N66604-20-Q-8024-0001.pdf
PDF 417 KB Posted
- Attached to
- Construction Project Shield Room Modification Federal contract opportunity
- Solicitation number
- N66604-20-Q-8024
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N66604-20-Q-8024-0004.pdf | ||
| N66604-20-Q-8024-0003.pdf | ||
| N66604-20-Q-8024-0002.pdf | ||
| N66604-20-Q-8024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300832183
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide a corrected Statement of Work (Section C).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Apr-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660420Q8024
X 9B. DATED (SEE ITEM 11)
10-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Apr-2020
CODE
NAVAL UNDERSEA WARFARE CENTER
LESLIE BRAZIL, CODE 0224
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
N66604 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6660420Q8024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
CONTENTS
Section/Paragraph
1 Background
1.1 Scope
2 Applicable Documents
2.1 Specifications Sections
2.2 Drawings
3 Administrative Requirements
3.1 Period of Performance
3.2 Prevailing Wage
3.3 Buy American Act
3.4 Contact List
3.5 Contractor Access and Use of Premises
3.5.1 Activity Regulations
3.5.2 NUWC Visit Request
3.5.3 Defense Biometrics Identification System
3.5.3.1 DBIDS Eligibility Requirements
3.5.3.2 DBIDS Notification Requirements
3.5.4 Arrival Instructions
3.5.5 Photography
3.5.6 Computer Use
3.5.7 Wi-Fi
3.5.8 Radio Transmitter Restrictions
3.5.9 No Smoking Policy
3.5.10 Working Hours
3.5.11 Supervision
3.5.12 Temporary Utilities
4 SAFETY
4.1 Workplace Safety
4.2 Personal Protective Equipment
4.3 Sanitation
4.4 Activity Hazard Analysis
4.5 Accident Reporting
4.6 Accident Notification
4.7 Definition of Recordable Injury or Illness
4.8 Emergency Medical Treatment
4.9 Periodic Inspections
CONTENTS (continued)
Section/Paragraph PAGE
5 PERFORMANCE REQUIREMENTS
5.1 Special Scheduling
5.2 Submittals
5.3 Preconstruction Conference
5.4 Utility Outage Request
5.5 Hot Work Permit
5.6 Existing Work
5.7 Occupancy of Premises
6 PROJECT CLOSEOUT
6.1 Cleanup
7 Figures 1-5
7.1 Figure 7.1. Location of room 118A
7.2 Figure 7.2. New door location
7.3 Figure 7.3. Location of cipher lock
7.4 7.5
Figure 7.4. Location of new filter holes for power Figure 7.5. Laydown/work area, Room 118
1. Background.
The Submarine Electromagnetic Systems Department current Shielded Radio Room needs a new larger door in a new location and removal of the existing door and relocation of the power filters to allow installation of the Columbia Class Radio Room. The work is required to support the Capital Investment Program for the Columbia Class Radio Room. The shielded Radio Room is located in room 118 of building 1319 at the Naval Undersea Warfare Center, Division Newport.
1.1 Scope.
The shielded Radio Room (118A), Figure 7.1, located in room 118 in building 1319 at the Naval Undersea Warfare Center, Division Newport shall be modified to allow the construction of the Columbia Class Radio Room inside it. The contractor shall:
a) Perform an initial measurement of the effective shielding of the existing Shielded room per AD 3.1. This shall serve as a baseline that the room must meet after modification;
b) The contractor shall fabricate and install (1) manual, single knife edged door with clear opening of 4’ wide x 8’ high in the location shown in Figure 7.2. The door shall swing out with the hinges on the right side of the door. The threshold of the new door will be as low as possible to meet the existing conditions of the welded room, and accommodate the RF seal around the door perimeter. The door (and framing) shall be prepared for and have the ability to accept a government installed CDX-10 cipher lock in the approximate location as shown in Figure 7.3. The lock shall be placed approximately 4’ 6” from the existing floor.
