This amendment to the solicitation provides responses to questions from potential offerors. The purpose is to procure Electronic Throttle Control Units and associated spares in accordance with the specified Technical Data Package. Offerors are advised that the anticipated award date is the third quarter of fiscal year 2018 under a firm fixed price contract with an estimated period of performance of 60 months. The solicitation will be competed on an unrestricted basis without any small business set-aside designation. Interested parties should monitor the Federal Business Opportunities website for release of the forthcoming request for proposals anticipated in June 2017. The Naval Surface Warfare Center Philadelphia Division will competitively award the contract in accordance with Federal Acquisition Regulations.

Amendment 0002

View the file

Other files

File Type Posted
N6449817R4008_0003.pdf PDF
N6449817R4008_0001.pdf PDF
N64498-17-R-4008_Final.pdf PDF
CDRLs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of amendment 0002 is to address questions related to the RFP.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6449817R4008

X 9B. DATED (SEE ITEM 11)

11-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Feb-2018

CODE

NAVAL SURFACE WARFARE CENTER PHILA

CODE 02222, LAUREN BYRNE

215-897-7677, LAUREN.BYRNE@NAVY.MIL

5001 SOUTH BROAD STREET

PHILADELPHIA PA 19112

N64498 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6449817R4008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

Request for Proposal Questions/Answers:

1. Request the Government consider including FAR Clause 52.232-16, Progress Payments in Section I.

FAR Clause 52.232-16 has been incorporated into the solicitation.

2. Page 11, Section C of the RFP, SOW paragraph 3.4.3 ESS Testing requires the Contractor to conduct ESS testing on Government specified units and LRUs. SOW Paragraphs 3.4.4 and 3.4.5 provide details for the profiles for thermal and vibration testing for ETCU units but there is nothing specified for the LRUs.

Additionally, page 15, SOW Paragraph 4.2.3 states the Government will provide all test equipment identified in Attachment 1, GFE for TK2013600-1 ETCU Test Set in support of ETCU Test Set. Will the Government provide the ESS profiles for thermal and vibration testing and test fixtures for each unique LRU? Or should the Offeror include the non-recurring engineering (NRE) costs for developing these ESS profiles and test fixtures for the LRUs in our proposal? If the Government will provide the ESS profiles and text fixtures for the LRUs, the offeror requests these items be included in the SOW GFE attachments.

SOW paragraph 3.4.4 and 3.4.5 are thermal and vibration profiles for the ETCU and the LRUs. For the purposes of producing a procurement estimate recommend the Bidder assume LRUs would be tested with a Government furnished test fixture in accordance with 3.4.4 and 3.4.5.

3. Can the Government provide any information as to the anticipated award date of this contract?

The anticipated award date for the contract is FY18Q3.

4. Page 19 of the RFP: Attachment 002 Table is entitled “GFM for TK2013200-1 CLIN 004”. The part number identified in the title for this table is for CLIN 0003, ETCU (Part Number TK2013200-1). Should the title for this table be revised to state “GFM for TK2013200-1 CLIN 0003” instead?

Yes, the title of the table should be revised from: GFM for TK2013200-1 CLIN 0004 to: GFM for

TK2013200-1 CLIN 0003.

5. CDRL A004 Reliability Test Procedure states “QTR” as the frequency of the data item deliverable in Block

10. Should the delivery frequency of CDRL A004, Reliability Test Procedure, state “ONE/R” in Block 10 instead?

Yes, CDRL A004 Reliability Test Procedure BLOCK 10 should be revised from: QTR to: ONE/R.

6. Page 11, Section C of the RFP, SOW paragraph 3.4.1 is entitled “LRU/Component Testing.” On Page 16, Section of the RFP, each of the SOW paragraphs 4.3.4 – 4.3.6/CLINs 0004 - 0006 require the Contractor to conduct Acceptance Testing in accordance with section 3.4.2 of the SOW, which is for a unit DVT. CLINs 0004-0006 are all Line Replaceable Units (LRUs). Is section 3.4.2 the correct testing paragraph for LRU acceptance? Should SOW paragraphs 4.3.4-4.3.6 reference section 3.4.1 instead?

The LRUs are identified in paragraph 4.3.1 however; the LRUs are required to go through Acceptance Testing in accordance with paragraph 4.3.2. The Contractor and the Government will work closely to identify what testing is to be accomplished for the LRUs. Paragraph 4.3.1 does not have a CDRL associated and the LRUs are required to pass Acceptance Testing therefore, 4.3.2 is the most logical location.

7. Page 16, Section C of the RFP, SOW paragraph 4.3.7/CLIN 0007 entitled “Sled Assembly” references “Acceptance Testing in accordance with section 3.5.1 of the SOW.” SOW Paragraph 3.5.1 is entitled “Monthly Accomplishments.” Should SOW paragraph 4.3.7 be revised to state “Acceptance Testing in accordance with section 3.4.1 of the SOW” instead, since CLIN 0007 is a LRU?

Yes, SOW paragraph should be updated from: 4.5.1 to: 4.3.2. This is similar to Question 3 in regards to the LRUs and Acceptance Testing.

8. Does the TDP to be provided by the Government upon request include a System Safety/Hazard Analysis report for the ETCU design? Or should offerors include a price for the completion of a System Safety/Hazard Analysis in the price proposal?

The Government is not invoking MIL‐STD‐882 explicitly.

9. The offeror requests clarification regarding how proposal hard copies should be presented. Is it acceptable to deliver the hard copies of each proposal volume in 3 ring-binders, one for each of the 3 separate documents (Solicitation, Offer and Award;

Technical; and Price)? If so, what information should appear on the binder cover (vs. a title page)?

Refer to sections L and M of the solicitation for proposal guidance.

10. Can 11x17” fold-outs be used for graphics or schedules? Does an 11X17” fold-out count as one page against the page count?

Refer to sections L and M of the solicitation for proposal guidance.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

1.0 INTRODUCTION

1.1 Definition.

This Statement of Work (SOW) describes the Government’s contract requirements and objectives for the procurement, fabrication, assembly, inspection, testing and delivery of the Electronic Throttle Control Unit (ETCU), and associated Line Replaceable Units (LRU).

1.2 Background.

The ETCU is a subcomponent of the Generation 2 Propulsion System Test Device (Gen 2 PSTD), a propulsion train monitoring and test device installed on Virginia (SSN 774) class submarines.

The ETCU, part number TK2013200-1, is comprised of the following LRUs, the Switch Assembly TK2013207-1, the Capacitor Assembly TK2013205-1, the Power Supply Assembly TK2013504-1, and the SLED Assembly TK2013201-1.

2.0 APPLICABLE DOCUMENTS

Government specifications and standards are defined current as of agreement to enter into a contract with the Government. The Contractor may request assistance from the Government to determine or clarify specifications or standards. The Contractor shall submit a bibliography of specifications and standards used with any documentation.

2.1 Department of Defense Standards.

2.2 Department of Defense Handbooks.

MIL-HDBK-781 Handbook For Reliability Test Methods, Plans, And Environments for Engineering, Development, Qualification, and Production

MIL-HDBK-2164D Environmental Stress Screening Process for

Electronic Equipment

(Copies of these documents are available online at http://quicksearch.dla.mil/qsSearch.aspx)

Availability of DoD Documents.

Unless otherwise indicated, copies of specifications, standards and handbooks listed above are available from the Standardization Document Order Desk, 700 Robbins Ave, Bldg 4D, Philadelphia PA 19111-5094

2.3 Non-Government standards and other publications.

ISO9001 Quality Management Systems – Requirements

(Copies of these documents are available online at http://www.iso.org/iso/home.htm)

SAE AS9102 Aerospace First Article Inspection Requirement

(Copies of these documents are available online at http://www.sae.org/)

3.0 SCOPE.

This SOW covers an effort in which the Contractor shall be responsible for all work associated with this effort in accordance with the requirements of this SOW and the Technical

Data Package (TDP), TK2013200 for the ETCU. The contractor shall be responsible for providing all aspects of the procurement, fabrication, assembly, inspection, testing and delivery processes to include, material procurement, electrical and mechanical fabrication, fabrication testing and assembly facilities, electrical and mechanical tooling, quality control, quality assurance, incoming inspections in-process inspections, final inspections, component testing, system testing and manpower with the expertise and knowledge to fully and successfully complete the contract. The Contractor shall be responsible for program management of the effort to include, financial tracking/reporting, program scheduling and performance. The Contractor also shall be responsible for all aspects of testing including first article inspection (FAI), testing of LRUs, environmental stress screening (ESS) and acceptance testing.

The Contractor shall procure, fabricate, assemble, inspect, test and deliver the ETCUs and associated LRUs in accordance with the quantities and target delivery dates as ordered by the Government and provided in Section 4.3 Ordering Schedule.

3.1 Procurement.

The Contractor shall identify, through a review of the TDP, all parts, materials, assemblies required for the effort, procure and manage all parts materials and assemblies, and determine their lead times in order to alleviate any unnecessary delays in production that will impact the program delivery schedule.

3.2 Fabrication/Assembly.

The Contractor shall produce all electronic, electrical and mechanical assemblies relevant to this SOW. The Contractor shall complete all work based on the furnished TDP which includes engineering prints, redline drawings, electrical schematics, wiring assemblies, mechanical assemblies and manufacturing instructions. The Contractor shall provide for tracking and status of all electronic, electrical and mechanical assemblies throughout the fabrication process to ensure that each step of the defined manufacturing process is accomplished. The Contractor shall ensure that all individuals involved in the fabrication and assembly process are properly trained, certified and experienced in the requisite fabrication areas. The Contractor shall provide proof of the training and certification verifying the training is current to the effort and provide the information to the Government upon request.

3.3 Quality Assurance.

The Contractor shall implement a Quality Assurance/Program Plan (QA) program that has established processes and procedures, allows for in-process and final inspections, allows for monitoring and control of critical processes identified for this effort, establish mechanisms for feedback of product performance, implement a root causes analysis and corrective action system and provides for continuous improvement. The Contractor shall be ANSI/ISO/ASQC-Q9001 certified or equivalent. The Contractor shall provide a Quality Program Plan (QPP) in accordance with CDRL A001.

(CDRL A001) DI-QCIC-81722 Quality Program Plan (QPP)

3.3.1 First Article Inspection (FAI).

The Contractor shall have a process to plan for the completion of FAI activities. The planning should address the activities to be performed throughout the FAI which is to give objective evidence that all engineering, design and specification requirements are correctly understood, accounted for, verified and documented. The contractor shall utilize AS9102 in the planning for performing and documenting the FAI. Any deficiencies identified during the conduct of FAI shall be corrected and demonstrated to the Government prior to completion and acceptance of FAI. The Contractor shall provide a FAI Report in accordance with CDRL T002.

(CDRL T002) DI-NDTI-80809 Inspection/Test Report

3.4 Testing.

The Contractor shall be responsible to conduct and provide proof of completion of all tests identified below. The Government will provide test equipment, test software and system software for utilization during the requisite test events. See Attachment 001 GFE for TK2013600-1 ETCU Test Set in support of ETCU Test Set. The Contractor shall inform the Government of the intended dates/schedule of the tests 30 days prior to the commencement of the test event.

3.4.1 LRU/Component Testing.

The Contractor shall produce and test individual LRUs and components to ensure that each LRU assembly has been accurately manufactured and will properly function as part of the overall assembly.

3.4.2 Acceptance Testing.

The Contractor shall be responsible to accomplish Acceptance Testing based on procedures as outlined in TK2013611 Hardware Design Verification Test (DVT) Procedure. The Contractor shall perform all procedures identified in Table 3-1 ETCU DVT Test List of TK2013611. The Government will have a representative present for any and all testing and will acknowledge completion of the tests conducted within TK2013611 Table 3-1. Each unit under test shall successfully pass all tests. Any failures shall be identified, corrected, and tested prior to acceptance by the Government. The contractor shall notify the Government 30 prior to any testing. The Contractor shall submit an Acceptance Test Report in accordance with CDRL T001.

(CDRL T001) DI-QCIC-81891 Acceptance Test Report (ATR)

3.4.3 Environmental Stress Screening (ESS) Testing.

The Contractor shall conduct ESS testing on Government specified units and LRUs which will consist of thermal cycling and 3-axis random vibration testing. The purpose of the ESS testing is to expose manufacturing and component defects and ensure that the defects are not carried through to the remaining deliverables. The order of testing is fixed, temperature cycling shall be completed successfully prior to vibration testing. The Contractor shall provide an Reliability Test Procedure per CDRL A004. ESS testing shall adhere to the following procedure:

(CDRL A004) DI-SESS-81629 Reliability Test Procedure

3.4.4 ESS temperature cycling.

ESS temperature cycling shall consist of six compete cycles between the limits of and including -20oC (+0o, -5o) and +65oC (+5o, -0o). The first cycle shall begin at room temperature and the last cycle shall end at room temperature. The temperature shall remain constant at each limit for a dwell period of 11/2 hours during each cycle. Transitions between temperature limits shall be made at a rate of at least 10oC per minute. The components shall be energized (not operating) during the high temperature portion of each cycle. The components shall be de-energized during transition periods to low temperatures and during the low temperature portion of any cycle. After the fifth cycle the equipment shall be energized and the End To End Test, section 3.5.3.5 of Table 3-1 of TK2013611 shall be run prior to the sixth cycle. If there are any failures during the End To End test, affect repairs as necessary and proceed to the sixth cycle.

At the completion of the sixth cycle, allow the equipment to return to ambient temperature. The equipment shall be energized and the End To End Test, section 3.5.3.5 of Table 3-1 of TK2013611 shall be run. If the test is successful, proceed to vibration testing. If the test is not completed successfully, affect repairs and repeat the sixth cycle. The Contractor shall repeat the sixth cycle as necessary until the system completes the End To End test with no failures.

3.4.5 ESS vibration levels and durations.

ESS vibration levels and durations shall be in accordance with values identified in table below. At the completion of each axis test the equipment shall be energized and the End To End Test, section 3.5.3.5 of Table 3-1 of TK2013611 shall be run.

Vibration Test Levels/Durations Sequence

No.

Axis Condition

Duration (min.)

1 Fore/Aft ESS Random Vibration, 20 – 2000 Hz, 6.067 grms 5

2 Vertical ESS Random Vibration, 20 – 2000 Hz, 6.067 grms 5

3 Side/Side ESS Random Vibration, 20 – 2000 Hz, 6.067 grms 5

At the conclusion of each vibration test axis, the ETCU shall be inspected thoroughly to ensure no damage has occurred to any part as a result of the vibration. Any damage shall be documented and the Contractor shall affect repairs. Upon completion of vibration of each axis, the Contractor shall conduct End To End testing.

The contractor shall notify the Government 30 prior to any testing. Upon completion of testing, the contractor shall submit an inspection test report per CDRL T002.

(CDRL T002) DI-NDTI-80809 Inspection/Test Report

3.5 Progress and Compliance.

3.5.1 Monthly Accomplishments.

The Contractor shall submit a Monthly Accomplishment Report identifying work done under this contract. The Contractor shall identify milestones accomplished since the previous month's report. The Contractor shall identify accomplishments scheduled for completion by the next monthly report. The Contractor shall identify issues associated with this effort. The Contractor shall submit the report by the 20th of each month or, should the 20th be during the weekend, on the first business day following. The Contractor shall coordinate closely with the COR to ensure the desired information is enclosed with the report. The Contractor shall provide a monthly status report in accordance with CDRL A002.

(CDRL A002) DI-MGMT-80227 Contractor’s Progress, Status and Management Report

3.5.2 Cost and Schedule Reporting.

The Contractor shall create and maintain a current Planned Objectives, Actions, and Milestones file tracking the progress of the effort expended in completing this contract. The Contractor shall provide a quarterly POAM in accordance with CDRL A003.

(CDRL A003) DI-MGMT-80507C Project Planning Chart

3.6 Deliverable Data/Contract Data Requirements List (CDRL).

The Contractor shall provide all data and documentation as specified in the CDRL. The Microsoft Office 2010 or newer suite of applications (Word, Excel, PowerPoint, Access, etc.) is the required file format for data furnished for this SOW. The Contractor shall provide an uncompressed copy of the text of each documents created for submission on the project. The deliverable shall indicate Contractor name, CDRL number, and date of submission. Graphics, tables, and other items beyond the capability of the Microsoft Office applications shall be provided in digital raw format and Portable Document Format if applicable.

3.7 Proprietary Data.

The Contractor shall not develop, employ or include any proprietary or similarly restricted features during the conduct of this contract.

All hardware and software items developed by the Contractor for use during the conduct or in support of this contract shall be delivered to the Government with at least Government Purpose Rights. Data usage rights of any NDI and COTS items used during the conduct or in support of this contract shall be retained by the original developers. The Contractor shall provide the Government access to all of its documentation throughout the contract period.

3.8 Facilities.

The Contractor shall provide all necessary facilities required to efficiently and effectively perform all tasks required by the SOW and the contract throughout the period of performance.

This shall include programmatic and engineering office spaces, conference rooms, laboratories capable of supporting assembly, and manufacturing, and testing areas.

4.0 REQUIREMENTS

4.1 System Definition.

The Contractor shall fabricate and assemble an ETCU, as identified in Table 001 and in accordance with section 4.3 Ordering Schedule.

Table 001 – ETCU

Nomenclature Part Number

Electronic Throttle Control Unit TK2013200-1

Deliverables shall be based on the TDP, Government approved drawing modifications, Equipment Specification, any and all other applicable documentation provided by the Government related to the production designs of the ETCU.

4.1.1 Line Replacement Unit (LRU).

The Contractor shall supply LRUs as defined in TABLE 002 and in accordance with section 4.3 Ordering Schedule.

TABLE 002 – LRUs

Nomenclature Part Number

Switch Assembly TK2013207-1

Capacitor Assembly TK2013205-1

Power Supply Assembly TK2013504-1

Sled Assembly TK2013201-1

Deliverables shall be based on the TDP, Government approved drawing modifications, Equipment Specification, any and all other applicable documentation provided by the Government related to the production designs of the LRUs.

4.2 Government Furnished Equipment/Information/Material.

4.2.1 Government Furnished Information (GFI).

The Contractor shall purchase and fabricate all required materials and components in accordance with the TDP identified in Table 003 except for quantity of items listed in Table 004 which will be furnished by the Government.

TABLE 003 – Government Furnished Information

Title Drawing Number Revision

Electronic Throttle Control Unit TK2013200 A

4.2.2 Government Furnished Material (GFM).

Upon Contractor’s written request to the Procuring Contracting Officer via the cognizant

Contract Administration Office, the Government will furnish the items identified in Table 004 for use in the performance of this contract.

TABLE 004 – Government Furnished Material Parent Part Item Description Part Number Quantity

TK2013565-1 Core Module TK2013220-1 10

TK2013565-1 Passive Copper Heatsink TK2013220-1 10

4.2.3 Government Furnished Equipment (GFE).

The Government will provide all test equipment identified within Figure 3-1 ETCU Test

Configuration of TK2013611, and attachment 001, GFE for TK2013600-1 ETCU Test Set in support of ETCU Test Set.

4.3 Ordering Schedule.

4.3.1 CLIN 0001 – ETCU with FAI: Units ordered under CLIN 0001 shall be built in accordance with the TDP identified in Table 003, with GFM identified in Table 004, shall conduct FAI in accordance with section 3.3.1 of the SOW, Acceptance Tested in accordance with section 3.4.2 of the SOW. The units shall be delivered within 9 months form acceptance of the order. The contractor shall provide an ATR and an FAI Test Report upon completion of testing per CDRL T001 and CDRL T002.

(CDRL T002) DI-NDTI-80809 Test/Inspection Report

4.3.2 CLIN 0002 – ETCU: Units ordered under CLIN 002 shall be built in accordance with the TDP identified in Table 003, with GFM identified in Table 004, and Acceptance Tested in accordance with section 3.4.2 of the SOW. The order shall be delivered within 9 months from acceptance of the order. The contractor shall provide an ATR of the results of the acceptance testing on the specified unit in accordance with CDRL T001.

4.3.3 CLIN 0003 – ETCU with GFM (Shell): shall be built in accordance with the TDP identified in Table 003, with GFM identified in Attachment 002, and Acceptance Testing in accordance with section 3.4.2 of the SOW. The units shall be delivered within 9 months from acceptance of the order. The contractor shall provide an ATR upon completion of acceptance testing per CDRL T001.

4.3.4 CLIN 0004 – Switch Assembly: Units ordered under CLIN 004 shall be built in accordance with the TDP, part number TK2013207-1, and Acceptance Testing in accordance with section 3.4.2 of the SOW. The units shall be delivered within 9 months from acceptance of the order. The contractor shall provide an ATR upon completion of acceptance testing per CDRL T001.

4.3.5 CLIN 0005 – Capacitor Assembly: Units ordered under CLIN 005 shall be built in accordance with the TDP, part number TK2013205-1, and Acceptance Testing in accordance with section 3.4.2 of the SOW. The units shall be delivered within 9 months from acceptance of the order. The contractor shall provide an ATR upon completion of acceptance testing per CDRL

4.3.6 CLIN 0006 – Power Supply Assembly: Units ordered under CLIN 006 shall be built in accordance with the TDP, part number TK2013504-1, and Acceptance Testing in accordance with section 3.4.2 of the SOW. The units shall be delivered within 9 months from acceptance of the order. The contractor shall provide an ATR upon completion of acceptance testing per CDRL T001.

4.3.7 CLIN 0007 – Sled Assembly: Units ordered under CLIN 007 shall be built in accordance with the TDP, part number TK2013201-1, and Acceptance Testing in accordance with section 3.5.1 of the SOW. The units shall be delivered within 9 months from acceptance of the order. The contractor shall provide an ATR upon completion of acceptance testing per CDRL

4.3.8 CLIN 0008 – ESS: Units ordered under CLIN 008 and ESS in accordance with section 3.4.3 of the SOW. Orders for ESS, when combined with another CLIN, shall add an additional month to the order. The contractor shall provide a report of the results of the ESS testing on the specified unit tested in accordance with CDRL T002.

(CDRL T002) DI-NDTI-80809 Test/Inspection Report

ATTACHMENTS

Attachment 001 – GFE for TK2013600-1 ETCU Test Set

Find No.

Part or Identification No.

Drawing or Specification No.

Nomenclature Qty

1 TK2013601-1 TK2013601

Test Equipment, Power Test Box, ETCU and ECP A1

2 TK2013603-1 TK2013603

Test Equipment, System Test Box, ECTU and ECP A2

3 TK2013607-1 TK2013607

ETCU DATA ACQUISITION SYSTEM

A3

4 1U3170 USB-SERIAL SDLC INTERFACE 1

5 TK2013605-2 TK2013605

TEST EQUIPMENT, SYSTEM TEST

CABLE, STANDARD, W2 W2

6 TK2013605-3 TK2013605

TEST EQUIPMENT, SYSTEM TEST

CABLE, STANDARD, W3 W3

7 TK2013605-4 TK2013605

TEST EQUIPMENT, SYSTEM TEST

CABLE, STANDARD, W4 W4

8 TK2013605-5 TK2013605

TEST EQUIPMENT, SYSTEM TEST

CABLE, STANDARD, W5 W5

9 TK2013605-6 TK2013605

TEST EQUIPMENT, SYSTEM TEST

CABLE, STANDARD, W6 W6

10 TK2013605-7 TK2013605

TEST EQUIPMENT, SYSTEM TEST

CABLE, STANDARD, W7 W7

11 TK2013605-8 TK2013605

TEST EQUIPMENT, SYSTEM TEST

CABLE, STANDARD, W8 W8

12 3021007-06 CABLE, USB 2.0, 6 FT 2

13 GUC2100 USB TO ETHERNET ADAPTER 2

14 DK-1511-010/BL

ETHERNET PATCH CABLE, 10 FT,

BLACK

15 U8031A 3 OUTPUT DC POWER SUPPLY PS1 1

16 3057/1 GR005

16 AWG SOLID COPPER GREEN WIRE

100 FT

17 2-320572-1 CRIMP LUG, 16-22AWG, 5/16" 1

18 312019-01 POWER CORD 1

19 2BA-60 CONNECTOR, ELECTRICAL W11-W12 2

20 PDTK2013612-1 PDTK2013612-1 ETCU DVT SOFTWARE SOURCE DISK 1

21 PDTK2013612-2 PDTK2013612-2 ETCU DVT SOFTWARE SOURCE DISK 1

22 PSB24-060-P 24V POWER SUPPLY, 60 WATT 1

23 LTP2884 USB ISOLATOR 1

24 FC-33 CURRENT LOOP ISOLATOR 4

Attachment 002 - GFM for TK2013200-1 CLIN 0003

(End of Summary of Changes)

Find No.

Drawing Number Nomenclature Qty

1 TK2013516 MACHINING, ENCLOSURE 1

2 TK2013249 TOP COVER, ETCU 1

3 TK2013250 DOOR ASSEMBLY 1

7 TK2013504 POWER SUPPLY ASSEMBLY A1 1

11 TK2013281 SCREW, CAP, SOCKET HEAD, MODIFIED 10

15 TK2013548 LABEL, SAFETY 1

16 TK2013271 COVER, POWER SUPPLY 1

19 TK2013246 GASKET, CONNECTOR 2

20 TK2013246 GASKET, CONNECTOR 1

21 TK2013246 GASKET, CONNECTOR 3

22 TK2013280 SCREW, BUTTON HEAD, MODIFIED 6

23 TK2013246 GASKET, CONNECTOR 2

24 SAE-AS85049/95 CONNECTOR, ACCESSORIES, NUT PLATE 1

25 SAE-AS85049/95 CONNECTOR, ACCESSORIES 2

26 SAE-AS85049/95 CONNECTOR, ACCESSORIES 3

27 SAE-AS85049/95

CONNECTOR ACCESS., ELECT., MTG DEVICE, FLANGE TYPE,CAT

MIL-DTL-

38999/33

CONNECTOR, ELECTRICAL, CIRCULAR, COVER 1

37 TK2013284 CONNECTOR J2 1

38 TK2013284 CONNECTOR J4 1

39 TK2013284 CONNECTOR J3 1

40 TK2013284 CONNECTOR J8 1

41 TK2013284 CONNECTOR J5 1

42 TK2013284 CONNECTOR J6 1

43 TK2013284 CONNECTOR J7 1

44 TK2013514 CONNECTOR, RECEPTACLE, ELECTRICAL, RJ-45 INSERT J9 1

200 MS51957 SCREW, MACHINE, PAN, CROSS 24

201 NAS620 WASHER, FLAT, REDUCED OD, NO. 4 26

202 MS51957 SCREW, MACHINE, PAN, CROSS 8

203 NAS620 WASHER, FLAT, NO. 6 12

206 NASM51576 SCREW, SHOULDER, SOCKET, HEXAGON 2

207 NAS1149 WASHER, FLAT/PLAIN 2

211 NAS1351 SCREW, CAP, SOCKET HEAD 26

212 NASM35338 WASHER, LOCK-SPRING 26

213 NAS1149 WASHER, FLAT/PLAIN 26

217 WASHER, SPRING TENSION, BELLEVILLE SPRING 10

219 NAS620 WASHER, FLAT 10

226 NASM35338 WASHER, LOCK-SPRING 6

227 NAS1149 WASHER, FLAT 6