N6449819Q5149.pdf
PDF 817 KB Posted
- Attached to
- The Naval Foundry and Propeller Center (NFPC) Duct Work: Design, Fabrication, and Installation
- Solicitation number
- N6449819Q5149
About this file
Request for Quote
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N6449819Q5149 05-Aug-2019
b. TELEPHONE NUMBER
215-897-2043
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 13 Sep 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N644989. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ANDREA TOMEO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0221, ANDREA TOMEO
215-897-2043, ANDREA.TOMEO@NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE N00151 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
NAVAL FOUNDRY & PROPELLER CENTER
THOMAS NEHER
1701 KITTY HAWK AVE
RECEIVING GATE 3
PHILADELPHIA PA 19112
TEL: 215-897-2258 FAX:
FAX:
TEL: 215-897-2043 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
332322
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF110
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N6449819Q5149
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Duct Work: Design, Fabrication, Installa
FFP
Duct Work: Design, Fabrication, and Installation
Vendor will provide Services and Material in accordance with Section C, Statement of Work.
Please Note: Statement of Work, Section C Paragraph 3.1.2, a CAD design drawing shall be submitted at proposal submission.
Please Note: Attachment 1: NFPC Duct Work Pictures.
FOB: Destination
PSC CD: J044
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Lot Technical Data
FFP
Comprehensive Ductwork Test Report (CDRL A001) Not Separately Priced (NSP)
PSC CD: J044
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
Statement of Work (SOW) for Duct work design, fabrication, and installation to properly exhaust multiple pieces of equipment to baghouse #3 located in Building 20 at The Naval Foundry and Propeller Center
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for Naval Foundry and Propeller Center (NFPC) who is responsible for the design, manufacture, and repair propellers for the US Navy.
1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied.
1.0.3 Government / Contractor Relationship
(a) The services to be delivered under this contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.
(b) The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence
(c) Contractor personnel under this contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.
(d) Employee Relationship:
1) The services to be performed under this contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
2) Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation.
This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.
(e) Inapplicability of Employee Benefits: This contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.
(f) Notice. It is the Contractor's, as well as the Government's, responsibility to monitor contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.
1) The Contractor should notify the Contracting Officer in writing within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the estimate in time by which the Government must respond to this notice to minimize cost, delay, or disruption of performance.
2) The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:
(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii) Countermand any communication regarded as a violation,
(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.
1.1 BACKGROUND
NFPC’s original ductwork connected to Baghouse #3 is severely contaminated from decades of usage which poses health risks to Government personnel due to inadequate exhaust capabilities.
The ductwork is also insufficiently sized for anticipated new machine installations and the relocation of existing machinery. Additionally, there are two (2) swing grinders that currently vent into the leg of the ductwork that lack the code required (Ref Paragraph 2.0: NFPA 91
Exhaust Systems Standards); the ductwork is missing a spark arrestor that prevents the emission of flammable particulates from combustion sources.
1.2 SCOPE OF WORK
The scope of work comprises of the removal of existing interior and exterior duct work, design of the duct work layout, fabrication, and the installation of industrial-grade duct work to provide allowances to connect six (6) pieces of foundry process machinery to exhaust into Baghouse #3 located in Building 20 of the Naval Foundry and Propeller Center in Philadelphia, PA.
2.0 APPLICABLE DOCUMENTS
Industrial Ventilation: A Manual of Recommended Practice for Design, 29th Edition. The contractor shall access this manual at the following website:
https://www.acgih.org/forms/store/ProductFormPublic/industrial-ventilation-a-manual-of-recommended-practice-for-design-29th-edition
International Mechanical Code 2018. The contractor shall access this manual at the following website:
https://codes.iccsafe.org/public/document/yc7355qxk7/copyright
NFPA 91 Exhaust Systems Standards. The contractor shall access this manual at the following website:
https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=91
NFPC Duct Work Pictures. The pictures shall be included in the solicitation as an attachment.
3.0. REQUIREMENTS
PLEASE NOTE: ALL REFERENCED COLUMNS ARE LOCATED IN BUILDING 20
AT NFPC- PHILADELPHIA.
3.1.1. The contractor shall provide design services in accordance with Industrial Ventilation Manual, International Mechanical Code 2018, and NFPA 91 Exhaust Systems Standards. Based on field acquired measurements, the duct work design shall meet optimal specifications to allow connection of six (6) pieces of equipment (refractory lathe, chop saws (2), grinder, swing saw, and swing grinder) to Baghouse #3 auxiliary exhaust subsystem.
3.1.2. The contractor shall provide NFPC’s Facility Engineering Department CAD design drawings at proposal submission. Failure to provide the CAD design drawings will disqualify you from being available to receive an award. The CAD design drawings shall detail how the work will be accomplished. The contractor shall provide the drawings in AutoCad DXF 2017 or earlier format.
3.1.3. Upon completion of duct work fabrication, the contractor shall schedule and deliver all components to Building 20 located at the Naval Foundry & Propeller Center. 48 hours prior to the delivery, the contractor shall contact NFPC to arrange delivery of the components.
3.1.4. The contractor shall schedule removal and installation date(s) based on NFPC’s production schedules. NFPC shall provide 3 weeks’ notice before the start of the removal of the existing ducts and installation of the new ducts.
3.1.5. The contractor shall provide all aerial lift and lifting handling equipment for the duration of duct work removal and installation of replacement ductwork.
3.1.6. The contractor shall provide a properly sized spark arrestor in accordance with Industrial Ventilation Manual, International Mechanical Code 2018, and NFPA 91 Exhaust Systems Standards. The spark arrestor will be utilized in conjunction with the swing grinder backstop and hood as required in Section 3.2.5.
3.1.7. The contractor shall be responsible to remove and dispose of all debris from work site.
3.1.8. The contractor shall remove existing interior and exterior duct work at Column A2.
3.1.8. The contractor shall remove designated interior and exterior horizontal header and vertical drops spanning from Columns A3 through A10.
3.1.9. The contractor shall remove and retain baffles and spark arrestor installed at Column A6.5 for eventual re-installation.
3.2.0. The contractor shall remove designated interior ducting penetrating interior wall that exhausts outside to stack spanning Column A7 through A10.
3.2.1. The contractor shall ensure the two exterior stacks extending from the swing grinder hood exhaust ducts are properly supported or removed if warranted.
3.2.2. The contractor shall remove existing swing grinder backstops and hoods, blower motors, ducting, electrical service to nearest point of disconnect, and any associated mounting equipment located between Columns A8 and A10.
3.2.3. The contractor shall make necessary repairs or properly seal any original interior or exterior holes, openings, or voids spanning from Columns A2 through A10 with suitable grade material not utilized for the installation of replacement ductwork.
3.2.4. The contractor shall remove the interior horizontal duct spanning Columns B5 through B10.
3.2.5. The contractor shall design and fabricate a replacement swing saw and swing grinder backstop and hood in accordance with Industrial Ventilation Manual, International Mechanical Code 2018, and NFPA 91 Exhaust Systems Standards. The backstop and hood shall provide optimal exhaust capability when connected to the new header.
3.2.6. The contractor shall design and fabricate a new main header intended for installation between Baghouse #3 through exterior wall to Columns A10 in accordance with Industrial Ventilation manual, International Mechanical Code 2018, and NFPA91 Exhaust System Standards. The new header shall provide optimal exhaust capability when connected.
3.2.7. The contractor shall design and fabricate new vertical drops destined for Columns A5(refractory lathe), A6(chop saw), A6.5(chop saw), A8(grinder), A9(swing saw hood), and A10(swing grinder hood) A10 in accordance with Industrial Ventilation manual, International Mechanical Code 2018, and NFPA91 Exhaust System Standards. The new vertical drops shall provide optimal exhaust capability when connected to main header.
3.2.8. The contractor shall install/connect the new swing saw and swing grinder backstop and hoods in original location (Columns A9-A10) A10 in conjunction with the installation of the required spark arrestors in accordance with Industrial Ventilation Manual, International Mechanical Code 2018, and NFPA 91 Exhaust Systems Standards.
3.2.9. The contractor shall install/connect new header spanning between baghouse #3 main trunk and continuing to Column A10 in accordance with Industrial Ventilation manual, International Mechanical Code 2018, and NFPA91 Exhaust System Standards. The open end of duct at Column A10 shall be blanked off.
3.3.0. The contractor shall install/connect new vertical drops to Columns A5(refractory lathe), A6(chop saw, A8(grinder), A9(swing saw hood), and A10(swing grinder hood) in accordance with Industrial Ventilation manual, International Mechanical Code 2018, and NFPA91 Exhaust System Standards.
3.3.1. The contractor shall install/connect new vertical drop to Column A6.5 in conjunction with the re-installation of previously removed baffles and spark arrestor in accordance with Industrial
Ventilation manual, International Mechanical Code 2018, and NFPA91 Exhaust System Standards.
3.3.2. The contractor shall test the exhaust system for proper operation in accordance with Industrial Ventilation Manual, International Mechanical Code 2018 and NFPA 91 Exhaust Systems and document all inlet readings in CDRL A001.
3.4.0. After completion of the work, the contractor shall provide a final “as-built” drawing. The contractor shall provide the drawings in AutoCad DXF 2017 or earlier format. The contractor shall provide the drawings no later than 30 days after completion of the work.
4.0 DATA REQUIREMENTS
4.1. Comprehensive Ductwork Test Report (CDRL A001)
4.1.1. The contractor shall provide a detailed test report following the installation and testing of the exhaust duct work. The contractor shall include cubic feet/minute, static pressure, and static resistance readings to determine verifiable performance of the various inlets and ductwork. The contractor shall prepare and deliver the report in accordance with the instructions of the CDRL.
After completion of the repair the contractor shall deliver the report within 7 days.
5.0 SECURITY REQUIREMENTS
5.1 The contractor shall be escorted onto the site, observed while they perform the work, and escorted off the site.
5.2 Escorted visit. Escorted visits are required for any person who is not assigned to NNSY/NFPC and/or does not have a valid clearance. Visitors will be escorted at all time by an NFPC employee and no exposure to any classified open storage areas or material. Requests for escorted access must be submitted 5 working days prior to arrival. If it is service or maintenance that needs to be done or an emergency the request needs to be submitted immediately in order to allow for ample time for proper vetting of individual/individuals requesting access.
The requesting NFPC code/shop will coordinate the visit and verify proof of US citizenship. The responsible code shall provide escort during the contractor’s visit.
Acceptable documents for proof of Citizenship are:
1. US Birth Certificate (original)
2. US Voters registration
3. US Passport
4. (Home Land security), Transportation Workers Identification Credential (TWIC)
5. Naturalization paperwork
NFPC code requiring visit must request for the contractor to submit SECNAV 5512 to kenya.l.jones.ctr@navy.mil
Code 1122 will review request and when acceptable notify requesting NFPC code/shop to arrange visit.
5.3 Contractor Vehicle Parking: (OPNAV 5530.14E) All contractor commercial vehicles must be visually inspected prior to entry into any NFPC buildings and are subject to random inspections anywhere on the compound. While on the compound, vehicles must visibly display vehicle parking pass (contact C1122). Vehicles must clearly display an authorized company sign or logo including a company phone number. Vehicles must only be allowed in the compound for transportation of contractors' tools, parts, and materials to and from the work site with the exception of MILCON scope projects. Vehicles must be registered to the company and not to an individual. Parking of POV's is available at “S” lot which is approximately one mile for work site. Contractor shall ensure that their vehicles, including delivery trucks, have valid and current vehicle registration and insurance upon arrival to NFPC. Non-valid and outdated or missing vehicle registration and insurance shall result in denied facility access requiring the Contractor to reschedule delivery immediately at the contractor’s expense.
5.4 Camera cell phones are not allowed in areas where NAVSEA work is being performed.
Camera cell phones are PROHIBITED:
In the CAA (Controlled Access Area), In Restricted Areas (Open Storage Confidential Areas, Secure Rooms, Vaults, etc.) and any location (office, trailer, shop, work area, etc.) where NAVSEA business is conducted.
Cell phones with the camera features disabled are no longer considered to be “camera” cell phones, and none of the restrictions for camera cell phones apply.
- “Disabled” means physical removal/destruction of the lens (drilling out, for instance) and filling the void with a permanent epoxy.
o The “acceptance criteria” is that it must be visually obvious to untrained personnel that the camera feature has been disabled. Accordingly, claiming that the camera feature or function has been “deprogrammed”, “inactivated” (or similar) would NOT be acceptable, since this cannot be readily verified by untrained personnel. Also, the camera feature or function could be reprogrammed or re-activated after inspection.
Cell phone owners should consider locations into which they intend/desire to carry cellphones before permanently modifying them. Modifications to cell phones are solely the decision and the responsibility of the owner.
Personnel camera cell phones are permitted in Personally Owned Vehicles parked outside of the Controlled Access Area. (General parking lots across the street)
Personal camera cell phones are permitted in areas outside of the CAA and where Naval Sea Systems Command (NAVSEA) business of a sensitive nature is NOT conducted.
This means that camera cell phones are PROHIBITED in Secure Rooms (regardless of where any of these areas are located), and in any meeting, discussion or forum where NAVSEA business of a sensitive nature is carried on.
Cellphone lockers/boxes will be placed at the entrance to facilities, or as close to the entrance as possible in order to facilitate this policy.
***********CAA-Controlled Access Area is anywhere within the fenceline***********
5.6. The contractor shall ensure that only contractor employees who meet the security requirements stated below perform under this contract at the Government site (e.g. delivery drivers and passengers, etc.). The contractor shall propose and maintain a list of employees whom meet these requirements and be willing to submit this list to the Government, along with the necessary documentation to prove they meet them (e.g. the results of a contractor conducted background check, etc.), for the Government’s security vetting, to include any Government background check, and approval. Once vetted and approved, a list of approved contractor employees must be maintained for the entire period of performance of the contract (i.e. propose new employees, replace existing employees or provide updates to existing employees’ records, as necessary). A minimum of two employees, primary and backup, should be cleared by the Government to perform the necessary functions under this contract (e.g. proposed drivers of a delivery vehicle) throughout the entire period of performance of the contract. Contractors must have the ability to be granted access by ensuring current documentation is available at the submission of their proposal to allow background checks for any proposed driver and passenger under the following criteria:
Felony conviction of any type within 10 years, or felony arrest that has not been adjudicated yet (includes "deferred findings").
Misdemeanor conviction or on-base arrest within 5 years, for any of the following types of crimes (includes "deferred findings"): Crimes of violence, sexual assault, larceny, drugs, or a habitual offender.
On the Sex Offender Registry.
Is barred from any Navy installation.
If a contractor’s employee is denied entry at delivery due to inaccurate or outdated personal and/or vehicle documentation, the Government is absolved of any costs accrued as a result of the denial and the contractor is still pledged to fulfill the contract requirements. Failure to fulfill the contract requirement may result in a termination for default pursuant to FAR 49.4.
6.0 PLACE OF PERFORMANCE
6.1 Performance will occur at the following government site:
Philadelphia Navy Yard Philadelphia, PA
The period of performance for this contract shall be one (1) year after date of contract (ADC).
The contractor shall be provided 3 weeks’ notice prior to the removal of the existing duct and installation of the new duct.
6.1.2 The specific location will be provided at time of award. The Contractor shall provide a list of employees who require access to these areas, including standard security clearance information for each person, to the Code 1120 Security Personnel no later than three business days after the date of award. The work space provided to the Contractor personnel shall be identified by the Awardee, with appropriate signage listing the company name and individual Contractor employee name.
6.1.3 Access to Government buildings at Naval Foundry & Propeller Center is from 0730 to 1800 Monday through Friday, except Federal holidays. Normal work hours are from 0730 to 1800, Monday through Friday. Contractor employees shall be under Government oversight at all times. Government oversight requires that a Government employee be present in the same building/facility whenever Contractor employee(s) are performing work under this contract.
Contractor personnel are not allowed to access any Government buildings at NFPC outside the hours of 0730 to 1800 without the express approval of the Procuring Contracting Officer (PCO).
6.1.4 Early Dismissal and Closure of Government Facilities
When a Government facility is closed and/or early dismissal of Federal employees is directed due to severe weather, security threat, or a facility related problem that prevents personnel from working, onsite Contractor personnel regularly assigned to work at that facility should follow the same reporting and/or departure directions given to Government personnel. The Contractor shall not direct charge to the contract for time off, but shall follow its own company policies regarding leave. Non-essential Contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal and during periods of inclement weather, onsite Contractors should monitor radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site Contractors will continue working established work hours or take leave in accordance with parent company policy. Those Contractors who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, and closings in accordance with the FAR, applicable cost accounting standards, and company policy. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The PCO will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy.
7.0 TRAVEL
Not applicable.
8.0 GOVERNMENT FURNISHED PROPERTY
Not applicable.
9.0 GOVERNMENT FURNISHED INFORMATION
Not applicable.
10.0 PURCHASES
Not applicable.
11.0 COUNTERFEIT MATERIAL PREVENTION
Not applicable.
12.0 PERSONNEL
Not applicable.
13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING
(ECRAFT) SYSTEM
Not applicable.
14.0 SPECIAL REQUIREMENTS
NFPC currently utilizes a bridge crane that covers the area where this requirement shall take place. NFPC heavily relies on the bridge crane to be used daily. Dependent upon the expected length or duration of time to install the duct work as prescribed by the contractor and due to potential conflicts to Foundry manufacturing schedules, NFPC may, at their discretion, require the vendor to complete portion(s) of the installation on 2nd shift.
The 2nd shift is defined as the time between 1425 until midnight. If the contractor requires the use of the 2nd shift, the Government shall have personnel to escort and oversee the work per the security requirements listed in section 5.0.
Prior to the start of work each day, the contractor shall contact the Government personnel to schedule the timeframe that the contractor is authorized to come in and complete the work. The Government personnel point of contact is:
Matt Luketina matthew.luketina@navy.mil
(215) 897-1881
SITE VISIT
SITE VISIT INFORMATION:
A site visit is scheduled for 21 August 2019 at 10:00 am. However, the site visit is NOT mandatory for contract award. If the offeror attends the site visit, it will be at your own expense.
The Government will not compensate or be responsible for any associated costs of the optional site visit. NOTE: The site visit log will NOT be made available to contractors. See FAR 52.237- 1 Site Visit.
52.237-1 SITE VISIT (APR 1984)
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
(a) An organized site visit has been scheduled for –
Wednesday, 21 August 2019 at 10:00 AM
(b) Participants will meet at – 4901 South 16th Street, Building 712 Philadelphia, PA 19112
ADDITIONAL SITE VISIT INFORMATION:
1. The site visit will be held 21 August 2019. Parties interested in attending the site visit shall meet at 10:00 AM at Building 712, 4901 South 16th Street located in the front of the building for a contractor briefing. The site visit will immediately follow.
2. If you plan on attending, you MUST notify Contract Specialist Andrea Tomeo at andrea.tomeo@navy.mil. Additionally, you MUST notify Security Specialist Kyle Curry and Derek Scachetti by email, kyle.j.curry@navy.mil and derek.scachetti@navy.mil no later than 07 August 2019 at 4:00 PM with the DEPARTMENT OF THE NAVY LOCAL POPULATION ID CARD/BASE ACCESS PASS REGISTRATION (attached to this soliciation) proporly filled-out. Pass Registration forms will not be accepted after 07 August 2019.
3. Your email to Andrea Tomeo MUST contain the names of the personnel attending. All personnel attending the site visit MUST bring with them a valid picture ID.
4. Attendees should be aware that no answers will be provided to verbal questions asked during the site visit.
Attendees are requested to provide all questions that they may have during the site visit be in written format and emailed to the Contract Specialist, Andrea Tomeo at andrea.tomeo@navy.mil. The answers to the questions will be posted as an amendment to the RFP on the Federal Business Opportunities (FBO) website (WWW.FBO.GOV).In addition, the list of the site visit attendees will not be made available. Contractors are encouraged to register as an Interested Vendor on FBO, with the specific solicitation of interest.
NOTE: Remarks and explanations addressed during the site visit shall not be deemed or construed to constitute any representation or warranty by the DOD, or legally binding agreement, contract orcommitment between the DOD and any other party, or alter the terms and conditions of the solicitation.
Reminder: It is the contractor’s responsibility to check the FBO website for all amendments to the subject solicitation.
(End of provision)
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated in response to Solicitation No.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-223-W002 ON-SITE SAFETY REQUIREMENTS (NAVSEA) (OCT 2018)
(a) The contractor shall ensure that each contractor employee reads any necessary safety documents within 30 days of commencing performance at any Government facility. Required safety documents can be obtained from the respective safety office. Contractors shall notify the Safety office points of contact below to report completion of the required training via email. The email shall include the contractor employee’s name, work site, and contract number.
(b) It is expected that contractor employees will have received training from their employer on hazards associated with the areas in which they will be working and know what to do in order to protect themselves. Contractors are required to adhere to the requirements of 29 CFR 1910, 29 CFR 1926 and applicable state and local requirements while in Government spaces. The contractor shall ensure that all on-site contractor work at the Government facility is in accordance with any local safety instructions as provided via the COR. The contractor shall report all work-related injuries/illnesses that occurred while working at the Government site to the COR.
(c) Contractors whose employees perform work within Government spaces in excess of 1000 hours per calendar quarter during a calendar year shall submit the data elements on OSHA Form 300A, Summary of Work Related Injuries and Illnesses, for those employees to the safety office, via the COR by 15 January for the previous calendar year, even if no work related injuries or illnesses occurred. If a contractor’s injury/illness rates are above the Bureau of Labor Statistics industry standards, a safety assessment may be performed by the Safety Office to determine if any administrative or engineering controls can be utilized to prevent further injuries/illnesses, or if any additional Personal Protective Equipment or training will be required.
(d) Any contractor employee exhibiting unsafe behavior may be removed from the Government site. Such removal shall not relieve the contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.
(e) The Safety Office points of contacts are as follows:
TBD
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A001- Acceptance Test Report (ATR), attached hereto.
(End of Text)
C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)
(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the
Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.
(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:
(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work.
Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;
(2) Description of work necessary to undo work already completed which has been deleted by the change;
(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;
(4) Description of interference and inefficiencies in performing the change;
(5) Description of each element of disruption and exactly how work has been, or will be disrupted:
(i) The calendar period of time during which disruption occurred, or will occur;
(ii) Area(s) aboard the vessel where disruption occurred, or will occur;
(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;
(iv) Scheduling of trades before, during, and after period of disruption;
(v) Description of measures taken to lessen the disruptive effect of the change;
(6) Delay in delivery attributable solely to the change;
(7) Other work attributable to the change;
(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, cross-referenced to the detailed information provided as required above; and
(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.
(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.
(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph
(b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.
C-237-H001 ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION
(NAVSEA) (OCT 2018)
(a) The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the for the Engineering, Software, and Technical Support Services via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs).
The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities; (4) D, Automatic Data Processing and Telecommunications, IT and Telecom- Telecommunications Transmission (D304) and Internet (D322) ONLY;
(5) S, Utilities ONLY;
(6) V, Freight and Shipping ONLY.
(b) The contractor is required to completely fill in all required data fields using the following web address https://www.ecmra.mil.
(c) Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://dod.ecmra.support.desk@mail.mil.
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
Section D - Packaging and Marking
D-211-H001 PACKAGING OF DATA (NAVSEA) (OCT 2018)
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 incorporating Change 2 dated 18 May 2016.
D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(1) name and business address of the Contractor
(2) contract number
(3) sponsor: TBD (Name of Individual Sponsor)
TBD
(Name of Requiring Activity)
TBD
(City and State)
Please Note: NFPC will provide the information when the reports are required.
D-211-H004 IDENTIFICATION MARKING OF PARTS--BASIC (NAVSEA) (OCT 2018)
For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:
(1) Parts shall be marked in accordance with generally accepted commercial practice.
(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (OCT 2018)
All Items- The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-15 approved 1 December 2015, Standard Practice for Commercial Packing.
D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government
E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.
E-246-H014 INSPECTION AND ACCEPTANCE OF ENGINEERING SERVICES (NAVSEA) (OCT 2018)
All CLINs - Inspection and acceptance shall be made by the Contracting Officer’s Representative (COR) or a designated representative of the Government.
E-246-H015 INSPECTION AND ACCEPTANCE OF ENGINEERING SERVICES IN SUPPORT OF SUPPLIES
(NAVSEA) (FEB 2019)
All CLIN(s)- For engineering services in support of delivered supplies, authorization for services shall be made by the PCO or Contracting Officer’s Representative (COR). Inspection and acceptance shall be made by the COR or a designated representative of the Government following the receipt of the certification of performance on the delivered hardware.
E-246-H016 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES (NAVSEA) (OCT 2018)
All Item(s) - Inspection and acceptance shall be made at destination by a representative of the Government.
E-246-W002 CERTIFICATE OF COMPLIANCE (NAVSEA) (OCT 2018)
(a) A certification of material shall be provided by the Contractor, one (1) copy to accompany the shipment (in the packing list envelope) and (l) copy mailed to arrive at time of receipt of the shipment. Mark all certificates to the attention of Code 00Q.
(b) The certificate shall state compliance of material with drawing specification and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date. The certificate shall state, above the signature of a legally authorized representative of the company, the following:
This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.
(c) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.
(d) The certificate shall read as follows:
I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.