N64498-16-R-5013_RFP.pdf
PDF 625 KB Posted
- Attached to
- 350 HP INDUCTION MOTORS REQUEST FOR PROPOSALS
- Solicitation number
- N64498-16-R-5013
About this file
350 HP INDUCTION MOTORS RFP (N64498-16-R-5013)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 25 Feb 2016
X
A
X B
X C X D
EX
X
G
F 37 - 45
46 - 49
X H 50 - 52
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 52
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N64498 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 2 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
5001 S. Broad St., Philadelphia conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
7 - 12
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 16 - 18 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 19 - 21 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
22 - 35
PART II - CO NTRACT CLAUSES
NAVAL SURFACE WARFARE CENTER PHILA
CODE 02312, ANGELA CUSATI
215-897-1891, ANGELA.CUSATI@NAVY.MIL
5001 SOUTH BROAD STREET
PHILADELPHIA PA 19112
215-897-1891
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
21 Jan 2016
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N64498-16-R-5013
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1
First Article Test Plan
350 HP Induction Motors First Article Test Plan + Military Performance Test in accordance with Section 2.1 of the Statement of Work and Contract Data
Requirement List (DD Form 1423) A001.
FOB: Destination
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0002 1
First Article Testing Report
350 HP Induction Motors First Article Testing Report in accordance with Section
2.2 of the Statement of Work and Contract Data Requirement List (DD Form
1423) A002. *NOT SEPERATELY PRICED*
FOB: Destination
MAX
NET AMT
NOT SEPERATELY PRICED
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0003 1
Engineering Drawing
350 HP Induction Motor Engineering Drawing in accordance with Section 2.3 of the Statement of Work and Contract Data Requirement List (DD Form 1423)
A003. *NOT SEPERATELY PRICED*
FOB: Destination
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0004 1
First Article Test (FAT) Unit
First Article Test Unit in accordance with the Section 2.4 of the Statement of
Work.
FOB: Destination
MAX
NOT SEPERATELY PRICED
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0005 4
350 HP Induction Motors – Year 1
350 HP Induction Motors - To be ordered from the date of contract award through
365 days thereafter (Year 1).
FOB: Destination
MAX
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0006 15
350 HP Induction Motors – Year 2
350 HP Induction Motors - To be ordered 366 days through 730 days after contract award (Year 2).
FOB: Destination
MAX
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0007 15
350 HP Induction Motors – Year 3
350 HP Induction Motors - To be ordered 731 days through 1095 days after contract award (Year 3).
FOB: Destination
MAX
NET AMT
CLAUSES INCORPORATED BY FULL TEXT
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and
Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 1095 days after contract award.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the
Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)
This entire contract is fixed price.
CONTRACT MINIMUM AND MAXIMUM:
CONTRACT MINIMUM: The contract minimum shall be met by either ordering the quantities listed above in
CLIN 0001 through CLIN 0004, or if First Article Testing (FAT) is waived, then the minimum shall be satisfied by ordering four (4) production units as listed in CLIN 0005.
CONTRTACT MAXIMUM: The contract maximum shall be the total of all quantities on all CLINS listed above.
FIRST ARTICLE TEST UNITS:
First Article Test Units shall not be delivered as part of the Production Quantity for any CLIN.
PRODUCTION UNITS NOTE:
The production of CLINS 0005 through 0007 is a separate event from CLINS 0001 through 0004. CLIN 0001, CLIN 0002, and CLIN 0004 must have occurred before production may commence. In no case will the release for production be granted prior to the successful completion of first article testing (contractor) and government technical evaluation.
Section C - Descriptions and Specifications
STATEMENT OF WORK
1. The 350 horsepower (HP) alternating current induction motors to be furnished shall be in accordance with
Military Performance Specification MIL-M-17060E dated 20 May 1977. Paragraphs (a) – (x) refer to Section
6.1.1 of MIL-M-17060E. Paragraphs (y) – (gg) are additional specifications required for motor procurement.
(a) Title: MIL-M-17060E, Motor, 60 Hertz, Alternating Current, Integral-Horsepower, Shipboard Use, Dated
20 May 1977 including Amendment 1, dated 15 May 1981 and the following
(b) Service – Service A for Surface Ships, Centrifugal Pump applications
(c) Ambient Temperature – 50 degrees Celsius
(d) Voltage - 440 Volts/60 Hz/3 Phase
(e) Duty - Continuous
(f) Enclosure – TEFC with labyrinth type non-rubbing seals both ends
(g) Horsepower – 350 continuous with locked rotor current not to exceed 2400 amperes and full load current not to exceed 400 amperes.
(h) RPM – 1800 (synchronous) constant speed
(i) Type – squirrel cage induction with not less than 80% power factor at full load
(j) Design – B with not less than 70% pull up rotor torque for centrifugal applications
(k) Slip – not to exceed 1.00 percent maximum at full rated load and temperature rise
(l) Mounting – foot mounted horizontal
(m) Bearing Types – Ball bearing, noise tested in accordance with MIL-B-17931 with grease slingers on shaft.
Bearings used each end shall be of different size not to exceed 314 nor less than size 311 with laminated phenolic ball retainer and preload spring inboard of free bearing. Bearing temperature rise outer ring of bearing not to exceed 40 degrees Celsius.
(n) Conduit Openings – the conduit openings shall be sized to suit one LSTSGU-400 cable, nylon tube size 9 and national pipe thread size 3-1/2
(o) Insulation Required – Class B or F. The stator windings shall be insulated and varnish treated to provide a
“sealing insulation system”. The sealed insulation system shall be accomplished by a manufacturer who shall be certified as required by MIL-M-17060E. The motor manufacturer shall submit a copy of their letter of certification with their offer. The sealed insulation system shall be in accordance with the requirements of MIL-M-17060E, Paragraph 4.3.4.20.
Random Wound Sealed Insulation System. Each random wound sealed insulation system motor shall have a stainless nameplate attached near the regular nameplate stating “STATOR WINDING INSULATED TO
PROVIDE A SEALED INSULATION SYSTEM. CAUTION: IF REWINDING IS REQUIRED DO
NOT USE BURNOUT OVEN FOR STRIPPING. CUT OFF ONE END TURN, HEAT WINDING BY
RADIANT HEAT AND PULL WINDING FROM SLOT”.
(p) Repair Parts – Not applicable
(q) Balance – Precision with facilities for fine balancing
(r) Temporary Air Filter – Not applicable
(s) Non Magnetic Motors – Not required
(t) Submarine Service – Not applicable
(u) Structureborne Noise – to be Type 2 with levels not to exceed 5db above that shown for 100Hz to 160Hz on Figure 1 Dated 21 June 1965 in MIL-STD-740 dated 13 Jan 1965.
(v) Service C Motors – Not applicable
(w) Shock Test – MIL-S-901, Grade A
(x) Packaging – standard commercial packaging
(y) Frame – 509 with dimensions and tolerances specified in NEMA MG1 Paragraph 4, with shaft extension dimensions as follows: From centerline of mounting hole in foot nearest to end of shaft (Drive End), 13.25 Inches (BA+N-W). Shaft diameter 2.375 inches
+0.000/-.001 (U). Shaft Length 4.50 inches (V). Shaft height from bottom of foot to centerline of shaft, 12.50 +.00/-.06 inches.
(z) Weight – not to exceed 3880 pounds
(aa) Motor Thermal Growth – “D” dimension from bottom of foot to centerline of shaft not to exceed 0.005 inches with temperature change from ambient to full load heat equilibrium.
(bb) Efficiency – Minimum 97 percent at 4/4 load, 96 percent at 3/4 load and 95 percent at
2/4 load. Test efficiency of each motor shall be shown on the nameplate.
(cc) Winding Temperature Rise – Not to exceed 70 degrees Celsius with minimum 7 hours at full 350 horsepower load in 50 degrees Celsius ambient. To be verified by test.
(dd) Thermal Protection – The motor shall be provided with thermal protection for stator and bearings, with monitor control including a plug in relay with minimum one pair of normally open and one pair of normally closed contacts mounted on motor. The motor system monitor shall be a series 145 as manufactured for military service by power control corporation, Pittsburgh, pa or equivalent NAVSEA approved motor thermal protection system.
The temperature sensing system shall include a minimum of five thermal sensors, one in contact with each bearing outer ring and three in the stator winding. Any deviation must be approved by procuring agency.
Positive temperature coefficient (PTC) thermal sensors shall be used and have a temperature coefficient of resistance at a 130 degrees Celsius switchpoint of not less than 15 percent per degree centigrade. High potential test shall be performed on the installed sensors between shorted sensors leads and the motor windings. The test voltage shall be twice the nominal system voltage plus 1000 volts.
(ee) Air Gap – 0.050 inches minimum
(ff) Motor Efficiency – Shall be determined by IEEE standard tests, IEEE Standard 112, Method “B” for Dynamometer and/or method “C” for duplicate machines with loss segregation identification as required in method “E” and using linear regression analysis.
Test record shall include both data with identification of stray losses in watts and shall be shown on the motor master drawing. Efficiency shall be shown on the motor nameplate.
(gg) Airborne Noise Levels – In accordance with table below in db referenced to 20 uPA sound pressure.
Octave Band Center Frequency – Hz
31.5 63 125 250 500 1K 2K 4K 8K
85 80 79 76 75 71 70 69 68
2. First Article Testing Requirements for 350 HP Induction Motor
2.1 Acceptance Test Plan: The contractor shall supply test plans for First Article Testing and Military
Performance Test on 350 HP Induction Motor. This test plans shall consist of tests to verify the
Induction Motor meets the Performance Requirements (Shock, Vibration, EMI, etc.) set forth in MIL-
M-17060E, Section 4.3.3, in this Military Specification.
2.2 Acceptance Test Report: Upon the completion of the first article testing, the contractor shall prepare and submit a report detailing the inspections/tests performed and the results of the inspections/tests.
2.3 350 HP Induction Motor Engineering Drawing: The contractor shall supply Engineering Drawing for
350 HP Induction Motor Engineering Drawing.
2.4 The First Article Test Unit that successfully passes testing shall be delivered as part of the requirements set forth in MIL-M-17060E, Section 4.3.4.19(h). This unit, however, will not be a part of the production units.
2.5 If the contractor has already designed and built a motor that meets all requirements and completed
First Article Testing in order to meet a previous commitment, provide documentation that First Article
Testing has already been completed.
CLAUSES INCORPORATED BY FULL TEXT
HQ C-1-0001 ITEM(S) A001, A002 & A003 - DATA REQUIREMENTS (NAVSEA) (SEP 1992)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form
1423, Exhibit(s) A, B & C, attached hereto.
CDRL No. Title Data Item
Description
A001 First Article Testing Test Plan & Military Performance Test DI-QCIC-80553A
A002 First Article Testing - Acceptance Test Report DI-QCIC-81891
A003 Engineering Drawing DI-DRPR-80651
CLAUSES INCORPORATED BY FULL TEXT
HQ C-2-0002 ACCESS TO PROPRIETARY DATA OR COMPUTER SOFTWARE
(NAVSEA) (JUN 1994)
(a) Performance under this contract may require that the Contractor have access to technical data, computer software, or other sensitive data of another party who asserts that such data or software is proprietary. If access to such data or software is required or to be provided, the Contractor shall enter into a written agreement with such party prior to gaining access to such data or software. The agreement shall address, at a minimum, (1) access to, and use of, the proprietary data or software exclusively for the purposes of performance of the work required by this contract, and (2) safeguards to protect such data or software from unauthorized use or disclosure for so long as the data or software remains proprietary. In addition, the agreement shall not impose any limitation upon the
Government or its employees with respect to such data or software. A copy of the executed agreement shall be provided to the Contracting Officer. The Government may unilaterally modify the contract to list those third parties with which the Contractor has agreement(s).
(b) The Contractor agrees to: (1) indoctrinate its personnel who will have access to the data or software as to the restrictions under which access is granted; (2) not disclose the data or software to another party or other Contractor personnel except as authorized by the Contracting Officer; (3) not engage in any other action, venture, or employment wherein this information will be used, other than under this contract, in any manner inconsistent with the spirit and intent of this requirement; (4) not disclose the data or software to any other party, including, but not limited to, joint venturer, affiliate, successor, or assign of the Contractor; and (5) reproduce the restrictive stamp, marking, or legend on each use of the data or software whether in whole or in part.
(c) The restrictions on use and disclosure of the data and software described above also apply to such information received from the Government through any means to which the Contractor has access in the performance of this contract that contains proprietary or other restrictive markings.
(d) The Contractor agrees that it will promptly notify the Contracting Officer of any attempt by an individual, company, or Government representative not directly involved in the effort to be performed under this contract to gain access to such proprietary information. Such notification shall include the name and organization of the individual, company, or Government representative seeking access to such information.
(e) The Contractor shall include this requirement in subcontracts of any tier which involve access to information covered by paragraph (a), substituting "subcontractor" for "Contractor" where appropriate.
(f) Compliance with this requirement is a material requirement of this contract.
CLAUSES INCORPORATED BY FULL TEXT
HQ C-2-0008 ASSIGNMENT AND USE OF NATIONAL STOCK NUMBERS (NAVSEA) (MAY 1993)
To the extent that National Stock Numbers (NSNs) or preliminary NSNs are assigned by the Government for the identification of parts, pieces, items, subassemblies or assemblies to be furnished under this contract, the Contractor shall use such NSNs or preliminary NSNs in the preparation of provisioning lists, package labels, packing lists, shipping containers and shipping documents as required by applicable specifications, standards or Data item
Descriptions of the contract or as required by orders for spare and repair parts. The cognizant Government Contract
Administration Office shall be responsible for providing the Contractor such NSNs or preliminary NSNs which may be assigned and which are not already in possession of the Contractor.
CLAUSES INCORPORATED BY FULL TEXT
HQ C-2-0009 ASSIGNMENT OF SERIAL NUMBER(S) (NAVSEA) (SEP 1990)
The Contractor shall request serial number assignment, in writing, from the Cognizant Technical Program Office, with a copy to the cognizant Contract Administration Office. The request for serial number assignment shall contain the following minimum information:
(a) Contract number;
(b) Assigned line item number and description;
(c) Assigned type designation;
(d) Assigned model number;
(e) Top drawing number and ID (List of Drawings) number;
(f) Exact quantity for which serial numbers are being requested, including preproduction samples required by the contract; and
(g) National Stock Number
HQ C-2-0026 FIRST ARTICLE (CONTRACTOR TESTING) (NAVSEA) (APR 2015)
(a) For the purpose of this contract, the "First Article" is synonymous with the terms "preproduction model(s) and
"preproduction equipment".
(b) The First Article shall conform in every respect to the requirements of this contract and shall be fully tested by the
Contractor to determine compliance with said requirements. The production equipment shall be manufactured with tools, material and methods that are the same as or representative of the tools, material and methods that were used to manufacture the First Article.
(c) Pursuant to paragraph (e) of the clause entitled "FIRST ARTICLE APPROVAL--CONTRACTOR TESTING"
(FAR 52.209-3), the First Article shall not be delivered as part of the production quantity.*
(End of Text)
HQ C-2-0062 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA)(SEP 1990)
If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):
(Offeror to fill in contract number(s), as applicable. See Section M)
Section D - Packaging and Marking
PRESERVATION AND PACKAGING:
CLIN 0005 through CLIN 0007:
Preservation and Packaging: Each 350 HP Induction Motor shall be preserved, packed and packaged in accordance with standard commercial practices necessary to ensure protection of the motors against physical damage and deterioration during shipment, limited handling and short term storage.
HQ D-1-0001 DATA PACKAGING LANGUAGE
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial
Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 with Change 1 dated 28
March 2013.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-16 Responsibility For Supplies APR 1984
252.246-7000 Material Inspection And Receiving Report MAR 2008
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 365 dys. ADC 1 NAVAL SURFACE WARFARE CENTER
CARDEROCK
STEPHEN CHUNG
1601 LANGLEY AVENUE, BLDG 542E
PHILADELPHIA PA 19112-5051
215-897-8656
FOB: Destination
N64498
0002 365 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
N64498
0003 365 dys. AFATA 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
N64498
0004 365 dys. AFATA 1 (SAME AS PREVIOUS LOCATION)
FOB: Destination
N64498
0005 365 dys. ARO 4 (SAME AS PREVIOUS LOCATION)
FOB: Destination
N64498
0006 280 dys. ARO 15 (SAME AS PREVIOUS LOCATION)
FOB: Destination
N64498
0007 280 dys. ARO 15 (SAME AS PREVIOUS LOCATION)
FOB: Destination
N64498
CLAUSES INCORPORATED BY REFERENCE
52.211-17 Delivery of Excess Quantities SEP 1989
52.242-15 Stop-Work Order AUG 1989
52.242-17 Government Delay Of Work APR 1984
52.247-34 F.O.B. Destination NOV 1991
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
252.204-0002 LINE ITEM SPECIFIC: SEQUENTIAL ACRN ORDER. (SEP 2009)
The payment office shall make payment in sequential ACRN order within the line item, exhausting all funds in the previous ACRN before paying from the next ACRN using the following sequential order: Alpha/Alpha;
Alpha/numeric; numeric/alpha; and numeric/numeric.
(End of clause)
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through
WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
COMBO
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
DESTINATION
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC N64498
Admin DoDAAC N64498
Inspect By DoDAAC N64498
Ship To Code N64498
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send
Additional Email Notifications” field of WAWF once a document is submitted in the system.
stephen.chung@navy.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Jameal Hollis jameal.hollis@navy.mi
(215) 897-7718
Richard Ford richard.a.ford@navy.mil
(301) 227-1116
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
HQ G-2-0002 CONTRACT ADMINISTRATION DATA
Enter below the address (street and number, city, county, state and zip code) of the Contractor's facility which will administer the contract if such address is different from the address shown on the SF 26 or SF 33, as applicable.
HQ G-2-0009 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (APR 2015)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the technical instruction (TI), sub line item number (SLIN), or contract line item number (CLIN) level, rather than on a total contract/TO basis, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide
Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by TI, SLIN, or CLIN level. For other than firm fixed price subcontractors, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer (CO) and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the CO and COR; or other method as agreed to by the CO.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data
Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and CO on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and CO email notification as required herein.
Section H - Special Contract Requirements
52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)
(a) Definition.
United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)--
(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites--
(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and
(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.
(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.
(3) Any required posters may be obtained as follows:
Poster(s) Obtain from
DOD Inspector General
ATTN: Defense Hotline
400 Army Navy Drive
Arlington, Virginia 22202-4704
(i) Appropriate agency name(s) and/or title of applicable Department of Homeland Security fraud hotline poster);
and
(ii) The website(s) or other contact information for obtaining the poster(s).)
(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in all subcontracts that exceed $5.5 million , except when the subcontract--
(1) Is for the acquisition of a commercial item; or
(2) Is performed entirely outside the United States.
5252.202-9101 ADDITIONAL DEFINITIONS (MAY 1993)
As used throughout this contract, the following terms shall have the meanings set forth below:
(a) DEPARTMENT - means the Department of the Navy.
(b) REFERENCES TO THE FEDERAL ACQUISITION REGULATION (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(c) REFERENCES TO ARMED SERVICES PROCUREMENT REGULATION OR DEFENSE ACQUISITION
REGULATION - All references in this document to either the Armed Services Procurement Regulation (ASPR) or the Defense Acquisition Regulation (DAR) shall be deemed to be references to the appropriate sections of the
FAR/DFARS.
(d) NATIONAL STOCK NUMBERS - Whenever the term Federal Item Identification Number and its acronym
FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number
(NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item
Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four position Federal Supply Class (FSC) plus the applicable nine position NIIN assigned to the item of supply.
5252.227-9113 GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM (APR 2015)
(a) The Contractor shall participate in the appropriate interchange of the Government-Industry Data Exchange Program
(GIDEP) in accordance with GIDEP PUBLICATION 1 dated April 2008. Data entered is retained by the program and provided to qualified participants. Compliance with this requirement shall not relieve the Contractor from complying with any other requirement of the contract.
(b) The Contractor agrees to insert paragraph (a) of this requirement in any subcontract hereunder exceeding
$500,000.00. When so inserted, the word "Contractor" shall be changed to "Subcontractor".
(c) GIDEP materials, software and information are available without charge from:
GIDEP Operations Center
P.O. Box 8000
Corona, CA 92878-8000
Phone: (951) 898-3207
FAX: (951) 898-3250
Internet: http://www.gidep.org
Section I - Contract Clauses
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 System for Award Management JUL 2013
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2015
52.204-13 System for Award Management Maintenance JUL 2013
52.204-17 Ownership or Control of Offeror NOV 2014
52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.210-1 Market Research APR 2011
52.211-5 Material Requirements AUG 2000
52.211-15 Defense Priority And Allocation Requirements APR 2008
52.215-2 Audit and Records--Negotiation OCT 2010
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.215-14 Integrity of Unit Prices OCT 2010
52.219-4 Notice of Price Evaluation Preference for HUBZone Small
Business Concerns
OCT 2014
52.219-8 Utilization of Small Business Concerns OCT 2014
52.219-9 Alt I Small Business Subcontracting Plan (OCT 2015) Alternate I OCT 2001
52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999
52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013
52.222-3 Convict Labor JUN 2003
52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2014
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
Exceeding $15,000
MAY 2014
52.222-21 Prohibition Of Segregated Facilities APR 2015
52.222-26 Equal Opportunity APR 2015
52.222-35 Equal Opportunity for Veterans OCT 2015
52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014
52.222-37 Employment Reports on Veterans OCT 2015
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons MAR 2015
52.222-54 Employment Eligibility Verification OCT 2015
52.223-6 Drug-Free Workplace MAY 2001
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.229-3 Federal, State And Local Taxes FEB 2013
52.232-1 Payments APR 1984
52.232-8 Discounts For Prompt Payment FEB 2002
52.232-11 Extras APR 1984
52.232-17 Interest MAY 2014
52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984
52.232-25 Prompt Payment JUL 2013
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-3 Alt I Protest After Award (Aug 1996) - Alternate I JUN 1985
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.242-13 Bankruptcy JUL 1995
52.243-1 Changes--Fixed Price AUG 1987
52.247-63 Preference For U.S. Flag Air Carriers JUN 2003
52.247-68 Report of Shipment (REPSHIP) FEB 2006
52.248-1 Value Engineering OCT 2010
52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-8 Default (Fixed-Price Supply & Service) APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7003 Agency Office of the Inspector General DEC 2012
252.203-7004 Display of Fraud Hotline Poster(s) OCT 2015
252.204-0012 PAYMENT INSTRUCTIONS FOR MULTIPLE
ACCOUNTING CLASSIFICATION CITATIONS
AUG 2013
252.204-7000 Disclosure Of Information AUG 2013
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A System for Award Management Alternate A FEB 2014
252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
AUG 2015
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting.
SEP 2015
252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
OCT 2015
252.219-7003 Small Business Subcontracting Plan (DOD Contracts) OCT 2014
252.223-7004 Drug Free Work Force SEP 1988
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013
252.225-7001 Buy American And Balance Of Payments Program-- Basic
(Nov 2014)
NOV 2014
252.225-7004 Report of Intended Performance Outside the United States and Canada--Submission after Award
OCT 2015
252.225-7009 Restriction on Acquisition of Certain Articles Containing
Specialty Metals
OCT 2014
252.225-7012 Preference For Certain Domestic Commodities FEB 2013
252.225-7013 Duty-Free Entry--Basic (Nov 2014) NOV 2014
252.225-7021 Trade Agreements--Basic (OCT 2015) OCT 2015
252.225-7048 Export-Controlled Items JUN 2013
252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business
Concerns
SEP 2004
252.227-7013 Rights in Technical Data--Noncommercial Items FEB 2014
252.227-7016 Rights in Bid or Proposal Information JAN 2011
252.227-7030 Technical Data--Withholding Of Payment MAR 2000
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment DEC 2012
252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(a) The Contractor shall conduct first article testing as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 365 calendar days from the date of this contract to
“ATTN: Stephen Chung, Naval Surface Warfare Center Philadelphia Division, 1601 Langley Avenue, Building
542E, Philadelphia, PA, 19112-5051” marked "FIRST ARTICLE TEST REPORT: Contract No. TBD, Lot/Item No.
TBD" Within 10 calendar days after the Government receives the test report, the Contracting Officer shall notify the
Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time
252.204-7008 Compliance with Safegaurding Covered Defense DEC 2015 Information Controls specified by the Government. The Government shall take action on this report within the time specified in paragraph
(b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 4, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of 15 units;
(2) Any order for a combination of items in excess of 15 units; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal
Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the
Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.
Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
(a) "Hazardous material", as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).
(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety
Data Sheet submitted under this contract.
Material Identification No.
(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.
(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety
Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with
Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items.
Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.
(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.
(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the
Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.
(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.
(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:
(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to--
(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;
(ii) Obtain medical treatment for those affected by the material; and
(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.
(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.
(3) The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .