828.
Although we did not receive Specification 8595331 entitled “Manufacturing Quality Assurance Specification, Torpedo Functional Item Replacement” with solicitation N66604-16-R-0094, but have it from other as yet un-awarded solicitations, we assume the current revision is “-“with a date of 3 March 2015? Should the Government formally provide this document as part of the solicitation package since Transmitter specification 8595319 directly requires its use for manufacturing screening? (Note that question #2 was asked with the assumption we have the correct document version.)
Yes. The Government provided document 8595331 on CD Supplement 1.
Per the following found in L40 COST PROPOSAL (JAN 2010)… (2) Offerors must support any proposed escalation factor with convincing rationale: factual data (including actual direct labor rates for at least three years) and complete supporting data and rationale for out-year escalation projections. In the absence of convincing rationale, the Government will use the current Data Resources Inc.
(DRI) recommendation for Professional and Technical Workers in evaluating the offer. Question: Is the 3.10% escalation that is found in the NUWC Division, Newport Cost Analysis Spreadsheet the DRI recommended escalation factor that will be applied to the contractor labor?
The most recent Global Insight recommendation for labor escalation is 2.9%.
The Government has listed several CLINs as Options to the base contract, however, the Government has not identified the latest date to exercise each option.
See revised Clause 52.217-7
The Government provided a delivery schedule for CLINs 0003 – 0010 that indicate “initial delivery to begin no later than 10 months after Production Option 1 Exercised”. Can the Government please clarify what quantity would constitute “initial delivery”? Further, was it the Government’s intent to indicate that initial delivery would begin after production Option 1 for all of the listed production CLINs? If not, please indicate for each CLIN the appropriate production option for which initial delivery would begin.
The RFP has been updated to allow a minimum lot size of 5 per month replacing the 16 month end date;
For CLINs 3 through 10, initial delivery to begin 12 months after each option is exercised.
The Government provided a TDP for the WES and Transmitter that indicates many obsolete components, yet both WES and Transmitter are currently being fabricated and delivered to the Government. Will the Government provide an updated TDP for the WES and Transmitter prior to contract award?
The approved and qualified WES and Transmitter TDPs were provided for this solicitation. Approved updates to the TDPs will be provided at contract award.
Due monthly. Customer has 30 business days to review. This cadence allows for delivery of CDRL A002 before the customer has completed review of the prior month’s document.
The Government has 30 days to review the first submission only. Subsequent submissions are due after approval of the first submission with a 15 day Government review.
Block 16 states one of these CDRL is necessary when CDRL A008 and A006 are approved. CDRL A008 is self-referential and CDRL A006 is for Variances which do not impact the TDP.
Block 16 of CDLS A008 thru A00C have been updated to require "approved changes per CDRLs A005 and A007"intstead A006 and A008.
This CDRL is due 15 days after drafting completes each individual approved change, leading to the potential for a significant number of deliveries.
The updated documentation for CDRLs A008 thru A00C shall be submitted 15 days after the documentation is released. The RFP will not change.
DD1423 form doesn’t specify applicability to 4.7.1.1 IBR, yet SoW content states it does
CDRL A00E has been updated to be applicable to SOW
4.7.1.1 IBR.
CDRL A002 applies to Firm Fixed Priced CLINs 0003 through 0010.
According to DFAR 234.201, Earned Value Management, section (1), (iv), (A) states that the application of Earned Value Management is discouraged on Firm Fixed Priced contracts. Should the FFP CLINs be removed from CDRL A002.
CDRL A002 has been updated to remove Firm Fixed Priced CLNs 0003 through 0010.
There is no Progress Payment clause in the RFP, should the contractor propose Performance Based Payments for the FFP CLINs?
Perfromance Based Payment Clause 52.232-32 added to
RFP.
There appears to be a conflict on external EVMS reporting, there is no EVMS clause in the RFP, yet there is an Integrated Program Management Report (IPMR) requiring external EVMS reporting.