The contractor shall provide a door closure mechanism with same, form, fit and function as that shown in Figure 7.3. The contractor shall provide removable ramps for access into existing chamber to prevent damage to the door frame/seal when rolling equipment in with a weight of 3000 Lb.
c) Remove the existing 3’-6” x 7’-0” high door/associated framework and any existing filter penetrations.
The holes remaining are to be patched by RF seal welding per AD 3.2 and 3.3. The existing cut out for the door in the chamber wall is approximately 52 ¾” wide by 92 ½” high. The chamber walls are fabricated from 10.2 A36 plate. The government shall do painting of new patchwork. The government shall accomplish removal of the existing door from the work site.
d) The contractor shall install three new filters for power per AD 3.4. The power filters are: a) two -
115VAC 3-phase delta rated for 200 amps; b) one – 440VAC 3-phase delta for 20 amps. The new power filters shall be placed in the area of the old door in the area shown in Figure 7.4. The Power line filters shall provide a minimum insertion loss of -100 dB from 14 kHz to 10 GHz when measured in accordance with MIL-STD-220C load conditions.
e) The contractor will be responsible for proving the required welding equipment. The government shall provide three (3) 220V 30AMP circuits for welding and at least two (2) 110V single-phase 30AMP circuits for general construction tools. Welding exhaust fumes will be mitigated as needed via ventilation to the nearest open access to the outside air. The government shall provide adequate temporary lighting (if required). The contractor shall provide all material, tools and labor to install the RF shielded door and filter holes. Contractor will provide all material, tools and labor to install the patch for the removed existing 3.5’ x 7’ RF door. A laydown/work area located in room 118 for the welders and storage area for materials shall be provided as shown in Figure 7.5. The work specified herein shall be performed at both the contractor's facility and at NUWCDIVNPT.
f) Perform a final measurement of the effective shielding of the modified Shielded room The contractor shall ensure the installed door and new filter holes meets the existing level of attenuation or better after installation per AD 3.5.
2. Applicable Documents.
The following document are applicable to this Statement of Work.
2.1 Specifications
The contractor shall perform the tasking required in Section 1.1 in accordance with the below Applicable Documents (AD):
NUMBER TITLE TASK NUMBER
3.1 IEEE-STD-299-2006 Standard Method for Measuring the
Effectiveness of Electromagnetic Shielding Enclosures (2006)
1.1.a
3.2 AWS D1.1 Structural Welding Code-Steel 1.1.c, 1.1.e
3.3 AWS D1.3 Structural Welding Code- Sheet Steel 1.1.c, 1.1.e
3.4 MIL-STD-220C 1.1.d
3.5 IEEE-STD-299-2006 Standard Method for Measuring the
Effectiveness of Electromagnetic Shielding Enclosures (2006)
1.1.f
2.2 Drawings
Not Applicable.
3. Administrative Requirements
3.1 Contract Completion Date.
All work must be completed within 150 days from contract award. Any modifications or extensions must be requested through the Contracting Officer for review and discussion.
3.2 Prevailing Wage. Contractors and subcontractors must pay workers at least the locally prevailing wages (including fringe benefits), listed in the Davis-Bacon wage determination in the contract, for the work performed.
3.3 Buy American Act. The Contractor shall use only domestic construction material in performing this contract, unless otherwise allowed by the Contracting Officer.
3.4 Contact List. Provide a list of contact personnel. The contact list must contain the names of key contractor and subcontractor points of contact, their title, addresses, and telephone numbers for use in the event of an emergency. Regularly update the contact list as work changes to ensure its current.
3.5 Contractor Access and Use of Premises
3.5.1. Activity Regulations. Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
3.5.2 NUWC Visit Request. A Visit Request is mandatory for all visitors to NUWCDIVNPT, government and civilian, regardless of the duration or classification of the visit. Access to NUWCDIVNPT will not be granted under any circumstances without a valid visit authorization request on file. Due to the number of visit requests received, along with current vetting requirements, FIFTEEN (15) WORKING DAYS PROCESSING TIME is required for all visit requests whether received through the Joint Personnel Adjudication System (JPAS), or by email. All incomplete visit requests will be denied. Resubmissions will also require fifteen workings for processing.
