View the file

Other files for this federal contract opportunity

Other files attached to SPAWAR MAINTENANCE ENGINEERING SUPPORT CENTER (MESC) PERFORMANCE BASED LOGISTICS ORGANIC (PBL-O) INTEGRATED LOGISTICS SUPPORT (ILS)- Intented Sole Source, newest first.
File Type Posted
3 PWS REVISED.docx DOCX document
3 SOLE SOURCE REDACTED.pdf PDF
3 CDRL A006.pdf PDF
3 CDRL A002.pdf PDF
3 CDRL A001.pdf PDF
3 CDRL A003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT:
TDP:
TM:
OTHER: MGMT
DSYSTEMITEM: MESC PBL-O ILS
E_CONTRACTPR_NO: N00039-16-C-0094
FCONTRACTOR: INUPIAQ ALASKA GROUP
1_DATA_ITEM_NO: A005
2_TITLE_OF_DATA_ITEM: Cost and Schedule Milestone Plan
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit:
5_CONTRACT_REFERENCE: PWS Para #5.2
6_REQUIRING_OFFICE: SPAWARSYSCEN Atlantic
7_DID_250_REQ: LT
8_APP_CODE: N/A
DIST_STATEMENT: N/A
10_FREQUENCY: 1TIME
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: 10DATO (See BLK 16)
13_DATE_OF_SUBSEQUENT_SUB: N/A
addressee1: COR
draft1:
reg1: 1
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 0
16_REMARKS: BLK 12: Due NLT 10 days after TO award date

BLK 14: COR will perform inspection and acceptance and report any discrepancies (must align with government schedule) to contractor.

Cost must track directly to the schedule of events/tasks.

Unless otherwise directed by TO, contractor shall provide CDRL document as an electronic transmission.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE: NSP
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page:
of_pages:
Reset:
reg38t: 1
2018-11-13T13:04:58-0500
HALL.BRIAN.MAGEE.1377197425
2018-11-13T14:13:11-0500
GAY.GWENDOLYN.J.1229470376

File details come from the government source that posted it.