SOLICITATION, OFFER AND AWARD

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

RATING PAGE OF PAGES

1 103

2. CONTRACT NO. 3. SOLICITATION NO. 4. TYPE OF SOLICITATION

[ ] SEALED BID (IFB)

5. DATE ISSUED 6. REQUISITION/PURCHASE NO.

N65540-13-R-0052

[ X ]

NEGOTIATED (RFP) 18 Nov 2013

7. ISSUED BY

NAVAL SURFACE WARFARE CENTER CARDEROCK

CODE 4211, JANE DEMATTO

215-897-7994, JANE.DEMATTO@NAVY.MIL

CODE N65540 8. ADDRESS OFFER TO (If other than Item7) CODE

5001 S. BROAD STREET

PHILADELPHIA PA 19112-5083

TEL: 215-897-7994

FAX: 215-897-7054

See Item 7

TEL:

FAX:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and 2 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in Building 4, 2nd Floor until 04:00 PM local time 19 Dec 2013 (Hour) (Date)

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION A. NAME B. TELEPHONE (Include area code) (NO COLLECT CALLS) C. E-MAIL ADDRESS

CALL: JANE M. DEMATTO 215-897-7994

11. TABLE OF CONTENTS

j ane.dematto@navy .mil

(X) SEC. DESCRIPTION

PART I - THE SCHEDULE

PAGE(S) (X) SEC. DESCRIPTION PAGE(S)

PART II - CONTRACT CLAUSES

X A SOLICITATION/ CONTRACT FORM 1 X I CONTRACT CLAUSES 47 - 73

X B SUPPLIES OR SERVICES AND PRICES/ COSTS 2 - 10 PART III - LIST OF DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

X C DESCRIPTION/ SPECS./ WORK STATEMENT

X D PACKAGING AND MARKING

11 - 32 X

J LIST OF ATTACHMENTS 74

PART IV - REPRESENTATIO NS AND INSTRUCTIONS

X E INSPECTION AND ACCEPTANCE

X F DELIVERIES OR PERFORMANCE

34 - 35

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

75 - 85

X G CONTRACT ADMINISTRATION DATA 37 - 41 X L INSTRS., CONDS., AND NOTICES TO OFFERORS 86 - 96

X H SPECIAL CONTRACT REQUIREMENTS 42 - 46 X M EVALUATION FACTORS FOR AWARD 97 - 103

OFFER (Must be fully completed by offeror)

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

AMENDMENT NO. DATE AMENDMENT NO. DATE

15A. NAME

AND

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

15B. TELEPHONE NO (Include area code) 15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION: 23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. ADMINISTERED BY (If other than Item7) CODE 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

TEL: EMAIL: (Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c) mailto:JANE.DEMATTO@NAVY.MIL mailto:jane.dematto@navy.mil

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE

0001 Lot

Section B - Supplies or Services and Prices

AMOUNT

Engineering and Technical Services

CPFF

in support of the Navy Modernization Programs of Hull Material and Electronics

(HM&E) systems from date of award through 12 months. Technical services are further described in the Statement of Work.

FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 Lot OPTION Engineering and Technical Servcies

CPFF

in support of the Navy Modernization Programs of Hull Material and Electronics

(HM&E) systems from 13 months through 24 months. Technical services are

0003 Lot

OPTION Engineering and Technical Services

CPFF

in support of the Navy Modernization Programs of Hull Material and Electronics

(HM&E) systems from 25 months through 36 months. Technical services are

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Support Costs

COST

includes material, travel, incidential subcontracting and other direct costs in support of Items 0001 through 0003 in accordance with the Statement of Work.

The estimated costs that will be incurred over the three-year period of the contract is $38,900,000.00. This cost is a Not-To-Exceed amount.

0005 1 Lot

0006 12 Lot

Technical Data for Item 0001 through 0003 in accordance with DD Form 1423 Contract Data

Requirements List contained herein: NSP: "NOT SEPARATELY PRICED".

FFP

NET AMT

Engineering and Support Services in support of the Navy Modernization Programs of Hull Material and Electronics

(HM&E) systems from time of award through 36 months. THIS CLIN IS

RESERVED FOR FIRM FIXED PRICE DELIVERY ORDERS WHEN

APPLICABLE. NO PRICING REQUIRED AT THIS TIME. TBN - "TO BE

NEGOTIATED"

FFP

NET AMT

NOTES TO SECTION B:

NSP – Not Separately Priced, included in the cost of Line Item 0005.

TBN – To Be Negotiated, included in the cost of Line Item 0006.

CONTRACT TYPE: The Carderock Division, Naval Surface Warfare Center, Naval Ship Systems

Engineering Station, Philadelphia, PA proposed to award one or more indefinite-delivery, indefinite quantity, cost-plus-fixed-fee type contract(s) providing support services as described in Section C, Statement of Work.. The resulting contract (s) incorporates provisions for the issuance of both Cost Plus

Fixed Fee (CLINs 0001 thru 0004) and Firm Fixed Price (CLIN 0006) task orders during the period beginning on the award date and ending 36 months if all options are exercised.

