This is a Request for Proposal (RFP) for a sole source contract with Rolls-Royce Marine North America (RRMNA) to repair waterjet and impeller drive shaft assemblies for Freedom Class Littoral Combat Ship (LCS-1) vessels. The Department of the Navy's Naval Surface Warfare Center Philadelphia Division (NSWCPD) intends to award a single Firm-Fixed-Price (FFP), Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract under 10 U.S.C. 3204(a)(1) for repairing three specific assets: 172AX MK1 Boost Waterjet Assembly, 172AX MK1 Steerable Waterjet Assembly, and Impeller Drive Shaft Assembly.
The contract will span five years, with a guaranteed minimum of $500 and quantities increasing each contract year (2 in Year 1, scaling up to 6 in Years 3-5). Key deliverables include Teardown, Test, and Evaluation (TTE) and repair services, with reporting requirements including visual inspections, pre-repair and final repair reports, and certification documentation. The solicitation is set aside for small businesses, with a 5% small business participation requirement. Offers are due by 04:00 PM on 05 Jun 2025, with a projected contract award to support the Navy's requirement of maintaining a ready-for-issue rotatable pool of waterjet and impeller shaft assemblies for LCS-1 hulls.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N6449823R4000 15-Mar-2023
b. TELEPHONE NUMBER
267-990-5870
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 05 Jun 2025
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N644989. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MATTHEW D PARLETT
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0231, MATTHEW PARLETT
267-990-5870, MATTHEW.D.PARLETT@NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS AX
13b. RATING
DO-A3
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
X SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 267-990-5870
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$11,000,000
NAICS:
811310
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF156
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N6449823R4000
Section A - Solicitation/Contract Form
NOTES
1. BASIS OF COMPETITION: A single Indefinite-Delivery, Indefinite-Quantity (IDIQ) Contract is intended to result from this solicitation. This requirement is being solicited on the basis of other than full and open competition to Rolls-Royce Marine North America, Inc. (RRMNA) in accordance with 10 U.S.C.
3204(a)(1).
2. MINIMUM & MAXIMUM: The guaranteed minimum is $500.00, to be satisfied by order of one (1) of
SLIN 0019AA. The contract maximum shall be the value of all CLINs to be determined at time of Contract award.
3. QUESTIONS: All questions regarding this solicitation shall be submitted in writing to
Michaela.C.DelRossi.civ@us.navy.mil, with a copy to Matthew.D.Parlett.civ@us.navy.mil, no later than
14 May 2025. Questions will be addressed during a subsequent pre-proposal teleconference on 21 May
2025.
mailto:Michaela.C.DelRossi.civ@us.navy.mil mailto:Matthew.D.Parlett.civ@us.navy.mil
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
TTE - 172AX MK1 Boost Waterjet
FFP
Teardown, Test, and Evaluation (TTE) for 172AX MK1 Boost Waterjet Assembly in accordance with the Performance Work Statement, Section C.
NSN: 2S 2010 01 622 3620
MFR PART NR: 6172252000
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001AA 2 Each Year 1 - TTE
FFP
Year 1 (from date of contract award through 12 months thereafter).
FOB: Origin (Shipping Point)
NSN: 2S 2010 01 622 3620
BRAND NAME/SOLE SOURCE: SS
PSC CD: J030
MAX
UNIT UNIT PRICE MAX AMOUNT
0001AB 4 Each Year 2 - TTE
FFP
Year 2 (from 12 months after date of contract award through 24 months thereafter).
FOB: Origin (Shipping Point)
NSN: 2S 2010 01 622 3620
BRAND NAME/SOLE SOURCE: SS
UNIT UNIT PRICE MAX AMOUNT
0001AC 6 Each Year 3 - TTE
FFP
Year 3 (from 24 months after date of contract award through 36 months thereafter).
FOB: Origin (Shipping Point)
NSN: 2S 2010 01 622 3620
BRAND NAME/SOLE SOURCE: SS
UNIT UNIT PRICE MAX AMOUNT
0001AD 6 Each Year 4 - TTE
FFP
Year 4 (from 36 months after date of contract award through 48 months thereafter).
FOB: Origin (Shipping Point)
NSN: 2S 2010 01 622 3620
BRAND NAME/SOLE SOURCE: SS
UNIT UNIT PRICE MAX AMOUNT
0001AE 6 Each Year 5 - TTE
FFP
Year 5 (from 48 months after date of contract award through 60 months thereafter).
FOB: Origin (Shipping Point)
NSN: 2S 2010 01 622 3620
BRAND NAME/SOLE SOURCE: SS
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED
TTE - 172AX MK1 Steerable Waterjet
FFP
Teardown, Test, and Evaluation for 172AX MK1 Steerable Waterjet Assembly in accordance with the Performance Work Statement, Section C.
NSN: 2S 2930 01 601 1649
MFR PART NR: 617252001
UNIT UNIT PRICE MAX AMOUNT
0002AA 2 Each TTE - Year 1
FFP
Year 1 (from date of contract award through 12 months thereafter).
FOB: Origin (Shipping Point)
NSN: 2S 2930 01 601 1649
UNIT UNIT PRICE MAX AMOUNT
0002AB 4 Each TTE - Year 2
FFP
Year 2 (from 12 months after date of contract award through 24 months thereafter).
FOB: Origin (Shipping Point)
NSN: 2S 2930 01 601 1649
UNIT UNIT PRICE MAX AMOUNT
0002AC 6 Each TTE - Year 3
FFP
Year 3 (from 24 months after date of contract award through 36 months thereafter).
FOB: Origin (Shipping Point)
NSN: 2S 2930 01 601 1649
UNIT UNIT PRICE MAX AMOUNT
0002AD 6 Each TTE - Year 4
FFP
Year 4 (from 36 months after date of contract award through 48 months thereafter).
FOB: Origin (Shipping Point)
NSN: 2S 2930 01 601 1649
UNIT UNIT PRICE MAX AMOUNT
0002AE 6 Each TTE - Year 5
FFP
Year 5 (from 48 months after date of contract award through 60 months thereafter).
FOB: Origin (Shipping Point)
NSN: 2S 2930 01 601 1649
UNIT UNIT PRICE MAX AMOUNT
0003 UNDEFINED
TTE - Impeller Drive Shaft
FFP
Teardown, Test, and Evaluation for Impeller Drive Shaft Assembly in accordance with the Performance Work Statement, Section C.
NSN: 7H 2010 01 632 6307
MFR PART NR: 617252003
UNIT UNIT PRICE MAX AMOUNT
0003AA 4 Each TTE - Year 1
FFP
Year 1 (from date of contract award through 12 months thereafter).
FOB: Origin (Shipping Point)
NSN: 7H 2010 01 632 6307
UNIT UNIT PRICE MAX AMOUNT
0003AB 8 Each TTE - Year 2
FFP
Year 2 (from 12 months after date of contract award through 24 months thereafter).
FOB: Origin (Shipping Point)
NSN: 7H 2010 01 632 6307
UNIT UNIT PRICE MAX AMOUNT
0003AC 12 Each TTE - Year 3
FFP
Year 3 (from 24 months after date of contract award through 36 months thereafter).
FOB: Origin (Shipping Point)
NSN: 7H 2010 01 632 6307
UNIT UNIT PRICE MAX AMOUNT
0003AD 12 Each TTE - Year 4
FFP
Year 4 (from 36 months after date of contract award through 48 months thereafter).
FOB: Origin (Shipping Point)
NSN: 7H 2010 01 632 6307
UNIT UNIT PRICE MAX AMOUNT
0003AE 12 Each TTE - Year 5
FFP
Year 5 (from 48 months after date of contract award through 60 months thereafter).
FOB: Origin (Shipping Point)
NSN: 7H 2010 01 632 6307
UNIT UNIT PRICE MAX AMOUNT
0004 24 Each Repair - 172AX MK1 Boost Waterjet
FFP
Repair of 172AX MK1 Boost Waterjet Assembly and Repackaging in accordance with the Performance Work Statement, Section C. To be negotiated at the Task
Order level once the Teardown, Test, and Evaluation work has been completed via delivery and approval CDRL # A006. To be ordered from date of contract award through 60 months thereafter.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
NSN: 2S 2010 01 622 3620
UNIT UNIT PRICE MAX AMOUNT
0005 24 Each Repair - 172AX MK1 Steerable Waterjet
FFP
Repair of 172AX MK1 Steerable Waterjet Assembly and Repackaging in accordance with the Performance Work Statement, Section C. To be negotiated at the Task Order level once the Teardown, Test, and Evaluation work has been completed via delivery and approval CDRL # A006. To be ordered from date of contract award through 60 months thereafter.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
NSN: 2S 2930 01 601 1649
UNIT UNIT PRICE MAX AMOUNT
0006 48 Each Repair - Impeller Drive Shaft
FFP
Repair of Impeller Drive Shaft Assembly and Repackaging in accordance with the
Performance Work Statement, Section C. To be negotiated at the Task Order level once the Teardown, Test, and Evaluation work has been completed via delivery and approval CDRL # A006.. To be ordered from date of contract award through
60 months thereafter.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
NSN: 7H 2010 01 632 6307
UNIT UNIT PRICE MAX AMOUNT
0007 1 Lot
OVER & ABOVE
FFP
See DFARS 252.217-7028. To Be Negotiated (TBN). No pricing needed at this time.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0008 72 Each
TECHNICAL DATA - CDRL A001
FFP
Technical Data in accordance with Contract Data Requirements List (CDRL)
A001 – Contract Status Report - DD Form 1423. Not Separately Priced (NSP).
0009 1 Each
TECHNICAL DATA - CDRL A002
FFP
Technical Data in accordance with CDRL A002 – Inspection and Test Plan - DD
Form 1423. NSP.
See Exhibit B
0010 1 Each
TECHNICAL DATA - CDRL A003
FFP
Technical Data in accordance with CDRL A003 – Welding Procedure
Qualification Test Report - DD Form 1423. NSP.
See Exhibit C
UNIT UNIT PRICE MAX AMOUNT
0011 1 Lot
TECHNICAL DATA - CDRL A004
FFP
Technical Data in accordance with CDRL A004 – Request For Waivers - DD
Form 1423. NSP.
See Exhibit D
UNIT UNIT PRICE MAX AMOUNT
0012 192 Each
TECHNICAL DATA - CDRL A005
FFP
Technical Data in accordance with CDRL A005 – Visual Preservation Report -
DD Form 1423. NSP.
See Exhibit E
UNIT UNIT PRICE MAX AMOUNT
0013 96 Each
TECHNICAL DATA - CDRL A006
FFP
Technical Data in accordance with CDRL A006 – Pre-Repair Report - DD Form
1423. NSP.
See Exhibit F
UNIT UNIT PRICE MAX AMOUNT
0014 96 Each
TECHNICAL DATA - CDRL A007
FFP
Technical Data in accordance with CDRL A007 – Final Repair Report - DD Form
1423. NSP.
See Exhibit G
UNIT UNIT PRICE MAX AMOUNT
0015 96 Each
TECHNICAL DATA - CDRL A008
FFP
Technical Data in accordance with CDRL A008 – Certification Data Report - DD
Form 1423. NSP.
See Exhibit H
UNIT UNIT PRICE MAX AMOUNT
0016 96 Each
TECHNICAL DATA - CDRL A009
FFP
Technical Data in accordance with CDRL A009 – GFP Report Periodic - DD
Form 1423. NSP.
UNIT UNIT PRICE MAX AMOUNT
0017 96 Each
TECHNICAL DATA - CDRL A010
FFP
Technical Data in accordance with CDRL A010 – GFP Report Final - DD Form
1423. NSP.
See Exhibit K
UNIT UNIT PRICE MAX AMOUNT
0018 12 Each
TECHNICAL DATA - CDRL A011
FFP
Technical Data in accordance with CDRL A011 – Small Business Utilization
Report - DD Form 1423. NSP.
FOB: Origin (Shipping Point)
See Exhibit L
UNIT UNIT PRICE MAX AMOUNT
0019 UNDEFINED
TECHNICAL DATA - CDRL A012
FFP
Technical Data in accordance with CDRL A012 – Quality Management System -
DD Form 1423.
See Exhibit M
UNIT UNIT PRICE MAX AMOUNT
0019AA 1 Each
GUARANTEED MINIMUM - CDRL A012
FFP
To be ordered at time of base contract award.
UNIT UNIT PRICE MAX AMOUNT
0019AB 23 Each
TECHNICAL DATA - CDRL A012
FFP
Technical Data in accordance with CDRL A012 – Quality Management System -
DD Form 1423. NSP.
0020 1 Each
TECHNICAL DATA - CDRL A013
FFP
Technical Data in accordance with CDRL A013 – Thermal Spray Procedure - DD
Form 1423. NSP.
See Exhibit N
Section C - Descriptions and Specifications
Performance Work Statement (PWS) for
Repair of LCS-1 Class Waterjet and Impeller Drive Shaft Assemblies
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD
Code 42, which is responsible for Propulsion Systems.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied
1.0.3 Government/Contractor Relationship
1.0.3.1 The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the
Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.0.3.3 Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
1.0.4 Employee Relationship:
1.0.4.1 The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a
Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
1.0.4.3 Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship.
Accordingly, entitlements and benefits applicable to such relationships do not apply.
1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.
1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii) Countermand any communication regarded as a violation,
(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.
1.1 BACKGROUND
The Propulsion Systems Division, Code 42, of the Naval Surface Warfare Center, Philadelphia Division
(NSWPCD), is responsible for maintaining a ready-for-issue rotatable pool of waterjet and impeller shaft assemblies to support Freedom Class Littoral Combat Ship (LCS-1) hulls.
1.2 SCOPE OF WORK
The scope of this contract is to perform the repair of the following US Navy National Stock Numbers (NSN):
Asset NSN
172AX MK1 Boost Waterjet Assembly 2S 2010 01 622 3620
172AX MK1 Steerable Waterjet Assembly 2S 2930 01 601 1649
Impeller Drive Shaft Assembly 2S 2010 01 632 6307
Re-packaging of 172AX MK1 Boost and 172AX
MK1 Steerable Waterjet Assembly
Re-packaging of Impeller Drive Shaft Assembly
2.0 APPLICABLE DOCUMENTS
2.1 The following Specifications are considered part of this contract as specified herein.
REF SPECIFICATION NUMBER REV DATE
A NAVSEA T9074-AS-GIB-010/271
B NAVSEA S9074-AQ-GIB-010/248
C ASQ/ANSI/ISO 9001
D NAVSEA S9086-HR-STM-010
NSTM 247 Waterjets
E RRMNA NWI SP 4.1-003 1 23 AUG 2019
F MIL-STD-2035
G S9245-AR-TSM-010
H RRMNA NWI SP 4.1-009 1 07 AUG 2019
I RRMNA NWI SP 3-008 3 1 APR 2020
J RRMNA NWI SP 4.1-008 1 07 AUG 2019
K NAVSEA S9247-AT-MMC-010
L NAVSEA S9074-AR-GIB-010/278
M MIL-STD-2191
N RRNMA 172 Axial MKI Waterjet Overhaul and
Installation Kit
O ISO 1940/1
P RRMNA DWG 617252002 C 10 FEB 2012
Q NAVSEA DWG 53711-631-8534685
R DoD Manual 4140.65
S MIL-DTL-2845
T International Standards for Phytosanitary
Measures (ISPM) No. 15
U RRMNA DWG J-20-2-63 E 27 MAR 2023
V RRNMA DWG J-20-3-22 B 27 MAR 2023
W RRNMA DWG J-20-2-70 B 27 MAR 2023
2.2 The following forms are considered part of this contract as specified herein. All forms can be found at https://www.dcma.mil/NPP/forms.aspx
NUMBER TITLE
9247/005 LCS FRE Variant Impeller Drive Shaft Assembly Visual Preservation Inspection
9247/006 LCS FRE Variant Waterjet Assembly Visual Preservation Inspection Report
9247/007 LCS FRE Variant Waterjet and Impeller Drive Shaft Assembly Visual Technical
Inspection Report
2.3 If during the performance of this contract the Contractor believes that the contract contains outdated or different versions of any specifications or standards, the Contractor may request that the contract be updated to include the current version of the applicable specification or standard. The Contractor should submit update requests to the Contracting Officer for approval. The Contractor shall perform the contract in accordance with the existing specifications and standards until notified by the Contracting Officer of the disposition of the request. Any approved alternate or updated specifications and standards will be incorporated into the contract.
2.4 In the event of a conflict between the text of this document and the references and/or drawings, the text of this document shall take precedence. Nothing in this document, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.
The Contractor shall reference and utilize the latest version available when performing tasks within this PWS.
3.0. REQUIREMENTS
3.1 General
3.1.1 Unless otherwise specified in the contract or task order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or task order, the Contractor may use its own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the
Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
3.1.2 If at any time during the pre-repair inspection or repair process, the Contractor determines that the
Impeller Drive Shaft Assembly, Waterjet Assembly, or any component which is not identified in
Reference N may be beyond economical repair (BER), the Contractor shall immediately notify the technical point of contact and provide a description of the Impeller Drive Shaft Assembly or
Waterjet Assembly condition. More than seventy-five percent (75%) of the Impeller Drive Shaft
Assembly or Waterjet Assembly replacement cost is considered BER for purposes of this paragraph.
3.1.3 If damage is identified due to shipping or packaging deficiencies or if the items are not preserved, packaged, packed, marked and transported in accordance with Reference D, the Contractor shall https://www.dcma.mil/NPP/forms.aspx submit a report of discrepancy (ROD), Form SF 364, in accordance with SECNAVINST 4355.18, within 30 days of receipt of any government furnished material (GFM).
3.1.4 For any work that is to be performed on the Impeller, the Contractor shall utilize personnel who have successfully completed the NAVSEA Propeller Visual Inspection Course. For cleaning, painting, packaging, and preserving, personnel do not have to successfully complete this course.
3.1.5 The Contractor shall utilize Nondestructive testing (NDT) personnel, procedures, and equipment, which are qualified in accordance with Reference A to be used for this contract, where necessary.
3.1.6 The Contractor shall utilize qualified welding procedures and operators in accordance with
Reference B, where necessary.
3.1.7 The Contractor shall utilize a qualified management system in accordance with Reference C.
3.1.8 The Contractor shall provide all drawings necessary to understand all results and reports that are provided per 3.2 and C.3.3.
3.1.9 The Contractor shall take and record all measurements in metric units.
3.1.10 Prior to any assessment, all non-weld filler material, previously applied shall be removed. Prior approved thermal spray does not need to be removed, unless repairs are necessary.
3.1.11 Non-weld filler material shall not be used as a repair method. Thermal spray may be considered for shaft repair, pending NAVSEA approval.
3.1.12 For all thread inspections, clean and inspect threaded parts for burnished, galled, crossed, torn, cracked, deformed or missing threads. All thread damage shall be documented. Thread damage may be acceptable if it can be repaired by handwork methods so that free fit threads engage by hand with no excessive play. Thread damage which extends to the root of a male thread is not acceptable. Stretched threads are also not acceptable. Use mating part to check threads.
3.1.13 Digital pictures of the entire Waterjet Assembly and Impeller Drive Shaft Assembly from two sides shall be taken before and after repair. Close-ups of any damaged areas, including painting, shall be provided throughout the pre-repair and repair stages. Digital pictures shall be taken depicting the before and after conditions of any area repaired. Pictures shall be labeled with asset serial number, location on asset, date, repair activity, and any other information to clearly identify the repair area and condition.
3.2 WATERJET ASSEMBLY AND IMPELLER DRIVE SHAFT ASSEMBLY REPAIR
3.2.1 Pre-Repair Inspection of Waterjet Assembly and Impeller Drive Shaft Assembly
3.2.1.1 Upon receipt of each Impeller Drive Shaft Assembly and Waterjet Assembly, the Contractor shall perform and document an initial Visual Preservation Inspection (VPI) in accordance with Reference D. Inspection results shall be documented using NAVSEA Forms 9247/5 and
9247/6 and reported in accordance with CDRL A005.
3.2.1.2 Each Impeller Drive Shaft Assembly and Waterjet Assembly shall be initially cleaned in accordance with Reference D. Initial cleaning shall remove all marine growth, but should leave any paint undisturbed.
3.2.1.3 After assemblies have been cleaned free of marine growth, a visual inspection of painted surfaces shall be performed. All defects shall be identified and size shall be quantified.
Documented results shall be reported in accordance with CDRL A006.
3.2.1.4 For locations where removal of paint is required to perform NDT inspections, cleanliness requirements shall be in accordance with NACE SSPC-SC 5 for abrasive blasting or NACE
SSPC-SC WJ-1 for hydroblasting. If abrasive blasting is used, blast media used shall be selected such that the blast process shall leave as much of the surface profile as possible while still being able to perform NDT inspections, with at least a blast profile of 2.0 to 4.0 mil. The blast process shall also minimize the need for additional blasting to re-establish the surface profile to allow for painting post repair.
3.2.1.5 Each Impeller Drive Shaft Assembly shall be inspected in accordance with Attachment 4.
Acceptance criteria shall be in accordance with the applicable component drawing and as outlined in Attachment 4. Results shall be reported in accordance with CDRL A006.
3.2.1.6 All paint and coatings shall be removed prior to pre-repair VTI inspections. The contractor is permitted to perform PT inspections on welded areas after paint and coatings are removed.
3.2.1.7 A complete Visual Technical Inspection (VTI) shall be performed for each Impeller in accordance with Reference D, and the applicable component drawing. All defects shall be identified. Results shall be documented using NAVSEA Form 9247/7 and reported in accordance with CDRL A006.
3.2.1.7.1 For the Impeller Sleeve, a thread inspection shall also be performed.
3.2.1.8 Liquid Penetrant (PT) inspection shall be performed for each Impeller and Impeller Sleeve in accordance with Reference A and applicable component drawing. Acceptance criteria shall be in accordance with Reference F table IV, Reference G Chapter 6 Class 2, and applicable component drawing. If there are any conflicting requirements, applicable component drawing shall take precedence. All defects shall be identified. Results shall be documented and reported in accordance with CDRL A006.
3.2.1.9 Each Impeller shall be dimensionally checked in accordance with Reference H. Acceptance criteria shall be in accordance with Reference H. Calculations associated with impeller mounting in Reference I shall be performed based on repair proposal to verify proposal will result in appropriate post-repair fit-up. Results shall be documented and reported in accordance with CDRL A006.
3.2.1.9.1 For the Impeller Sleeve, measure all critical sleeve dimensions in accordance with applicable component drawing. Calculations associated with impeller mounting in
Reference I shall be performed based on repair proposal to verify proposal will result in appropriate post-repair fit-up.
3.2.1.10 A complete Visual Technical Inspection (VTI) shall be performed for each Waterjet
Assembly in accordance with Reference D, and the applicable component drawing. In addition all sub-bullet tasks shall be performed. All defects shall be identified, and results shall be documented using NAVSEA Form 9247/7 and reported in accordance with CDRL
A006.
3.2.1.10.1 For each Stator, perform thread inspection of Stator End Cone mounting holes, Hub
Bearing cooling water fittings, and lift points.
3.2.1.10.2 For each Stator End Cone, perform thread inspection of lifting fixture hole.
3.2.1.10.3 For each Steerable Waterjet Steering Nozzle, perform thread inspection of mounting holes for covers of Slew Link and Upper Reversing Bucket connection joints.
3.2.1.10.4 For each Steerable Waterjet Upper Reversing Bucket, perform thread inspection of mounting holes for covers of Lower Reversing bucket connection joints.
3.2.1.10.5 For each Steerable Waterjet Lower Reversing Bucket, perform thread inspection of covers of Slew Link connection joint.
3.2.1.10.6 For each Steerable Waterjet Hydraulic Hose Manifold, perform thread inspection of all hose connection mounting holes.
3.2.1.10.7 For each Steerable Waterjet Steering and Reversing Cylinder, perform thread inspection of hose mounts, Lock Screw hole, Feed Pipe, Valve mount, Valve Cover mount, Feed Pipe block mount, and the Head.
3.2.1.10.8 For each Steerable Waterjet Guide Pin, Steering/Steering Cylinder Pin, Upper
Bucket Pin, Lower Bucket Pin, Slew Link Pin, Reversing Pin, Feedback Cable Pin, and Pump Alignment Pin, perform thread inspection of applicable puller holes.
3.2.1.11 Liquid Penetrant (PT) inspection shall be performed for each Waterjet Assembly in accordance with Reference A in the areas listed below. Acceptance criteria shall be in accordance with Reference F, Section 7, Class 2 and applicable component drawing. If there are any conflicting requirements, applicable component drawing shall take precedence.
Results shall be documented and reported in accordance with CDRL A006.
3.2.1.11.1 For each Stator, PT inspection shall be performed in critical areas as specified by applicable component drawing, as well as all Hub Bearing Assembly landing surfaces, Pump Alignment Pin recesses, Lift Points, Stator Flange Bushings, Guide
Pin holes, and Steering Pin holes.
3.2.1.11.2 For each Stator End Cone, PT inspection shall be performed on mating surface and mounting bolt holes.
3.2.1.11.3 For each Impeller Housing, PT inspection shall be performed in critical areas as specified by applicable component drawing. Calculations associated with impeller tip clearances shall be performed based on repair proposal to verify proposal will result in appropriate post-repair fit up.
3.2.1.11.4 For each Boost and Steerable Nozzle Extension, PT inspection shall be performed in critical areas as specified by reference E.
3.2.1.11.5 For each Shock Retention Bracket, PT inspection shall be performed on the entire bracket.
3.2.1.11.6 For each Boost Waterjet Pump Alignment Pin, PT inspection shall be performed on the entire pin.
3.2.1.11.7 For each Steerable Waterjet Steering Nozzle, PT inspection shall be performed in critical areas as specified by reference E, as well as all Guide Pin holes/holders, Steering Pin holes/holders, Reversing Pin holes, Upper Bucket Pin holes, Slewing
Link Pin holes, and welds around Nozzle Link Boss.
3.2.1.11.8 For each Steerable Waterjet Upper Reversing Bucket, PT inspection shall be performed on all Upper Bucket Pin holes, Lower Bucket Pin holes, Reversing Pin holes, and on all welds between Bucket Pivot Boss and Bucket Side Plates, Bucket
Side Plates and Bucket Beam, and Bucket Side Plates and Bucket Flow Plate.
3.2.1.11.9 For each Steerable Waterjet Lower Reversing Bucket, PT inspection shall be performed on all Lower Bucket Pin holes and Slewing Pin holes.
3.2.1.11.10 For each Steerable Waterjet Slewing Link, PT inspection shall be performed on all
Internal and Exterior Slewing Link Pin hole surfaces.
3.2.1.11.11 For each Steerable Waterjet Guide Pin, Steering/Steering Cylinder Pin, Upper and Pump Alignment Pin, PT inspection shall be performed on entire pin.
3.2.1.12 For each Waterjet Assembly, dimensional inspections shall be performed in accordance with
Reference D and all applicable drawings, in areas specified below. All results shall be reported in accordance with CDRL A006, and shall include design dimension, allowable tolerance, and measured dimension.
3.2.1.12.1 For each stator, dimensions shall be taken for all Hub Bearing Assembly landing surfaces, Pump Alignment Pin recesses, Lift Points, Guide Pin holes, and Steering
Pin holes.
3.2.1.12.2 For each Stator End Cone, dimensions shall be taken for interfacing pilot to the hub bearing assembly.
3.2.1.12.3 For each Impeller Housing, inside diameter shall be measured in accordance with component drawing.
3.2.1.12.4 For each Boost and Steerable Nozzle Extension, measure flatness and surface finish of flanges interfacing to the stator.
3.2.1.12.5 For each Steerable Waterjet Steering Nozzle, perform dimensional inspection of holes for guide pins, cylinder pins, and pins for upper reversing bucket and slew link joints.
3.2.1.12.6 For each Steerable Waterjet Upper Reversing Bucket, perform dimensional inspection of holes for guide pins, cylinder pins, and pins for upper reversing bucket and slew link joints.
3.2.1.12.7 For each Steerable Waterjet Lower Reversing Bucket, perform dimensional inspection of holes for pins for upper reversing bucket and slew link joints.
3.2.1.12.8 For each Steerable Waterjet Slewing Link, dimensions shall be taken for all Slewing
Link Pin holes.
3.2.1.12.9 For each Steerable Waterjet Steering and Reversing Cylinder, dimensions shall be taken in accordance with applicable component drawing.
3.2.1.12.10 For each Steerable Waterjet Guide Pin, Steering/Steering Cylinder Pin, Upper and Pump Alignment Pin, dimensions shall be taken of all applicable retaining ring grooves and pin shoulder details. Also, each pin’s overall diameter shall be taken at 3 locations, one in each third of the pin length.
3.2.1.12.11 A visual and dimensional inspection of the water lubricated bearing assembly shall be performed, including inside diameter measurements between diametrically opposed bearing pad surfaces (six total locations circumferentially) and surface finish of each bearing pad surface (twelve total locations circumferentially).
Diameter and surface finish measurements shall be repeated for a total of three sets of measurements along the length of the bearing (forward, middle, aft).
3.2.1.13 For sealing surfaces, acceptance criteria shall be in accordance with applicable component drawing. In addition, should a sealing surface contain a leakage path across
50% or greater of the seal contact width, that shall be deemed unsatisfactory.
3.2.1.14 If an unsatisfactory scan, visual, dimensional, or NDT inspection is due to product quality deficiencies, a product quality deficiency report (PQDR), Form SF 368 shall be submitted in accordance with CDRL A006.
3.2.1.15 The contractor shall submit a repair plan, including all anticipated repairs, cost, and estimated repair timeline with CDRL A006.
3.2.1.16 All design modifications that have been incorporated for new construction shall be incorporated during this overhaul period if modification has not been accomplished yet.
If the contractor believes a design modification should NOT be incorporated, justification should be provided as part of CDRL A006.
3.2.1.17 If there are any known or anticipated deviations the Contractor shall submit a Request for
Deviation/Waiver in accordance with CDRL A004 on a case by case basis. This shall include the effect on performance, function, reliability, durability, integrated logistics support, interface, and/or software. The contractor shall also include engineering rationale as to why such effects are technically acceptable.
3.2.1.18 Upon completion of all inspections, the Contractor shall prepare and submit a Pre-Repair
Inspection Report in accordance with CDRL A006.
3.2.2 Repair of Waterjet Assembly and Impeller Drive Shaft Assembly
3.2.2.1 Upon approval of CDRL A006, the Contractor shall repair Impeller Drive Shaft Assembly and Waterjet Assembly in accordance with approved repair plan, Reference K, the applicable component drawing, and Attachment 4. When repair tolerances are not specified, new manufacturing tolerances shall be met.
3.2.2.2 All welding shall be in accordance with Reference L, Class M-1, Category A.
3.2.2.2.1 For propulsion shafting, if welding is to be used as a repair method, requirements outlined in Attachment 4 apply.
3.2.2.3 If the Contractor would like to use thermal spray as a method of repairing the shaft, a procedure must be submitted and approved by NAVSEA prior to use.
3.2.2.4 For sealing surfaces, minor hand repair may be used to repair or restore a part to usable condition. Method of repair shall be stated in the repair proposal.
3.2.2.5 Internal threads may be repaired by re-tapping provided loss of threads does not exceed 10% or by welding, drilling, and tapping. External threads may be repaired by chasing or by welding and re machining. Replace nylon pellets. Threaded parts shall be replaced if repair is considered uneconomical. MolyKote and similar compounds shall not be used on threaded fasteners in contact with hydraulic fluid.
3.2.2.6 For each Impeller Sleeve and Hub Bearing Sleeve, if sleeve is installed and does not meet all acceptance criteria, the Contractor shall replace the sleeve.
3.2.2.7 For each Stator, Stator Vane leading edge gage profiles may be used to guide repair of those areas.
3.2.2.8 For each Stator, Impeller Housing, Nozzle Extension, Steering Nozzle, Upper Reversing
Bucket, Lower Reversing Bucket, and Slewing Link, masking for paint shall be accomplished in accordance with an instruction/specification that shall be submitted by RR for review and approval. Once approved, PWS will be updated with reference details.
3.2.2.9 The Contractor shall replace all components in Reference N.
3.2.2.10 Upon completion of repairs, the Contractor shall balance Impellers as a separate component in accordance to References O and P. All results, including original unbalance, remaining residual unbalance, and calculated allowable unbalance shall be documented and reported in accordance with CDRL A007.
3.2.2.11 Upon completion of all repairs, the Contractor shall perform all pre-repair inspections specified in C.3.2.1. All results shall be documented and reported in accordance with CDRL
A007.
3.2.2.12 Upon completion of all repairs and satisfactory post-repair inspections, the Contractor shall reassemble each Waterjet Assembly and Impeller Drive Shaft Assembly. Impeller Drive Shaft
Assembly shall be reassembled using Reference I.
3.2.2.13 Upon completion of reassembly, operational tests shall be performed in accordance with
Reference J. All results shall be documented and reported in accordance with CDRL A007.
3.2.2.14 The Contractor shall submit a Request for Deviation/Waiver in accordance with CDRL A004 on a case by case basis. This shall include the effect on performance, function, reliability, durability, integrated logistics support, interface, and/or software. The contractor shall also include engineering rationale as to why such effects are technically acceptable.
3.2.2.15 Upon completion of all repairs, balancing, post-repair inspections, reassembly, and operational tests, the Contractor shall prepare and submit a Final Repair Report in accordance with CDRL A007.
3.2.2.16 Upon approval of CDRL A007, the Contractor shall paint each Impeller Drive Shaft
Assembly and Waterjet Assembly in accordance with an instruction/specification that shall be submitted by RR for review and approval. Once approved, PWS will be updated with reference details.
3.2.2.17 Upon approval of CDRL A007, the Contractor shall preserve, package, pack, and mark the
Impeller Drive Shaft Assembly and Waterjet Assembly in accordance with References R, S, T, U, V, and W. If there is any conflicting information, References U, V, and W take precedence.
3.2.2.17.1 Each asset shall be stamped to include the following on each major component
3.2.2.17.1.1 Nomenclature:
3.2.2.17.1.2 NSN:
3.2.2.17.1.3 PN:
3.2.2.17.1.4 Government Assembly S/N:
3.2.2.17.2 Government Assembly S/N will be provided after approval of CDRL A006.
3.2.2.18 Waterjet Assembly and Impeller Drive Shaft Assembly crates shall be built in accordance with Reference S, U, V, and W.. The following conditions must also be met:
3.2.2.18.1 The ability to use sling points and fork lift points shall be required in the packaging design. Fork lift capabilities shall meet the following: fork spread of 60" and the forks themselves 12" wide and 4" thick.
3.2.2.18.2 Components deemed as “Crated for ship install,” as defined in Reference N, shall be packaged in accordance with References R, S, and T, and included in the Waterjet
Assembly crate to be used upon delivery to the ship.
3.2.2.19 Upon completion of preservation, packaging, packing, and marking of each Impeller Drive
Shaft Assembly and Waterjet Assembly, the Contractor shall perform a final VPI in accordance with Reference K. Inspection results shall be documented and reported in accordance with CDRL A005.
3.2.2.20 For each Impeller Drive Shaft Assembly and Waterjet Assembly, the contractor shall submit a
Certification Report in accordance with CDRL A008 and a copy of the report shall be attached to each Assembly container in accordance with Reference S.
3.2.2.21 A copy of the signed Certification Report, the latest VTI, VPI and final approved repair report of the Impeller Drive Shaft Assembly and Waterjet Assembly, shall be packaged with asset for final delivery.
3.3 ASSEMBLY RE-PACKAGING
3.3.1 If at any time an Assembly needs to be re-packaged outside of efforts explained in Sections C.3.1 and C.3.2, the following shall be utilized.
3.3.2 During packaging of each Impeller Drive Shaft Assembly and Waterjet Assembly, the Contractor shall perform and document an initial Visual Preservation Inspection (VPI) in accordance with
Reference D. An inventory of any loose parts shall be documented. Inspection results shall be documented and reported in accordance with CDRL A005.
3.3.3 The Contractor shall clean each Impeller Drive Shaft Assembly and Waterjet Assembly, in accordance with Reference D.
3.3.4 The Contractor shall preserve, package, pack, and mark the Impeller Drive Shaft Assembly and
Waterjet Assembly in accordance with References R, S, T, U, V, and W. If there is any conflicting information, References U, V, and W take precedence.
3.3.5 Waterjet Assembly and Impeller Drive Shaft Assembly crates shall be built in accordance with
Reference S, U, V, and W. The following conditions must also be met:
3.3.5.1 The ability to use sling points and fork lift points shall be required in the packaging design.
Fork lift capabilities shall meet the following: fork spread of 60" and the forks themselves 12" wide and 4" thick.
3.3.5.2 Components deemed as “Crated for ship install,” as defined in Reference M, shall be packaged in accordance with References R, S, and T, and included in the Waterjet Assembly crate to be used upon delivery to the ship.
3.3.6 Upon completion of preservation, packaging, packing, and marking of each Impeller Drive Shaft
Assembly and Waterjet Assembly, the Contractor shall perform a final VPI in accordance with
Reference K. Inspection results shall be documented and reported in accordance with CDRL
A005.
3.3.7 A copy of the latest VPI of the Impeller Drive Shaft Assembly and Waterjet Assembly shall be packaged with asset for final delivery.
3.4 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete
Materials or Components
3.4.1 The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.
4.0 DATA REQUIREMENTS
4.1. Contract Status Report (CDRL A001)
4.2. Inspection System Program and Test Report (CDRL A002)
4.2.1. The Contractor shall prepare and submit an Inspection System Program and Test Plan in accordance with Data Item Description DI-QCIC-81110, as modified, referenced on Contract Data Requirements
List DD Form 1423.
4.2.2. Plan shall include the contractor’s quality system procedures that meet the requirements of Reference
C.
4.2.3. The contractor shall submit inspection and test procedures for the inspection and testing of Impeller
Drive Shaft Assembly, and Waterjet Assembly in accordance with contract requirements. If the contractor wishes to make any changes to these documents after submittal, they shall make these proposals to the Government for review and approval.
4.2.4. Test Procedures. The Contractor shall submit procedures for all inspections and tests planned to demonstrate that the specified requirements will be met.
4.3. Weld Procedures and Qualification Test Report (CDRL A003)
4.3.1. The Contractor shall submit welding procedures that apply to the repair of Impeller Drive Shaft
Assembly and Waterjet Assembly. Prior to performing any welding (production or repair), the applicable welding procedure qualification data shall be submitted and approved in accordance with
Data Item Description DI-MISC-80876, as modified, listed on Contract Data Requirements List DD
Form 1423. Welding procedures shall be submitted for information with the supporting procedure qualification data.
4.3.2. Submit copies of all welding procedures and performance qualification data prior to performance of welding. The contractor shall submit welding procedures that apply only to the repair of Impeller
Drive Shaft Assembly, and Waterjet Assembly. In addition, provide a copy of any previous Navy approval of procedures relating to welding. The approval letter must reference the applicable welding procedure and/or welding procedure qualification data number. Submission of welding procedures and qualification data is not required for tack/spot welds.
4.3.3. Welder Performance Qualification. The Contractor shall submit welder performance qualification records in accordance with Reference B.
4.4. Request for Deviation / Waiver (CDRL A004)
4.4.1. The contractor shall submit a request for deviation/waiver for all anticipated unrepairable and/or out of tolerance conditions that are not recommended to be repaired. Format and content shall be in accordance with ANSI EIA-649. The contractor shall utilize DD Form 1694 for submission of all requests.
4.4.2. DD Form 1694 shall include the effect on performance, function, reliability, durability, integrated logistics support, interface, and/or software. The contractor shall also include engineering rationale as to why such effects are technically acceptable.
4.4.3. Requests shall be submitted for pre-existing conditions found during initial inspections and during any repair if necessary.
4.5. Visual Preservation Inspection (VPI) (CDRL A005)
4.5.1. The contractor shall submit visual inspection reports for pre and post repaired conditions.
4.5.2. For Impeller Drive Shaft Assembly, a visual preservation inspection (VPI) report, NAVSEA Form
9247/5 shall be completed and submitted.
4.5.3. Form Waterjet Assembly, a visual preservation inspection (VPI) report, NAVSEA Form 9247/6 shall be completed and submitted.
4.5.4. In addition to submittal in accordance with DD-1423-1, a copy of each Visual Inspection shall be submitted via email to NSWCPD C/427 & C/423.
4.6. Pre-Repair Report (CDRL A006)
4.6.1. A paint inspection of all painted surfaces shall be completed and submitted.
4.6.2. For each Impeller Drive Shaft Assembly, a pre-repair visual technical inspection (VTI) report, NAVSEA form 9247/7 shall be completed and submitted.
4.6.3. For each Waterjet Assembly, a pre-repair visual technical inspection (VTI) report, NAVSEA form
9247/7 shall be completed and submitted.
4.6.4. Each pre-repair Dimensional Inspection Report shall include all data, information, and associated calculations from measurements of the items to demonstrate the conformance to all dimensions, inspections, tolerances, and other requirements specified by the applicable technical requirements.
4.6.4.1. For Impeller Shaft, a dimensional inspection report in the Contractor’s format shall be completed and submitted. Report format shall be prior approved by NAVSEA C/427.
4.6.4.2. For Impeller, a dimensional inspection report in the Contractor’s format shall be completed and submitted. Report format shall be prior approved by NAVSEA C/427.
4.6.4.3. For Waterjet Assembly, a dimensional inspection report in the Contractor’s format shall be
4.6.5. If an unsatisfactory visual or dimensional inspection is due to product quality deficiencies, a product quality deficiency report (PQDR), Form SF 368 shall be submitted.
4.6.6. A complete list of anticipated requests for deviation/waiver shall be completed and submitted.
4.6.7. A repair plan, including all anticipated repairs and estimated repair timeline shall be completed and submitted.
4.7. Final Repair Report (CDRL A007)
4.7.1. A summary of all accomplished repairs shall be submitted in the Contractor’s format. Report format shall be prior approved by NAVSEA C/427.
4.7.2. All applicable stress relief documentation shall be included in the Final Repair Report.
4.7.3. For Impeller Drive Shaft Assembly, a post-repair visual technical inspection (VTI) report, NAVSEA
Form 9247/7 shall be completed and submitted.
4.7.4. For Waterjet Assembly, a post-repair visual technical inspection (VTI) report, NAVSEA Form
9247/7 shall be completed and submitted.
4.7.4.1. A post-repair VTI report shall be completed prior to final coating and submitted with CDRL
A007.
4.7.4.2. A post-repair visual inspection shall be completed after final coating is applied and submitted with CDRL A007.
4.7.5. Each post-repair Dimensional Inspection Report shall include all data, information, and associated calculations from measurements of the items to demonstrate the conformance to all dimensions, inspections, tolerances, and other…