Attachment 5 - Base Engineering Systems Engineering Plan Rev 7-26-2017.pdf

PDF 15 MB Posted

Attached to
Guam Military Buildup MILCON C4ISR Engineering, Planning and Design
Solicitation number
N66001-17-R-0002
Issued by

View the file

Other files

File Type Posted
SIPH 4-0 DTD 12 NOV 2014.pdf PDF
Attachment 7 - Reference Information Sheet.docx DOCX document
Attachment 3 - Rate Sheet.xlsx XLSX spreadsheet
SPEG 1.4_Guide.pdf PDF
Amendment 01.pdf PDF
Amendment 02.pdf PDF
Attachment 6 - Organizational Experience Matrix.doc DOC document
Attachment 2 - Wage Determination.docx DOCX document
Attachment 8 - Past Performance Questionnaire.doc DOC document
GMB C4ISR Questions and Answers #2.docx DOCX document
GMB C4ISR Questions and Answers 3.docx DOCX document
Attachment 1 - DD254.pdf PDF
Attachment 4 - Desired Personnel Qualifications.docx DOCX document
N66001-17-R-0002.pdf PDF
GMB C4ISR Questions and Answers.docx DOCX document
SPEG 1.4 DTD 22 June 11.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

Base Electronic Systems Engineering Plan (BESEP)

N66001-17-R-0002 Source Selection Information—See FAR 2.101 and 3.104

XYZ Consolidated Communications/Electrical Facility

Includes: Base Electronic Systems Engineering Plan, Assumptions, Drawings ii

P-XYZ Communications/Electrical Facility

Base Electronic System Engineering Plan (BESEP)

(SIGNATURE PAGE)

Prepared by: Date:

PROJECT ENGINEER

SSC PACIFIC

Reviewed by: Date:

C4I PROGRAM MANAGER

SSC PACIFIC

Approved by: Date:

DIVISION HEAD

SSC PACIFIC

Accepted by: Date:

iii

RECORD OF CHANGES

*A - ADDED M - MODIFIED D - DELETED

CHANGE

NUMBER

DATE

FIGURE #, TABLE OR

PARAGRAPH

*A M D

TITLE OR BRIEF DESCRIPTION

DOCUMENT

CHANGE

REQUEST

NUMBER

iv

TABLE OF CONTENTS

1 BACKGROUND AND SCOPE

1.1 SCOPE AND PURPOSE

1.2 BACKGROUND

2 ELECTRONIC SYSTEMS DESIGN

2.1 C4ISR/IT SYSTEMS DESCRIPTION

Marine Corps Enterprise Network (MCEN) ........................................................................ 7 2.1.1

Tactical RF Systems and Network ..................................................................................... 7 2.1.2

Audiovisual/Video Teleconferencing (AV/VTC) .................................................................. 8 2.1.3

Electronic Key Management System (EKMS) .................................................................... 8 2.1.4

2.2 DESIGN CONSIDERATIONS

Installation Engineering ...................................................................................................... 9 2.2.1

3 FACILITY REQUIREMENT

3.1 TELECOMMUNICATIONS REQUIREMENTS

Outside Plant (OSP) Infrastructure................................................................................... 10 3.1.1

ISP Infrastructure.............................................................................................................. 11 3.1.2

Telecommunications Equipment ...................................................................................... 13 3.1.3

Backboards ....................................................................................................................... 14 3.1.4

Telecommunications Bonding System ............................................................................. 14 3.1.5

Cable Pathways................................................................................................................ 14 3.1.6

Cable Labeling.................................................................................................................. 14 3.1.7

Telephone ......................................................................................................................... 15 3.1.8

3.2 ARCHITECTURAL REQUIREMENTS

AV/VTC Spaces................................................................................................................ 15 3.2.1

Classified Areas................................................................................................................ 16 3.2.2

3.3 STRUCTURAL REQUIREMENTS

Equipment Cabinets ......................................................................................................... 17 3.3.1

3.4.2 Multi-purpose Rooms

3.4 MECHANICAL REQUIREMENTS

Environmental Controls .................................................................................................... 17 3.4.1

Heat Load ......................................................................................................................... 17 3.4.2

3.5 ELECTRICAL REQUIREMENTS

Exterior Electrical Requirements ...................................................................................... 17 3.5.1

Interior Electrical Requirements ....................................................................................... 17 3.5.2

C4ISR/IT Equipment and Equipment Cabinet Power ...................................................... 18 3.5.3 v

AV Power .......................................................................................................................... 18 3.5.4

Lighting ............................................................................................................................. 18 3.5.5

Grounding and Bonding ................................................................................................... 19 3.5.6

Surge Protective Devices (SPDs) .................................................................................... 19 3.5.7

3.6 AUDIO VISUAL AND VIDEO TELECONFERENCING

Cable Tray System ........................................................................................................... 20 3.6.1

Projector System .............................................................................................................. 20 3.6.2

AV/VTC Equipment and Storage...................................................................................... 20 3.6.3

Backboards and Standoffs ............................................................................................... 21 3.6.4

Digital Time Zone Clocks and Digital Signs ..................................................................... 21 3.6.5

Telecommunications Outlets .......................................................................................... 21 3.6.6

AV Floor Boxes or Wall Outlets ........................................................................................ 21 3.6.7

4 ENVIRONMENTAL AND SAFETY CONCERNS ................................................................... A-1

4.1 HAZARDOUS MATERIALS .................................................................................................... A-1

4.2 ELECTROMAGNETIC RADIATION ....................................................................................... A-1

4.3 FALL PROTECTION ............................................................................................................... A-1

4.4 ELECTRICAL HAZARDS ........................................................................................................ A-2

4.5 COLLATERAL EQUIPMENT .................................................................................................. A-2

APPENDIX A ACRONYMS ............................................................................................................ A-3

APPENDIX B REFERENCES ......................................................................................................... B-6

LIST OF TABLES

Table 2-1 Systems by Room

BACKGROUND AND SCOPE 1

Scope and Purpose 1.1

Naval Facilities Engineering Command Pacific (NAVFAC PAC) is executing Military Construction (MILCON) Project P-XYZ to design and construct facilities in support of the bases communications and electrical shops. This project includes the construction of a new regimental consolidated Communications/Electrical (Comm/Elec) facility and parking structure. This project will also provide Anti- Terrorism/Force Protection (AT/FP) standards compliance as well as Leadership in Energy and Environmental Design (LEED) and Energy Policy Act (EPAct) of 2005 compliance. Design authorization for P-XYZ was issued on 15 June 2015. NAVFAC PAC facility design is ongoing and based on a project scope and design concept detailed in the charrette report dated 14 October 2014 and on Functional Analysis Concept Development (FACD) Report dated 19 Nov 2015.

The purpose of this BESEP is to provide Command, Control, Computers, Communications, Intelligence, Surveillance, Recognizance, and Information Technology (C4ISR/IT) requirements for facility design being performed by the NAVFAC PAC Architectural and Engineering (A&E) firm.

This document provides construction requirements such as space relationships; power; heating, ventilating, and air conditioning (HVAC); and cable infrastructure to support the C4ISR/IT systems to be installed in the new facility.

Section 2 provides an overview of the C4ISR/IT systems, design approach, and design considerations.

Section 3 provides detailed C4ISR/IT requirements with respect to civil, architectural, structural, electrical, mechanical, and security disciplines. The intent of Section 3 is to support MILCON planners with C4ISR/IT requirements to be submitted for inclusion into the building design.

Non-C4ISR/IT facility requirements such as medical equipment and non-Information Technology (IT) requirements are not addressed herein. Administrative and storage spaces as well as associated non- C4ISR/IT administrative requirements (e.g., shredders, refrigerators, and typewriters) are not addressed herein.

Background 1.2

Currently, the base communications facilities consist of a total of 4,229 m2 (45,519 SF) of spaces dispersed over seven different buildings. The basic facility requirement (BFR) for these communication shops (assuming UDP rotations) is 6,327 m2 (68,100 SF), leaving the communication shops deficient in required work space by over 2,089 m2 (22,583 SF). Furthermore, none of the said buildings were designed as Communications or Comm/Elec Maintenance facilities

MILCON P-XYZ aims to consolidate the base shops into a single facility that addresses the inadequacies of the current buildings. The new facilities include a two-story Comm/Elec building and a seven-story parking structure.

Current notional designs propose a new two-story 65,352 square foot building and a new seven-story, 152,653 square foot parking structure, and a new unit marshalling area (UMA) at an estimated construction cost of $64,700,000. Construction is planned to be completed in one phase with an estimated duration of 2.5 years.

ELECTRONIC SYSTEMS DESIGN 2

C4ISR/IT Systems Description 2.1

The C4ISR/IT effort for this project primarily involves relocating and performing a technical refresh on existing systems. The system design for this project is based on the existing equipment and projected equipment requirements. The building floor plans are shown in Error! Reference source not found.2 nd Error! Reference source not found.. As system changes are identified, they should be included into the design efforts. The floor plans may be modified subject to final building design.

Marine Corps Enterprise Network (MCEN) 2.1.1

The MCEN is the Marine Corps shore-based enterprise network and provides a wide variety of IT services to the Marine Corps users. MCEN provides access to both the Non-Secure Internet Protocol Router Network (NIRPNet) and the Secure Internet Protocol Router Network (SIPRNet) enclaves.

The MCEN equipment that will be installed in the comm/elec facility consists of both network equipment and workstations. The number and types (NIPR and SIPR) of MCEN workstations in each space is detailed in Table 2-1. The MCEN counts are based on the results of the preliminary C4I/telecommunications coordination meeting that took place during the charrette and are documented in the charrette report.

Tactical RF Systems and Network 2.1.2

The Tenants and 2nd Tenants both have mobile satellite communications (SATCOM) systems that are used during exercises in conjunction with tactical network equipment.

Table 2-1 Systems by Room

Location NIPR SIPR Printers Systems

Multi-purpose Room #1 1 - - Unclassified VTC

Multi-purpose Room #2 1 - - Unclassified VTC

Multi-purpose Room #3 1 - - Unclassified VTC

Marine Secure Room 2 2 - Classified VTC

EKMS Vault 1 1 - EKMS

N6 HQ Office #1 1 - - -

N6 HQ Office #2 1 - - -

N6 HQ Office #3 1 - - AV

N6 HQ Work Room 2 - - AV

N6 Radio 7 - 2 -

N6 Wire 5 - 1 -

N6 Maint/Tech 5 - 1 -

N6 Data 8 - 2 -

1/3 HQ Office #1 1 - - -

1/3 HQ Office #2 1 - - -

1/3 HQ Office #3 1 - - AV

1/3 HQ Work Room 2 - - AV

1/3 Radio 7 - 2 -

1/3 Wire 5 - 1 -

1/3 Maint/Tech 4 - 1 -

Location NIPR SIPR Printers Systems

1/3 Data 7 - 1 -

2/3 HQ Office #1 1 - - -

2/3 HQ Office #2 1 - - -

2/3 HQ Office #3 1 - - AV

2/3 HQ Work Room 1 - - AV

2/3 Radio 7 - 2 -

2/3 Wire 5 - 1 -

2/3 Maint/Tech 4 - 1 -

2/3 Data 7 - 1 -

3/3 HQ Office 2 - - -

3/3 Transition Area 4 - 1 -

2nd HQ Office #1 1 - - AV

2nd HQ Office #2 1 - - -

2nd HQ Office #3 1 - - -

2nd Secure Room 1 - - -

2nd Radio 2 - 1 -

2nd Wire 4 - 1 -

2nd Maint/Tech 4 - 1 -

2nd Data 6 - 2 -

2nd Firing Battery Alpha 3 - 1 -

2nd Firing Battery Bravo 3 - 1 -

2nd Firing Battery Liaison 3 - 1 -

Total 126 3 25 -

Audiovisual/Video Teleconferencing (AV/VTC) 2.1.3

The comm/elec facility will house three (3) multi-purpose training rooms that will be used to hold briefs and video teleconferences. There will be an AV system in each multi-purpose room and all rooms shall be able to be combined to accommodate larger audiences but also be able to be operated independently.

The middle multi-purpose room, in addition to the AV system, shall also have a VTC system capable of holding VTCs at the unclassified level. The two outer rooms should also be able to view and listen to VTCs operated in the middle room but the outer rooms do not need to be able to participate in the VTCs.

The Tenants also have a secure VTC conference room in the comm/elec facility that will have a classified AV/VTC system. This system will facilitate briefs and VTCs at the secret level.

Electronic Key Management System (EKMS) 2.1.4

EKMS is the system responsible for the generation, distribution, accounting, and management of electronic keys for communications security (COMSEC) devices. This system is a classified system and will be located in the EKMS vault on the second floor of the facility. Key Management Infrastructure (KMI) will replace EKMS in the future.

Design Considerations 2.2

Follow-on design and installation engineering should be accomplished throughout the 30, 60, 90, and 100 percent Design Reviews to ensure that operational requirements are validated and satisfied. This review process will minimize the disruption to personnel and operations and allow the project to stay within budget and within established schedules. The SPAWAR methodology of this follow-on engineering is presented as one possibility for consideration:

Installation Engineering 2.2.1

a. Installation Design Plan (IDP): The IDP is a detailed drawing package that contains all information needed to allow installers to successfully install and troubleshoot each system. It contains floor plans and cabinet elevations, antenna layouts and elevations, system block diagrams, cabling and wiring details, patch panel layouts, cable routing layouts, Alternating Current (AC) power distribution, and miscellaneous installation details.

b. Cutover Plan: The Cutover Plan creates a schedule for transitioning of the C4ISR/IT systems and specifies the order in which systems will be activated and the order in which connections will be made, broken, and checked. System interdependencies, estimated transition times, required downtimes, risks, and related issues will all be identified in the plan and communicated with stakeholders. The cutover plan will also specify the roles and responsibilities of each activity involved in the transition effort. A faces to spaces plan needs to be developed with customer input to ensure a smooth transition.

c. SOVT Plan: The SOVT Plan demonstrates that the new or relocated systems/equipment have been properly installed and are ready for operation. The SOVT Plan will describe pre-relocation baseline tests, stand-alone tests, off-line tests, and end-to-end on- line system tests. Upon completion of the SOVT, the system is turned over to the user for operational and maintenance responsibility.

d. ULSS: The ULSS provides essential logistics support information for new systems. Current support for existing systems will also be summarized. The support information covers warranty, hardware and software maintenance, training, technical documentation, and supply support.

e. A project management plan should be developed to establish work packages and to track performance, cost, and schedule.

For a detailed description of the complete SPAWAR approved installation process please refer to the Shore Installation Process Handbook (SIPH) Version 4.0, November 12, 2014.

FACILITY REQUIREMENT 3

This section contains the physical plant requirements to be satisfied by the MILCON project in support of the C4ISR/IT electronics equipment installation. These preliminary physical plant details should not be interpreted as the design of the facility.

Telecommunications Requirements 3.1

The MILCON shall provide the telecommunications infrastructure cabling and associated items for the unclassified and classified C4ISR/IT data systems. Only the infrastructure for the C4ISR/IT installation which includes the classified and unclassified IT data systems, telephones, CATV and AV/VTC systems are documented herein. The MILCON project shall also provide the dedicated infrastructure items in support of the ESS.

The design shall comply with applicable American National Standards Institute/Telecommunications Industry Association (ANSI/TIA) and Unified Facilities Criteria (UFC) Standards for Building Telecommunications Wiring and the completed installation shall comply with CNSSAM TEMPEST/1- 13.

The construction of the Outside Plant (OSP) and Inside Plant (ISP) for the new facility shall meet the Telecommunications Infrastructure Standards, BO 2800.1.

Outside Plant (OSP) Infrastructure 3.1.1

OSP infrastructure ducts and cabling shall be provided to support the Tenants and 2nd Tenants comm/elec facility’s telecommunications requirements. JHITS (or JHITS replacement) contractor shall install the required OSP cabling as part of the MILCON.

The MILCON effort will need to identify viable pathways for OSP cabling to the new building consisting of new and/or existing maintenance holes/handholes/ducts for submittal/approval by The Command N6. The pathways will utilize the existing communications base infrastructure duct systems where feasible.

Trenching and installation of new communications ducts and maintenance holes/handholes may be required in areas where existing base infrastructure is inadequate or not available.

Ducts, Maintenance Holes, and Maintenance Handholes 3.1.1.1

Any existing OSP infrastructure cabling currently located in the Joint Electrical Manhole System (JEMS) duct system that will be re-utilized by this project shall be relocated to the Outside Cable Rehabilitation (OSCAR) ducts. As of now, only one cable that is slated for use by this project has been identified as being located in the JEMS system and will need to be relocated. The electrical manhole/duct system shall not be used for telecommunications OSP infrastructure cabling. All new OSP infrastructure cabling installed as part of this project shall be installed in existing or new OSCAR ducts. Underground ducts shall be utilized vice direct burial cable. Notional telecommunication plans were presented in the FACD report and are shown in Figures 4 and 5.

The following ductlines will be added. Four (4) 103 mm (4 -inch) concrete encased ducts will be added from OSCAR telecommunications maintenance hole (TMH) 33 on Selden Street to a TMH on the project site. From the TMH on the project site, three (3) 103 mm (4-inch) ducts will be run to the main Telecommunications Room (TR) of the comm/elec facility and two (2) 103 mm (4-inch) ducts will be run to the ground floor TR for the parking structure. Also, four (4) 103 mm (4-inch) ducts will be added between OSCAR TMH 52 and TMH 33. Between the mobile antenna array and the comm/elec facility two (2) 103 mm (4-inch) ducts will be installed.

There is also a direct-buried Joint Trunking System (JTS) line that intersects the footprint of the comm/elec facility. The JTS cable can be cut at the perimeter of the site and removed or abandoned. The government will reroute the JTS cable in the future. Note that Error! Reference source not found. does ot show the rerouting of the JTS line.

Exterior Telephone and Data Services 3.1.1.2

The telephone services for the new facility will be obtained through exterior telecommunication services from the base telephone switch in Building 213. Unclassified and classified data services will be obtained from the area distribution node (ADN) at Building 1089. Classified data services such as the MCEN SIPRNet will utilize exterior telecommunications via a cryptographic device. Services will enter the comm/elec facility via the main TR on the ground floor.

CATV Services 3.1.1.3

The MILCON shall provide adequate space for the exterior CATV cabling in the OSCAR system and in the building cable entrance. Exterior CATV cabling will be installed by the local CATV carrier. Each tenant is responsible to provide funding for activation of CATV.

Cable Requirements 3.1.1.4

Fiber Optic Cable 3.1.1.4.1

The OSP fiber cable shall consist of one (1) minimum 48-strand single mode fiber optic cable run from Building 1089 and shall comply with those sections of the ANSI/TIA-568-C.0 through C.3 that apply to outside plant cable. The individual fibers and groups of fibers shall be identified in accordance with ANSI/TIA-598-C. The cable shall be listed and marked as required by the applicable electrical code and local building code requirements. The mechanical and environmental specifications for OSP optical fiber cable shall be in accordance with American National Standards Institute/Insulated Cable Engineers Association (ANSI/ICEA) S-87- 640. OSP optical fiber cable shall be of a water-block construction and shall meet the requirements for compound flow and water penetration as established by ANSI/ICEA S-87-

640. The OSP optical fiber cables shall be of non-metallic member construction. Fiber optic cables shall terminate on patch panels mounted in the equipment cabinet.

Copper Cable 3.1.1.4.2

The OSP copper cable shall consist of 200-pairs to the comm/elec facility and 25-pairs to the parking structure and shall comply with those sections of ANSI/TIA-568-C.0 through C.2 that apply to OSP cable.

The OSP copper telephone cable shall terminate on terminal blocks on the backboard in the TR of the new building and at the provisioning vendor point of presence in Building 213. Terminal blocks shall be equipped with protective devices connected to the building ground system.

The telecommunications subcontractor shall install a tie cable between the Entrance Facility (EF) backboard (on 110 terminal blocks) to the voice cabinet (copper patch panels) and provide patch cables to complete the connection to the horizontal voice cables. The telecommunications subcontractor will also install tie cables from the voice cabinet of each TR to the backboard of the EF.

ISP Infrastructure 3.1.2

The MILCON shall provide ISP infrastructure backbone and the horizontal cabling infrastructure needed to meet the C4ISR/IT requirements of each tenant.

Telecommunication Spaces 3.1.2.1

The MILCON shall provide Telecommunications Rooms (TRs) to support the horizontal distribution to the various users in the facility. There shall be two (2) TRs on the ground floor and two (2) TRs on the second floor. The main TR shall be on the ground floor of the facility and may also serve as the EF to support the equipment associated with the incoming services.

TRs shall be located such that the longest cable run from the TR to user outlet does not exceed 295 ft and should be located away from Electromagnetic Interference (EMI) noise sources such as electrical transformers and switchgears, RF sources, transmitters, large motors and generators, etc. Working space to the front and rear of any electronic equipment in the TR must be at a minimum the width of the equipment or 3 feet, whichever is greater.

Intra-Building Backbone Infrastructure 3.1.2.2

Fiber Optic Cable 3.1.2.2.1

Intra-building backbone infrastructure cabling shall be provided by the MILCON. Fiber optic single mode cable shall be used for the unclassified and classified data intra- building cabling distribution. Single mode fiber shall be 9/125um, 0.5dB/km attenuation (or better) at 1310 and 1550nm. Optical fiber cabling shall comply with ANSI/TIA-568-C.3. Plenum-rated cable (type OFNP) is required for all fiber cabling running through plenum spaces. Connector strain relief and adapter housing should be identifiable in accordance with ANSI/TIA-658-C.2. Backbone cables shall be a minimum of 24-strand single-mode fiber optic cables between TRs and 12-strand single-mode fiber optic cable between the main TR and the SIPR equipment cabinet in the Tenants’ secure room.

Copper Cable 3.1.2.2.2

Copper unclassified backbone trunks for telephone distribution shall be, at a minimum, multi-pair bulk Category 6 unshielded twisted pair (UTP) cable and comply with ANSI/TIA-568-C.2. Plenum-rated copper cable (type CMP) is required for all telephone cables running through plenum spaces.

Pathways 3.1.2.2.3

TRs on the same floor shall be connected by a minimum of three (3) 103 mm (4- inch) conduits. Vertically stacked TRs shall be connected by a minimum of five (5) 103 mm (4-inch) conduits.

Horizontal Infrastructure 3.1.2.3

Horizontal copper cabling shall be provided in support of unclassified and classified data and telephone to the users. Unclassified data will be used to support MCEN NIPRNet. Classified data will be used to support MCEN SIPRNet.

Two strands of SM fiber will be installed to every single user work area outlet. Fiber connectors will be SC APC (angled physical contact). The projected equipment for each space can be found in Table 2-1.

Unclassified Outlets 3.1.2.3.1

The horizontal cabling for unclassified data and telephone shall be copper minimum Category 6 UTP and comply with ANSI/TIA-568-C.2 and 2 strands of single mode fiber with APC connectors. Plenum-rated copper cable (type CMP) is required for all cables running through plenum spaces. The cables shall be terminated on patch panels that allow for locking (non-proprietary) patch cables. One equipment cabinet will be used for data cables and one equipment cabinet will be used for voice cables. The Category 6 cables shall bet terminated T-568-A.

A typical unclassified user outlet shall consist of four (4) Category 6 cable connections, each terminated to an 8-position 8-contact (8p8c) modular jack and two (2) strands of fiber optic cable. Of the four Category 6 cables, two cables are designated for data ports and two cables for telephone ports. N6has designated that green balanced twisted pair cables be used for unclassified data and white balanced twisted pair cables be used for unclassified telephone. Verify with N6the type of fiber optic cable to install.

Classified Outlets 3.1.2.3.2

A typical classified user outlet shall consist of two (2) Category 6 cable connections, each terminated to an 8p8c modular jack. N6has designated that red, shielded, balanced twisted pair Category 6 cables be used for classified data. The Category 6 cables shall be terminated T-568-A.

Tactical Network 3.1.2.4

A pathway and cabling is required between the Tenants’ Tactical Communications room and the Secure Conference room so the Tenants can extend their tactical network and their external connection to Marine Division (see Section 3.2.2) to the Secure Conference room during exercises. There shall be both copper and fiber connectivity between the Tenants’ Tactical Communications room and the Secure Conference room.

Telecommunications Equipment 3.1.3

The MILCON shall provide passive telecommunication related items including but not limited to enclosures and racks, backboards, cable trays, patch panels, data outlets, conduits, ground bus bars, and equipment cabinet power strips.

Equipment Cabinets 3.1.3.1

Equipment cabinets in TRs shall be 30” wide, 36” to 42” deep, and 84” high to allow for the installation of C4ISR/IT equipment, power strips, grounding system, patch panels and cable management systems.

Cabinets shall be securely mounted to the floor and a dedicated electrical outlet will be installed within each cabinet. Cabinet specifications should be coordinated with the installation activity and N6prior to procurement and installation.

Equipment cabinets shall have a standard 19-inch-wide mounting space. Adjustable front mounting rails, rear mounting rails, and a spare middle rail set shall be provided. Lockable front and rear doors shall be provided on all cabinets. All rails shall be factory marked with rack unit (RU) indicators. Front and rear doors shall be either slotted or perforated on at least 50% of the surface area or as needed to provide adequate ventilation for equipment in the cabinet. Cooling fans must be provided in all equipment cabinets. Side panels shall be provided on all cabinets unless specified otherwise. Security cabinets must have side panels.

The depth of working space in front and rear of equipment cabinets shall not be less than 3 feet.

However, it is recommended to allow for 4 feet of frontal clearance. The width of working space shall be the width of the cabinets or 30 inches whichever is greater. The clearances shall be provided for service access, maintenance, and installation of equipment in accordance with National Electric Code (NEC) and

TIA-569-C.

Power Strip 3.1.3.1.1

A six-foot power strip, with 16 each 120 VAC, 20A outlets, shall be installed inside the cabinet. The power strips shall be securely mounted to prevent accidental detachment resulting from impact or pulling.

Telecommunications Grounding Busbar 3.1.3.1.2

Each TR shall have a Telecommunications Grounding Busbar (TGB) installed and each equipment cabinet shall have a Rack Grounding Busbar (RGB) installed in the cabinet and bonded to the telecommunication bonding system (see Section 3.1.5) with a 6 AWG copper wire or larger. The RGB shall be tapped with 10-32 holes at two-inch intervals and be 0.25 inches thick by 2 inches wide at a minimum.

Patch Panels 3.1.3.2

The MILCON shall provide locking fiber optic and copper patch panels (that do not require proprietary patch cables) to support the unclassified and classified OSP and ISP infrastructure cabling requirements.

Fiber optic and copper patch panels shall be mounted in equipment racks on mounting rails that are recessed from the front of the enclosure. Horizontal cable management panels should be interleaved with the patch panels in order to keep patch panels cabling organized. Patch panel ports shall be labeled to identify the distant end termination points. Distant end termination point information shall include room name/number, equipment enclosure/rack number, patch panel number, and jack number.

Unclassified backbone and horizontal patch panels shall be grouped separately from each other.

Horizontal copper patch panels shall be functionally grouped together for ease of patching.

Backboards 3.1.4

Any backboards that the MILCON installs shall be plywood that is AC-grade, void-free, fire-retardant or be coated with two coats of fire-resistant paint on all sides (where required) and kiln-dried to maximum moisture content of 15%. It is recommended that fire-retardant plywood is used in lieu of painting and that the fire rating be printed and clearly visible on the plywood.

Telecommunications Bonding System 3.1.5

The MILCON shall provide or ensure a telecommunication bonding system is installed. A TGB shall be installed in all TRs and shall be bonded to the grounding electrode system through the Telecommunications Main Grounding Busbar (TMGB). The TMGB should be properly bonded to the main electrical system ground.

The MILCON shall ensure that all raceways, equipment cabinets, equipment racks, and patch panels are properly bonded to the telecommunication ground system.

The MILCON shall provide copper ground bus bars at the workbenches in all the maintenance/tech shops. These ground bus bars are required for equipment grounding and should be tied to the electrical system ground.

Cable Pathways 3.1.6

Separate dedicated raceway systems for the C4ISR/IT cabling are required for the security system, CATV, telephone service provider, and non-C4ISR/IT systems to meet physical security and separation requirements as well as facilitate cable pulling and prevent liability problems among different installation groups.

Where dropped ceilings are used, the clearance between the dropped ceiling and the bottom of overhead wireways shall be at least 6 inches so that ceiling panels can be removed to gain access to the wireways.

The dedicated security system infrastructure shall be restricted for security use only; no other power or communication cable(s) are authorized in these pathways.

Ensure all raceways are properly bonded to the telecommunication bonding system. All signal cabling pathways shall be adequately separated from EMI radiation sources (i.e., light fixtures, electrical power wiring, etc.).

Cable Labeling 3.1.7

All cables shall be labeled on both ends with a unique cable identification number and with a description of the distant end termination points. Labels shall have legible, printed text and shall not be handwritten.

Cable labels shall be chosen to match the cable diameter. In general, cable numbering and labeling shall follow the guidance provided in Appendix Q of the SPAWAR Shore Installation Process Handbook (SIPH). Data and voice horizontal cables and backbone cables shall follow The Command CISD labeling schemes.

Telephone 3.1.8

Telephone service on The Command is provided by JHITS. Users/activity should coordinate with JHITS and N6for telephone service, activation and numbers.

Architectural Requirements 3.2

AV/VTC Spaces 3.2.1

The comm/elec facility will house three (3) multi-purpose training rooms. There will be an AV system in each multi-purpose room and all rooms shall be able to be combined for large audiences but also operate independently. MILCON shall design the multi-purpose rooms to meet following requirements:

a. Ceiling heights should be a minimum of 10 feet from finished floor to the ceiling or the bottom of the ceiling light fixtures if hanging or surface mounted light fixtures are installed. This height requirement will allow for a less obstructive view of wall mounted displays and cameras. Higher ceiling heights will be required in larger rooms where large projector screens are installed.

b. Rooms shall have suspended ceilings with standard sized acoustically absorbing tiles. The ceiling tile grid shall be aligned to the center of the conference table (if applicable) so that light fixtures and ceiling mounted AV hardware can be installed and aligned to the main meeting participants.

The design of the room with respect to wall finishes, acoustics/sound suppression and lighting shall provide for clear video and audio during VTC sessions and AV presentations.

c. Lighting design and layout shall enhance participants within camera view without casting dark shadows on faces. Lighting should highlight the facial features without causing uncomfortable glare for the participants or on the VTC displays. Indirect fluorescent lights, preferably recessed within the ceiling and directed towards the back of the room, are recommended for 85% of the room lighting along with wall wash lighting that provides an even cover of light on sides and rear walls for the remaining 15% of the light. Zoned and dimmer-controlled lighting shall be incorporated as appropriate. The room shall include presenter (briefer) lighting at the front of the room as necessary. Podium lighting may be required and shall be installed in coordination with the placement of the podium. If hanging fixtures are used, light fixtures should not hang from the ceiling in such a way that they would block projectors or be in the camera field of view. See Section 3.5.5.2 for additional requirements regarding AV/VTC lighting.

d. Ambient room noise for the room are to not exceed NC 30 and the reverberation time (RT60) to be in the range of 0.5 to 0.7 across the speech frequencies. The room shall be evaluated in accordance with the ANSI/ASA S12.2 Criteria for Evaluating Room Noise and tested in accordance with ANSI S1.13 Measurement of Sound Pressure Levels in Air.

e. The room shall have all openings and cracks sealed to minimize sound transmission with walls, floor, and ceiling permanently attached to each other.

f. Room walls shall be covered with a neutral colored sound absorbing wall panels. Wall panels shall be removable for true wall access. Chair rails shall be installed to protect the sound panels from damage.

g. AV and VTC room flooring shall have carpet covered flooring.

h. Windows are not recommended in VTC-capable rooms. However, if windows are installed, adjustable window coverings shall be installed for security reasons and to prevent exterior glare on displays and camera view.

Classified Areas 3.2.2

The Tenants have identified the need for two (2) adjacent classified spaces: an EKMS Vault and a room for processing classified documents and holding classified VTCs. These spaces will be used to store information up to the Secret level and will be certified to the Open Storage Secret level. Vault construction is required for EKMS and the classified VTC room will be constructed as a secure room.

The 2nd Tenants have identified the need for one (1) classified space that will be used to store information up to the Secret level and will be certified to the Closed Storage Secret level. This room will be constructed as a secure room.

The secure rooms and vault shall be constructed of solid, strong materials that will deter and detect unauthorized penetration. The rooms shall provide adequate attenuation of internal sounds that would divulge classified information through walls, doors, ceilings, air vents and ducts.

Secure Room and Vault Construction 3.2.2.1

The MILCON shall design these rooms to meet the requirements outlined in SECNAV M-5510.36 for vaults and secure rooms including the following:

a. Interior walls and partitions around these rooms shall have walls that extend from the true structural floor to the true structural ceiling with permanent construction materials, wire mesh, or 18-gage expanded steel screen.

b. Ceilings shall be constructed of plaster, gypsum, wallboard material, hardwood, or any other acceptable material.

c. The access door to the rooms shall be substantially constructed of wood, metal, or other solid material and be equipped with a built-in General Services Administration (GSA) approved combination lock meeting Federal Specification FF-L-2740. Doors other than the access door shall be secured from the inside. Key operated locks that can be accessed from the exterior side of the door are not authorized.

d. Windows shall be made opaque or equipped with blinds, drapes, or other coverings.

e. Utility openings such as ducts and vents shall be kept at less than man-passable (96 square inches) opening. Openings larger than 96 square inches shall be hardened per the Military Handbook 1013/1A.

f. Since classified amplified discussions will be held in the Tenants’ secure room with the secure VTC terminal, it is recommended that the room be designed for a minimum rating of Sound Transmission Class (STC) 50.

AV/VTC Considerations 3.2.2.2

The Tenants’ secure room will house the classified VTC system and requires additional architectural design considerations to ensure optimum performance of the AV/VTC system. The architectural requirements from Section 3.2.1 shall also be incorporated into the design of the Tenants’ secure room.

Security Classification Levels 3.2.2.3

The security classification level of each area will be determined by the Special Security Officer (SSO) and the facility security manager. The CSA for The Command shall review the physical security pre-construction plans for the facility and is responsible for providing construction advice and assistance as well as approving pre-construction plans.

Structural Requirements 3.3

Equipment Cabinets 3.3.1

MILCON-installed equipment cabinets shall be anchored to the true floor.

3.4.2 Multi-purpose Rooms

It is recommended that the multi-purpose rooms not have freestanding columns as they may restrict the audience’s view of the display screens.

Mechanical Requirements 3.4

Environmental Controls 3.4.1

The MILCON shall provide 24/7 air conditioning units for all TRs, the EKMS vault, and the Tenants’ secure room. The air conditioning system shall provide adequate cooling to electronics equipment and personnel comfort as defined in MIL-HDBK-1012/1.

The design criteria for the environmental system of the telecommunication spaces is as follows:

a. 72 degrees plus or minus 2 degrees Fahrenheit (F).

b. 45 plus or minus 5 percent relative humidity year round.

c. Temperature rate of change of 3.6 degree F/hr.

d. Humidity rate of change of 2 percent/hr.

e. All outside and re-circulated air shall be filtered with a minimum filter efficiency of 45 percent.

f. Maintain a positive pressure with a minimum of one air change per hour.

The TRs and rooms housing security and IDS equipment should have backup stand-alone air conditioners connected to the standby emergency generator power to prevent the loss of cooling in the event of power loss or air handler/chiller problems

Heat Load 3.4.2

The total C4ISR/IT equipment heat load is estimated to be 138,356 BTU/HR. This estimate does not include the equipment heat load for the IDS. The AV/VTC system heat loads are estimated values and should be verified upon completion of the AV/VTC system design.

Electrical Requirements 3.5

The MILCON shall provide adequate power, lighting, grounding, and bonding to support the C4ISR/IT requirements. The MILCON project shall also provide the power for the IDS and CATV system.

Exterior Electrical Requirements 3.5.1

The MILCON shall provide adequate electrical receptacles on the exterior of the buildings to support the tenant operations and maintenance. At this time, there are no special or additional requirements for exterior electrical receptacles.

Interior Electrical Requirements 3.5.2

The electronics equipment used within the new facility requires 208Y/120V 60Hz AC power. The total electronic equipment power load is estimated at 40,562 W. This estimate does not include the power requirements for the IDS system. The AV/VTC systems power loads are estimated values and should be verified upon completion of the AV/VTC system design.

The MILCON shall provide an adequate amount of electrical receptacles to support each user and be located near each user telecommunication outlet. A typical user will require four duplex 120V out- lets. No more than four typical users should be served by a single 20A breaker.

A duplex 120V outlet shall be provided near printers, copy machines, fax machines, and multi- function devices. Separate circuit breakers are recommended for large copy machines, multi-function devices, and other large size equipment.

The tenants requested electrical receptacles be spaced in 10 ft intervals in maintenance areas to support the numerous radios and computers that they need to power for testing and training.

Each telecommunications cabinet will have a dedicated power circuit with a quad outlet installed with the cabinet.

C4ISR/IT Equipment and Equipment Cabinet Power 3.5.3

It is recommended that the distribution power panels for telecommunication equipment be separate from those servicing lighting systems.

The MILCON shall provide power to the power strips in all equipment cabinets. It is recommended to install two one-pole, 120V, 20A circuits per equipment cabinet with the two circuits fed from different power panel sources.

Some equipment cabinets may require two or three pole circuit breakers and/or circuit breakers greater than 20A. No special power requirements have been identified at this time.

AV Power 3.5.4

Power outlets shall be provided on the ceiling, floor, and on the walls for AV cabinets, AV equipment, wall-mounted displays, projectors, and digital time zone clocks. The power outlets specified for the AV requirements are in addition to the normally installed wall outlets that are required in accordance with the NEC. AV power outlets shall be one-pole, 120V, 20A circuits, unless otherwise specified and shall be recessed into the walls and floors. See Section 3.6 for additional information regarding AV power requirements.

Lighting 3.5.5

Interior lighting and area lighting systems shall be designed in accordance with MIL-HDBK 1004/1.

General Lighting levels shall be in accordance with MIL-HDBK 1190 and IESNA. All fixtures will have energy efficient fluorescent lamps with electronic ballasts with built-in Radio Frequency Interference (RFI) suppression. Light switches shall be located for easy access upon entry.

Telecommunications Room Lighting 3.5.5.1

Interior lighting shall be provided in the TRs for equipment cabinets. Lighting shall not be installed over the cabinets and should be positioned in a way to illuminate the front and rear of the equipment cabinets.

A minimum equivalent of approximately 538 lux or 50 foot-candles (FC) measured 3 feet above the finished floor shall be provided.

Battery-powered emergency lighting units that automatically activate upon the loss of AC power shall be provided in all TRs.

AV/VTC Lighting 3.5.5.2

Lighting for the multi-purpose rooms and SIPR room shall support the AV, VTC, and briefing functions of the room. Lighting shall be zoned and provided with specialty fluorescent fixtures and dimming devices.

See Section 3.2.1 for additional AV/VTC lighting requirements.

General Task Lighting 3.5.5.2.1

Indirect/direct fluorescent fixtures supplemented with spotlights shall be provided. The fluorescent fixtures shall be low interference shielded electronic ballasts. Lighting shall be fully dimming (1 percent electronic dimming ballasts or better) and zoned for front (from screen to middle of the room) and back (from mid-room to rear wall).

VTC Lighting 3.5.5.2.2

For VTC lighting, where applicable, specialty directional lighting shall be capable of providing 80-100 FC and be designed to illuminate the faces of participants (front row seats/tables). Evenly lit wall wash lighting shall be provided on the rear and side walls to eliminate shadows picked up by VTC camera.

Presenter Lighting 3.5.5.2.3

Spotlighting (directional dimming fixture) should be provided for presenter locations to the left and right of the display and shall provide 110-120 FC of illumination on the presenter. Spotlighting shall be designed to minimize spillover onto the screens. Light dimmers/switches shall be located on the wall near the podium and at the inside wall of the main room entry doors.

Dimming System 3.5.5.2.4

A programmable lighting dimming system compatible with an AV controller shall be set up for the rooms.

The lighting system shall have a minimum of 6 programmable presets and zoned to provide the following capabilities at a minimum:

a. General Task Lighting: Multiple rows of independently zoned lights (parallel to the video display screens) shall be capable of providing 70-80 FC at the tabletop height. The front lighting zone(s) shall be designed to minimize light spillover onto the projector screens. The lighting shall be designed to provide uniform illumination throughout the room.

b. VTC Lighting (where applicable): Specialty lighting (directional) shall be capable of providing 80- 100 FC on VTC participants (front row seats/tables) to illuminate the faces of the VTC or VIP participants.

c. Presenter Lighting: Spotlighting (directional dimming fixture) for podium shall provide 110-120 FC of illumination on the presenter. The spotlighting shall be designed to minimize spillover onto the display screens and provide even illumination of the presenter. Light dimmers/switches (remote) controls shall be located on the wall near the podium and at the inside walls of the main room entry doors.

d. Coordination with the installation activity is required to ensure compatibility with the AV control system.

Grounding and Bonding 3.5.6

The MILCON shall provide a grounding electrode system in accordance with MIL-HDBK-419(A) and MIL- HDBK-1012/1. For the newly constructed facilities, the MILCON shall ensure the grounding electrode system is independently tested while the grid is still exposed, prior to completion of construction. The MILCON shall provide copper ground bus bars at the workbenches in all the maintenance/tech shops.

These ground bus bars are required for equipment grounding.

Surge Protective Devices (SPDs) 3.5.7

SPDs using Metal Oxide Varistors (MOVs) or similar devices shall be installed at the service entrance and input side of the main distribution switchgear.

AV equipment rack and/or credenzas, podium and/or presenters desk shall be furnished by and installed under the MILCON. The credenzas, podiums and presenters desks shall be equipped with equipment rack mounting brackets to enable installation of AV equipment.

Backboards and Standoffs 3.6.4

Wooden backboards or standoffs, with a minimum 3/4 inch thickness, shall be installed flush with sound absorbing panels on walls to structurally support the wall mounted equipment such as flat panel displays and VTC cameras. Wooden backboards and standoffs shall allow the equipment to be supported to at least two (2) separate wall structural framing members and shall be aesthetically finished to match the surrounding finish. The dimensions of the backboard or standoff shall be coordinated with the equipment being installed. The number and locations of the backboards (or standoffs) shall be coordinated with the room layout and equipment being installed.

One (1) 4-11/16 inch square x 2-1/8 inch deep outlet box shall be installed above the wooden backboard.

Where two (2) wooden backboards are installed, three (3) 4-11/16 inch square x 2-1/8 inch deep outlet boxes shall be installed above the wooden backboards and evenly spaced between the wooden backboards. Each outlet box shall have a 1 inch diameter conduit (with pullstring). The conduits shall be stubbed out above the accessible ceiling as close to the cable tray as possible. The outlet boxes and conduit shall provide pathways for the audio, video and control cabling from the wall mounted AV and VTC equipment to above the accessible ceiling. Four (4) CAT6 cables shall be run from each outlet box to the AV/VTC closet and terminated on a patch panel in the AV/VTC cabinet. The location and heights shall be coordinated with the wooden backboard and equipment.

A duplex electrical receptacle shall also be installed above each of the wooden backboards. The electrical receptacles shall be on dedicated circuits.