The contract will contain one base year, with four one year option periods. THIS IS AN

UNRESTRICTED ACQUISITION.

MULTIPLE AWARDS: As detailed in Section M, award will be made to the offeror(s) whose offer(s) are determined to represent the best value to the Government. The Government intends to award multiple contracts based on budgetary constraints.

ESTIMATED LEVEL OF EFFORT:

a. The level of effort for the performance of this contract is based upon an anticipated total estimated level of effort of 1,219,045 man-hours of direct labor ever the period of the three-year contract performance period. The total number of man-hours of direct labor includes subcontracted labor hours, but do not include holiday, sick leave, vacation and other absence hours. The anticipated labor hours to be expended hereunder is estimated to be specified above, which quantity set forth herein or as expressly changed by formal modification thereto, is hereafter referred to as “estimated total hours”.

b. For purposes of preparing a cost proposal, the offeror should assume that the following number and mix of labor hours will be required, divide approximately equally over the three year contract period.

The estimated composition of the 1,219,045 man-hours of direct labor is as follows:

Labor Category Year 1 Year 2 Year 3 Total

Program Manager 10,500 10,500 10,500 31500

Senior Engineer 13,334 13,334 13,332 40000

Engineer 19,334 19,334 19,332 58,000

Logistician 5,667 5,666 5,667 17,000

QA Specialist 3,334 3,333 3,333 10,000

Technical Writer 2,000 2,000 2,000 6,000

Systems/Program Analyst 3,666 3,666 3,668 11,000

Computer Programmer 10,333 10,333 10,334 31,000

CAD Designer 4,000 4,000 4,000 12,000

Clerk/Typist 4,333 4,333 4,334 13,000

Senior Engineering Tech 28,125 28,125 28,125 84,375

Sr Engineering Tech (OT) 2,813 2,812 2,812 8,437

Engineering Technician 16,875 16,875 16,875 50,625

Engineering Tech (OT) 1,688 1,687 1,687 5,062

Planner/Estimator 6,094 6,094 6,093 18,281

Planner/Estimator (OT) 610 609 609 1,828

Site Foreman 16,875 16,875 16,875 50,625

Site Foreman (OT) 1,688 1,687 1,687 5,062

QA Technician 7,031 7,031 7,031 21,093

QA Technician (OT) 703 703 703 2,109

Marine Equip Mechanic 37,500 37,500 37,500 112,500

Marine Eq Mechanic (OT) 3,750 3,750 3,750 11,250

HVAC Technician 22,500 22,500 22,500 67,500

HVAC Technician (OT) 2,250 2,250 2,250 6,750

Shipfitter/Welder/Burner 28,125 28,125 28,125 84,375

Shipfitter/Weldr/Burner (OT) 2,813 2,812 2,812 8,437

Pipefitter/Brazier 32,813 32,812 32,812 98,437

Pipefitter/Brazier (OT) 3,281 3,281 3,281 9,843

Marine Electrician 32,813 32,812 32,812 98,437

Marine Electrician (OT) 3,281 3,281 3,281 9,843

Electronic Technician 18,709 18,708 18,708 56,125

Electronic Technician (OT) 1,871 1,871 1,870 5,612

Machinist 18,750 18,750 18,750 56,250

Machinist (OT) 1,875 1,875 1,875 5,625

Maintenance Trades Help 13,968 13,969 13,969 41,906

Maintenance Trades (OT) 1,397 1,397 1,396 4,190

Painter/Sandblaster 15,000 15,000 15,000 45,000

Painter/Sandblaster (OT) 1,500 1,500 1,500 4,500

Insulator/Lagger 4,688 4,687 4,687 14,062

Insulator/Lagger (OT) 462 471 473 1,406

Total 406,349 406,348 406,348 1,219,045

c. The contractor shall not be obligated to continue performance beyond the estimated total hours provided.

d. The minimum value of services (including cost plus fixed fee) that must be ordered from each awardee will be $100,000.00.

e. The rate of man-hours used may fluctuate throughout the term of the contract provided such fluctuation does not result in the utilization of the total man-hours of effort prior to expiration of the term, thereof, and it is further understood and agreed that the number of hours for any classification may be utilized by the contractor in any other direct labor classification, if necessary in the period of performance of the work. If at any time during the performance of this contract, the number of direct labor hours (not including “excess hours*”) utilized under this contract exceeds 75% of the total estimated hours, the contractor shall immediately notify the contracting officer of such circumstances.

*Excess hours represent hours exceeding the estimated level of effort amount.

f. Nothing herein shall be construed to alter or waive any of the rights or obligations of either party pursuant to the clause hereof entitled “Limitation of Cost” and/or “Limitation of Funds”.

g. It is understood and agreed that the number of hours and total dollar amount of each labor category specified in any task order issued under this contract are estimates only and shall not limit the use of hours or dollar amounts in any labor category which may be required and provided for under an individual task order.

h. The Government intends to reimburse support on the basis of actual reasonable and allowable costs incurred plus G&A. (NO FEE)

i. As part of your Cost Proposal submission, the contractor is required to complete the Labor Rate substantiation table (See Section J) and provide all pertinent supporting information (DCAA Audit or rate check information) to facilitate the cost realism analysis of your proposed direct labor rate and all indirect rate (i.e., G&A, Overhead, etc).

SUPPORT COSTS

CLIN 0004 covers support costs, which includes incidental travel and material. Offerors are required to provide as part of its proposal any indirect markup rates (i.e. G&A and material handling) as detailed in

Sections L and M. It is intended to reimburse support and subcontract costs on the basis of actual reasonable and allowable costs. For evaluation purposes, the Government will add the offeror’s proposed markup costs to the stated base support costs of $38,900,000.00. The resulting cost (base plus any markup) will be a Not-To-Exceed amount in the contract award.

SUBMISSION OF OFFERS

As detailed in Section L of this solicitation, offerors are required to submit both a technical and a cost proposal as part of their offer. Offerors who are large business concerns are additionally required to submit a proposed Subcontracting Plan in accordance with Clauses 52.219-9 entitled “Small Business Subcontracting Plan” and 252.219-7003 entitled “Small, Small Disadvantaged and Women-Owned Small Business Subcontracting Plan (DOD Contracts).” Offerors are advised of the requirements contained in Clauses 52.219-8, entitled “Utilization of Small Business Concerns,” 52.244-2 entitled “Subcontracts - Alternate I” and 52.244-5 entitled “Competition in Subcontracting” concerning proposed subcontracting. Offerors are required to furnish all applicable information required by Clause

52.244-2, entitled “Subcontracts - Alternate I”, as part of their offer. Failure to comply with the instructions set forth in Section L of this Solicitation or to provide all information requested may result in rejection of the offer.

CLAUSES INCORPORATED BY REFERENCE

HQ B-2-0007 LIMITATION OF COST OR LIMITATION OF FUNDS

LANGUAGE

JUL 2010

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the

Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

HQ B-2-0007 LIMITATION OF COST OR LIMITATION OF FUNDS LANGUAGE

The clause entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF FUNDS" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.

HQ B-2-0014 PAYMENTS OF FEE (S) (COMPLETION) (NAVSEA) (MAY 1993)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, "fixed fee" in cost-plus-fixed-fee type contracts for completion and phase type contracts.

(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be equal to percent ( ) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST AND PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or "INCENTIVE FEE" clause, as applicable (percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money). Total fee(s) paid to the

Contractor shall not exceed the fee amount(s) set forth in this contract.

(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, in accordance with the clause of this contract entitled "LIMITATION OF FUNDS" (FAR 52.232-22) or "LIMITATION OF COST"

(FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the

Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the

Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.

(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) in accordance with paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.

HQ B-2-0020 TRAVEL COSTS - ALTERNATE I (NAVSEA) (DEC 2005)

(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its reasonable actual travel costs in accordance with FAR 31.205-46. The costs to be reimbursed shall be those costs accepted by the cognizant DCAA.

(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.

(c) Relocation costs and travel costs incident to relocation are allowable to the extent provided in FAR 31.205-35;

however, Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incident to relocation.

(d) The Contractor shall not be reimbursed for the following daily local travel costs:

(i) travel at U.S. Military Installations where Government transportation is available,

(ii) travel performed for personal convenience/errands, including commuting to and from work, and

(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the

Contractor's or employee's convenience.

Section C - Descriptions and Specifications

1.0 INTRODUCTION

This Statement of Work (SOW) provides Naval Surface Warfare Center Carderock Division – Ship

Systems Engineering Station (NSWCCD-SSES) the ability to support various sponsors and stakeholders for various Navy Modernization Programs utilizing the Alteration Installation Team (AIT) process. This effort shall provide blue collar installation and technical services for upgrading Hull, Mechanical and

Electrical (HM&E) systems and deploying technologies which improve availability, increase reliability, ship mission readiness, and decrease maintenance and workload requirements for machinery systems and components. The target platforms of installation are primarily on U.S. Navy Surface Ships, Carriers, Submarines and Service Craft. In addition to the active and reserve U.S. Navy ships, this contract also supports HM&E upgrades on Foreign Military Sales (FMS) platforms, Army watercraft, Military Sealift

Command (MSC), land-based test sites, and other DOD platforms. This SOW outlines general contractor requirements and will be supplemented by specific work statements in individual task orders. Task orders will vary in the level and complexity of requirements, from full scope of the technical services of this SOW to narrow portions of the SOW.

Work performed under this SOW will require the contractor to have a NAVSEA 04XQ approved

Quality Plan/Quality Management System (QMS).

SUBSAFE work will not be authorized under this contract. However, there may be work performed within SUBSAFE boundaries and the offeror must have personnel that have SUBSAFE/SOC Awareness training prior to conducting work.”

2.0 BACKGROUND

The mission of the NSWCCD-SSES is to transition HM&E machinery technology to the U.S. Navy active/reserve Fleet, and support various sponsors for Navy Modernization Programs. This requires development and execution of various Ship Changes (SCs) and SHIPALTs to upgrade and maintain in a more cost-effective and timely manner the system/equipment readiness of various Navy HM&E and electronic systems. This contract primarily supports large Modernization Programs and/or critical-path

SCs/Alterations that are accomplished in Navy Chief Naval Operation (CNO) availabilities.