Should the IPMR requirement be removed from the RFP?
The RFP has been updated to add EVMS Clause 52.234-4.
The Government has included FAR clauses 52.215-20 "Requirements for Cost or Pricing Data or Information Other than Certified Cost or Pricing Data" which allows the Contractor to request an exemption to providing certified cost or pricing data should they meet the requirements set forth within the clause, otherwise the Contractor must submit a certificate of current cost or pricing data prior to contract award. However, due to the competitive nature of this acquisition and in accordance with the exception in FAR 15.403- 1(b)(1) the requirement for certified cost or pricing data should be removed.
Additional cost or pricing data may be required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (SEE PROVISION 252.215-7008 ONLY
ONE OFFER)
Should the references to Table 15-2 of FAR 15.408 be removed from the RFP since this is a competitive Proposal?
Additional cost or pricing data may be required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (SEE PROVISION 252.215-7008 ONLY
ONE OFFER)
Do the GFE Items, 6238331 Transmitter Test Set, 6114186 Analog Card Test Set, and the 6370639 WAS/WES Test Set, test sufficiently to meet the requirements of the applicable CIPS/TRS documents.
Yes, the GFE Items, 6238331 Transmitter Test Set, 6114186 Analog Card Test Set, and the 6370639 WAS/WES Test Set, sufficiently test to meet the requirements of the applicable CIPS/TRS documents.
Is the government covering the cost of maintenance and repair of the GFE test sets?
Yes, the Government is covering the cost of maintenance and repair of the GFE test sets.
If a failure does occur during Government IV&V, and it is determined that the failure does appear to be related to the WES or SONAR Signal transmitter Assembly, will the Contractor continue to be funded under engineering services through FRACAR submission and corrective action implementation, particularly if it is proven the FIR was built compliantly to the GFE TDP?
If a failure does occur during Government IV&V, and it is determined that the failure does appear to be related to the WES or SONAR Signal transmitter Assembly, the Contractor will be funded under engineering services through FRACAR submission and corrective action implementation, even if it is proven the FIR was built compliantly to the GFE TDP.
SOW sections 4.7.3 and 4.7.4 are confusing regarding Contractor First Article Testing, Government First Article Testing, and the delivery of First Article units. Is it the Government’s intent that:
• The First Article Test Plan identifies all First Article tests and whether they are Contractor or Government tests.
• The First Article Test Procedures address only the Contractor First Article tests. The First Article Test Procedures do not need to address the Government First Article tests.
• The First Article Test Report documents only the results of the Contractor First Article testing. The First Article Test Report does not need to document the results of the Government First Article testing.
• Following successful completion of Contractor First Article testing and approval of the Contractor First Article Test Report, the First Article units will be delivered IAW the RDD schedule to the Government for Government First Article testing.
• Following the Government’s completion of Government First Article testing, the Government will transition into Government IV&V testing.
It is the Government’s intent that:
• The First Article Test Plan identifies all First Article tests and whether they are Contractor or Government tests.
• The First Article Test Procedures should address all First Article tests, by including Contractor First Article Test Procedures and documenting which tests will be conducted by the Government.
• The First Article Test Report documents the results of all First Article testing, Contractor and Government.
The Government will provide Government First Article test data to the contractocr.
• Following successful completion of Contractor First Article testing the Contractor shall provide First Article units to the Government for Government First Article testing. After completion of ALL First Article Testing, the Contractor shall prepare a First Article Test Report. Upon successful completion of ALL First Article Testing and Government approval of the FIrst Article Test Report, the contractor shall deliver the First Article units to the Government for Government IV&V testing.
• Upon successful completion of ALL First Article Testing and Government approval of the FIrst Article Test Report, the contractor shall deliver the First Article units to the Government for Government IV&V testing.
IBR entrance criteria d., TDP baseline or PMB? TDP is not part of IBR. The IBR entrance criteria d should state; the contractor baseline must be established and must reflect the entire scope of work documented at the appropriate level of detail before the formal IBR can be conducted.
Is IBR a gate to commence First Article tasking? The IBR is a gate to "proceed" with First Article tasking.
Solicitation document, Page 117, Item (2) titled 'General Format and Markings', Sub-Item (i): Do foldout pages up to 11 x 17 inches (to be used for diagrams, charts, or graphic material) count as one (1) or two (2) pages?
One (1) page
The transmitter specification, 8595319, paragraph 4.2.3.3.1.2.2 entitled "High Temperature Operating", is required for First Article testing and then Periodic Testing per the specification, Table III.
Paragraph 4.2.3.3.1.2.2 requires that the transmitter be assembled to the "digital G & C subsection (that includes other electronic FIRS) equipped with compatible watertight extension shell and submerged in a temperature-controlled, continuously-mixed water environment". When reviewing the solicitation's list of GFE, Sechan does not see a G & C section listed; there is however a "Transmitter Chassis Adapter", P/N 6239161 listed. The questions are:
a) Does the Government plan on providing the G & C section when needed and Sechan ship back or will this be provided upon contract award and added to the GFE list?
b) Is the Transmitter Chassis Adapter, P/N 6239161, the referenced "watertight extension shell" mentioned in the aforementioned transmitter specification?
c) If the answer to b) is "no", does the Government plan on providing the extension shell and add to the GFE list? If not, does that mean Sechan has to provide; if so, is a drawing going to be provided so Sechan can price and then fabricate a proper extension shell?
a) No, a G&C section will not be provided. The "High Temperature Operating" testing is included in the Envirnmental Conditions testing that the Government will perform as stated in the SOW paragraph 4.7.2.
b) No, the Transmitter Chassis Adapter, P/N 6239161, is not the referenced "watertight extension shell" mentioned in the aforementioned transmitter specification. The Transmitter Chassis Adapter assembly, P/N 6239161, is a fixture for the Analog Card test set.
c) The Government will not provide the extension shell as this test is performed by the Government at Government facilities.
There appears to be a conflict in the RFP regarding the Government’s intent to award any resulting contract to a single offeror for all units of all items as specified in Section M under clause HQ M-2-0001 vs.
the language in Section L clause 52.215-1 (f)(6) which states that the Government reserves the right to make multiple awards if the Government deems it to be in their best interest. In order for the Contractor to provide its best offer can the Government please clarify if the intent is in fact to make a single award for all units of all items as stated in Section M clause HQ M-2-0001.
The Governments intent is to make a single award.
The Government provided a TDP for the WES that indicates the requirement for many firmware programs, yet no native firmware design files were provided. Will the Government provide an updated TDP for the WES with current and complete firmware program design files at award to minimize cost to the government?
Yes, the Government will provide the firmware design files at contract award.
Document 6370640 sheet 2 Cable Connection Diagram indicates the WAS/WES Test Set 6370639 is connected to a WES, WAS and Tuning Box. Will a WAS and Tuning Box be provided as GFE along with the 6370639 Test Set?
A Tuning Box and WAS will not be provided as GFE. They are not required for testing of the WES.
Only one 6934830 Electronic Assembly WES MARK 22 MOD 1 is offered as GFE with no spare Circuit cards, yet two 5728260 Transmitter Assemblies are offered as GFE along with several spare Circuit Card Assemblies. Can the government provide a second GFE 6934830 Electronic Assembly WES MARK 22 MOD 1 along with spare Circuit Card Assemblies, to mitigate schedule risk to the contractor?
The Government will consider supplying a second GFE 6394830 Electronic Assembly WES MARK 22 MOD 1 upon request after contract award based on availability.
Document 6370639 WAS/WES Test Set indicated a Test Requirement 6370644 and Interface Control Document 6370641, yet these documents were not provided in the TDP Will the Government provide these documents to enable the contractor to more adequately assess WES test scope?
The Government will provide top level drawing 6370644 on unclassified CD Supplement 2. Drawing 6370641 is not available. However, the Government will provide the WAS/WES Test Set Functional Unit Design Specification Engineering Notebook which contains the same information. The Government does not intend to provide documents referenced within these upper level drawings. They will be provided as necessary after contract award.
The WES QATP indicated a WAS/WES Test Set TRD 6301758-956, yet this document was not provided in the TDP Will the Government provide this document to enable the contractor to more adequately assess WES test scope?
Yes, the Government will provide document 6301758- 956 on classified CD Supplement 2. The Government does not intend to provide documents referenced within these upper level drawings. They will be provided as necessary after contract award.
The TDP and WES Test Set GFI did not provide sufficient information to assess the duration of Factory Acceptance Testing for the WES.
Will the government provide typical WES Factory Acceptance Test duration to enable the contractor to more adequately assess WES test scope?
The duration for conducting the Unit Under Test (UUT) testing on the WAS/WES Test Set is approximately 2 hours.
The TDP and WES Test Set GFI did not provide sufficient information to determine if the GFE WES test set has the capability to test the lower level WES Circuit Card Assemblies per the applicable TRS documents in the TDP. Is the GFE WES test set capable of testing any or all WES Circuit Card Assemblies per the applicable TRS documents in the TDP to enable the contractor to more adequately assess WES test scope?
The WES GFE test set does not have the capability to test individual circuit card assemblies.
Document 6239983 is called out in documents 6880000 and 6880001 but is missing from the TDP. Can the government provide this document to enable the contractor to more adequately assess WES scope?
Document 6239983 was included in the classified CD provided with the Technical Information for Solicitation Number N66604-15-R-0931 WES and Sonar Signal Transmitter Assemblies CD provided for the RFP which is
21-OCT-2015.
Transmitter specification 8595319, paragraph 3.2.3.2.3, entitled "Shipboard Shock, Stowage", requires a MIL-S-901, Grade A shock to the shock spectra of Confidential drawing 8243524. This drawing was not provided as part of the TDP classified disk. Is the Navy going to provide this drawing or does the aforementioned paragraph need modified to provide the required details?
Since the Government will be conducting environmental testing, confidential drawing 8243524 is not required and will not be provided.
Transmitter specification 8595319, paragraph 3.2.2.1, entitled "Configuration and Dimensions", states in part that drawing 5728260 provides the Transmitter dimensions. This drawing has no dimensions. Is there a drawing that provides the transmitter overall dimensions?
Transmitter Interface Control drawing 6934911 has the overall Transmitter dimensions. This document will be provided on unclassified CD Supplement 2.
WES specification 6934828, paragraph 3.2.2.2, entitled "Configuration and Dimensions", states in part that drawing 6934830 provides the WES dimensions. This drawing has no dimensions. Is there a drawing that provides the WES overall dimensions?
WES Interface Control drawing 5729531 provides the overall dimensions for the WES. This drawing was included in the classified CD provided with the Technical Information for Solicitation Number N66604-15-R-0931 WES and Sonar Signal Transmitter Assemblies CD provided for the RFP which is 21-OCT-2015.
The following have been modified:
NOTES TO OFFERORS
NOTES TO OFFEORS
1.Offerors shall complete all Sections identified under Clause L5 REQUIREMENTS FOR OFFEROR
COMPLETION
2. Offerors shall complete and submit the Cost Analysis Spreadsheet for all CPFF and Cost
Reimbursement line items using the NUWC Division, Newport Cost Analysis Spreadsheet (SEE
CLAUSE L46).
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/Partnerships/CommercialC ontracts/InformationeCraft/CostPriceAnalyst.aspx .