Visitors who arrive prior to the fifteen-day processing window will not be guaranteed access. For questions regarding visit requests, contact NUWCDIVNPT Visitor Control at (401) 832-2152.
To submit a visit request, either:
(a) Submit through JPAS. Use SMO code 666045
(b) Fax forms to: (401) 832-4396
(c) Send an encrypted email file through the Secure Access File Exchange (SAFE) located at https://safe.amrdec.army.mil/safe/Welcome.aspx
(d) Email password protected documents directly to NUWC Security and then send a second email containing the password.
Send email correspondence to: Zachary.J.Davis@navy.mil Deanna.L.Monell.ctr@navy.mil Gina.Fleming.ctr@navy.mil
Regardless of how the request is submitted, the request MUST BE ON COMPANY LETTERHEAD. If your company does not have company letterhead, either stamp the paper with a company address stamp or attach a business card; something to demonstrate that you are a legitimate business. TYPE the Visitor Request so the information can be legible.
Include ALL of the following information on your visit request:
Company or Organization Name, Complete Address, Telephone Number, and Fax Number
Facility to be visited (Naval Undersea Warfare Center Division, Newport, RI)
Facility Sponsor (NUWC Government Employee)
Visitor(s) Full Name(s) (As it appears on government issued ID - i.e. Driver's License)
Visitor(s) Full Social Security Number Visitor(s) Date of Birth
Visitor(s) Place of Birth (City & State) If born outside the U.S., you MUST provide a Naturalization
Number or Passport Number
Visitor(s) Citizenship
Visitor(s) in possession of a Common Access Card (CAC)
Visitor(s) in possession of a Military ID
Visitor(s) in possession of a Defense Biometrics Identification System (DBIDS) card
Visitor(s) email address(es)
Specific Date(s) of Visit, Including Year Purpose of Visit
Contract / Purchase Order Number (N/A or as appropriate) - if there is no contract number, visits will be limited to a maximum of 30 days.
Authorized Signature: Name, Title, and Signature of Requesting Company Authorizing Official (MUST be a US Citizen). Individuals MUST NOT sign their own request.
In addition to a visit request, Naval Station requires one of the following in order to enter the base, along with your NUWC visitor badge:
(a) CAC
(b) DBIDS card
(c) Retired Military ID
If an individual does not have a CAC or retired military ID, they must obtain a DBIDS card. Refer to paragraph
"DEFENSE BIOMETRICS IDENTIFICATION SYSTEM".
3.5.3 Defense Biometrics Identification System. Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html.
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
3.5.3.1 DBIDS Eligibility Requirements. Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.
Please keep in mind, DBIDs is only good for 179 days. The company must resubmit their DBIDS vetting spreadsheet every 170 days in order to stay active with their DBIDS card. 170 days is requested so that the vetting can be sent and cleared before the 179 day expiration. If DBIDS isn't sent every 170 days, when the 179 day period expires, they will be denied access to the base and will have to wait 5 business days in order for their vetting to clear again. DBIDS is separate from the visitor request.
3.5.3.2 DBIDS Notification Requirements.
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
3.5.4 Arrival Instructions. Visitors must stop at Building 80 (80 Fleet Access Rd, Newport, RI 02841) and get their NUWC visitor pass before going to Naval Station Gate 1 (Building 1377, Cloyne Ct, Newport, RI 02840) to get a DBIDS card. Visitors must not try to enter NUWC with only their visitor pass and no DBIDS (or CAC) as the gate guard will confiscate their NUWC visitor pass and you will be turned around at the gate.
3.5.5 Photography. Unofficial photography is prohibited on NUWCDIVNPT. In order to use a camera for documenting construction progress, a Non-NUWC Owned Camera Permit Request must be submitted through your NUWC Sponsor to NUWC Security. NUWC Security will review the request and based on the justification and location of use, may permit the camera’s use.
3.5.6 Computer Use. Non-NUWC Owned Computers are prohibited on NUWCDIVNPT unless otherwise permitted. In order to bring a computer onto NUWC for use in recording daily production reports, a Non-NUWC Owned Computer Request must be submitted through your NUWC Sponsor to NUWC’s Information Technology Office. The computer is not allowed to have a web camera and must not use Wi-Fi or other wireless technology.
Internet access must be by cellular network card or by hardwiring to a smartphone that connects to the internet via cellular network.
3.5.7 Wi-Fi. The use of Wi-Fi is strictly prohibited on NUWCDIVNPT. Electronics with built in Wi-Fi must turn their Wi-Fi signals off prior to coming on board.
3.5.8 Radio Transmitter Restrictions. 2-way radios are prohibited on NUWCDIVNPT.
3.5.9 No Smoking Policy. Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. If needed, the Government will identify designated smoking areas.
3.5.10 Working Hours. At the preconstruction conference, establish a set of regular working hours consisting of an 8 1/2 hour period, between 7 a.m. and 5:30 p.m., Monday through Friday, excluding Government holidays. This will become the contractor’s regular working hours. Work outside regular working hours will require Contracting Officer approval.
3.5.11 Supervision. A Superintendent, Site Safety and Health Officer (SSHO), and Quality Control (QC) Manager is required for this project. These positions must be capable of reading, writing, and conversing fluently in the English language, and must be on the job-site at all times during the performance of contract work. The superintendent may also serve as the SSHO and as the QC manager.
3.5.12 Temporary Utilities. Not Applicable.
4 SAFETY
4.1 Workplace Safety. Comply with EM 385-1-1, NFPA 70, NFPA 70E, NFPA 241, Federal and State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard prevails.
4.2 Personal Protective Equipment (PPE). Use of PPE is governed by the nature of the work being performed. Use personal hearing protection at all times in designated noise hazardous areas or when performing noise hazardous tasks. Safety glasses must be worn or carried on each person. Mandatory PPE includes:
a. Hard Hat
b. Long Pants
c. Appropriate Safety Shoes
d. Appropriate Class Reflective Vests
e. Work Gloves
f. Safety Glasses
4.3 Sanitation. Not Applicable.
4.4 Activity Hazard Analysis (AHA). The principle purpose of an AHA is to reduce the overall risk of the hazards associated with construction work. Provide an AHA for every operation involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work.
The analysis must identify and evaluate hazards and outline the proposed methods and techniques for the safe completion of each phase of work. At a minimum, define activity being performed, sequence of work, specific safety and health hazards anticipated (slip or trips, cuts, dust or chips in eyes), control measures (to include personal protective equipment) to eliminate or reduce each hazard to acceptable levels, equipment to be used (hand tools, backhoe), inspection requirements (list the inspect ion requirements for the activity to ensure the controls are working, an d equipment is inspected to ensure proper operation), training requirements for all involved (any unique training required to make the established controls work) and the competent person in charge of that phase of work.
The AHA shall be continuously reviewed and, when appropriate, modified to address changing site conditions or operations. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls. Activity Hazard Analysis shall be updated as necessary to provide an effective response to changing work conditions and activities
4.5 Accident Reporting. For recordable injuries and illnesses, and property damage accidents resulting in a least $2,000 in damages, the prime Contractor shall conduct an accident investigation to establish the root cause of the accident, complete the Navy Contractor Significant Incident Report (CSIR) and provide the report to the Contracting Officer within five calendar days of the accident. The Contracting Officer will provide copies of any required or special forms.
4.6 Accident Notification. Notify the Contracting Officer as soon as practical, but not later than four hours after any accident meeting the definition of recordable injuries or illnesses or high visibility accidents, property damage equal to or greater than $2,000. Information shall include Contractor name, contract title, type of contract, name of activity, installation or location where accident occurred, date and time of accident, names of personnel injured, extent of property damage (if any), extent of injury (if known) and brief description of accident (to include Type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on site and Government investigation is conducted.
4.7 Definition of Recordable Injury or Illness. Any work related injury or ill ness that results in:
(1) Death, regardless of the time between the injury and death, or the length of the illness;
(2) Days away from work;
(3) Restricted work;
(4) Transfer to another job;
(5) Medical treatment beyond first aid;
(6) Loss of consciousness;
(7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) listed above.
4.8 Emergency Medical Treatment. Contractor shall arrange for their own emergency medical treatment.
The Government has no responsibility to provide emergency medical treatment.
4.9 Periodic Inspections. The work site may be inspected periodically for OSHA and Navy violations.
Abatement of violations will be the responsibility of the Contractor and/or the Government as determined by the Contracting Officer. The Contractor shall provide assistance to the Safety Office escort and the federal or state OSHA inspector if a complaint is filed. Any fines levied on the Contractor by federal or state OSHA offices due to safety/health violations shall be paid promptly.
If the Contractor fails or refuses to promptly comply with safety requirements, the Contracting Office may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of claim for extension of time or for excess costs or damages to the Contractor.
The Safety Office will investigate all complaints of unsafe or unhealthful working conditions received from Contractor’s employees, federal civilian employees, or military personnel. The Safety Office will notify the Contracting Officer of the results of such investigations.
5 PERFORMANCE REQUIREMENTS. Room 118A will be empty of all Land Based Radio Room material and the shield room floor cut back for welding by 12” from the existing door and new door by others prior to project start. The outside sheet rock and framing will be removed by others prior to project start.
5.2 Submittals. Government approval is required for all submittals. Provide submittals electronically in PDF format, unless otherwise directed by the Contracting Officer. Bookmark files exceeding 30 pages to allow efficient navigation. Attach a cover transmittal sheet to be used to record approval or disapproval. The following submittals are required:
Contact List Construction Schedule Activity Hazard Analysis Weekly Payrolls Accident Prevention Plans
5.3 Pre- installation meeting. Prior to the start of demolition, the Contractor representatives, who have a responsibility or significant role in accident prevention must attend the Pre- installation meeting. At the Pre-installation meeting, the Government and Contractor will develop a mutual understanding of schedule, the accident prevention plan, and administrative requirements. Work is not permitted to begin until all deficiencies in the accident prevention plan have been corrected and approved by the Contracting Officer.
5.4 Utility Outage Request. Not Applicable.
5.5 Hot Work Permit. Submit and obtain a written permit prior to performing "Hot Work" (i.e. welding or cutting) or operating other flame-producing/spark producing devices, from the Fire Division. Allow 5 days prior to the desired start of hot work for permit issuance. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. Provide at least two 20 pound 4A:20 BC rated extinguishers for normal "Hot Work". The extinguishers must be current inspection tagged, and contain an approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity.
The Fire Watch must be trained in accordance with NFPA 51B and remain on-site for a minimum of one hour after completion of the task or as specified on the hot work permit.
When starting work in the facility, require personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the emergency Fire Division phone number, (401) 841-3333. REPORT ANY
FIRE, NO MATTER HOW SMALL, TO THE RESPONSIBLE FIRE DIVISION IMMEDIATELY.
When starting work in the facility, require personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the emergency Fire Division phone number, (401) 841-3333. REPORT ANY
FIRE, NO MATTER HOW SMALL, TO THE RESPONSIBLE FIRE DIVISION IMMEDIATELY.
5.6 Existing Work. In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work that remain.
b. Repair or replace portions of existing work that was altered during rip out operations.
5.7 Occupancy of Premises. Building 1319 will be occupied during the performance of work. Perform work in a manner to cause as little disturbance to building occupants as possible. Refer to paragraph “Special Scheduling”.
6 PROJECT CLOSEOUT
6.1 Cleanup. Remove temporary barriers and enclosures. Leave room 118A "vacuum clean." Use only nonhazardous cleaning materials, including natural cleaning materials, in the final cleanup. Ensure all materials and rubbish are placed in the proper container. Remove temporary controls.
7 Figures 1-7
Figure 7.1. Location of room 118A
Figure 7.2. New door location
Figure 7.3. Location of cipher lock
Figure 7.4. Location of new filter holes for power
20’ 6”
15’ 6”
Room
Figure 7.5. Laydown/work area, Room 118