RFP_N64498-17-R-5004_FINAL.pdf
PDF 4 MB Posted
- Attached to
- Radar Tank Level Indicators
- Solicitation number
- N64498-17-R-5004
About this file
RFP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers.docx | DOCX document | |
| Amendment_0001.docx | DOCX document | |
| CDRLs_20170307_Approved.pdf | ||
| duong_Follow_on_TLI_Contract_DD0254_Rev2.pdf | ||
| Source_of_Repair.pdf | ||
| Warranty_Information.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 04:00 PM local time 16 Jun 2017
X
A
X B
X C X D
EX
X
G
F 322 - 350
351 - 360
X H 361 - 366 alicia.mcpeters@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 366
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N64498 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
NSWCPD Building #4 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
ALICIA MCPETERS 215-897-1949
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 172
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
173 - 228
229 - 230
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
231 - 232
233 - 292 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 293 - 296 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 297 - 300 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
301 - 320
PART II - CO NTRACT CLAUSES
NAVAL SURFACE WARFARE CENTER PHILA
CODE 0232, ALICIA MCPETERS
215-897-1949, ALICIA.MCPETERS@NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
215-897-1949
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
16 May 2017
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N64498-17-R-5004
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 367 Each Radar with Flanged Sounding Adapter
Ordering Year 1: Radar with Flanged Sounding Adapter (complete assembly).
Ordered from date of award through 365 days. In accordance with the Specification in Section C.
FOB: Destination
FFP
NET AMT
0002 2 Each Radar with Threaded Air Adapter
Ordering Year 1: Radar with Threaded Air Swivel Adapter (complete assembly).
Ordered from date of award through 365 days. In accordance with the
Specification in Section C.
0003 70 Each Radar Sensor 1.5" Weld
Ordering Year 1: Radar Sensor complete with 1.5" NPS Weld Boss. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0004 2 Each Radar Sensor 1.5" Threaded
Ordering Year 1: Radar Sensor complete with 1.5" NPSH Threaded Boss. Ordered from date of award through 365 days. In accordance with the Specification in
Section C.
0005 2 Each Radar Sensor 2" ANSI Flange
Ordering Year 1: Radar Sensor with 2" ANSI Flange. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0006 1 Each Radar TLI Only
Ordering Year 1: Radar TLI Only. Ordered from date of award through 365 days.
In accordance with the Specification in Section C.
0007 87 Each Interface TDR for Level or Interface
Ordering Year 1: Interface TDR for Level or Interface. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0008 14 Each 24" Upper Rod Cu-Ni
Ordering Year 1: 24" Upper Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0009 73 Each 48" Upper Rod Cu-Ni
Ordering Year 1: 48" Upper Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0010 14 Each 17" Upper Rod Cu-Ni
Ordering Year 1: 17" Upper Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0011 14 Each 11.75" Upper Rod Cu-Ni
Ordering Year 1: 11.75" Upper Rod Cu-Ni. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0012 30 Each 24" Rod Cu-Ni
Ordering Year 1: 24" Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0013 236 Each 48" Rod Cu-Ni
Ordering Year 1: 48" Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0014 30 Each 17" Rod Cu-Ni
Ordering Year 1: 17" Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0015 30 Each 11.75" Rod Cu-Ni
Ordering Year 1: 11.75" Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0016 59 Each 48" Upper Tube Kit Cu-Ni
Ordering Year 1: 48" Upper Tube Kit Cu-Ni. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0017 28 Each 72" Upper Tube Kit Cu-Ni
Ordering Year 1: 72" Upper Tube Kit Cu-Ni. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0018 28 Each 17" Upper Tube Kit Cu-Ni
Ordering Year 1: 17" Upper Tube Kit Cu-Ni. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0019 4 Each 48" Single Tube Kit Cu-Ni
Ordering Year 1: 48" SingleTube Kit Cu-Ni. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0020 4 Each 72" Single Tube Kit Cu-Ni
Ordering Year 1: 72" SingleTube Kit Cu-Ni. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0021 4 Each 48" Intermediate Tube Kit Cu-Ni
Ordering Year 1: 48" Intermediate Tube Kit Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0022 219 Each 72" Intermediate Tube Kit Cu-Ni
Ordering Year 1: 72" Intermediate Tube Kit Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0023 4 Each 17" Intermediate Tube Kit Cu-Ni
Ordering Year 1: 17" Intermediate Tube Kit Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0024 65 Each 48" End Tube Kit Cu-Ni
Ordering Year 1: 48" End Tube Kit Cu-Ni. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0025 22 Each 72" End Tube Kit Cu-Ni
Ordering Year 1: 72" End Tube Kit Cu-Ni. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0026 65 Each 48" End Tube Kit Cu-Ni
Ordering Year 1: 48" End Tube Kit Cu-Ni. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0027 87 Each Spacer
Ordering Year 1: Spacer. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0028 5 Each 100 ft TDR with Coax Probe
Ordering Year 1: 100 ft TDR with Coax Probe. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0029 5 Each 100 ft TDR w/Coax Probe w/Remote Display
Ordering Year 1: 100 ft TDR with Coax Probe with Remote display cable. Ordered from date of award through 365 days. In accordance with the Specification in
Section C.