3. All offerors shall fill in $100,000.00 in Section B for PIO CLINs 0011, 0021, 0022 & 0023.
4. The FEE TABLE in Section B shall be completed by the offeror and is applicable to CPFF
CLINs 0001 – 0002, 0012 – 0015.
http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/Partnerships/CommercialContracts/InformationeCraft/CostPriceAnalyst.aspx http://www.navsea.navy.mil/Home/WarfareCenters/NUWCNewport/Partnerships/CommercialContracts/InformationeCraft/CostPriceAnalyst.aspx
5. CLINs 0016 – 0019 are Cost Reimbursement only. All offerors shall fill in the Governments following estimated costs plus any applicable burdens in Section B for each CLIN.
0016 - $23,550 ($6K Material, $17,550 Travel)
0017 - $30,345 ($6K Material, $24,345 Travel)
0018 - $19,590 ($6K Material, $13,590 Travel)
0019 - $19,590 ($6K Material, $13,590 Travel)
6. All offers must be made valid through 31 JULY 2016
7. DFAR Clause 252.211-7003 UNIQUE ITEM IDENTIFIER (UID) shall apply (See RFP
Section I) This clause also requires that UID information must be submitted in WAWF and that a
UID tag must be affixed to the item prior to shipping.
8. Deadline for Industry Submission of Questions is hereby established. The deadline for RFP questions submission is 11/13/15 – 2:00 PM EST. After this date and time, the Government may not respond to questions received.
9. This solicitation is issued under full and open competition.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0011
The CLIN extended description has changed from:
Provisioned Item Order
To:
Provisioned Item Order - The PIO is for long lead items or components within scope of the SOW (YEAR 1).
CLIN 0021 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0021 1 Lot
OPTION PIO
FFP
Provisioned Item Order - The PIO is for long lead items or components within scope of the SOW (YEAR 2)
FOB: Destination
NET AMT
CLIN 0022 is added as follows:
0022 1 Lot
OPTION PIO
FFP
Provisioned Item Order - The PIO is for long lead items or components within scope of the SOW (YEAR 3)
CLIN 0023 is added as follows:
0023 1 Lot
OPTION PIO
FFP
Provisioned Item Order - The PIO is for long lead items or components within scope of the SOW (YEAR 4)
HQ B-2-0023 CONTRACT SUMMARY FOR PAYMENT OFFICE (COST/
FIXED PRICE) (FEB 1997)
This contract includes the following mixture of cost reimbursement and fixed price line items:
Item Type
0003 - 0011 , 0021, 0022 & 0023 FFP
0001 – 0002, 0012 - 0015 CPFF
0016 – 0019 CR
CR – Cost Reimbursement
FFP – Firm Fixed Price
CPFF – Cost plus Fixed Fee
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
C25 ACCESS TO GOVERNMENT SITE (APR 2015)
NOTE:
(1) The Contractor will have access to the Government-owned facilities located at NUWC Division
Newport, Rhode Island; NUWC Division Keyport, Washington; and NUWC Division Keyport facilities located at Naval Submarine Base Bangor, Washington as required in support of production, testing efforts, troubleshooting, failure analysis, meetings etc. on a not to interfere basis.
(2) For access to Government facilities, the Contractor shall establish a Test Availability Plan
(TAP) with the appropriate Government activity 90 days prior to planned use.
(3) The Government shall not be responsible for conflicts, delays, or disruptions to any work performed by the Contractor due to use of any or all of such property under this contract or any other contracts under which use of such property is authorized.
(a) Contractor personnel shall comply with all current badging and security procedures required to gain access to any Government site. Access to Naval Undersea Warfare Center Division, Newport sites may only be gained by obtaining a badge (either permanent or temporary) from the security office. If the company cannot complete a background investigation, compliance with SECNAV M-5510.30, Section 9-20, FACILITY ACCESS
DETERMINATION (FAD) PROGRAM is specifically required. Badges shall be issued only after completion of a background investigation completed using the electronic Questionnaire for Investigation Processing (eQIP).
Contractor personnel requiring a Common Access Card, access to controlled unclassified information (CUI) and/or user level access to DoN or DoD networks and information systems, system security and network defense systems, or to system resources providing visual access and/or ability to input, delete or otherwise manipulate sensitive information without control to identify and deny sensitive information, are required to have a favorably adjudicated
NACLC.
The Contractor shall ensure that Contractor personnel employed on any Government site become familiar with and obey Activity regulations. Contractor personnel shall not enter restricted areas unless required to do so and until cleared for such entry. The Contractor shall request permission to interrupt any activity roads or utility services in writing a minimum of 15 calendar days prior to the date of interruption. Contractor personnel shall wear personal protective equipment in designated areas. All contractor equipment shall be conspicuously marked for identification.
The contractor shall strictly adhere to Federal Occupational Safety and Health Agency (OSHA) Regulations, Environmental Protection Agency (EPA) Regulations, and all applicable state and local requirements.
(b) The contractor shall ensure that each contractor employee reads the pamphlet entitled, “Occupational Safety and
Health Information for Contractors” prior to commencing performance at any NUWCDIVNPT site. This document is available under “Contractor Info” at: http://www.navsea.navy.mil/nuwc/newport/docs/Forms/AllItems.aspx
(c) The contractor shall ensure that each contractor employee reads the document entitled, “NUWC Environmental
Policy” prior to commencing performance at any NUWCDIVNPT site. This document is available at:
http://www.navsea.navy.mil/nuwc/newport/docs/EMS_EnvPolicy1.pdf .
(d) The contractor shall ensure that each contractor employee who is resident at any NUWCDIVNPT site completes
Environmental Awareness training within 30 days of commencing performance at that site. This training is available on the ISO 14001 webpage on the NUWCDIVNPT Intranet and is also available on the NUWC Division Newport
Internet site. This document is available at:
http://www.navsea.navy.mil/nuwc/newport/docs/External%20ISO14001_2009%20Training.pdf .
(e) The Contractor shall report compliance with paragraphs (c) and (d) of this clause no later than thirty days after award and monthly thereafter via e-mail to the Contracting Officer's Representative (COR) with a copy to NWPT.NUWC_NPT_1023_Training@navy.mil . Compliance reports shall include a list of all employees with access to any NUWCDIVNPT site with the date each employee reviewed the Environmental Policy document and the date each employee completed the Environmental Awareness Training.
(f) The contractor shall remove from the Government site any individual whose presence is deemed by the
Commander, NUWCDIVNPT, to be contrary to the public interest or inconsistent with the best interests of national security.
HQ C-2-0062 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA)
(SEP 1990)
If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):
http://www.navsea.navy.mil/nuwc/newport/docs/EMS_EnvPolicy1.pdf http://www.navsea.navy.mil/nuwc/newport/docs/External%20ISO14001_2009%20Training.pdf
(Offeror to fill in contract number(s), as applicable. See Section M)
C11 STATEMENT OF WORK (JAN 2012)
Services are to be performed in accordance with the Statement of Work attached below:
SECTION C – STATEMENT OF WORK
1. BACKGROUND
The Naval Undersea Warfare Center Division, Newport (NAVUNSEAWARCENDIVNPT) located in Rhode Island
(RI) and the Naval Undersea Warfare Center Division, Keyport (NAVUNSEAWARCENDIVKPT) located in
Washington (WA) are responsible for supporting all life cycle phases of the Lightweight and Heavyweight Torpedo systems including requirements definition, design, development, integration and test of torpedo upgrades and automated test equipment, weapon procurement and production support activities, torpedo performance analysis and operational readiness, and technical support for foreign military sales. In support of these activities, these facilities maintain corporate and scientific/engineering knowledge and specialized facilities for planning, developing, and conducting research, advanced development, production hardware assessment and operational systems development for all torpedo systems including export weapons.
Currently, the United States Navy (USN) maintains an active inventory of MK48 Mod 6 and Mod 7 Heavyweight
Torpedoes. The current Warhead Electronics System (WES) and SONAR Signal Transmitter Assemblies used in the MK48 Heavyweight Torpedo were last acquired in the early 1990’s. Recent assessments of the torpedo inventory have identified a need for the USN to acquire additional WES and SONAR Signal Transmitter
Assemblies. In response, NAVUNSEAWARCENDIVNPT has completed an effort to modernize the WES and
SONAR Signal Transmitter Assembly Technical Data Packages (TDPs) and is seeking to procure WES and SONAR
Signal Transmitter Assemblies that meet the requirements within the TDP. The Undersea Weapons Program Office
(PMS 404) will be sponsoring the Naval Undersea Warfare Center for the acquisition of these WES and SONAR
Signal Transmitter Assemblies.
2. SCOPE
This Statement of Work (SOW) sets forth the work efforts required by the contractor to fabricate, assemble, test, inspect, package, and deliver First Article and Production WES and SONAR Signal Transmitter Assemblies for the
MK48 Heavyweight Torpedoes to include performing program management, and engineering and technical services. The WES and SONAR Signal Transmitter Assemblies shall be built In Accordance With (IAW) the build-to-print TDP, Applicable document 3.1.1. All work to be performed under this SOW shall require a secure facility and personnel with required security clearances IAW Attachment XXX (DD-254).
2.1 Sponsors
This contract is sponsored by the following organizations:
1) PMS404
2.2 Funding
This contract is funded using the following categories:
1) WPN
2) FMS
3) OMN
3. DOCUMENTS
To the extent referenced herein, the following documents form a part of this SOW and are hereby incorporated by reference. If no revision is indicated, the revision in effect on the date of contract award applies. In the event of a conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall take precedence. The contractor shall perform all SOW tasks IAW applicable documents identified in Table 3.1.
Reference documents in table 3.2 are provided for guidance.
3.1 Applicable Documents:
Applicable
Document
Document # Document Title Date or Revision Applicable
SOW Task
3.1.1 N/A
Torpedo MK 48 Warhead Electronics
System (WES) Assembly & SONAR
Signal Transmitter Assembly
Technical Data Package
N/A
4.4, 4.4.1, 4.7, 4.7.1.3, 4.7.3, 4.7.5, 4.9, 4.9.3, 6
3.1.2 6934830 Electronic Assembly WES MARK 22
MOD 1
E
4.4, 4.4.1, 4.7, 4.7.1.3, 4.7.3, 4.7.5, 4.9, 4.9.3, 6
3.1.3
6934828
(Classified
Document)
Critical Item Product Fabrication
Specification for Electronic Assembly, WES MARK 22 MOD 1
B
4.7.2, 4.7.3, 4.9.2.2, 4.9.3,
3.1.4 5728260 SONAR Signal Transmitter Assembly R
4.4, 4.4.1, 4.7, 4.7.1.3, 4.7.3, 4.7.5, 4.9, 4.9.3, 6
3.1.5 8595319
Critical Item Product Fabrication
Specification for the MOD 7 Common
Broadband Advanced SONAR System
(CBASS) Analog Transmitter
Assembly
B 4.7.2, 4.7.3, 4.9.3, 6
3.1.6 MIL-STD-3018 Parts Management 27 October 2011 4.2
3.1.7 MIL-STD-31000 Technical Data Packages 5 November 2009 4.4
3.1.8 - Torpedo Systems Department
Configuration Management Plan D 4.4, 6
3.1.9 S0199-133-A-O-C
Configuration Management Plan for
Undersea Weapons Program (PMS404) D 4.4, 6
3.1.10 - Undersea Weapons Program Office, Risk Process Description
8 September
4.1.1, 6
3.1.11
ANSI/ISO/ASQ
9001-2008
Quality Management Systems -
Requirements Standard November 2008 4.6
3.1.12 GEIA-859-A Data Management April 2012 4.3
3.1.13 6370639 WAS/WES Test Set B 4.7.2, 4.7.4, 4.9.2.2
3.1.14 WAS/WES Test Set Documentation --
4.7.2, 4.7.4, 4.9, 4.9.2.2
3.1.15 6238331 Analog Transmitter Test Set C 4.7.2, 4.7.4, 4.9, 4.9.2.1
3.1.16 -- Analog Transmitter Test Set
Documentation
4.7.2, 4.7.4, 4.9, 4.9.2.1
3.1.17 6114186 Analog Card Test Set D 4.7.2, 4.7.4, 4.9, 4.9.2.1
3.1.18 -- Analog Card Test Set Documentation -- 4.7.2, 4.7.4, 4.9, 4.9.2.1
3.1.19 MIL-HDBK-2155
Failure, Reporting, Analysis and
Corrective Action Taken
11 December
4.6, 4.7.5
3.2 Reference Documents:
As stated in section 3.0, Reference Documents in table 3.2 are provided for guidance.
Applicable
Document
Document # Document Title Date or
Revision
Applicable
SOW Task
3.2.1 MIL-STD-1521
Technical Reviews and Audits for
Systems, Equipment, and Computer
Software
B 4.7.1
3.2.2 MIL-STD-1686
Electrostatic Discharge Control Program for Protection of Electrical and
Electronic Parts, Assemblies and
Equipment
C 4.6
3.2.3 MIL-HDBK-263
Electrostatic Discharge Control
Handbook for Protection of Electrical and Electronic Parts, Assemblies and
Equipment (Excluding Electrically
Initiated Explosive Devices) (Metric)
B 4.6
3.2.4 QATP20120003
MK 48 Heavyweight Torpedo Advanced
Capability (ADCAP) Warhead
Electronics System (WES) Government
Qualification Acceptance Test Plan
(QATP)
A 4.8, 4.10.1, 6
3.2.5 QATP20130004
MK 48 Heavyweight Torpedo Advanced
Capability (ADCAP) Transmitter
Government Qualification Acceptance
Test Plan (QATP)
A 4.8, 4.10.1, 6
3.2.6
- TOR-
2007(8583)-6414, Volume 1
Technical Reviews and Audits for
Systems, Equipment, and Computer
Software
1 4.7.1
3.2.7 EIA-649-B Configuration Management Standard April 2011 4.4
4. REQUIREMENTS
The contractor shall perform the tasking in this SOW IAW applicable documents listed in section 3.1. The requirements defined in sections 4.1 thru 4.6 shall be applicable throughout the period of performance of the contract including Preproduction – First Article, Integration Validation and Verification (IV&V) testing, and
Production.
4.1 Program Management Plan
The contractor shall prepare a Program Management Plan (PMP). The PMP shall contain the contractor’s management and scheduling of all efforts necessary to meet the contract requirements. The contractor shall designate a Program Manager who shall have responsibility for all aspects of this contract.
Deliverables: The contractor shall deliver a Program Management Plan IAW CDRL A001
4.1.1 Integrated Program Management Report (IPMR)
The contractor shall prepare monthly Integrated Program Management Reports (IPMR) to include the efforts of all activities, including all subcontractors and suppliers.
The contractor shall include an Integrated Master Schedule (IMS) as part of the monthly IPMR detailing all program activities required for the performance of this contract. The contractor shall update the IMS monthly.
The contractor shall implement a comprehensive risk management process to include program risk areas and the program’s critical path to systematically identify, quantify, track and mitigate schedule, and technical risks. The contractor shall provide updated risk item reports, which include the identification and adjudication of risk items, within the monthly IPMR.
Deliverables: The contractor shall deliver Integrated Program Management Reports IAW CDRL A002
4.2 Parts Management
The contractor shall establish and maintain a Parts Management Plan for components that will be utilized in the construction of the WES and SONAR Signal Transmitter Assemblies.