This contract covers blue collar support for installations primarily on U.S. Navy Surface Ships, Carriers Submarines and Service Craft. In addition, this contract also supports HM&E upgrades on

Foreign Military Sales (FMS) platforms, Army watercraft, Military Sealift Command (MSC), land-based test sites, and other DOD platforms.

As part of this mission, various NSWCCD-SSES Divisions support sponsors for program management or are In-Service Engineering Agents (ISEAs) for their system/equipment for the transition of new technologies through the various acquisition phases. The Alteration/SC installation process consists of several acquisition phases, including advance planning, Research and Development (R&D), ship check, surveys, assessments, fabrication, prototype/proof-in install, final design shipboard installation, testing, lessons learned gathering and completion/close-out. Alteration / SCs for ship specific systems and modifications must be authorized and mature in design before the work is to commence.

This contract covers large Modernization Programs where NSWCCD-SSES is the ISEA for various

HM&E systems and equipment. These Programs consist of critical-path SCs/Alterations that are typically complex in nature and are crucial to the execution of meeting key production, light-off and testing milestones during ship CNO availabilities. In addition, these installs are intricate in system arrangement, interface and distributive system impact. Some of the programs supported include, but are not limited to:

DDG51 Class Control systems: MCS, DCS, IBNS, GEDMS, Radar TLI, etc.

CG47 Class Integrated Ship Control (ISC) including interface to all sensor systems

LSD41/49 Class Mid-Life – MCS, SCS, LAN and PLMU

Scalable Integrated Bridge System (SIBS) / Electronic Charting Display Information

System – Navy (ECDIS-N)

R-114 Conversion – A/C and Refrigerant Plants

Hazardous Minimization Center (HAZMINCEN)

Submarine Program alterations (Title K SHIPALTs and A&Is)

Submarine Fleet alterations (Title D SHIPALTs)

Integrated Condition Assessment System (ICAS)

Carrier Navigation and Control Systems

Ship Steam, Auxiliary, Seawater, Compressed Air, Machinery Automation and Fluid systems

Steam/Diesel and 400 Hz/DC Electric Power systems

Machinery and Damage Control Systems

Self-Contained Breathing Apparatus (SCBA) and Firefighting systems

Submarine Sail system

Networks and LAN

This contract does provide for task orders for ship/system maintenance and ship/system repair services that are fully bounded and conform to NSWCCD-SSES command repair process and policy. This contract does not provide services for "open and inspect" accomplishment. It is anticipated that repair tasks may be required to complete the modernization effort, and will comprise a small percentage in each of the awarded task orders.

Examples of allowable repair work include:

(a) Equipment/system repair that interfaces with an approved SC/alternations and would need to be fully operational in order to successfully light off and test the SC/Alterations.

(b) Components and systems where NSWCCD-SSES is the In-Service Engineering Agent (ISEA) that requires specialized subcontractor support to repair damaged or faulty equipment.

(c) General Shipyard repair packages where the Shipyard does not have a ship repair contracting vehicle to complete availability. Be advised prior approval must be in place with NSWCCD-SSES Commanding Officer and senior leadership before this type of work can be placed on this contract.

3.0 Scope of Work

The contractor shall provide all required labor, materials, and resources to integrate and modify shipboard and shore-based systems. Alteration/SC industrial services include prefabrication/fabrication, system/equipment pre-install checkout (PICO), shipboard installations, Integrated Logistics Support (ILS), material support, Quality Assurance inspection and completion documentation. Services are required to support various levels of ship systems integration. This integration covers component level digital upgrades through system level upgrades. Systems shall include HM&E, and Electronic.

In addition, the contractor shall be prepared to provide all necessary resources including material, to affect multiple ship systems installations and their interfaces for all types of ships (including, but not limited to: aircraft carriers, surface ships, watercrafts, cutters, submarines and land-based sites) in locations worldwide. Material requirements and specifications, along with Government furnished

Information/Equipment, will be provided per individual task order.

3.1 Technical Services Required:

3.1.1 Contractor Alteration /SC teams to support major Modernization Programs for blue collar install and Test the new technologies into existing platforms.

3.1.2 Contractor engineering support required to integrate new technologies into existing ship HM&E and electronic systems.

3.1.3 Contractor provided services for procuring material required for fabricating, assembling, installing, and conducting the testing for each applicable ship class as defined by the design guidance package including NAVSEA approved drawings.

3.1.4 Contractor develops In-Process Control Procedures (IPCPs) utilizing NAVSEA Standard Items and design detailing their process for installing the SC/alterations.

3.1.5 Contractor provides Quality Assurance and inspection to support the proper installation for technologies being introduced into existing platforms.

3.1.6 Provide other logistic support services including kitting/shipping of material, participating in meetings, visiting government field and industry sites, review of installation correspondence, providing background to these reviews, and participating in inventory reviews of both hardware and software.

3.2 Alteration/Ship Change (SC) Installations

3.2.1 Conduct Alteration/SC Installation Planning

3.2.1.1 Provide necessary facilities, equipment, tools, security badges, and trade personnel to accomplish installation of new technologies.