0030 5 Each 20 ft TDR with Coax Probe
Ordering Year 1: 20 ft TDR with Coax Probe. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0031 5 Each 20 ft TDR w/Coax Probe w/ Remote Display
Ordering Year 1: 20 ft TDR with Coax Probe with Remote display cable. Ordered from date of award through 365 days. In accordance with the Specification in
Section C.
0032 10 Each Level Switch Vibration Probe
Ordering Year 1: Level Switch Vibration Probe. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0033 10 Each Level Switch Adapter
Ordering Year 1: Level Switch Adapter. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0034 2 Each CHT System Radar
Ordering Year 1: CHT System Radar. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0035 60 Each Flange Full Port Ball Valves
Ordering Year 1: Flange Full Port Ball Valves. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0036 60 Each Socket Weld Valve
Ordering Year 1: Socket Weld Valve. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0037 2 Each Solenoid Valves for CHT Flush
Ordering Year 1: Solenoid Valves for CHT Flush. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0038 9 Each Laptop Based Programming Software
Ordering Year 1: Laptop Based Programming Software for TLIs. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0039 9 Each Communication Interface Cable for TLI
Ordering Year 1: Communication Interface Cable for TLI Communication.
Ordered from date of award through 365 days. In accordance with the
Specification in Section C.
0040 1 Each SFS Flanged Swivel & Sound Adapter Only
Ordering Year 1: SFS Flanged Swivel & Sound Adapter Only. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0041 1 Each Flanged Hinged Sounding Adapter Only
Ordering Year 1: Flanged Hinged Sounding Adapter Only. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0042 1 Each 1 1/2" ASME FF Threaded Flange
Ordering Year 1: 1 1/2" ASME FF Threaded Flange. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0043 2 Each LHD 36" x 36" I/O Enclosure
Ordering Year 1: LHD 36" x 36" I/O Enclosure with CPU and dual backplanes.
Ordered from date of award through 365 days. In accordance with the
Specification in Section C.
0044 2 Each LHD 36" x 36" I/O Enclosure
Ordering Year 1: LHD 36" x 36" I/O Enclosure without CPU and dual backplanes.
Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0045 8 Each LSD 36" x 36" I/O Enclosure
Ordering Year 1: LSD 36”x36” I/O Enclosure with CPU, HTTP Webserver
Communication, and single 13 slot backplane. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0046 1 Each 30”x30” I/O Enclosure with CPU
Ordering Year 1: 30”x30” I/O Enclosure with CPU, HTTP Webserver
Communication, and single 10 slot backplane. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0047 1 Each 23”x23” I/O Enclosure with CPU
Ordering Year 1: 23”x23” I/O Enclosure with CPU, HTTP Webserver
Communication, and single 7 slot backplane. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0048 2 Each 19" Operator Interface Panel (OIP)-Atom
Ordering Year 1: 19" OIP - Atom. Ordered from date of award through 365 days.
In accordance with the Specification in Section C.
0049 2 Each Foundation, 19" OIP - Atom
Ordering Year 1: Foundation, 19" OIP - Atom. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0050 2 Each Connector Kit, 19" OIP - Atom
Ordering Year 1: Connector Kit, 19" OIP - Atom. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0051 4 Each 19" OIP - Skylake
Ordering Year 1: 19" OIP - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0052 4 Each Foundation, 19" OIP - Skylake
Ordering Year 1: Foundation, 19" OIP Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0053 4 Each Connector Kit, 19" OIP - Skylake
Ordering Year 1: Connector Kit, 19" OIP - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0054 2 Each 19" OIP - Core i7
Ordering Year 1: 19" OIP - Core i7. Ordered from date of award through 365 days.
In accordance with the Specification in Section C.
0055 2 Each Foundation, 19" OIP - Core i7
Ordering Year 1: Foundation, 19" OIP - Core i7. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0056 2 Each Connector Kit, 19" OIP - Core i7
Ordering Year 1: Connector Kit, 19" OIP - Core i7. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0057 8 Each 19" All-In-One (AIO) - Atom
Ordering Year 1: 19" AIO - Atom. Ordered from date of award through 365 days.
In accordance with the Specification in Section C.
0058 8 Each Foundation, 19" AIO
Ordering Year 1: Foundation, 19" AIO - Atom. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0059 8 Each Connector Kit, 19" AIO - Atom
Ordering Year 1: Foundation, 19" AIO. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0060 2 Each 19" AIO - Skylake
Ordering Year 1: 19" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0061 2 Each Foundation, 19" AIO - Skylake
Ordering Year 1: Foundation, 19" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0062 2 Each Connector Kit, 19" AIO - Skylake
Ordering Year 1: Connector Kit, 19" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0063 16 Each 24" AIO - Atom
Ordering Year 1: 24" AIO - Atom. Ordered from date of award through 365 days.
In accordance with the Specification in Section C.
0064 16 Each Foundation, 24" AIO - Atom
Ordering Year 1: Foundation, 24" AIO - Atom. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0065 16 Each Connector Kit, 24" AIO - Atom
Ordering Year 1: Connector Kit, 24" AIO - Atom. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0066 2 Each 24" AIO - Skylake
Ordering Year 1: 24" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0067 2 Each Foundation, 24" AIO - Skylake
Ordering Year 1: Foundation, 24" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0068 2 Each Connector Kit, 24" AIO - Skylake
Ordering Year 1: Connector Kit, 24" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0069 4 Each Slim Design Atom Quad Core Embeded Compu
Ordering Year 1: Slim Design Atom Quad Core Embeded Computer. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0070 4 Each Skylake Quad Core Embeded Computer
Ordering Year 1: Skylake Quad Core Embeded Computer. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0071 4 Each Skylake Dual Core Embeded Computer
Ordering Year 1: Skylake Dual Core Embeded Computer. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0072 1 Each 15" Flat Panel Display
Ordering Year 1: 15" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0073 1 Each Foundation, 15" Flat Panel Display
Ordering Year 1: Foundation, 15" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0074 1 Each Connector Kit, 15" Flat Panel Display
Ordering Year 1: Connector Kit, 15" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0075 2 Each 19" Flat Panel Display
Ordering Year 1: 19" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0076 2 Each Foundation, 19" Flat Panel Display
Ordering Year 1: Foundation, 19" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0077 2 Each Connector Kit, 19" Flat Panel Display
Ordering Year 1: Connector Kit, 19" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0078 1 Each 24" Flat Panel Display
Ordering Year 1: 24" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0079 1 Each Foundation, 24" Flat Panel Display
Ordering Year 1: Foundation, 24" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0080 1 Each Connector Kit, 24" Flat Panel Display
Ordering Year 1: Connector Kit, 24" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0081 1 Each 46" Flat Panel Display
Ordering Year 1: 46" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0082 1 Each Foundation, 46" Flat Panel Display
Ordering Year 1: Foundation, 46" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0083 1 Each Connector Kit, 46" Flat Panel Display
Ordering Year 1: Connector Kit, 46" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0084 19 Each 1500 Watt Shipboard UPS
Ordering Year 1: 1500 Watt Shipboard Uninterruptable Power Supply (UPS).
Ordered from date of award through 365 days. In accordance with the
Specification in Section C.
0085 7 Each 700 Watt Shipboard UPS
Ordering Year 1: 700 Watt Shipboard UPS. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0086 1 Each 20 Port Layer 3 Ethernet Switch
Ordering Year 1: 20 Port Layer 3 Ethernet Switch. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0087 5 Each Dual Power Input. Redundancy Kit
Ordering Year 1: Dual Power Input. Redundancy Kit. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0088 5 Each Fiber Media Option Kit
Ordering Year 1: Fiber Media Option Kit. Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0089 5 Each OIP and AIO Field Side Connector Kit
Ordering Year 1: OIP and AIO Field Side Connector Kit. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0090 1 Lot Souding Tube Surveys Calibration/Startup
CPFF
Ordering Year 1: Sounding Tube Surveys, Radar TLI/TDR Configuration and
Setup. Ordered from date of award through 365 days. In accordance with the
Specification in Section C.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0091 Lot Sensor Verification and TDR Cleaning
CPFF
Ordering Year 1: Sensor Verification and TDR Cleaning. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0092 Lot TLI Training Session
CPFF
Ordering Year 1: TLI Training Session. Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0093 Lot Labor for Engineering Design
CPFF
Ordering Year 1: Labor for Engineering Design. Ordered from date of award through 365 days. In accordance with the Specification in Section C, Paragraph
3.13 and the level of effort outlined in Paragraph 11.
0094 Lot Other Direct Cost: Installation Material
COST
Ordering Year 1: Other Direct Costs: Installation Material. NOT TO EXCEED
$100,000; Ordered from date of award through 365 days. In accordance with the
0095 Lot Other Direct Cost: TLI Misc Material
COST
Ordering Year 1: Other Direct Costs: TLI Misc Material. NOT TO EXCEED
$200,000; Ordered from date of award through 365 days. In accordance with the
0096 Lot Other Direct Cost: PLC Misc Material
COST
Ordering Year 1: Other Direct Costs: PLC Misc Material. NOT TO EXCEED
$200,000; Ordered from date of award through 365 days. In accordance with the
0097 Lot Other Direct Cost: Computer Misc Materia
COST
Ordering Year 1: Other Direct Costs: Computer Misc Material. NOT TO
EXCEED $200,000; Ordered from date of award through 365 days. In accordance with the Specification in Section C.
0098 Lot Other Direct Cost: Travel Expenses
COST
Ordering Year 1: Other Direct Costs: Travel Expenses. NOT TO EXCEED
$240,000; Ordered from date of award through 365 days. In accordance with the
0099 Lot Other Direct Cost: Freight
COST
Ordering Year 1: Other Direct Costs: Freight in support of Misc. Hardware CLINs
0094-0097. NOT TO EXCEED $80,000; Ordered from date of award through
365 days. In accordance with the Specification in Section C.
0100 1 Lot First Article Testing
COST
First Article Testing. NOT TO EXCEED $500,000 for the entire five (5) year ordering period, Max Ordering $100,000 per ordering year. To be ordered in accordance with the Specification, Section 3.17, as required.
0101 382 Each Radar with Flanged Sounding Adapter
Ordering Year 2: Radar with Flanged Sounding Adapter (complete assembly).
Ordered from 366 days through 730 days ADC. In accordance with the
Specification in Section C.
0102 2 Each Radar with Threaded Sounding Adapter
Ordering Year 2: Radar Sensor with Threaded Air Swivel Adapter (complete assembly). Ordered from 366 days through 730 days ADC. In accordance with the
Specification in Section C.
0103 74 Each Radar Sensor 1.5" Weld
Ordering Year 2: Radar Sensor complete with 1.5" NPS Weld Boss. Ordered from
366 days through 730 days ADC. In accordance with the Specification in Section
C.
0104 2 Each Radar Sensor 1.5" Threaded
Ordering Year 2: Radar Sensor complete with 1.5" NPSH Threaded Boss. Ordered from 366 days through 730 days ADC. In accordance with the Specification in
Section C.
0105 2 Each Radar Sensor 2" ANSI Flange
Ordering Year 2: Radar Sensor with 2" ANSI Flange. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0106 1 Each Radar TLI Only
Ordering Year 2: Radar TLI Only. Ordered from 366 days through 730 days ADC.
In accordance with the Specification in Section C.
0107 114 Each Interface TDR for Level or Interface
Ordering Year 2: Interface TDR for Level or Interface. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0108 21 Each 24" Upper Rod Cu-Ni
Ordering Year 2: 24" Upper Rod Cu-Ni. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0109 93 Each 48" Upper Rod Cu-Ni
Ordering Year 2: 48" Upper Rod Cu-Ni. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0110 21 Each 17" Upper Rod Cu-Ni
Ordering Year 2: 17" Upper Rod Cu-Ni. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0111 21 Each 11.75" Upper Rod Cu-Ni
Ordering Year 2: 11.75" Upper Rod Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0112 40 Each 24" Rod Cu-Ni
Ordering Year 2: 24" Rod Cu-Ni. Ordered from 366 days through 730 days ADC.
In accordance with the Specification in Section C.
0113 253 Each 48" Rod Cu-Ni
Ordering Year 2: 48" Rod Cu-Ni. Ordered from 366 days through 730 days ADC.
In accordance with the Specification in Section C.
0114 40 Each 17" Rod Cu-Ni
Ordering Year 2: 17" Rod Cu-Ni. Ordered from 366 days through 730 days ADC.
In accordance with the Specification in Section C.
0115 40 Each 11.75" Rod Cu-Ni
Ordering Year 2: 11.75" Rod Cu-Ni. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0116 76 Each 48" Upper Tube Kit Cu-Ni
Ordering Year 2: 48" Upper Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0117 38 Each 72" Upper Tube Kit Cu-Ni
Ordering Year 2: 72" Upper Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0118 76 Each 17" Upper Tube Kit Cu-Ni
Ordering Year 2: 17" Upper Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0119 6 Each 48" Single Tube Kit Cu-Ni
Ordering Year 2: 48" SingleTube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0120 6 Each 72" Single Tube Kit Cu-Ni
Ordering Year 2: 72" SingleTube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0121 6 Each 48" Intermediate Tube Kit Cu-Ni
Ordering Year 2: 48" Intermediate Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0122 273 Each 72" Intermediate Tube Kit Cu-Ni
Ordering Year 2: 72" Intermediate Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0123 6 Each 17" Intermediate Tube Kit Cu-Ni
Ordering Year 2: 17" Intermediate Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0124 85 Each 48" End Tube Kit Cu-Ni
Ordering Year 2: 48" End Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0125 29 Each 72" End Tube Kit Cu-Ni
Ordering Year 2: 72" End Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0126 85 Each 48" End Tube Kit Cu-Ni
Ordering Year 2: 48" End Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0127 114 Each Spacer
Ordering Year 2: Spacer. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0128 20 Each 100 ft TDR with Coax Probe
Ordering Year 2: 100 ft TDR with Coax Probe. Ordered from 366 days ADC. In accordance with the Specification in Section C.
0129 20 Each 100 ft TDR w/Coax Probe w/Remote Display
Ordering Year 2: 100 ft TDR with Coax Probe with Remote display cable. Ordered from 366 days through 730 days ADC. In accordance with the Specification in
Section C.
0130 20 Each 20 ft TDR with Coax Probe
Ordering Year 2: 20 ft TDR with Coax Probe. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0131 20 Each 20 ft TDR w/Coax Probe w/ Remote Display
Ordering Year 2: 20 ft TDR with Coax Probe with Remote display cable. Ordered from 366 days through 730 days ADC. In accordance with the Specification in
Section C.
0132 10 Each Level Switch Vibration Probe
Ordering Year 2: Level Switch Vibration Probe. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0133 10 Each Level Switch Adapter
Ordering Year 2: Level Switch Adapter. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0134 2 Each CHT System Radar
Ordering Year 2: CHT System Radar. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0135 60 Each Flange Full Port Ball Valves
Ordering Year 2: Flange Full Port Ball Valves. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0136 60 Each Socket Weld Valve
Ordering Year 2: Socket Weld Valve. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0137 2 Each Solenoid Valves for CHT Flush
Ordering Year 2: Solenoid Valves for CHT Flush. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0138 9 Each Laptop Based Programming Software
Ordering Year 2: Laptop Based Programming Software for TLIs. Ordered from
366 days through 730 days ADC. In accordance with the Specification in Section
C.
0139 9 Each Communication Interface Cable for TLI
Ordering Year 2: Communication Interface Cable for TLI Communication.
Ordered from 366 days through 730 days ADC. In accordance with the
Specification in Section C.
0140 1 Each SFS Flanged Swivel & Sound Adapter Only
Ordering Year 2: SFS Flanged Swivel & Sound Adapter Only. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0141 1 Each Flanged Hinged Sounding Adapter Only
Ordering Year 2: Flanged Hinged Sounding Adapter Only. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0142 1 Each 1 1/2" ASME FF Threaded Flange
Ordering Year 2: 1 1/2" ASME FF Threaded Flange. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0143 2 Each LHD 36" x 36" I/O Enclosure
Ordering Year 2: LHD 36" x 36" I/O Enclosure with CPU and dual backplanes.
Ordered from 366 days through 730 days ADC. In accordance with the
Specification in Section C.
0144 2 Each LHD 36" x 36" I/O Enclosure
Ordering Year 2: LHD 36" x 36" I/O Enclosure without CPU and dual backplanes.
Ordered from 366 days through 730 days ADC. In accordance with the
Specification in Section C.
0145 4 Each LSD 36" x 36" I/O Enclosure
Ordering Year 2: LSD 36”x36” I/O Enclosure with CPU, HTTP Webserver
Communication, and single 13 slot backplane. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0146 1 Each 30”x30” I/O Enclosure with CPU
Ordering Year 2: 30”x30” I/O Enclosure with CPU, HTTP Webserver
Communication, and single 10 slot backplane. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0147 1 Each 23”x23” I/O Enclosure with CPU
Ordering Year 2: 23”x23” I/O Enclosure with CPU, HTTP Webserver
Communication, and single 7 slot backplane. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0148 8 Each 19" OIP - Atom
Ordering Year 2: 19" OIP - Atom. Ordered from 366 days through 730 days ADC.
In accordance with the Specification in Section C.
0149 8 Each Foundation, 19" OIP - Atom
Ordering Year 2: Foundation, 19" OIP - Atom. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0150 8 Each Connector Kit, 19" OIP - Atom
Ordering Year 2: Connector Kit, 19" OIP - Atom. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0151 16 Each 19" OIP - Skylake
Ordering Year 2: 19" OIP - Skylake. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0152 16 Each Foundation, 19" OIP - Skylake
Ordering Year 2: Foundation, 19" OIP - Skylake. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0153 4 Each Connector Kit, 19" OIP - Skylake
Ordering Year 2: Connector Kit, 19" OIP - Skylake. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0154 8 Each 19" OIP - Core i7
Ordering Year 2: 19" OIP - Core i7. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0155 8 Each Foundation, 19" OIP - Core i7
Ordering Year 2: Foundation, 19" OIP. - Core i7. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0156 8 Each Connector Kit, 19" OIP - Core i7
Ordering Year 2: Connector Kit, 19" OIP - Core i7. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0157 8 Each 19" AIO - Atom
Ordering Year 2: 19" AIO - Atom. Ordered from 366 days through 730 days ADC.
In accordance with the Specification in Section C.
0158 8 Each Foundation, 19" AIO - Atom
Ordering Year 2: Foundation, 19" AIO - Atom. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0159 8 Each Connector Kit, 19" AIO - Atom
Ordering Year 2: Connector Kit, 19" AIO - Atom. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0160 2 Each 19" AIO - Skylake
Ordering Year 2: 19" AIO - Skylake. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0161 2 Each Foundation, 19" AIO - Skylake
Ordering Year 2: Foundation, 19" AIO - Skylake. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0162 2 Each Connector Kit, 19" AIO - Skylake
Ordering Year 2: Connector Kit, 19" AIO - Skylake. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0163 16 Each 24" AIO - Atom
Ordering Year 2: 24" AIO - Atom. Ordered from 366 days through 730 days ADC.
In accordance with the Specification in Section C.
0164 16 Each Foundation, 24" AIO - Atom
Ordering Year 2: Foundation, 24" AIO - Atom. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0165 16 Each Connector Kit, 24" AIO - Atom
Ordering Year 2: Connector Kit, 24" AIO - Atom. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0166 8 Each 24" AIO - Skylake
Ordering Year 2: 24" AIO - Skylake. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0167 8 Each Foundation, 24" AIO - Skylake
Ordering Year 2: Foundation, 24" AIO - Skylake. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0168 8 Each Connector Kit, 24" AIO - Skylake
Ordering Year 2: Connector Kit, 24" AIO - Skylake. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0169 16 Each Slim Design Atom Quad Core Embeded Compu
Ordering Year 2: Slim Design Atom Quad Core Embeded Computer. Ordered from
366 days through 730 days ADC. In accordance with the Specification in Section
C.
0170 16 Each Skylake Quad Core Embeded Computer
Ordering Year 2: Skylake Quad Core Embeded Computer. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0171 4 Each Skylake Dual Core Embeded Computer
Ordering Year 2: Skylake Dual Core Embeded Computer. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0172 2 Each 15" Flat Panel Display
Ordering Year 2: 15" Flat Panel Display. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0173 2 Each Foundation, 15" Flat Panel Display
Ordering Year 2: Foundation, 15" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0174 2 Each Connector Kit, 15" Flat Panel Display
Ordering Year 2: Connector Kit, 15" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0175 4 Each 19" Flat Panel Display
Ordering Year 2: 19" Flat Panel Display. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0176 4 Each Foundation, 19" Flat Panel Display
Ordering Year 2: Foundation, 19" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0177 4 Each Connector Kit, 19" Flat Panel Display
Ordering Year 2: Connector Kit, 19" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0178 2 Each 24" Flat Panel Display
Ordering Year 2: 24" Flat Panel Display. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0179 2 Each Foundation, 24" Flat Panel Display
Ordering Year 2: Foundation, 24" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0180 2 Each Connector Kit, 24" Flat Panel Display
Ordering Year 2: Connector Kit, 24" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0181 1 Each 46" Flat Panel Display
Ordering Year 2: 46" Flat Panel Display. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0182 1 Each Foundation, 46" Flat Panel Display
Ordering Year 2: Foundation, 46" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0183 1 Each Connector Kit, 46" Flat Panel Display
Ordering Year 2: Connector Kit, 46" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0184 19 Each 1500 Shipboard UPS
Ordering Year 2: 1500 Shipboard UPS. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0185 7 Each 700 Shipboard UPS
Ordering Year 2: 700 Shipboard UPS. Ordered from 366 days through 730 days
ADC. In accordance with the Specification in Section C.
0186 6 Each 20 Port Layer 3 Ethernet Switch
Ordering Year 2: 20 Port Layer 3 Ethernet Switch. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0187 5 Each 20 Port Layer 3 Ethernet Switch
Ordering Year 2: 20 Port Layer 3 Ethernet Switch. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C.
0188 5 Each Fiber Media Option Kit
Ordering Year 2: Fiber Media Option Kit. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0189 5 Each OIP and AIO Field Side Connector Kit
Ordering Year 2: OIP and AIO Field Side Connector Kit. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0190 Lot Sounding Tube Survey Calibration/Startup
CPFF
Ordering Year 2: Sounding Tube Surveys, Radar TLI/TDR Configuration and
Setup. Ordered from 366 days through 730 days ADC. In accordance with the
0191 Lot Sensor Verification and TDR Cleaning
CPFF
Ordering Year 2: Sensor Verification and TDR Cleaning. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0192 Lot TLI Training Session
CPFF
Ordering Year 2: TLI Training Session. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0193 Lot Labor for Engineering Design
CPFF
Ordering Year 2: Labor for Engineering Design. Ordered from 366 days through
730 days ADC. In accordance with the Specification in Section C, Paragraph
3.13 and the level of effort outlined in Paragraph 11.
0194 Lot Other Direct Cost: Installation Material
COST
Ordering Year 2: Other Direct Costs: Installation Material. NOT TO EXCEED
$100,000; Ordered from 366 days through 730 days ADC. In accordance with the
0195 Lot Other Direct Cost: TLI Misc Material
COST
Ordering Year 2: Other Direct Costs: TLI Misc Material. NOT TO EXCEED
$200,000; Ordered from 366 days through 730 days ADC. In accordance with the
0196 Lot Other Direct Cost: PLC Misc Material
COST
Ordering Year 2: Other Direct Costs: PLC Misc Material. NOT TO EXCEED
$200,000; Ordered from 366 days through 730 days ADC. In accordance with the
0197 Lot Other Direct Cost: Computer Misc Materia
COST
Ordering Year 2: Other Direct Costs: Computer Misc Material. NOT TO
EXCEED $200,000; Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0198 Lot Other Direct Cost: Travel Expenses
COST
Ordering Year 2: Other Direct Costs: Travel Expenses. NOT TO EXCEED
$240,000; Ordered from 366 days through 730 days ADC. In accordance with the
0199 Lot Other Direct Cost: Freight
COST
Ordering Year 2: Other Direct Costs: Freight in support of Misc. Hardware CLINs
0194-0197. NOT TO EXCEED $80,000; Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.
0201 382 Each Radar with Flanged Sounding Adapter
Ordering Year 3: Radar Sensor with Flanged Sounding Adapter (complete assembly). Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0202 2 Each Radar with Threaded Sounding Adapter
Ordering Year 3: Radar Sensor with Threaded Air Swivel Adapter (complete assembly). Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0203 74 Each Radar Sensor 1.5" Weld
Ordering Year 3: Radar Sensor complete with 1.5" NPS Weld Boss. Ordered from
731 days through 1,095 days ADC. In accordance with the Specification in
Section C.
0204 2 Each Radar Sensor 1.5" Threaded
Ordering Year 3: Radar Sensor complete with 1.5" NPSH Threaded Boss. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in
Section C.
0205 2 Each Radar Sensor 2" ANSI Flange
Ordering Year 3: Radar Sensor with 2" ANSI Flange. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0206 1 Each Radar TLI Only
Ordering Year 3: Radar TLI Only. Ordered from 731 days through 1,095 days
ADC. In accordance with the Specification in Section C.
0207 114 Each Interface TDR for Level or Interface
Ordering Year 3: Interface TDR for Level or Interface. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0208 21 Each 24" Upper Rod Cu-Ni
Ordering Year 3: 24" Upper Rod Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0209 93 Each 48" Upper Rod Cu-Ni
Ordering Year 3: 48" Upper Rod Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0210 21 Each 17" Upper Rod Cu-Ni
Ordering Year 3: 17" Upper Rod Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0211 21 Each 11.75" Upper Rod Cu-Ni
Ordering Year 3: 11.75" Upper Rod Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0212 40 Each 24" Rod Cu-Ni
Ordering Year 3: 24" Rod Cu-Ni. Ordered from 731 days through 1,095 days
ADC. In accordance with the Specification in Section C.
0213 253 Each 48" Rod Cu-Ni
Ordering Year 3: 48" Rod Cu-Ni. Ordered from 731 days through 1,095 days
ADC. In accordance with the Specification in Section C.
0214 40 Each 17" Rod Cu-Ni
Ordering Year 3: 17" Rod Cu-Ni. Ordered from 731 days through 1,095 days
ADC. In accordance with the Specification in Section C.
0215 40 Each 11.75" Rod Cu-Ni
Ordering Year 3: 11.75" Rod Cu-Ni. Ordered from 731 days through 1,095 days
ADC. In accordance with the Specification in Section C.
0216 76 Each 48" Upper Tube Kit Cu-Ni
Ordering Year 3: 48" Upper Tube Kit Cu-Ni. Ordered from 731 days through
1,095 days ADC. In accordance with the Specification in Section C.
0217 38 Each 72" Upper Tube Kit Cu-Ni
Ordering Year 3: 72" Upper Tube Kit Cu-Ni. Ordered from 731 days through
1,095 days ADC. In accordance with the Specification in Section C.
0218 76 Each 17" Upper Tube Kit Cu-Ni
Ordering Year 3: 17" Upper Tube Kit Cu-Ni. Ordered from 731 days through
1,095 days ADC. In accordance with the Specification in Section C.
0219 6 Each 48" Single Tube Kit Cu-Ni
Ordering Year 3: 48" SingleTube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0220 6 Each 72" Single Tube Kit Cu-Ni
Ordering Year 3: 72" SingleTube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0221 6 Each 48" Intermediate Tube Kit Cu-Ni
Ordering Year 3: 48" Intermediate Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0222 273 Each 72" Intermediate Tube Kit Cu-Ni
Ordering Year 3: 72" Intermediate Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0223 6 Each 17" Intermediate Tube Kit Cu-Ni
Ordering Year 3: 17" Intermediate Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0224 85 Each 48" End Tube Kit Cu-Ni
Ordering Year 3: 48" End Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0225 29 Each 72" End Tube Kit Cu-Ni
Ordering Year 3: 72" End Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0226 85 Each 48" End Tube Kit Cu-Ni
Ordering Year 3: 48" End Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0227 114 Each Spacer
Ordering Year 3: Spacer. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0228 20 Each 100 ft TDR with Coax Probe
Ordering Year 3: 100 ft TDR with Coax Probe. Ordered from 731 days through
1,095 days ADC. In accordance with the Specification in Section C.
0229 20 Each 100 ft TDR w/Coax Probe w/Remote Display
Ordering Year 3: 100 ft TDR with Coax Probe with Remote display cable. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in
Section C.
0230 20 Each 20 ft TDR with Coax Probe
Ordering Year 3: 20 ft TDR with Coax Probe. Ordered from 731 days through
1,095 days ADC. In accordance with the Specification in Section C.
0231 20 Each 20 ft TDR w/Coax Probe w/ Remote Display
Ordering Year 3: 20 ft TDR with Coax Probe with Remote display cable. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in
Section C.
0232 10 Each Level Switch Vibration Probe
Ordering Year 3: Level Switch Vibration Probe. Ordered from 731 days through
1,095 days ADC. In accordance with the Specification in Section C.
0233 10 Each Level Switch Adapter
Ordering Year 3: Level Switch Adapter. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0234 2 Each CHT System Radar
Ordering Year 3: CHT System Radar. Ordered from 731 days through 1,095 days
ADC. In accordance with the Specification in Section C.
0235 60 Each Flange Full Port Ball Valves
Ordering Year 3: Flange Full Port Ball Valves. Ordered from 731 days through
1,095 days ADC. In accordance with the Specification in Section C.
0236 60 Each Socket Weld Valve
Ordering Year 3: Socket Weld Valve. Ordered from 731 days through 1,095 days
ADC. In accordance with the Specification in Section C.
0237 2 Each Solenoid Valves for CHT Flush
Ordering Year 3: Solenoid Valves for CHT Flush. Ordered from 731 days through
1,095 days ADC. In accordance with the Specification in Section C.
0238 9 Each Laptop Based Programming Software
Ordering Year 3: Laptop Based Programming Software for TLIs. Ordered from
731 days through 1,095 days ADC. In accordance with the Specification in
Section C.
0239 9 Each Communication Interface Cable for TLI
Ordering Year 3: Communication Interface Cable for TLI Communication.
Ordered from 731 days through 1,095 days ADC. In accordance with the
Specification in Section C.
0240 1 Each SFS Flanged Swivel & Sound Adapter Only
Ordering Year 3: SFS Flanged Swivel & Sound Adapter Only. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0241 1 Each Flanged Hinged Sounding Adapter Only
Ordering Year 3: Flanged Hinged Sounding Adapter Only. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0242 1 Each 1 1/2" ASME FF Threaded Flange
Ordering Year 3: 1 1/2" ASME FF Threaded Flange. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0243 2 Each LHD 36" x 36" I/O Enclosure
Ordering Year 3: LHD 36" x 36" I/O Enclosure with CPU and dual backplanes.
Ordered from 731 days through 1,095 days ADC. In accordance with the
Specification in Section C.
0244 2 Each LHD 36" x 36" I/O Enclosure
Ordering Year 3: LHD 36" x 36" I/O Enclosure without CPU and dual backplanes.
Ordered from 731 days through 1,095 days ADC. In accordance with the
Specification in Section C.
0245 4 Each LSD 36" x 36" I/O Enclosure
Ordering Year 3: LSD 36”x36” I/O Enclosure with CPU, HTTP Webserver
Communication, and single 13 slot backplane. Ordered from 731 days through
1,095 days ADC. In accordance with the Specification in Section C.
0246 1 Each 30”x30” I/O Enclosure with CPU
Ordering Year 3: 30”x30” I/O Enclosure with CPU, HTTP Webserver
Communication, and single 10 slot backplane. Ordered from 731 days through
1,095 days ADC. In accordance with the Specification in Section C.
0247 1 Each 23”x23” I/O Enclosure with CPU
Ordering Year 3: 23”x23” I/O Enclosure with CPU, HTTP Webserver
Communication, and single 7 slot backplane. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.
0248 8 Each 19" OIP - Atom
Ordering Year 3: 19" OIP - Atom. Ordered from 731 days through 1,095 days
ADC. In accordance with the Specification in Section C.
0249 8 Each Foundation, 19" OIP - Atom
Ordering Year 3: Foundation, 19" OIP - Atom. Ordered from 731 days through
1,09…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .