This is a Vendor Questions Answered document providing clarifications on Solicitation N6449826Q52480004 for industrial workhorses issued by the Naval Sea Systems Command, Department of the Navy, for delivery to the Naval Foundry and Propeller Center (NFPC) in Philadelphia. The solicitation requires contractors to supply twelve (12) industrial workhorses rated at 150,000 lbs. capacity each and six (6) additional units of the same specification, with shipping included in the price. Two sizes are specified: 24 inches high by 36 inches wide and 36 inches high by 42 inches wide, with the width measurements representing the length of the top beam and a required top beam depth of 12 inches. Contractors must develop their own engineered design subject to Navy approval, with a flat continuous steel top surface required. Load capacity of 150,000 lbs. per unit applies only when resting on the frame or legs, not on casters; casters are for positioning unloaded workhorses and must include locking retractable mechanisms suitable for rough, uneven concrete and wood floors. Load distribution is evenly distributed at 150,000 lbs. per unit or 300,000 lbs. per pair.

Certification requirements include PE-stamped drawings and structural calculations; physical proof-load testing is not required. Contractors must submit engineering drawings to the contract specialist for government approval, with an anticipated one-week turnaround. The 90-calendar-day delivery timeline begins after drawing approval, not from the award date, allowing contractors to submit drawings promptly. Safety-yellow powder coating (specific color not required) is mandated; galvanized finishes are not acceptable. A 6:1 safety factor is acceptable, and industry standards for weight-handling equipment apply. Forklift pockets and additional lifting lugs are not required. Contractors must complete form 1449 and adhere to all requirements in Section C and Section 3.0 of the Statement of Work. Proposals should be emailed to christopher.m.mccarthy26.civ@us.navy.mil and anthony.j.diplacido.civ@us.navy.mil. Small business primes may include the experience and project references of proposed performing fabrication manufacturers or subcontractors in their evaluation. No questions submitted after November 3, 2026, can be guaranteed a response.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1:

Is this tender coming back to life? I am asking because one of my customers just reached out to me to quote this to them.

Then I thought I should look to see if it was posted on Sam’s.

I see that it is and you are the person of contact but it shows as inactive.

Clarification to Question 1:

The SAM Number is N6449826Q52480004. That is the notice ID on SAM.GOV. I do not know what you mean by solicitation number.

Response to Clarification Request to Question 1:

I will be providing a quote for this.

Can you confirm if a quote is all that is required at this time or do you require us to complete these forms?

Answer to Response to Clarification Request to Question 1:

You need to complete the form 1449 and follow all the requirements laid out in Section C (Statement of Work) and more specifically Section 3.0 REQUIREMENTS.

Question 2:

This morning I reviewed SAM & PIEE to see if the answers to questions were posted, but I am not yet seeing them. In the interim, we have been preparing our quote with the information provided and look forward to competing for this project. We would greatly appreciate any information or guidance when the answers to the questions below are posted.

Answer 2:

NSWCPD is working to answer the questions you asked of us. We need a little more time.

Question 3:

Length/depth: Section 3.2 gives height and width (24" H x 36" W and 36" H x 42" W) but no length or top depth. What top length and depth are required for each size? Section C, SOW 3.2, pages 5-6. Is the 36" and 42" "wide" the length of the top beam? What front-to-back depth do you need for the top and the base?

Answer 3:

The 36" and 42” “width” measurement is the length of the top beam. Top beam depth is 12”.

Question 4:

Is there an existing drawing, sketch, or photo of the work horses currently used at NFPC that we can reference?

Answer 4:

SEE DIAGRAM ABOVE

Question 5:

Load rating: is the 150,000 lbs. per unit capacity required with the load on the casters, or only when the unit is lowered and resting on its frame or legs?

Answer 5:

Casters are for positioning unloaded workhorses for setup and storage, not for load.

Question 6:

Casters: are there required caster sizes, wheel material, or floor conditions we should design around? Is locking required?

Answer 6:

Locking casters are required. Rough and uneven concrete and wood floors.

Question 7:

Load application: will the load be a point load, or spread evenly across the full steel top? As per SOW.

150,000lbs, capacity per unit; 300,000 lbs. Capacity per pair evenly distributed Question 8:

Approval drawings: what is the expected turnaround time for NFPC drawing approval, and does the 90-day delivery start at award or at drawing approval?

Answer 8:

The “90 days” starts after drawing approval.

Question 9:

Load testing: does certification require a physical proof-load test, or are PE-stamped calculations acceptable?

Answer 9:

PE stamped drawings are acceptable. No load test required.

Question 10:

Load rating: is the 150,000 lbs. per unit capacity required with the load on the casters, or only when the unit is lowered and resting on its frame or legs?

Answer 10:

Load rating is only for resting on legs, casters are for moving and positioning unloaded workhorses.

Question 11:

Delivery (Section F, page 16, and SOW paragraph 3.1, page 5): CLINs 0001 and 0002 call for delivery 90 calendar days from date of award, and drawings must be approved by NFPC before manufacturing starts. Will the Government accept delivery 90 calendar days after drawing approval, or 120 calendar days after award?

Answer 11:

Drawing submission shall be in a timely manner, the government anticipates approval in 1 week and 90 days after approval will be acceptable.

Question 12:

Delivery (Section F, page 16, and SOW paragraph 3.1, page 5): CLINs 0001 and 0002 call for delivery 90 calendar days from date of award, and drawings must be approved by NFPC before manufacturing starts. Will the Government accept delivery 90 calendar days after drawing approval, or 120 calendar days after award?

Answer 12:

Drawing submission shall be in a timely manner, the government anticipates approval in 1 week and 90 days after approval will be acceptable.

Question 13:

Length (SOW paragraph 3.2, page 5): the requirement gives a height and width for each size but no length. Is there a required length or footprint for each work horse?

Answer 13:

Heights and widths as stated with top beam at 12” depth.

Question 14:

Are there existing engineering drawings, photographs, sketches, or examples of the industrial work horses currently used at the Naval Foundry and Propeller Center?

Answer 14:

SEE DIAGRAM ABOVE

Question 15:

What is the required overall length of each work horse? The specifications provide height and width but do not appear to identify length.

Answer 15:

The 36" and 42” “width” measurement is the length of the top beam. Top beam depth is 12”.

Question 16:

Are there specific requirements for the top surface, load distribution, or points of contact with the supported equipment?

Answer 16:

FLAT STEEL TOP REFERENCE IMAGE ABOVE.

Question 17:

Are there specifications for the spring-loaded compression casters, including wheel size, quantity, and arrangement?

Answer 17:

Sufficient to move and position horses easily.

Question 18:

Is the contractor expected to develop the complete engineering design, subject to Navy approval, or is there an existing design that must be followed?

Answer 18:

CONTRACTOR CAN DEVELOP ENGINEERED DESIGN REFERENCE IMAGE ABOVE.

Question 19:

Technical Drawings: Are there any existing engineering drawings, design specifications, or reference drawings available for the required industrial workhorses? If so, could you please provide them?

Answer 19:

REFERENCE IMAGE ABOVE

Question 20:

Detailed Specifications: Are there additional requirements regarding structural steel grades, material thicknesses, frame design, welding standards, dimensions, tolerances, or caster specifications?

Answer 20:

NO

Question 21:

Load Certification: Are there specific engineering standards, load-testing procedures, or certification requirements that manufacturers must follow to verify the 150,000-lb capacity per unit?

Answer 21:

PE stamped drawings are acceptable. No load test required.

Question 22:

Design Approval: Could you please clarify the process for submitting engineering drawings for Government approval before fabrication, including any specific requirements for PE-stamped drawings?

Answer 22:

Email drawings to contract specialist.

Question 23:

Reference Information: If available, could you share photographs, previous equipment drawings, or other technical references to help manufacturers understand the intended design?”

Answer 24:

REFERENCE IMAGE ABOVE.

Question 25:

Section C, SOW 3.2, pages 5-6. Is the 36" and 42" "wide" the length of the top beam? What front-to-back depth do you need for the top and the base?

Answer 25:

The 36" and 42” “width” measurement is the length of the top beam. Top beam depth is 12”.

Question 26:

SOW 3.2, page 6. How many casters per horse? We plan for the casters to retract so the frame sits on the floor under load. Is that acceptable, or is there a required caster rating?

Answer 26:

Retractable locking casters shall be sufficient to support unloaded horses during setup and storage.

Question 27:

SOW 3.3, page 6. Does "certified with the requested load rating" mean PE-stamped calculations, or do you need a physical proof-load test? If a test, at what percent of rated load, and on every unit or one per size?

Answer 27:

PE stamped drawings are acceptable. No load test required.

Question 28:

SOW 3.3, page 6. Is a PE licensed in any U.S. state acceptable, or must the engineer be licensed in Pennsylvania?

Answer 28:

No preference.

Question 29:

SOW 3.2, page 6. Is a minimum design factor or standard required (for example ASME B30 or a 2:1 factor on yield)?

Answer 29:

Industry standards for weight handling equipment.

Question 30:

DFARS 252.211-7003, pages 27-31. Do the work horses need IUID data matrix marking?

Answer 30:

NFPC does not require it.

Question 31:

SOW 3.1, page 5. Does the 90-day delivery start at award or at drawing approval?

Answer 31:

90 days after drawing approval is acceptable.

Question 32:

SOW 3.2, page 5. Is a specific safety yellow color number required?

Answer 32:

NO

Question 33:

Do you have any more specifications for the workhorses beyond capacity?

Answer 33:

REFERENCE IMAGE ABOVE AND SOW SEC 3.

Question 34:

Can we split delivery based on lead times?

Answer 34:

Yes

Question 35:

Delivery (Section F, page 16, and SOW paragraph 3.1, page 5): CLINs 0001 and 0002 call for delivery 90 calendar days from date of award, and drawings must be approved by NFPC before manufacturing starts. Will the Government accept delivery 90 calendar days after drawing approval, or 120 calendar days after award?

Answer 35:

Drawing submission shall be in a timely manner, the government anticipates approval in 1 week and 90 days after approval will be acceptable.

Question 36:

Length (SOW paragraph 3.2, page 5): the requirement gives a height and width for each size but no length. Is there a required length or footprint for each work horse?

Answer 36:

The 36" and 42” “width” measurement is the length of the top beam. Top beam depth is 12”.

Question 37:

Overall Dimensions Reference: Section C, Paragraph 3.2, Page 5 The solicitation specifies two workhorse sizes: 24" high x 36" wide and 36" high x 42" wide, each rated for 150,000 lbs. Can the Government clarify the intended orientation of these dimensions and provide the required third dimension (depth/length)? Specifically, are there maximum footprint restrictions for either configuration?

Answer 37:

The 36" and 42” “width” measurement is the length of the top beam. Top beam depth is 12”.

Question 38:

Steel Top Surface Reference: Section C, Paragraph 3.2, Page 6 Can the Government provide the desired dimensions, thickness, and profile of the steel top surface? Is a flat, continuous steel plate required, or are alternative configurations acceptable?

Answer 38:

FLAT CONTINUOUS REFERENCE IMAGE ABOVE.

Question 39:

Design Configuration Reference: Section C, Paragraphs 3.1 and 3.2, Page 5 Does the Government have an existing drawing, preferred design, or reference configuration that the workhorses should follow? Alternatively, is the contractor permitted to develop its own engineered design, provided all dimensional, load capacity, and certification requirements are satisfied?

Answer 39:

REFERENCE IMAGE ABOVE.

Question 40:

Lifting and Handling Provisions Reference: Section C, Paragraph 3.2, Pages 5–6 Are additional handling provisions, such as lifting lugs or forklift pockets, required or permitted as part of the proposed design?

Answer 40:

NO

Question 41:

Load Certification and Testing Reference: Section C, Paragraph 3.3, Page 6 The solicitation requires the workhorses to be certified for the specified load rating and PE-stamped drawings upon completion. Can the Government clarify whether certification through engineering calculations and PE-stamped documentation is sufficient, or whether physical proof-load testing is required of each horse? If physical testing is required, please identify the applicable testing standard and required test load.

Answer 41:

PE stamped drawings are acceptable. No load test required.

Question 42:

A vendor is reviewing RFQ N6449826Q5248 for the Industrial Workhorses requirement and would like to submit a competitive quotation. During our review of the solicitation documents, we could not locate the engineering or fabrication drawings referenced in the technical requirements. Could you please provide any available drawings, dimensional specifications, material requirements, and applicable load-testing criteria associated with this requirement? This information will help our engineering team accurately evaluate the manufacturing requirements and prepare a technically compliant quotation. Thank you for your assistance. We look forward to your response.

Answer 42:

Reference image above also reference sec 3.2 in the SOW

Question 43:

“We are reviewing Solicitation No. N6449826Q52480004 for the industrial workhorses and would appreciate clarification on the design specifications.

The solicitation requires drawings to be submitted to the Naval Foundry and Propeller Center (NFPC) for approval before manufacturing, with PE-stamped drawings provided upon completion. However, we have not identified any design drawings in the solicitation documents.

Could you please confirm whether government-provided drawings or a specific Navy design standard are available for this requirement? If available, kindly provide the drawings or direct us to where they can be accessed. If no specific drawings or design standards are available, please confirm whether the contractor may develop its own design, provided it meets all specified dimensions, structural requirements, and load capacities, subject to NFPC approval before manufacturing.”

Answer 43:

CONTRACTOR MAY DEVELOP OWN DESIGN. REFERENCE IMAGE ABOVE.

Question 44:

Length/depth: Section 3.2 gives height and width (24" H x 36" W and 36" H x 42" W) but no length or top depth. What top length and depth are required for each size?

Answer 44:

The 36" and 42” “width” measurement is the length of the top beam. Top beam depth is 12”.

Question 45:

Is there an existing drawing, sketch, or photo of the work horses currently used at NFPC that we can reference?

Answer 45:

REFERENCE IMAGE ABOVE.

Question 46:

Load rating: is the 150,000 lb per unit capacity required with the load on the casters, or only when the unit is lowered and resting on its frame or legs?

Answer 46:

Casters are for positioning unloaded workhorses for setup and storage, not for load.

Question 47:

Casters: are there required caster sizes, wheel material, or floor conditions we should design around? Is locking required?

Answer 47:

Locking casters over rough, uneven concrete and wood floors.

Question 48:

Load application: will the load be a point load, or spread evenly across the full steel top?

Answer 48:

As per SOW 3.2 150,000lbs, capacity per unit; 300,000 lbs. Capacity per pair evenly distributed.

Question 49:

Approval drawings: what is the expected turnaround time for NFPC drawing approval, and does the 90-day delivery start at award or at drawing approval?

Answer 49:

Drawing submission shall be in a timely manner, the government anticipates approval in 1 week and 90 days after approval will be acceptable.

Question 50:

Load testing: does certification require a physical proof-load test, or are PE-stamped calculations acceptable?

Answer 50:

PE stamped drawings are acceptable. No load test required.

Question 51:

Are there any government supplied drawing to augment the details in section 3.0 of the SOW?

Answer 51:

REFERENCE IMAGE ABOVE.

Question 52:

Is there a required overall length for either size of work horse?

Answer 52:

REFERENCE IMAGE ABOVE.

Question 53:

Is the 150,000 lb capacity intended to be uniformly distributed across the entire top surface, or should the units accommodate concentrated loading?

Answer 53:

As per SOW 3.2 150,000lbs, capacity per unit; 300,000 lbs. Capacity per pair evenly distributed.

Question 54:

Are there any reference drawings or photographs of the existing work horses?

Answer 54:

SEE IMAGE ABOVE.

Question 55:

Is there a specified design safety factor or required proof-load test?

Answer 55:

PE stamped drawings are acceptable. No load test required.

Question 56:

Are there specific requirements for the spring-loaded compression casters, including minimum wheel size or load capacity?

Answer 56:

Locking Casters shall be sufficient to move the unloaded horses easily.

Question 57:

Will PE-stamped engineering calculations and drawings be sufficient to certify the capacity, or is physical load testing required?”

Answer 57:

PE stamped drawings are acceptable. No load test required.

Question 58:

Load Capacity: Please confirm whether the 150,000 lbs capacity per unit refers to a point load or an evenly distributed load. Please confirm both capacities.

Answer 58:

As per SOW 3.2 150,000lbs, capacity per unit; 300,000 lbs. Capacity per pair evenly distributed.

Question 59:

Top Surface Width: Please specify the required width of the top bearing surface. Our manufacturer recommends using a 1" × 6" flat bar with tapped holes. Would this design be acceptable?

Answer 59:

SEE IMAGE ABOVE.

Question 60:

Finish: Would a galvanized finish be acceptable instead of the specified safety-yellow powder coating?

Answer 60:

NO

Question 61:

Safety Factor: Is there a required safety factor for the design? Our manufacturer recommends a 6:1 safety factor. Please confirm whether this is acceptable.

Answer 61:

Acceptable Question 62:

Forklift Pockets: Are forklift tubes/pockets required or preferred for handling and transportation?

Answer 62:

NO

Question 63:

Overall Dimensions: The specifications identify 12 units at 24" high × 36" wide and 6 units at 36" high × 42" wide. Is there a required front-to-back depth, and are the listed dimensions exact or adjustable within an approved design?

Answer 63:

The 36" and 42” “width” measurement is the length of the top beam. Top beam depth is 12”.

Question 64:

Load Distribution: Is the required 150,000 lb capacity per stand based on an evenly distributed load across the top surface, or should the stands be designed to accommodate concentrated point loads?

Answer 64:

As per SOW 3.2 150,000lbs, capacity per unit; 300,000 lbs. Capacity per pair evenly distributed.

Question 65:

Structural Materials: Are there preferred steel grades, structural member types, or minimum material specifications, or may the manufacturer propose an engineered structural steel design meeting the required capacity?

Answer 65:

Manufacturer may propose design.

Question 66:

Engineering Requirements: Will PE-stamped fabrication drawings and supporting structural calculations satisfy the certification requirements, or is physical load testing also required?

Answer 66:

PE stamped drawings are acceptable. No load test required.

Question 67:

Caster Requirements: Are there specific caster specifications, or may we propose spring-loaded compression casters that retract under load, allowing the structure to bear directly on its steel supports?

Answer 67:

Locking retractable casters are acceptable.

Question 68:

Drawing Approval: What is the anticipated review and approval timeframe for the required fabrication drawings prior to manufacturing?

Answer 68:

Government anticipates 1 week for approvals.

Question 69:

SOW Section 3.2, page 5-6: The units are specified by height and width, but no overall length/depth or top-surface footprint appears. Is there an intended third dimension or reference drawing, or may the supplier propose an engineered footprint meeting the capacity requirement?

Answer 69:

The 36" and 42” “width” measurement is the length of the top beam. Top beam depth is 12”.

Question 70:

SOW Sections 3.1-3.3, pages 5-6: Is a PE-stamped structural design/calculation package and manufacturer load-rating certification sufficient, or is a physical proof-load test required? Are there specific requirements for the spring-loaded compression casters under a rated load?

Answer 70:

PE stamped drawings are acceptable. No load test required. Casters are fir positioning unloaded horses.

Question 71:

Section L, Factor 2 (Past Performance): May the experience and project references of a proposed performing fabrication manufacturer/subcontractor be included and evaluated as part of a small-business prime’s quotation, or must the prime have directly performed comparable steel fabrication contracts?

Answer 71:

This is acceptable.

Question 72:

Section F, pages 16-17: Delivery is identified as the Naval Foundry and Propeller Center in Philadelphia, but F-247-N002 includes Portsmouth Naval Shipyard delivery instructions. Please confirm Philadelphia is the only shipment destination and whether Portsmouth-specific driver instructions apply.

Answer 72:

Philadelphia is the only shipping destination.

Question 73:

We plan to certify the 150,000 lbs. rating with PE-stamped drawings and an engineer-rated capacity tag on each unit, without a physical proof-load test. Could you confirm this meets 3.3, or let us know if the Navy requires proof-load testing?

Answer 73:

PE stamped drawings are acceptable. No load test required.