3.2.1.2 Conduct pre-installation site surveys/ship checks on designated ships to identify situational interferences between NAVSEA approved drawings and specific physical and environmental conditions. Unless otherwise directed by NSWCCD-SSES, conduct site surveys with program, ISEA representatives or Subject Matter Experts (SME) prior to scheduled installations in accordance with direction or guidance typically via phonecon or e-mails provided in applicable individual task orders.

3.3. General Alteration /SC Installation Requirements

3.3.1 Assign a Contractor's Team Leader (Site Foreman or designee) to attend a "team leader meeting” with

NSWCCD-SSES program/ISEA/SME representative for review of Alteration /SC Installation requirements prior to an installation. Prepare a draft POA&M that lays out the installation schedule prior to team leader meeting. Be prepared to discuss all aspects of installation including material status, shipping schedule, installation requirements, proposed financial costs, Quality Assurance, and safety concerns. Coordinate schedule information with NSWCCD-SSES, ship's force, and other activities as necessary to ensure proper support is available and interference or delays are minimized.

During the Alteration / SC, ensure the following minimum requirements are met:

(a) Shipboard Industrial Safety: In conducting task order efforts, comply with applicable safety regulations. This includes a mandatory review of the

System/equipment Work Authorization Form (WAF) and tag out procedures, and all shipboard electrical training.

(b) Conform to existing shipboard routines regarding cleanliness, personnel conduct, and ship’s

Security and integrity.

3.3.1.1 Adhere to all environmental laws and regulations including federal, state, local, Naval, International, ship and industrial facility.

When handling hazardous material and/or waste, handling reports and disposal invoices are required through local procedures. Government will not be responsible for the Contractor’s misuse of hazardous material/waste or for Contractor accident cleanup costs.

3.3.1.2 Ensure that all shipboard work follows the established NSWCCD-SSES processes including mandatory use of QA workbooks. These workbooks must adhere to prescribed outline and include all necessary In-Process Control Procedures (IPCPs), personnel qualifications, personnel certifications, and POA&M. These workbooks are required for all shipboard industrial work. See

Section 4.3

3.3.1.3 Provide verification of certification for welders, pipe fitters, and all trades requiring certification.

Personnel shall carry on their person a copy of the certification at all times during the Alteration/SC.

No welder shall be permitted to work, in connection with Alteration/SC to vessels, unless they are at the time, qualified to the standards established by the U.S. Coast Guard American Bureau of Shipping or Department of the Navy for the type of welding being performed. No welder shall be permitted to work on production or pre-fabrication applications of welding other than those for which they have qualified and been approved by the Program Office.

3.3.1.4 Provide SUBSAFE/SOC awareness training to all employees prior to conducting any submarine work even though no SUBSAFE work is authorized to be accomplished under this contract.

3.3.1.5 Rehabilitate affected spaces to original or equivalent condition which includes, but is not limited to:

(a) Cleaning, preparing, priming and painting the new and disturbed surfaces to match surrounding areas.

(b) Replacing all deck coverings and insulation damaged incidental to installation. If more than 40 percent (40%) of the deck surface area is damaged, replacement covering of the complete space will be specified. Replace all damaged deck covering with matching styles, colors, and grades in accordance with current requirements.

3.3.1.6 Repairing all damaged lagging and installing new lagging where appropriate.

3.3.1.7 Preparing and attaching applicable labels/tags to power panels, piping, data cables and power cables.

3.3.1.8 Proper dressing of all cables for proper cable bend radius and equipment entry.

3.3.1.9 Perform a daily thorough cleaning of affected spaces, at end of each shift.

3.3.1.10 Ensure that all applicable personnel are briefed on their responsibilities at least two (2) working days prior to starting task for each separately placed task order on this contract.

3.3.1.11 Provide redlined drawing packages (if applicable) to the government On-Site Install Coordinator (OSIC) and/or NSWCCD-SSES Program Manager, ISEA or SME NLT (10) days after completion of each installation.

3.4 Installation Ground Rules

3.4.1 Prior to the installation start date, the Site Foreman shall meet with the NSWCCD-SSES Program

Manager, ISEA or SME representative to review the installation plan, drawings and schedule and to reaffirm all requirements.

3.4.1.1 During the installation phase onboard the ship, the NSWCCD-SSES PM, SME, or OSIC will representative communicate their requirements to the Site Foreman (rather than individual team members). When the Foreman leaves the ship while work is in progress, he/she will appoint someone to act in his/her absence and identify this individual to the NSWCCD-SSES

Representative.

3.4.1.2 The Site Foreman shall brief the NSWCCD-SSES OSIC daily on installation progress, including:

- Status of planned production schedule

- Number of personnel onboard

- Material needed or proposed substitution

- Any proposed design changes or interferences in the installation

- Labor hours used on previous day

- Status of local shipyard support

The Site Foreman also shall brief the NSWCCD-SSES OSIC on work progress/problems upon completion of each workday.

3.4.1.3 Contractor employees will not visit or contact ships without prior NSWCCD-SSES written approval.

3.4.1.4 All communication with DOD, Naval Activities, and ships shall be via NSWCCD-SSES Program

Manager, ISEA or SME.

3.4.1.5 Security clearances will be forwarded to ships and installation facilities by Contractor. Contractor

CAC badges shall be obtained via the COR.

3.4.1.6 All work will be inspected in accordance with the criteria provided under separately placed task orders and with the provisions of this contract.

3.4.1.7 Coordination of each Alteration /SC is the responsibility of the assigned NSWCCD-SSES AIT

Program Manager/ISEA/SME and OSIC. The NSWCCD- SSES OSIC Representative may halt work and convene an off-ship meeting whenever he/she determines that this is required to resolve problems. This responsibility applies to all aspects of an Alteration/SC.

3.4.1.8 AIT contractor site foreman and shipboard personnel must maintain all sections of a Quality

Assurance (QA) workbook during industrial production. QA Workbook must be available to

OSIC for review.

4.0 ENGINEERING

4.1 Perform engineering analysis, research and design:

4.1.1 Furnish support for engineering and technical investigations and analyses relating to concepts and designs, focusing on installation engineering, compatibility and operability, and interfaces.

Prepare procedures for integration of new installation/Alteration / SC projects, including identifying and defining interfaces and relationships between these programs and other DOD systems and subsystems. Specifically, the Contractor shall:

(a) Collect data elements for technical and schedule impact.

(b) Conduct interface design studies to include recommendations to resolve component or system interface problems.

(c) Perform on-site surveys, validations, and verifications in compliance with operational standards in the development of recommendations for improvements or technical change.

(d) Review/develop test specifications and monitor testing of HM&E and

Electronic Systems.

(e) Develop drawings, field sketches, test procedures and/or results installation procedures, maintenance procedures, etc., as required to accomplish necessary work, and to provide revised or updated documentation reflecting the ship's changed configuration.

4.2 Material Support

4.2.1 The contractor is only authorized to purchase and provide materials incidental to the performance of the services to be furnished under individual task orders.

The procurement of material or equipment of any kind, other than that incidental to and necessary for furnishing of the required services, is not authorized nor will any costs incurred be considered allowable.

In addition, the purchase of general purpose business items/expenses required for the conduct of the contractor’s normal business operations are not authorized and will not be allowed as a direct cost.

General purpose business items include, but are not limited to, the cost for items such as telephone charges, cellular telephones, fax machines, reproduction machines, word processing equipment, personal computers, office equipment and consumable supplies.

4.2.2 It is anticipated that incidental materials will be required for the contractor to procure to support installations. These items include, but not limited to: metal plate, angle, bar, channel, pipe, tee, elbow, coupling, welding electrode, welding studs, welding rods, cable hangers, electrical cable, circuit breakers, electrical lugs, connectors/backshells, paint, lagging paste, rubber channel, hydraulic fluid, various oils, electrical/mechanical switches, gaskets, stuffing tubes, packing assembly, paint roller, paint brushes, fire cloth, masking tape, and gloves.

4.2.3 Materials that are not authorized for procurement include cadmium plated fasteners, items containing asbestos, item substitutions, and any material that does not conform to local environmental regulations.

4.2.4 For large material procurements that the NSWCCD-SSES SME is unable to have in place to support an install, the task order SME will identify the material requirement and justification to the COR in advance of task order submittal. Materials required other than what is specified under each task order must be approved by the Contracting Officer.

4.3 Quality Assurance

4.3.1 Contractor must maintain an approved NAVSEA 04XQ Quality Assurance Plan/Quality

Management System (QMS) to support the AIT efforts tasked under this contract. All installation tasks require a Quality Assurance Plan. The contractor shall remain 100 percent responsible for adherence to QA Plan requirements. The Contractor will maintain this system at no cost to the

Government and submit all updates to the NSWCCD-SSES Program Manager immediately for his/her concurrence prior to start of installation.

The prime Contractor is responsible for auditing and certifying that all consultants, subcontractors, and suppliers are in compliance with these quality requirements.

4.3.2 Conduct quality studies and inspections of design, manufacturing, pre-fabrication production, control, inspection, assembly, testing, installation, packaging, and shipping for the purpose of assembling data into a QA manual.

4.3.3 Ensure Quality Assurance Test and Inspection (T&I) Plans are accomplished in accordance with approved drawings NAVSEA Standard Items (NSIs), and applicable Government/commercial standards and specifications including but not limited to documents listed in the

Standards/Specification section of this SOW. Contractor will develop their In-Process Control

Procedures (IPCPs) in accordance with NSI 009-09. In addition to the above, the contractor shall perform the following tests:

(a) Ensuring proper continuity in cables and correctness of electric hookup

(b) Pressure testing of watertight compartment entries

(c) Ensuring proper bonding, grounding, and shielding of cables and equipment

(d) Providing one copy of a report listing the insulation resistance for each cable test

(e) Non-destructive testing of weld joints

(f) Ensuring proper piping system installation and testing

(g) Securing cables to the cable wire ways with flexible cinch banding straps

(h) Ensuring kick pipes and stuffing tubes are used for all penetrations of decks and watertight bulkheads. Stuffing tubes shall be statically tested for water tight integrity.

(i) Ensuring validity of gas free certificate prior to welding

(j) Installing collars and nylon stuffing tubes in all penetrations of non-watertight bulkhead

(k) Ensuring proper input and output power levels

4.3.4 Identify cabling and equipment by installing nameplates and cables bands as follows:

(a) Nameplates shall conform to MIL-P-15024

(b) Cable tags (bands) shall be of soft aluminum and conform to MIL-A-2877 and shall be embossed with the applicable cable designation using numbers and capital letters having minimum height of 3/16 inch and embossed to at least 1/64 inch above the surface. Cable tags and securing strips shall have a thickness of 0.014 and 0.016 inch respectively. Cable tags shall be minimum width of one-half inch.

4.3.5 Metal Spraying - Ferrous surfaces which are not readily accessible and are susceptible to corrosion damage shall be coated with metal spray per DOD-STD-

2138 (SH) Metal Sprayed Coating Systems for Corrosion Protection Aboard

Naval Ships.

4.3.6 Component Designation - Each component such as switches, pumps and heat exchangers shall have a label plate to identify it by functional name and assigned number. Label shall comply with MIL-P-15024 and shall be the most economical permitted, provided they are suitable for their environment.

4.3.7 Piping Designation - All systems shall be marked (in black) for identification.

This marking shall be the functional name of the system and, where necessary for differentiation between two pipes of the same system, the specific service shall be included. In addition to the specific service, the system pressure and direction-of-flow shall be indicated. For outside diameter of 2 inch and larger (bare or lagged) pipe, markings shall be painted on pipes or lagging using stenciled letters 1 inch high. Where pipe sizes are too small for lettering, label plates inscribed with system name and, where necessary, the service shall be wired or banded to the pipe. Piping in machinery spaces shall be marked at least twice, once near entry and once near exit. At the interconnection of systems each system shall be marked nearby, wherever this is practicable. Where piping is behind protective battens, one label plate should be attached to the batten. These label plates should be of the type and material listed on applicable drawings.

4.3.8 Valve Designation - Valve handles and operating levers located interior to the ship shall be color-coded. Where a valve is installed below a floor plate or grating or is similarly hidden (e.g., behind paneling) a marking shall be installed both on the valve and on the portable access plate. For valves behind vending machines, salad bars, or other semi-portable obstructions marking should be installed both on the valve and on an adjacent bulkhead, visible despite the object hiding the valve. Markings shall be inscribed on a circular label plate and secured in place by the hand wheel nut. Where the hand wheel size or location prevents the use of one of the above methods, markings shall be inscribed on a flat rectangular label plate to fit the valve or piping and wired to or similarly secured in place on the valve or piping adjacent to the valve. Attachment shall be in such manner as to prevent movement of the label and assure easy reading.

Insulating material shall be used as baking when label plates are attached to bare valves or piping to prevent electrolytic corrosion between dissimilar metals. Letters shall not be less than 1/8 inch high.

4.3.9 Instrument Designation - Label plates shall be provided for all indicating and recording instruments installed.

Inscription shall indicate the purpose or use of the instrument and shall bear the designation of the related component or system; wherever appropriate the label shall be installed below the instrument and on the plate supporting the instrument. Label plates shall be types and materials listed in applicable drawings.

4.3.10 Electrical Terminal Designation - Electrical terminals shall be identified using sleeves imprinted with the cable designation, the nearest connection point, the opposite connection point and the wire number.

4.3.11 Provide receipt inspection of all material procured.

4.3.12 Inspect all prefabricated parts and conduct certifying test where applicable.

4.3.13 Ensure all personnel (including subcontractors) know and adhere to the requirements of this contract and the awarded Contractor's approved Quality Assurance Program.

5.0 STANDARDS/SPECIFICATIONS

5.1 Contractor References (In performing this contract, the Contractor is referred to, but not limited to, the following documents):

MIL-STDS, MIL-SPECS, and Instructions at http://www.dsp.dla.mil/app_uil/SpecsAndStandards.aspx

Navy Modernization Program (NMP) Manual SL720-AA-MAN-030 at https://www.nde.navy.mil/

NAVSEA Technical Specification 9090-310 (revision) at https://www.nde.navy.mil/

NAVSEA Standard Items at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx

NAVSEA C9210.4 (revision) - All non-nuclear work on nuclear powered ships must be in strict compliance with the Naval Sea Systems Command Instruction (classified instructions under separate cover)

Applicable Ship Change Documents (SCDs)/Ship Alteration Records (SARs) provided by

NSWCCD-SSES SME

Applicable Ship's Installation Drawings (SIDs) and Sketches provided by NSWCCD-SSES http://www.dsp.dla.mil/app_uil/SpecsAndStandards.aspx http://www.nde.navy.mil/ http://www.nde.navy.mil/ http://www.nde.navy.mil/ http://www.nde.navy.mil/ http://www.nde.navy.mil/ http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx

SME

NAVSEA S9AAO-AB-GSO-010/GOS, General Specification for Overhaul of Surface Navy

Ships

NAVSEA S9AAO-AA-SPN-010/GEN SPEC, General Specifications for Ships

CINCLANTFLT/CINCPACFLTINST 4790.3, Joint Fleet Maintenance Manual (JFFM)

MIL-STD-1310, (Navy) Bonding and Grounding

NAVSEA S9300-AW-EDG-010, Electrical Plant Installation Standard Methods (EPISM)

NAVSEA Technical Publication S9074-AQ-GIB-010/248, Requirements for Welding and

Brazing Procedure and Performance Qualification

NAVSEA Technical Publication S9074-AR-GIB-010/278, Requirements for Fabrication

Welding and Inspection, and Casting Inspection and Repair for Machinery, Piping, and Pressure

Vessels

MIL-STD-1689A, Fabrication, Welding and Inspection of Ship Structures

NAVSEA Technical Publication 59074-AR-GIB-010/1688, Requirements for Fabrication

Welding and inspection of Submarine Structure.

ISO-9001 Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing http://www.iso.org

ISO-9002 Quality Systems - Model for Quality Assurance in Production, Installation and

Servicing http://www.iso.org

5.2 Military Specification Use

Wherever MILSPECS and MIL Standards are cited, it shall be understood that they are for guidance only.

6.0 DELIVERABLES

6.1 Data Requirements

All data deliverables shall be in accordance with the attachedform DD 1423 included with this solicitation.

6.1.1 In performing this contract, the Contractor is required to, but not limited to, providing the following documentation as applicable for each individual task order:

a. Contract / Delivery Order Status Report, Data Item A001

b. Contract Financial Status Report, (bi-weekly or monthly) Data Item A002

c. Plan of Attack and Milestone (POA&M) Schedule, Data Item A003

d. Quality Assurance (QA) Workbook, Data Item A004

e. Personnel Qualifications / Certifications / Training list, Data Item A005 http://www.iso.org/ http://www.iso.org/

f. In-Process Control Procedures (IPCPs), Data Item A006

g. Weekly Production Status Reports, Data Item A007

h. Red-lined Ship Installation Drawings (SIDs), Data Item A008

i. Lessons-Learned Report, Data Item A009

j. Minutes of Meetings, Data Item A010

k. Pre-Project GFE/CFE Warehouse Inventory Report. Inventory Status Report of all material, tools, and equipment acquired for installations at time of contract award and quarterly thereafter, Data Item A011

l. Hazardous Materials/Waste, Handling reports and Disposal Invoices/Data as required Item A012

m. Pre-installation Site Survey Results, Data Item A013

n. Completed Installation and Check Out Test reports, Data Item A014

o. Technical reports as required to complete individual task orders, Data Item A015

p. Database or other Electronic Documents, Data Item A016

q. Incurred Cost Report

r. Burn Rate Report

s. Labor Rate Substantiation Table

6.1.2 Enterprise‐wide Contractor Manpower Reporting Application (ECMRA)

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil .

Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) S, Utilities ONLY;

(5) V, Freight and Shipping ONLY.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.

Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.

7.0 GOVERNMENT FURNISHED MATERIAL/INFORMATION (GFM-GFI)

7.1 GFM & GFI will be specified in individual task orders.

The contractor shall furnish all necessary equipment required for the performance of individual task orders. The contractor shall be responsible for providing all hand tools necessary, at no cost to the Government, in performance of this contract.

Hand tools are described as standard tools of the trade such as hammers, drills, screwdrivers, pliers, connector crimp tools, awls, saws, etc. and typical tools required to perform tasks set forth in the specific task orders and modifications. It shall be the contractor's responsibility to maintain all Contractor furnished test equipment properly calibrated and in a ready for use condition to the extent necessary to avoid impacting the performance requirements of the task order.

8.0 PERSONNEL QUALIFICATIONS

8.1 The contractor shall provide fully trained and experienced personnel necessary to perform the design, installation and repair services as specified in individual task orders. The contractor shall also provide training for keeping its personnel abreast of industry and trade advances and for establishing and maintaining proficiency on equipment, computer languages and computer operating systems as necessary during the contract period of performance. Training of personnel shall be performed by the contractor at their own expense.

8.1.1 All services shall be performed by fully qualified individuals in the relevant profession, trade or field and possess any licenses required by law or in applicable standards and specifications. The functions to be performed by all personnel shall reasonably correspond to the title of the labor or job category.

8.1.2 When performing special processes such as welding, brazing and non-destructive testing on board Naval vessels and small crafts, the contractor personnel shall be certified to the requirements of T9074-AQ-BIB-010/248

(Requirements for Welding and Brazing Procedure and Performance Qualification); T9074-AS-GIB-010/278

(Requirements for Non-Destructive Testing Methods); S9074-AR-GIB-010/278 (Requirements for Fabrication, Welding and Inspection and Casting Inspection and Repair for Machinery, Piping and Pressure Vessels); and

T9074-AB-GIB-010/1688 (Requirements for Fabrication, Welding and Inspection of Submarine Structure). For non-

Naval vessels and small crafts, contractor personnel shall be…