RFP_N64498-17-R-5004_FINAL.pdf

PDF 4 MB Posted

Attached to
Radar Tank Level Indicators
Solicitation number
N64498-17-R-5004
Issued by

About this file

RFP

View the file

Other files

File Type Posted
Questions_and_Answers.docx DOCX document
Amendment_0001.docx DOCX document
CDRLs_20170307_Approved.pdf PDF
duong_Follow_on_TLI_Contract_DD0254_Rev2.pdf PDF
Source_of_Repair.pdf PDF
Warranty_Information.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 04:00 PM local time 16 Jun 2017

X

A

X B

X C X D

EX

X

G

F 322 - 350

351 - 360

X H 361 - 366 alicia.mcpeters@navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

1 366

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N64498 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

NSWCPD Building #4 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ALICIA MCPETERS 215-897-1949

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 172

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

173 - 228

229 - 230

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

231 - 232

233 - 292 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 293 - 296 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 297 - 300 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

301 - 320

PART II - CO NTRACT CLAUSES

NAVAL SURFACE WARFARE CENTER PHILA

CODE 0232, ALICIA MCPETERS

215-897-1949, ALICIA.MCPETERS@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

215-897-1949

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

16 May 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N64498-17-R-5004

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 367 Each Radar with Flanged Sounding Adapter

Ordering Year 1: Radar with Flanged Sounding Adapter (complete assembly).

Ordered from date of award through 365 days. In accordance with the Specification in Section C.

FOB: Destination

FFP

NET AMT

0002 2 Each Radar with Threaded Air Adapter

Ordering Year 1: Radar with Threaded Air Swivel Adapter (complete assembly).

Ordered from date of award through 365 days. In accordance with the

Specification in Section C.

0003 70 Each Radar Sensor 1.5" Weld

Ordering Year 1: Radar Sensor complete with 1.5" NPS Weld Boss. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0004 2 Each Radar Sensor 1.5" Threaded

Ordering Year 1: Radar Sensor complete with 1.5" NPSH Threaded Boss. Ordered from date of award through 365 days. In accordance with the Specification in

Section C.

0005 2 Each Radar Sensor 2" ANSI Flange

Ordering Year 1: Radar Sensor with 2" ANSI Flange. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0006 1 Each Radar TLI Only

Ordering Year 1: Radar TLI Only. Ordered from date of award through 365 days.

In accordance with the Specification in Section C.

0007 87 Each Interface TDR for Level or Interface

Ordering Year 1: Interface TDR for Level or Interface. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0008 14 Each 24" Upper Rod Cu-Ni

Ordering Year 1: 24" Upper Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0009 73 Each 48" Upper Rod Cu-Ni

Ordering Year 1: 48" Upper Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0010 14 Each 17" Upper Rod Cu-Ni

Ordering Year 1: 17" Upper Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0011 14 Each 11.75" Upper Rod Cu-Ni

Ordering Year 1: 11.75" Upper Rod Cu-Ni. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0012 30 Each 24" Rod Cu-Ni

Ordering Year 1: 24" Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0013 236 Each 48" Rod Cu-Ni

Ordering Year 1: 48" Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0014 30 Each 17" Rod Cu-Ni

Ordering Year 1: 17" Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0015 30 Each 11.75" Rod Cu-Ni

Ordering Year 1: 11.75" Rod Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0016 59 Each 48" Upper Tube Kit Cu-Ni

Ordering Year 1: 48" Upper Tube Kit Cu-Ni. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0017 28 Each 72" Upper Tube Kit Cu-Ni

Ordering Year 1: 72" Upper Tube Kit Cu-Ni. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0018 28 Each 17" Upper Tube Kit Cu-Ni

Ordering Year 1: 17" Upper Tube Kit Cu-Ni. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0019 4 Each 48" Single Tube Kit Cu-Ni

Ordering Year 1: 48" SingleTube Kit Cu-Ni. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0020 4 Each 72" Single Tube Kit Cu-Ni

Ordering Year 1: 72" SingleTube Kit Cu-Ni. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0021 4 Each 48" Intermediate Tube Kit Cu-Ni

Ordering Year 1: 48" Intermediate Tube Kit Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0022 219 Each 72" Intermediate Tube Kit Cu-Ni

Ordering Year 1: 72" Intermediate Tube Kit Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0023 4 Each 17" Intermediate Tube Kit Cu-Ni

Ordering Year 1: 17" Intermediate Tube Kit Cu-Ni. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0024 65 Each 48" End Tube Kit Cu-Ni

Ordering Year 1: 48" End Tube Kit Cu-Ni. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0025 22 Each 72" End Tube Kit Cu-Ni

Ordering Year 1: 72" End Tube Kit Cu-Ni. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0026 65 Each 48" End Tube Kit Cu-Ni

Ordering Year 1: 48" End Tube Kit Cu-Ni. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0027 87 Each Spacer

Ordering Year 1: Spacer. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0028 5 Each 100 ft TDR with Coax Probe

Ordering Year 1: 100 ft TDR with Coax Probe. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0029 5 Each 100 ft TDR w/Coax Probe w/Remote Display

Ordering Year 1: 100 ft TDR with Coax Probe with Remote display cable. Ordered from date of award through 365 days. In accordance with the Specification in

Section C.

0030 5 Each 20 ft TDR with Coax Probe

Ordering Year 1: 20 ft TDR with Coax Probe. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0031 5 Each 20 ft TDR w/Coax Probe w/ Remote Display

Ordering Year 1: 20 ft TDR with Coax Probe with Remote display cable. Ordered from date of award through 365 days. In accordance with the Specification in

Section C.

0032 10 Each Level Switch Vibration Probe

Ordering Year 1: Level Switch Vibration Probe. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0033 10 Each Level Switch Adapter

Ordering Year 1: Level Switch Adapter. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0034 2 Each CHT System Radar

Ordering Year 1: CHT System Radar. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0035 60 Each Flange Full Port Ball Valves

Ordering Year 1: Flange Full Port Ball Valves. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0036 60 Each Socket Weld Valve

Ordering Year 1: Socket Weld Valve. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0037 2 Each Solenoid Valves for CHT Flush

Ordering Year 1: Solenoid Valves for CHT Flush. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0038 9 Each Laptop Based Programming Software

Ordering Year 1: Laptop Based Programming Software for TLIs. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0039 9 Each Communication Interface Cable for TLI

Ordering Year 1: Communication Interface Cable for TLI Communication.

Ordered from date of award through 365 days. In accordance with the

Specification in Section C.

0040 1 Each SFS Flanged Swivel & Sound Adapter Only

Ordering Year 1: SFS Flanged Swivel & Sound Adapter Only. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0041 1 Each Flanged Hinged Sounding Adapter Only

Ordering Year 1: Flanged Hinged Sounding Adapter Only. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0042 1 Each 1 1/2" ASME FF Threaded Flange

Ordering Year 1: 1 1/2" ASME FF Threaded Flange. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0043 2 Each LHD 36" x 36" I/O Enclosure

Ordering Year 1: LHD 36" x 36" I/O Enclosure with CPU and dual backplanes.

Ordered from date of award through 365 days. In accordance with the

Specification in Section C.

0044 2 Each LHD 36" x 36" I/O Enclosure

Ordering Year 1: LHD 36" x 36" I/O Enclosure without CPU and dual backplanes.

Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0045 8 Each LSD 36" x 36" I/O Enclosure

Ordering Year 1: LSD 36”x36” I/O Enclosure with CPU, HTTP Webserver

Communication, and single 13 slot backplane. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0046 1 Each 30”x30” I/O Enclosure with CPU

Ordering Year 1: 30”x30” I/O Enclosure with CPU, HTTP Webserver

Communication, and single 10 slot backplane. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0047 1 Each 23”x23” I/O Enclosure with CPU

Ordering Year 1: 23”x23” I/O Enclosure with CPU, HTTP Webserver

Communication, and single 7 slot backplane. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0048 2 Each 19" Operator Interface Panel (OIP)-Atom

Ordering Year 1: 19" OIP - Atom. Ordered from date of award through 365 days.

In accordance with the Specification in Section C.

0049 2 Each Foundation, 19" OIP - Atom

Ordering Year 1: Foundation, 19" OIP - Atom. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0050 2 Each Connector Kit, 19" OIP - Atom

Ordering Year 1: Connector Kit, 19" OIP - Atom. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0051 4 Each 19" OIP - Skylake

Ordering Year 1: 19" OIP - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0052 4 Each Foundation, 19" OIP - Skylake

Ordering Year 1: Foundation, 19" OIP Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0053 4 Each Connector Kit, 19" OIP - Skylake

Ordering Year 1: Connector Kit, 19" OIP - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0054 2 Each 19" OIP - Core i7

Ordering Year 1: 19" OIP - Core i7. Ordered from date of award through 365 days.

In accordance with the Specification in Section C.

0055 2 Each Foundation, 19" OIP - Core i7

Ordering Year 1: Foundation, 19" OIP - Core i7. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0056 2 Each Connector Kit, 19" OIP - Core i7

Ordering Year 1: Connector Kit, 19" OIP - Core i7. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0057 8 Each 19" All-In-One (AIO) - Atom

Ordering Year 1: 19" AIO - Atom. Ordered from date of award through 365 days.

In accordance with the Specification in Section C.

0058 8 Each Foundation, 19" AIO

Ordering Year 1: Foundation, 19" AIO - Atom. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0059 8 Each Connector Kit, 19" AIO - Atom

Ordering Year 1: Foundation, 19" AIO. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0060 2 Each 19" AIO - Skylake

Ordering Year 1: 19" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0061 2 Each Foundation, 19" AIO - Skylake

Ordering Year 1: Foundation, 19" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0062 2 Each Connector Kit, 19" AIO - Skylake

Ordering Year 1: Connector Kit, 19" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0063 16 Each 24" AIO - Atom

Ordering Year 1: 24" AIO - Atom. Ordered from date of award through 365 days.

In accordance with the Specification in Section C.

0064 16 Each Foundation, 24" AIO - Atom

Ordering Year 1: Foundation, 24" AIO - Atom. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0065 16 Each Connector Kit, 24" AIO - Atom

Ordering Year 1: Connector Kit, 24" AIO - Atom. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0066 2 Each 24" AIO - Skylake

Ordering Year 1: 24" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0067 2 Each Foundation, 24" AIO - Skylake

Ordering Year 1: Foundation, 24" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0068 2 Each Connector Kit, 24" AIO - Skylake

Ordering Year 1: Connector Kit, 24" AIO - Skylake. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0069 4 Each Slim Design Atom Quad Core Embeded Compu

Ordering Year 1: Slim Design Atom Quad Core Embeded Computer. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0070 4 Each Skylake Quad Core Embeded Computer

Ordering Year 1: Skylake Quad Core Embeded Computer. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0071 4 Each Skylake Dual Core Embeded Computer

Ordering Year 1: Skylake Dual Core Embeded Computer. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0072 1 Each 15" Flat Panel Display

Ordering Year 1: 15" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0073 1 Each Foundation, 15" Flat Panel Display

Ordering Year 1: Foundation, 15" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0074 1 Each Connector Kit, 15" Flat Panel Display

Ordering Year 1: Connector Kit, 15" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0075 2 Each 19" Flat Panel Display

Ordering Year 1: 19" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0076 2 Each Foundation, 19" Flat Panel Display

Ordering Year 1: Foundation, 19" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0077 2 Each Connector Kit, 19" Flat Panel Display

Ordering Year 1: Connector Kit, 19" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0078 1 Each 24" Flat Panel Display

Ordering Year 1: 24" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0079 1 Each Foundation, 24" Flat Panel Display

Ordering Year 1: Foundation, 24" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0080 1 Each Connector Kit, 24" Flat Panel Display

Ordering Year 1: Connector Kit, 24" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0081 1 Each 46" Flat Panel Display

Ordering Year 1: 46" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0082 1 Each Foundation, 46" Flat Panel Display

Ordering Year 1: Foundation, 46" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0083 1 Each Connector Kit, 46" Flat Panel Display

Ordering Year 1: Connector Kit, 46" Flat Panel Display. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0084 19 Each 1500 Watt Shipboard UPS

Ordering Year 1: 1500 Watt Shipboard Uninterruptable Power Supply (UPS).

Ordered from date of award through 365 days. In accordance with the

Specification in Section C.

0085 7 Each 700 Watt Shipboard UPS

Ordering Year 1: 700 Watt Shipboard UPS. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0086 1 Each 20 Port Layer 3 Ethernet Switch

Ordering Year 1: 20 Port Layer 3 Ethernet Switch. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0087 5 Each Dual Power Input. Redundancy Kit

Ordering Year 1: Dual Power Input. Redundancy Kit. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0088 5 Each Fiber Media Option Kit

Ordering Year 1: Fiber Media Option Kit. Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0089 5 Each OIP and AIO Field Side Connector Kit

Ordering Year 1: OIP and AIO Field Side Connector Kit. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0090 1 Lot Souding Tube Surveys Calibration/Startup

CPFF

Ordering Year 1: Sounding Tube Surveys, Radar TLI/TDR Configuration and

Setup. Ordered from date of award through 365 days. In accordance with the

Specification in Section C.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0091 Lot Sensor Verification and TDR Cleaning

CPFF

Ordering Year 1: Sensor Verification and TDR Cleaning. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0092 Lot TLI Training Session

CPFF

Ordering Year 1: TLI Training Session. Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0093 Lot Labor for Engineering Design

CPFF

Ordering Year 1: Labor for Engineering Design. Ordered from date of award through 365 days. In accordance with the Specification in Section C, Paragraph

3.13 and the level of effort outlined in Paragraph 11.

0094 Lot Other Direct Cost: Installation Material

COST

Ordering Year 1: Other Direct Costs: Installation Material. NOT TO EXCEED

$100,000; Ordered from date of award through 365 days. In accordance with the

0095 Lot Other Direct Cost: TLI Misc Material

COST

Ordering Year 1: Other Direct Costs: TLI Misc Material. NOT TO EXCEED

$200,000; Ordered from date of award through 365 days. In accordance with the

0096 Lot Other Direct Cost: PLC Misc Material

COST

Ordering Year 1: Other Direct Costs: PLC Misc Material. NOT TO EXCEED

$200,000; Ordered from date of award through 365 days. In accordance with the

0097 Lot Other Direct Cost: Computer Misc Materia

COST

Ordering Year 1: Other Direct Costs: Computer Misc Material. NOT TO

EXCEED $200,000; Ordered from date of award through 365 days. In accordance with the Specification in Section C.

0098 Lot Other Direct Cost: Travel Expenses

COST

Ordering Year 1: Other Direct Costs: Travel Expenses. NOT TO EXCEED

$240,000; Ordered from date of award through 365 days. In accordance with the

0099 Lot Other Direct Cost: Freight

COST

Ordering Year 1: Other Direct Costs: Freight in support of Misc. Hardware CLINs

0094-0097. NOT TO EXCEED $80,000; Ordered from date of award through

365 days. In accordance with the Specification in Section C.

0100 1 Lot First Article Testing

COST

First Article Testing. NOT TO EXCEED $500,000 for the entire five (5) year ordering period, Max Ordering $100,000 per ordering year. To be ordered in accordance with the Specification, Section 3.17, as required.

0101 382 Each Radar with Flanged Sounding Adapter

Ordering Year 2: Radar with Flanged Sounding Adapter (complete assembly).

Ordered from 366 days through 730 days ADC. In accordance with the

Specification in Section C.

0102 2 Each Radar with Threaded Sounding Adapter

Ordering Year 2: Radar Sensor with Threaded Air Swivel Adapter (complete assembly). Ordered from 366 days through 730 days ADC. In accordance with the

Specification in Section C.

0103 74 Each Radar Sensor 1.5" Weld

Ordering Year 2: Radar Sensor complete with 1.5" NPS Weld Boss. Ordered from

366 days through 730 days ADC. In accordance with the Specification in Section

C.

0104 2 Each Radar Sensor 1.5" Threaded

Ordering Year 2: Radar Sensor complete with 1.5" NPSH Threaded Boss. Ordered from 366 days through 730 days ADC. In accordance with the Specification in

Section C.

0105 2 Each Radar Sensor 2" ANSI Flange

Ordering Year 2: Radar Sensor with 2" ANSI Flange. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0106 1 Each Radar TLI Only

Ordering Year 2: Radar TLI Only. Ordered from 366 days through 730 days ADC.

In accordance with the Specification in Section C.

0107 114 Each Interface TDR for Level or Interface

Ordering Year 2: Interface TDR for Level or Interface. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0108 21 Each 24" Upper Rod Cu-Ni

Ordering Year 2: 24" Upper Rod Cu-Ni. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0109 93 Each 48" Upper Rod Cu-Ni

Ordering Year 2: 48" Upper Rod Cu-Ni. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0110 21 Each 17" Upper Rod Cu-Ni

Ordering Year 2: 17" Upper Rod Cu-Ni. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0111 21 Each 11.75" Upper Rod Cu-Ni

Ordering Year 2: 11.75" Upper Rod Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0112 40 Each 24" Rod Cu-Ni

Ordering Year 2: 24" Rod Cu-Ni. Ordered from 366 days through 730 days ADC.

In accordance with the Specification in Section C.

0113 253 Each 48" Rod Cu-Ni

Ordering Year 2: 48" Rod Cu-Ni. Ordered from 366 days through 730 days ADC.

In accordance with the Specification in Section C.

0114 40 Each 17" Rod Cu-Ni

Ordering Year 2: 17" Rod Cu-Ni. Ordered from 366 days through 730 days ADC.

In accordance with the Specification in Section C.

0115 40 Each 11.75" Rod Cu-Ni

Ordering Year 2: 11.75" Rod Cu-Ni. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0116 76 Each 48" Upper Tube Kit Cu-Ni

Ordering Year 2: 48" Upper Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0117 38 Each 72" Upper Tube Kit Cu-Ni

Ordering Year 2: 72" Upper Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0118 76 Each 17" Upper Tube Kit Cu-Ni

Ordering Year 2: 17" Upper Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0119 6 Each 48" Single Tube Kit Cu-Ni

Ordering Year 2: 48" SingleTube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0120 6 Each 72" Single Tube Kit Cu-Ni

Ordering Year 2: 72" SingleTube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0121 6 Each 48" Intermediate Tube Kit Cu-Ni

Ordering Year 2: 48" Intermediate Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0122 273 Each 72" Intermediate Tube Kit Cu-Ni

Ordering Year 2: 72" Intermediate Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0123 6 Each 17" Intermediate Tube Kit Cu-Ni

Ordering Year 2: 17" Intermediate Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0124 85 Each 48" End Tube Kit Cu-Ni

Ordering Year 2: 48" End Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0125 29 Each 72" End Tube Kit Cu-Ni

Ordering Year 2: 72" End Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0126 85 Each 48" End Tube Kit Cu-Ni

Ordering Year 2: 48" End Tube Kit Cu-Ni. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0127 114 Each Spacer

Ordering Year 2: Spacer. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0128 20 Each 100 ft TDR with Coax Probe

Ordering Year 2: 100 ft TDR with Coax Probe. Ordered from 366 days ADC. In accordance with the Specification in Section C.

0129 20 Each 100 ft TDR w/Coax Probe w/Remote Display

Ordering Year 2: 100 ft TDR with Coax Probe with Remote display cable. Ordered from 366 days through 730 days ADC. In accordance with the Specification in

Section C.

0130 20 Each 20 ft TDR with Coax Probe

Ordering Year 2: 20 ft TDR with Coax Probe. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0131 20 Each 20 ft TDR w/Coax Probe w/ Remote Display

Ordering Year 2: 20 ft TDR with Coax Probe with Remote display cable. Ordered from 366 days through 730 days ADC. In accordance with the Specification in

Section C.

0132 10 Each Level Switch Vibration Probe

Ordering Year 2: Level Switch Vibration Probe. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0133 10 Each Level Switch Adapter

Ordering Year 2: Level Switch Adapter. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0134 2 Each CHT System Radar

Ordering Year 2: CHT System Radar. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0135 60 Each Flange Full Port Ball Valves

Ordering Year 2: Flange Full Port Ball Valves. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0136 60 Each Socket Weld Valve

Ordering Year 2: Socket Weld Valve. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0137 2 Each Solenoid Valves for CHT Flush

Ordering Year 2: Solenoid Valves for CHT Flush. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0138 9 Each Laptop Based Programming Software

Ordering Year 2: Laptop Based Programming Software for TLIs. Ordered from

366 days through 730 days ADC. In accordance with the Specification in Section

C.

0139 9 Each Communication Interface Cable for TLI

Ordering Year 2: Communication Interface Cable for TLI Communication.

Ordered from 366 days through 730 days ADC. In accordance with the

Specification in Section C.

0140 1 Each SFS Flanged Swivel & Sound Adapter Only

Ordering Year 2: SFS Flanged Swivel & Sound Adapter Only. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0141 1 Each Flanged Hinged Sounding Adapter Only

Ordering Year 2: Flanged Hinged Sounding Adapter Only. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0142 1 Each 1 1/2" ASME FF Threaded Flange

Ordering Year 2: 1 1/2" ASME FF Threaded Flange. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0143 2 Each LHD 36" x 36" I/O Enclosure

Ordering Year 2: LHD 36" x 36" I/O Enclosure with CPU and dual backplanes.

Ordered from 366 days through 730 days ADC. In accordance with the

Specification in Section C.

0144 2 Each LHD 36" x 36" I/O Enclosure

Ordering Year 2: LHD 36" x 36" I/O Enclosure without CPU and dual backplanes.

Ordered from 366 days through 730 days ADC. In accordance with the

Specification in Section C.

0145 4 Each LSD 36" x 36" I/O Enclosure

Ordering Year 2: LSD 36”x36” I/O Enclosure with CPU, HTTP Webserver

Communication, and single 13 slot backplane. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0146 1 Each 30”x30” I/O Enclosure with CPU

Ordering Year 2: 30”x30” I/O Enclosure with CPU, HTTP Webserver

Communication, and single 10 slot backplane. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0147 1 Each 23”x23” I/O Enclosure with CPU

Ordering Year 2: 23”x23” I/O Enclosure with CPU, HTTP Webserver

Communication, and single 7 slot backplane. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0148 8 Each 19" OIP - Atom

Ordering Year 2: 19" OIP - Atom. Ordered from 366 days through 730 days ADC.

In accordance with the Specification in Section C.

0149 8 Each Foundation, 19" OIP - Atom

Ordering Year 2: Foundation, 19" OIP - Atom. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0150 8 Each Connector Kit, 19" OIP - Atom

Ordering Year 2: Connector Kit, 19" OIP - Atom. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0151 16 Each 19" OIP - Skylake

Ordering Year 2: 19" OIP - Skylake. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0152 16 Each Foundation, 19" OIP - Skylake

Ordering Year 2: Foundation, 19" OIP - Skylake. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0153 4 Each Connector Kit, 19" OIP - Skylake

Ordering Year 2: Connector Kit, 19" OIP - Skylake. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0154 8 Each 19" OIP - Core i7

Ordering Year 2: 19" OIP - Core i7. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0155 8 Each Foundation, 19" OIP - Core i7

Ordering Year 2: Foundation, 19" OIP. - Core i7. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0156 8 Each Connector Kit, 19" OIP - Core i7

Ordering Year 2: Connector Kit, 19" OIP - Core i7. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0157 8 Each 19" AIO - Atom

Ordering Year 2: 19" AIO - Atom. Ordered from 366 days through 730 days ADC.

In accordance with the Specification in Section C.

0158 8 Each Foundation, 19" AIO - Atom

Ordering Year 2: Foundation, 19" AIO - Atom. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0159 8 Each Connector Kit, 19" AIO - Atom

Ordering Year 2: Connector Kit, 19" AIO - Atom. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0160 2 Each 19" AIO - Skylake

Ordering Year 2: 19" AIO - Skylake. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0161 2 Each Foundation, 19" AIO - Skylake

Ordering Year 2: Foundation, 19" AIO - Skylake. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0162 2 Each Connector Kit, 19" AIO - Skylake

Ordering Year 2: Connector Kit, 19" AIO - Skylake. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0163 16 Each 24" AIO - Atom

Ordering Year 2: 24" AIO - Atom. Ordered from 366 days through 730 days ADC.

In accordance with the Specification in Section C.

0164 16 Each Foundation, 24" AIO - Atom

Ordering Year 2: Foundation, 24" AIO - Atom. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0165 16 Each Connector Kit, 24" AIO - Atom

Ordering Year 2: Connector Kit, 24" AIO - Atom. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0166 8 Each 24" AIO - Skylake

Ordering Year 2: 24" AIO - Skylake. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0167 8 Each Foundation, 24" AIO - Skylake

Ordering Year 2: Foundation, 24" AIO - Skylake. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0168 8 Each Connector Kit, 24" AIO - Skylake

Ordering Year 2: Connector Kit, 24" AIO - Skylake. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0169 16 Each Slim Design Atom Quad Core Embeded Compu

Ordering Year 2: Slim Design Atom Quad Core Embeded Computer. Ordered from

366 days through 730 days ADC. In accordance with the Specification in Section

C.

0170 16 Each Skylake Quad Core Embeded Computer

Ordering Year 2: Skylake Quad Core Embeded Computer. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0171 4 Each Skylake Dual Core Embeded Computer

Ordering Year 2: Skylake Dual Core Embeded Computer. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0172 2 Each 15" Flat Panel Display

Ordering Year 2: 15" Flat Panel Display. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0173 2 Each Foundation, 15" Flat Panel Display

Ordering Year 2: Foundation, 15" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0174 2 Each Connector Kit, 15" Flat Panel Display

Ordering Year 2: Connector Kit, 15" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0175 4 Each 19" Flat Panel Display

Ordering Year 2: 19" Flat Panel Display. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0176 4 Each Foundation, 19" Flat Panel Display

Ordering Year 2: Foundation, 19" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0177 4 Each Connector Kit, 19" Flat Panel Display

Ordering Year 2: Connector Kit, 19" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0178 2 Each 24" Flat Panel Display

Ordering Year 2: 24" Flat Panel Display. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0179 2 Each Foundation, 24" Flat Panel Display

Ordering Year 2: Foundation, 24" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0180 2 Each Connector Kit, 24" Flat Panel Display

Ordering Year 2: Connector Kit, 24" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0181 1 Each 46" Flat Panel Display

Ordering Year 2: 46" Flat Panel Display. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0182 1 Each Foundation, 46" Flat Panel Display

Ordering Year 2: Foundation, 46" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0183 1 Each Connector Kit, 46" Flat Panel Display

Ordering Year 2: Connector Kit, 46" Flat Panel Display. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0184 19 Each 1500 Shipboard UPS

Ordering Year 2: 1500 Shipboard UPS. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0185 7 Each 700 Shipboard UPS

Ordering Year 2: 700 Shipboard UPS. Ordered from 366 days through 730 days

ADC. In accordance with the Specification in Section C.

0186 6 Each 20 Port Layer 3 Ethernet Switch

Ordering Year 2: 20 Port Layer 3 Ethernet Switch. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0187 5 Each 20 Port Layer 3 Ethernet Switch

Ordering Year 2: 20 Port Layer 3 Ethernet Switch. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C.

0188 5 Each Fiber Media Option Kit

Ordering Year 2: Fiber Media Option Kit. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0189 5 Each OIP and AIO Field Side Connector Kit

Ordering Year 2: OIP and AIO Field Side Connector Kit. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0190 Lot Sounding Tube Survey Calibration/Startup

CPFF

Ordering Year 2: Sounding Tube Surveys, Radar TLI/TDR Configuration and

Setup. Ordered from 366 days through 730 days ADC. In accordance with the

0191 Lot Sensor Verification and TDR Cleaning

CPFF

Ordering Year 2: Sensor Verification and TDR Cleaning. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0192 Lot TLI Training Session

CPFF

Ordering Year 2: TLI Training Session. Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0193 Lot Labor for Engineering Design

CPFF

Ordering Year 2: Labor for Engineering Design. Ordered from 366 days through

730 days ADC. In accordance with the Specification in Section C, Paragraph

3.13 and the level of effort outlined in Paragraph 11.

0194 Lot Other Direct Cost: Installation Material

COST

Ordering Year 2: Other Direct Costs: Installation Material. NOT TO EXCEED

$100,000; Ordered from 366 days through 730 days ADC. In accordance with the

0195 Lot Other Direct Cost: TLI Misc Material

COST

Ordering Year 2: Other Direct Costs: TLI Misc Material. NOT TO EXCEED

$200,000; Ordered from 366 days through 730 days ADC. In accordance with the

0196 Lot Other Direct Cost: PLC Misc Material

COST

Ordering Year 2: Other Direct Costs: PLC Misc Material. NOT TO EXCEED

$200,000; Ordered from 366 days through 730 days ADC. In accordance with the

0197 Lot Other Direct Cost: Computer Misc Materia

COST

Ordering Year 2: Other Direct Costs: Computer Misc Material. NOT TO

EXCEED $200,000; Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0198 Lot Other Direct Cost: Travel Expenses

COST

Ordering Year 2: Other Direct Costs: Travel Expenses. NOT TO EXCEED

$240,000; Ordered from 366 days through 730 days ADC. In accordance with the

0199 Lot Other Direct Cost: Freight

COST

Ordering Year 2: Other Direct Costs: Freight in support of Misc. Hardware CLINs

0194-0197. NOT TO EXCEED $80,000; Ordered from 366 days through 730 days ADC. In accordance with the Specification in Section C.

0201 382 Each Radar with Flanged Sounding Adapter

Ordering Year 3: Radar Sensor with Flanged Sounding Adapter (complete assembly). Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0202 2 Each Radar with Threaded Sounding Adapter

Ordering Year 3: Radar Sensor with Threaded Air Swivel Adapter (complete assembly). Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0203 74 Each Radar Sensor 1.5" Weld

Ordering Year 3: Radar Sensor complete with 1.5" NPS Weld Boss. Ordered from

731 days through 1,095 days ADC. In accordance with the Specification in

Section C.

0204 2 Each Radar Sensor 1.5" Threaded

Ordering Year 3: Radar Sensor complete with 1.5" NPSH Threaded Boss. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in

Section C.

0205 2 Each Radar Sensor 2" ANSI Flange

Ordering Year 3: Radar Sensor with 2" ANSI Flange. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0206 1 Each Radar TLI Only

Ordering Year 3: Radar TLI Only. Ordered from 731 days through 1,095 days

ADC. In accordance with the Specification in Section C.

0207 114 Each Interface TDR for Level or Interface

Ordering Year 3: Interface TDR for Level or Interface. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0208 21 Each 24" Upper Rod Cu-Ni

Ordering Year 3: 24" Upper Rod Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0209 93 Each 48" Upper Rod Cu-Ni

Ordering Year 3: 48" Upper Rod Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0210 21 Each 17" Upper Rod Cu-Ni

Ordering Year 3: 17" Upper Rod Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0211 21 Each 11.75" Upper Rod Cu-Ni

Ordering Year 3: 11.75" Upper Rod Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0212 40 Each 24" Rod Cu-Ni

Ordering Year 3: 24" Rod Cu-Ni. Ordered from 731 days through 1,095 days

ADC. In accordance with the Specification in Section C.

0213 253 Each 48" Rod Cu-Ni

Ordering Year 3: 48" Rod Cu-Ni. Ordered from 731 days through 1,095 days

ADC. In accordance with the Specification in Section C.

0214 40 Each 17" Rod Cu-Ni

Ordering Year 3: 17" Rod Cu-Ni. Ordered from 731 days through 1,095 days

ADC. In accordance with the Specification in Section C.

0215 40 Each 11.75" Rod Cu-Ni

Ordering Year 3: 11.75" Rod Cu-Ni. Ordered from 731 days through 1,095 days

ADC. In accordance with the Specification in Section C.

0216 76 Each 48" Upper Tube Kit Cu-Ni

Ordering Year 3: 48" Upper Tube Kit Cu-Ni. Ordered from 731 days through

1,095 days ADC. In accordance with the Specification in Section C.

0217 38 Each 72" Upper Tube Kit Cu-Ni

Ordering Year 3: 72" Upper Tube Kit Cu-Ni. Ordered from 731 days through

1,095 days ADC. In accordance with the Specification in Section C.

0218 76 Each 17" Upper Tube Kit Cu-Ni

Ordering Year 3: 17" Upper Tube Kit Cu-Ni. Ordered from 731 days through

1,095 days ADC. In accordance with the Specification in Section C.

0219 6 Each 48" Single Tube Kit Cu-Ni

Ordering Year 3: 48" SingleTube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0220 6 Each 72" Single Tube Kit Cu-Ni

Ordering Year 3: 72" SingleTube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0221 6 Each 48" Intermediate Tube Kit Cu-Ni

Ordering Year 3: 48" Intermediate Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0222 273 Each 72" Intermediate Tube Kit Cu-Ni

Ordering Year 3: 72" Intermediate Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0223 6 Each 17" Intermediate Tube Kit Cu-Ni

Ordering Year 3: 17" Intermediate Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0224 85 Each 48" End Tube Kit Cu-Ni

Ordering Year 3: 48" End Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0225 29 Each 72" End Tube Kit Cu-Ni

Ordering Year 3: 72" End Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0226 85 Each 48" End Tube Kit Cu-Ni

Ordering Year 3: 48" End Tube Kit Cu-Ni. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0227 114 Each Spacer

Ordering Year 3: Spacer. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0228 20 Each 100 ft TDR with Coax Probe

Ordering Year 3: 100 ft TDR with Coax Probe. Ordered from 731 days through

1,095 days ADC. In accordance with the Specification in Section C.

0229 20 Each 100 ft TDR w/Coax Probe w/Remote Display

Ordering Year 3: 100 ft TDR with Coax Probe with Remote display cable. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in

Section C.

0230 20 Each 20 ft TDR with Coax Probe

Ordering Year 3: 20 ft TDR with Coax Probe. Ordered from 731 days through

1,095 days ADC. In accordance with the Specification in Section C.

0231 20 Each 20 ft TDR w/Coax Probe w/ Remote Display

Ordering Year 3: 20 ft TDR with Coax Probe with Remote display cable. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in

Section C.

0232 10 Each Level Switch Vibration Probe

Ordering Year 3: Level Switch Vibration Probe. Ordered from 731 days through

1,095 days ADC. In accordance with the Specification in Section C.

0233 10 Each Level Switch Adapter

Ordering Year 3: Level Switch Adapter. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0234 2 Each CHT System Radar

Ordering Year 3: CHT System Radar. Ordered from 731 days through 1,095 days

ADC. In accordance with the Specification in Section C.

0235 60 Each Flange Full Port Ball Valves

Ordering Year 3: Flange Full Port Ball Valves. Ordered from 731 days through

1,095 days ADC. In accordance with the Specification in Section C.

0236 60 Each Socket Weld Valve

Ordering Year 3: Socket Weld Valve. Ordered from 731 days through 1,095 days

ADC. In accordance with the Specification in Section C.

0237 2 Each Solenoid Valves for CHT Flush

Ordering Year 3: Solenoid Valves for CHT Flush. Ordered from 731 days through

1,095 days ADC. In accordance with the Specification in Section C.

0238 9 Each Laptop Based Programming Software

Ordering Year 3: Laptop Based Programming Software for TLIs. Ordered from

731 days through 1,095 days ADC. In accordance with the Specification in

Section C.

0239 9 Each Communication Interface Cable for TLI

Ordering Year 3: Communication Interface Cable for TLI Communication.

Ordered from 731 days through 1,095 days ADC. In accordance with the

Specification in Section C.

0240 1 Each SFS Flanged Swivel & Sound Adapter Only

Ordering Year 3: SFS Flanged Swivel & Sound Adapter Only. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0241 1 Each Flanged Hinged Sounding Adapter Only

Ordering Year 3: Flanged Hinged Sounding Adapter Only. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0242 1 Each 1 1/2" ASME FF Threaded Flange

Ordering Year 3: 1 1/2" ASME FF Threaded Flange. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0243 2 Each LHD 36" x 36" I/O Enclosure

Ordering Year 3: LHD 36" x 36" I/O Enclosure with CPU and dual backplanes.

Ordered from 731 days through 1,095 days ADC. In accordance with the

Specification in Section C.

0244 2 Each LHD 36" x 36" I/O Enclosure

Ordering Year 3: LHD 36" x 36" I/O Enclosure without CPU and dual backplanes.

Ordered from 731 days through 1,095 days ADC. In accordance with the

Specification in Section C.

0245 4 Each LSD 36" x 36" I/O Enclosure

Ordering Year 3: LSD 36”x36” I/O Enclosure with CPU, HTTP Webserver

Communication, and single 13 slot backplane. Ordered from 731 days through

1,095 days ADC. In accordance with the Specification in Section C.

0246 1 Each 30”x30” I/O Enclosure with CPU

Ordering Year 3: 30”x30” I/O Enclosure with CPU, HTTP Webserver

Communication, and single 10 slot backplane. Ordered from 731 days through

1,095 days ADC. In accordance with the Specification in Section C.

0247 1 Each 23”x23” I/O Enclosure with CPU

Ordering Year 3: 23”x23” I/O Enclosure with CPU, HTTP Webserver

Communication, and single 7 slot backplane. Ordered from 731 days through 1,095 days ADC. In accordance with the Specification in Section C.

0248 8 Each 19" OIP - Atom

Ordering Year 3: 19" OIP - Atom. Ordered from 731 days through 1,095 days

ADC. In accordance with the Specification in Section C.

0249 8 Each Foundation, 19" OIP - Atom

Ordering Year 3: Foundation, 19" OIP - Atom. Ordered from 731 days through

1,09…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .