This combined synopsis/solicitation requests offers for a 60-foot dive support boat. The Navy seeks one aluminum boat to support divers for underwater ship maintenance and repair work. Offerors must submit responses by the date specified. The solicitation incorporates standard FAR clauses for commercial items. The Navy will award a single fixed-price purchase order to the responsible offeror with the most advantageous quote based on evaluation criteria in sections L and M of the solicitation. Interim payments will be made upon completion of milestones such as ordering major components, hull welding, and sea trials. The contractor must provide adequate security for financing. This document summarizes requirements for the dive support boat procurement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 14 - CLIN Pricing Chart_v1.xls | XLS spreadsheet | |
| N6426724Q5020_Amendment3.pdf | ||
| N6426724Q5020_Amendment2.pdf | ||
| N6426724Q5020_Amendment1.pdf | ||
| Attachment 2 - 60DS Spec Response Matrix.xlsx | XLSX spreadsheet | |
| Attachment 5 - Electrical Load Analysis AC Distribution.xlsx | XLSX spreadsheet | |
| Attachment 6 - Unique Item Identification.pdf | ||
| Attachment 7 - Initial Spare Parts List.xlsx | XLSX spreadsheet | |
| Attachment 9 - Warranty Terms.docx | DOCX document | |
| Attachment 10 - Delivery Schedule.xlsx | XLSX spreadsheet | |
| Attachment 11 - Technical Data Rights Assertion.docx | DOCX document | |
| Attachment 12 - Past Performance and Experience.docx | DOCX document | |
| Attachment 14 - CLIN Pricing Chart.xls | XLS spreadsheet |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6426724Q5020
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each 60' Dive Support Boat
FFP
60' Dive Support Boat.
See Section C, Statement of Work.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
PSC CD: 1940
NET AMT
0002 1 Each Aft Deck Extreme Cold Weather Enclosure
FFP
Aft Deck Extreme Cold Weather Enclosure.
See Section C, Statement of Work.
0003 1 Lot OPTION Engineering & Industrial Services
FFP
Engineering & Industrial Services See Section C, Statement of Work.
0004 1 Each Shipping
FFP
Shipping.
See Section C, Statement of Work.
PSC CD: V999
Section C - Descriptions and Specifications
PURCHASE DESCRIPTION
SALES TAX EXEMPTION
The contractor is hereby advised that the United States Government and Agencies thereof are exempt from State and Local Government tax by virtue of Article 6 of the United States Constitution. No exemption certificate is required.
1. INTRODUCTION
Program Executive Office Unmanned and Small Combatants (PEO USC), Boats and Crafts (PMS300) requires the procurement and delivery of a 60 foot (60’) aluminum Dive Support boat to Puget Sound Naval Shipyard (PSNS) located in Bremerton, WA as directed by OPNAV N97.
2. BACKGROUND
Dive Support boats serve US Navy divers in underwater ship’s husbandry, maintenance, repair, and cleaning of submarines, carriers and other assets at Naval Bases, Shipyards and other activities, and other salvage and diving operations worldwide. These boats directly support material readiness and mission readiness of submarines, surface combatants and aircraft carriers. Current assets are non-standard, 15m and 50’ workboats that are beyond their service life and have been significantly modified to meet fleet requirements.
3. SCOPE
The Contractor shall provide and deliver one (1) 60’ Dive Support (DS) boat in accordance with this Statement of Work (SOW), Paragraph 5.0 Requirements.
4. APPLICABLE DOCUMENTS
N/A
5. REQUIREMENTS
5.1 GENERAL STATEMENT OF WORK
This Statement of Work (SOW) defines the effort required for the design, build, testing, configuration control, documentation, and program management for the acquisition of the Dive Support Boat.
Only the Procuring Contracting Officer (PCO) has the authority for the U.S. Navy to authorize or change work and sign contract documents. No other personnel are authorized by their formal communications or by their course of conduct to commit the U.S. Navy to price changes, schedule changes, or to perform different or additional work. The Contractor shall only execute tasking or requests for support under this contract when such direction comes from, or is agreed to by, the PCO.
The award of the contract does not indicate the Government has approved or certified the design provided with the proposal. The Contractor shall remain fully responsible for delivering the boat, which meets the requirements of this Contract.
5.1.1 BACKGROUND
Dive operations are primarily conducted via surface support air to conduct underwater ships husbandry for surface ship and submarine availabilities and repairs. Basic underwater ships husbandry for surface ships include cofferdam installations to support internal work, hull inspections, propeller inspections and change-outs, underwater painting and epoxy repairs, photography (both still and video), and masker emitter belt cleaning. Submarine-specific jobs include shaft bearing change-outs, retractable bow plane cofferdams, secondary propulsion motor change-outs, security swims, arrival and departure swim-outs. Umbilical systems that are sourced from the dive support boat carry breathing air, hot water (to warm dive suits), voice and video communications, and air or hydraulic hoses for power tools. For normal operations, the boat is underway in a harbor or transiting between operational sites, but spends most of its operational time moored alongside other vessels.
5.1.2 QUANTITIES
The contract is for one (1) 60’ DS boat.
5.1.3 DESIGN, MANAGEMENT AND PRODUCTION
The Contractor will be responsible for managing all activities (design, engineering, logistics, testing and production) under this contract for successful execution. After award the Government will conduct a Design Maturity Review with the Contractor that will occur prior to the start of Initial Production.
5.2 CONTRACT LINE ITEM NUMBER DESCRIPTIONS
5.2.1 CLIN 0001– DIVE SUPPORT BOAT
The Contractor shall construct the boat in accordance with SOW, Paragraph 5.3 below and the Specification (Attachment 1 - DS Boat Specification Rev). All boat-specific efforts shall be included in the pricing for this CLIN including:
5.2.1-1 BOAT– The Contractor shall provide the boat in accordance with the Specification (Attachment 1 - Dive Support Boat Spec Rev A (11JAN2024))
5.2.1-2 UID – The Contractor shall provide Unique Item Identification (UID) and Documentation for every boat in accordance with DFARS Clause 252.211-7003 and the requirements provided in the UID (Attachment 6 - Unique Item Identification).
5.2.1-3 BOAT SPARES – The Contractor shall provide initial boat spares for the boat in accordance with Attachment 7 - Initial Spare Parts List and SOW, Paragraph 5.3 below.
5.2.1-4 COPY OF BOAT SPECIFIC TECHNICAL DATA PACKAGE (TDP) – The contractor shall provide for each boat one hard copy and one electronic copy (CD/DVD) of the Final TDP specific to the 60’ DS Boat.
5.2.1-5 PRE-DELIVERY INSPECTIONS AND TRIALS (PDIT)
The Contractor shall perform boat Pre-Delivery Inspections and Trials (PDIT), in accordance with SOW, Paragraph 5.3 and the Specification (Attachment 1 - Dive Support Boat Spec Rev A (11JAN2024)), Section 094.
5.2.1-6 CREW FAMILIARIZATION AND TRAINING
The Contractor shall provide crew familiarization and training, in accordance with SOW, Paragraph
5.3. Crew familiarization training will be scheduled at a mutually agreeable time following receipt and issue of the boat at the end user location.
5.2.2 CLIN 0002 – AFT DECK EXTREME COLD WEATHER ENCLOSURE
The Contractor shall construct an insulated extreme cold weather enclosure for the aft deck in accordance with Section 169-5 of the Specification (Attachment 1 - Dive Support Boat Spec Rev A (11JAN2024)).
5.2.3 CLIN 0003 – ENGINEERING & INDUSTRIAL SERVICES (OPTION)
The Contractor shall provide Engineering and Industrial Services in support of this contract in accordance with Section H of this Contract entitled “ENGINEERING & INDUSTRIAL SERVICES.” The work to be performed shall consist of that which is required to support the program in any of the following areas:
Design Engineering & Production Services, and Testing Phase Support. Requirements under this CLIN might include, but are not limited to changes to the configuration baseline, Government requirements identified during pre-delivery inspection, issue resolution support during Government testing, and the development of various engineering products. Examples of work that might be accomplished under this CLIN include equipment installation, rigging support, component replacement, minor design upgrades and subject matter expert technical assistance. The requirements associated with this CLIN are over and above those specified in other contract CLINs.
5.2.4 CLIN 0004 – SHIPPING - The Contractor shall deliver the boat to the location specified in Section F (Deliveries or Performance) and in accordance with SOW, Paragraph 5.3. Spare parts and items not integrated into the boat shall be wrapped in protective packaging or container and shall be shipped to the same location either with the boat or via separate shipping.
5.3 STATEMENT OF WORK, DESIGN, PRODUCTION AND DOCUMENTATION
5.3.1 CONFERENCES AND REVIEWS
The Contractor shall conduct a Post Award Conference (PAC) and Progress Reviews. The Contractor shall prepare meeting minutes.
5.3.1-1 Post Award Conference: The Contractor shall conduct a PAC with the Government within 45 days after contract award and subsequent boat option exercise, as needed. The conference will be held either at the Contractor’s facility, by phone, or virtually online via Microsoft (MS) Teams, and at the Government’s discretion. The purpose of the conference is to (1) review the contract and technical documents, (2) review the technical and schedule requirements, and (3) discuss the roles and working relationships between the Contractor and the Government.
5.3.1-2 Design Maturity Review (DMR): The Contractor shall schedule and host Government personnel for a DMR prior to the start of the boat build. The DMR shall be scheduled at least 30 days prior to the review. The purpose of the DMR is to demonstrate that the design is sufficiently mature to start the build of the 60’ DS boat and that the status of material ordering and delivery will support the proposed build schedule. Any potential risk areas shall be identified and mitigation plans discussed.
The Government should be satisfied that all requirements in the Specification (Attachment 1 - Dive Support Boat Spec Rev A (11JAN2024)) have been incorporated into the design. The Government will notify the Contractor within 7 days of the Design Maturity Review whether or not the start of boat build is authorized. The following shall be provided 14 days prior to the Design Maturity Review:
A. Updated Design, Production, and Delivery Schedule, including:
• Contractor facilities: The Contractor shall provide evidence of the facilities readiness,
• Production Manning: The Contractor shall provide evidence that manning resources are available to support planned production, B. Material and purchased parts status, including but not limited to:
• hull and deck materials,
• major equipment,
• long-lead time items.
C. Preliminary Master Data Index.
D. DRAFT Technical Design Analyses for final Government Approval:
• Allocated Baseline Weight Estimate (ABWE),
• Initial Stability (including General HydroStatics (GHS) geometry and run files used in the analysis).
E. Preliminary Technical Design Analyses demonstrating approach and maturity of the design, including but not limited to:
• Electrical load analysis,
• HVAC Sizing and Insulation Design,
• Engine Room and Dive Equipment Room Ventilation Sizing and Design.
F. Preliminary build drawings to support reviews of Technical Design Analyses and demonstrate the approach to meet the Specification, including but not limited to:
• Outboard Arrangement Drawing,
• Inboard Arrangement Drawing,
• AC and DC Electrical One Line Drawings,
• Hoisting Drawing, G. Description of approach to completing Preliminary Test Plans, including but not limited to:
• Scale Weight,
• Pull Tests,
• Fuel Tank(s) and System(s) Pressure Tests
H. Specification Review of Proposed Equipment, submitted in Microsoft Word/Excel format for review of proposed commercial off-the-shelf (COTS) products intended to meet the requirements of the specification for the following, at minimum:
• Electrical cabling and circuit protection,
• Lighting,
• HVAC systems,
• Safety equipment (e.g. detectors, alarms, etc.),
• Outfitting,
• Any proposed brand name “equals” (see Attachment 1 - Dive Support Boat Spec Rev A (11JAN2024), Section 042),
• Any additional items identified by the Contractor or Government during the Post Award Conference.
I. Requests For Variance (RFV): There shall be no open RFVs. Contract Problem Identification Reports (CPIRs) shall have a documented resolution.
J. Risk Assessment: an assessment of risk and the risk management approach to eliminate or mitigate those risks.
5.3.1-3 Progress Reviews: Progress Reviews shall be held at the Contractor’s discretion or by Government request, as needed to support the production schedule. Reviews will be held at the Contractor’s facility, by phone, or virtually online via Microsoft (MS) Teams, and shall not interfere with continued progress or production of the boat. Reviews shall not be used as approval to proceed in design or production, unless otherwise specified, and should be used only for informing the Government of process on production, builder questions, and impending risk to program.
5.3.2 WARRANTY
The Contractor will correct defects for the boat, and all installed equipment, for minimum of 1 year, starting from the date the boat is officially issued to the Navy's end-user after the contractor resolves all discrepancies from the Post Delivery Inspection Report (PDIR) in accordance with the warranty provided in Attachment 9 - Warranty Terms.
5.3.3 PROGRAM MANAGEMENT
Roles and Responsibilities
5.3.3-1 The Contractor shall establish a project management structure that ensures overall quality of the boat components, consistent with their chosen engineering and manufacturing approach.
5.3.3-2 The Contractor shall designate a Project Manager (PM) to serve as the principal representative of the Contractor throughout the duration of contract performance. The PM shall be responsible for the performance of the contract and on-time delivery of technically compliant boats and associated equipment. At all times, the PM shall have the responsibility for ensuring program integrity and overall contract performance. The contractor shall ensure that administration, logistics, financial and other task requirements pertinent to contract performance are addressed.
5.3.3-3 The Government points of contact are listed in the clause “G-242-H001 GOVERNMENT
CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND RESPONSIBILITIES (NAVSEA)
(OCT 2023)”
5.3.4 INVOICES
The Contractor shall provide affidavits or invoices from the suppliers of all essential materials used in the building of the boat. The affidavits or invoices shall be used together with records identifying the lot or serial numbers of the boat in which such materials were used.
5.3.5 SPARES
5.3.5-1 Boat (initial) Spares: The Contractor shall provide initial spares for the boat as outlined in Attachment 7 - Initial Spare Parts List. The spares provided for the boat shall match the propulsion configuration/OEM installed on the boat. Spares shall be managed as part of the configuration management process and the Contractor shall inform the Government of any necessary part number updates that will be required throughout the execution of this contract. Boat and Spares shall be packaged and marked in accordance with Section D of this contract.
5.3.5-2 Updates: The Contractor shall recommend updates to the contract spares list throughout the life- cycle of this contract. It is anticipated that parts will become obsolete or newer parts will become available that should be provided as part of spares offered.
5.3.6 DELIVERY
The Contractor shall safely deliver the boat to the awarded location, as defined in Section F of this contract.
The Contractor shall be responsible for ensuring the boat is delivered fully assembled, operational, in original condition and still meets the Specification (Attachment 1 - Dive Support Boat Spec Rev A (11JAN2024)) requirements upon delivery. The boat may be delivered on the water, under its own power, to the final destination. Main engine hours at final delivery should be less than 350 hours per engine. If delivered in this manner, all periodic maintenance shall be conducted (oil changes, filter changes, cleanings or any other item or action required by the equipment’s OEM/manual), logged along with date, hours of the equipment or other relevant data, and any spare liquids, filters, etc., that are used, shall be replaced prior to final acceptance of the boat. The boat shall be properly cleaned and restored to like-new condition following the delivery trip. The boat shall be hauled-out and the hull shall be pressure washed, hull paint touched up, repairs made if necessary, and made available for inspection by the Government at a location not more than approximately a 4-hour drive from the final destination. A log of the trip shall be made, including passage descriptions, speeds, engine RPMs, all stop-overs, any equipment failures and remedies, or any other significant issues arising. The log shall be presented to the Government at final delivery. The boat shall be inspected in accordance with Section E and all PDIR discrepancies must be resolved prior to acceptance by the Government.
5.3.7 ESSENTIAL CYBERSECURITY COMPONENT (ECSC) DATA COLLECTION
For each boat the Contractor shall document and provide the Essential Cybersecurity Component (ECSC) details of hardware model/part number, hardware serial number, software version, and firmware version in accordance with Sections 085 of the Specification (Attachment 1 - Dive Support Boat Spec Rev A
(11JAN2024)).
5.3.8 TECHNICAL DATA PACKAGE
5.3.8-1 General: The Contractor shall provide a copy of the Technical Data Package (TDP) with the boat in accordance with Section 085 of the Specification (Attachment 1 - Dive Support Boat Spec Rev A (11JAN2024)). The costs (e.g. print, arrange, bind, etc.) to provide a copy of the TDP, including updating boat applicability and individual boat certifications, shall be included in the unit prices under
CLIN 0001.
5.3.8-2 Format: Drawings shall be provided in hard copy, DWG/DXF format and PDF format. Boat technical manual and COTS manuals, instructions or cut sheets, certifications, analyses, master data index, and all other data shall be provided in hard copy and PDF format. Calculations shall be submitted in their native electronic format.
5.3.8-3 Data Security: Most of the data in the TDP is considered Controlled Unclassified Information (CUI) and therefore, the Contractor shall exchange data with the Government via a Government provided Integrated Digital Environment (IDE) or Government approved File Exchange Server utilizing appropriate Public Key Infrastructure/Information Assurance protocols.
5.3.8-4 Submittal: A complete preliminary TDP shall be submitted electronically to the Technical Point of Contact (TPOC) a minimum of 45 days prior to pre-delivery inspection and trials (PDIT).
The Government will provide comments and questions on the preliminary TDP. Early submittals are encouraged and will be reviewed as soon as practicable. One hard copy of the TDP and one electronic copy of the TDP shall be provided at each PDIT for additional Government review. Any additional TDP comments will be included in the PDIT Discrepancy List. The Contractor shall respond to the comments either by correction/incorporation or by providing Contractor responses (e.g. resolution plan, notification of boat correction, clarification questions, etc.) within 15 days of the PDITs.
One hard copy and one electronic copy (CD/DVD) of the Final TDP (with all comments incorporated) shall be provided with the delivery of the 60’ DS Boat. One electronic copy of the Final TDP (with all comments incorporated) shall be submitted to the Government TPOC concurrent with delivery of the 60’ DS Boat.
5.3.8-5 TDP Acceptance: Government acceptance of the preliminary technical analysis package, preliminary TDP, and final TDP for payment events is predicated upon accuracy (data matching the as-built configuration of the boat) and completeness (all technical data provided with status/rationale provided for any outstanding/missing data).
5.3.9 DATA RIGHTS
5.3.9-1 It is the Government's desire that all non-commercial technical data (TD) included in the TDP (baseline or as modified by any Engineering Change Proposals) be delivered with a minimum of Government Purpose Rights (as defined in DFARS 252.227-7013 and 252.227-7014). If the Offeror proposes to deliver commercial TD, it is the Government’s desire to obtain a license to the commercial TD that would grant the Government the equivalent of Government Purpose Rights as a minimum. The Government’s overall goal is to have the ability to maintain and repair the vessel and its systems, to include providing that information to third parties for the purpose of developing and executing the required work expediently. All TDP deliverables shall be marked with appropriate data rights legends per DFARS 252.227-7013 and 252.227-7014 as applicable.
5.3.9-2 The Contractor’s Data Rights assertions will be incorporated in the contract as Attachment 11 - Technical Data Rights Assertion.
5.3.9-3 End Use License Agreement Indemnification:
1. Except when indemnification by the Government is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures, any supply or service acquired under this contract that is subject to any End Use License Agreement (EULA) or similar legal instrument which includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
2. Any such clause is unenforceable against the Government.
3. Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA or similar legal instrument.
4. Any such clause is deemed to be stricken from the EULA or similar legal instrument.
5.3.9-4 If the Contractor ceases doing business and/or cannot fulfill its obligations under this contract, the Government shall automatically be granted Government Purpose Rights to all existing data developed under this contract.
5.3.10 TEST CERTIFICATIONS
Test certification documentation for items in the Specification (Attachment 1 - Dive Support Boat Spec Rev A (11JAN2024)), Section 092 shall be provided in electronic format (PDF). All pull test plans shall be submitted to the Government TPOC and approved prior to testing. Testing results shall be submitted a minimum of 3 business days prior to PDIT start date to the Government TPOC.
5.3.11 BUILDER’S TRIALS (BT)
The Contractor shall perform and submit the first boat BT results in electronic format (PDF) a minimum of 3 business days prior to PDIT start date to the Government TPOC. These trials and reports shall be conducted in accordance with the Specification (Attachment 1 - DS Boat Specification Rev), Section 094.
5.3.12 PRE-DELIVERY INSPECTION AND TRIAL
5.3.12-1 General: The Contractor shall schedule and host Government personnel to inspect and conduct sea trials on the boat. These trials shall be conducted in accordance with the Specification (Attachment 1 - DS Boat Specification Rev), Section 094.
5.3.12-2 Notification of Trials: The Contractor shall provide a minimum of 45 days’ notice of date of PDIT, and it is recommended the Contractor schedule PDIT no later than 3 weeks prior to the contracted delivery date to allow sufficient time for required evolutions (i.e. PDIT discrepancies corrections, shipping, and receipt at destination). Scheduling in this manner will ensure contracted delivery dates are met.
Notification of PDIT date(s) and agenda/test plan shall be provided to the Government Assistance Program Manager (APM).
5.3.12-3 Trials Readiness: If upon arrival, the Government and the Builder are unable to satisfactorily perform the PDIT as outlined in the Specification (Attachment 1 - DS Boat Specification Rev), Section 094-2, the Builder may be held financially responsible for cost reimbursement of Government and/or Government representative's travel and labor associated with PDITs. The Contractor shall notify the Government of any PDIT delays no later than 5 days before planned arrival. Written notice of PDIT delay shall be accompanied by a request of extension to the Contracting Officer and Program Office Point of Contact. If as a result a delayed PDIT or other delays resulting from this action the builder cannot meet the contractual delivery date, consideration for late delivery shall be required. FAR Clause 52.246-2(e)(1) will be exercised at Government’s discretion for potential Contractor liabilities if PDIT cannot be satisfactorily performed after arrival of the Government PDIT team on-site. A typical PDIT takes place over 3-½ days.
5.3.12-4 Pre-Transport Inspection: The Government reserves the right to schedule and conduct a Pre-Transport Inspection. The Pre-Transport Inspection is intended to reduce the likelihood of major discrepancies at the post-delivery inspection.
5.3.12-5 Acceptance: Satisfactory inspection and verification, including TDP reviews (i.e. drawings, manuals, certifications, etc.), proper operation of the boat, and corrections of PDIT discrepancies are conditions for final acceptance of the boat by the Government. All PDIT and TDP discrepancies must be resolved/corrected by the Contractor prior to delivery. Any unresolved discrepancies may result in acceptance and/or payment delays.
5.3.12-6 Photos Photographs for items listed in the Specification (Attachment 1 - DS Boat Specification Rev) shall be submitted to the Government TPOC electronically (jpeg format) as stages or parts are completed.
5.3.13 CREW FAMILIARIZATION AND TRAINING
(a) The Contractor shall provide one (1) week of basic familiarization and training at the End User’s location for up to ten (10) students. End User locations are defined in Section F. This training shall include builder and OEM training in real world environments, utilizing the Boat Technical Manual content as the course and student guide.
(b) Course content shall include, but not be limited to, an overview of the boat’s basic Hull Mechanical and Electrical (HM&E) Systems, Navigation System, and Communications systems, startup/operation/shut down procedures, basic trouble-shooting, preventative maintenance and general emergency procedures.
(c) The crew familiarization course shall address component change-out procedures for items that are part of systems or major equipment, such as items in: Engines, Transmissions, Generators, Bow thruster, piping and mechanical systems, Air Conditioners, Electrical Systems (DC and AC), Navigation System, Communication System.
1. Underway operations shall include but not be limited to: boat start-up, close quarter maneuvering, anchoring, towing, docking, and shutdown.
2. The Contractor shall provide all training materials. One (1) hard copy of the Boat Technical Manual shall be provided to each student. The contractor is required to provide fuel for crew familiarization.
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-202-H002 ADDITIONAL DEFINITIONS–ALTERNATE I (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(e) NAVSEA 08 - means the Deputy Commander, Nuclear Propulsion Directorate, Naval Sea Systems Command of the Department of the Navy.
(f) Lead Shipbuilder, Lead Yard or Lead Shipyard - mean (List contractor) in its capacity as Contractor under Contract No. (List Contract) for the construction of the (List first ship of the class).
(g) Follow Shipbuilder, Follow Yard or Follow Shipyard - mean a prime contractor performing a contract for the construction of follow ships of the (List ship class) Class.
(h) Lead Ship or First Ship of the Class - mean the (List first ship.)
(i) Follow Ship – means any ship of the (List class) Class other than the first ship.
(j) Design Agent - means (List contractor) in its capacity as Design Agent, not in its capacity as shipbuilding contractor.
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-211-H001 ACCESS TO THE VESSEL(S) (NAVSEA) (OCT 2018)
Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.
C-211-H003 DRY-DOCKING FACILITIES AND SHIPBUILDING WAYS CERTIFICATION (NAVSEA) (OCT 2018)
Dry-docking facilities and shipbuilding ways employed in the performance of this contract shall be certified in accordance with MIL-STD-1625D (SH) dated 27 August 2009, Safety Certification Program for Dry-docking Facilities and Shipbuilding Ways for U.S. Navy Ships. The "Facility Certification Report" shall be submitted to NAVSEA Code 04 via the cognizant Supervisor of Shipbuilding not less than twelve (12) months prior to the scheduled launching of the first vessel constructed under this contract.
C-211-H007 PROTECTION OF THE SHIP DURING ADVERSE ENVIRONMENTAL CONDITIONS
(NAVSEA) (APR 2021)
The Contractor shall ensure that the ship(s) and all related material at the Contractor's facilities are protected during conditions of heavy weather, high winds, heavy snow and icing, high water or similar adverse environmental conditions.
The Contractor shall develop, maintain, and implement as necessary an “Adverse Environmental Conditions Plan” which prescribes the actions and procedures and assigns responsibilities for action to be taken in preparation for and during the period of adverse environmental conditions. The Contractor shall furnish the plan to the Supervisor and shall make such changes in the plan as the Supervisor considers necessary to provide for adequate protection of the ship(s) and the materials and equipment to be installed therein.
C-211-H008 QUALIFICATION OF CONTRACTOR NON-DESTRUCTIVE TESTING (NDT) PERSONNEL
(NAVSEA) (OCT 2018)
(a) The Contractor and any Non-destructive Testing (NDT) subcontractor shall utilize for the performance of required NDT, only Level I, II and III personnel currently certified in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271, Revision 1 of 11 September 2014. Documentation pertaining to the qualification and certification of NDT personnel shall be made available to the Contracting Officer for review upon request.
(b) These requirements do not apply with respect to nuclear propulsion plant systems and other matters under the technical cognizance of the Office of Navy Nuclear Propulsion (NAVSEA 08). Because of health and safety considerations, such matters will continue to be handled as directed by NAVSEA 08.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
C-211-H019 COMMONALITY AND STANDARDIZATION (NAVSEA) (FEB 2022)
The Contractor shall develop and implement a Commonality and Standardization Plan, reducing range and increasing depth of like equipment, to enhance supportability, minimize life cycle costs, and increase system readiness and interoperability across ships/ship classes through the selection of equipment and components which are, to the maximum extent possible, (1) common for application within the Class and (2) common with equipment/components currently installed in U.S. Navy ships. The Contractor shall utilize both Industry (e.g., the Common Parts Catalog) and Government (e.g., NAVSEA Enterprise Commonality Virtual Shelf and the Hull, Mechanical and Electrical Equipment Data Research System (HEDRS)) tools to implement its Commonality and Standardization Plan. For selecting Hull Mechanical and Electrical (HM&E) equipment/components, the Contractor shall utilize NAVSEA Enterprise Commonality Virtual Shelf before other tools, if the items meet the contract requirements. The Virtual Shelf is a web-based repository of HM&E equipment/components that meet cross-platform requirements and specifications and provide superior Total Ownership Cost (TOC). Information to gain access to the Virtual Shelf is located on the following web site: https://www.pdrep.csd.disa.mil/
C-211-H020 PROTECTION OF THE VESSEL (NAVSEA) (MAR 2019)
(a) The Contractor shall exercise reasonable care, as agreed upon with the Supervisor, to protect the vessel from fire, and shall maintain a system of inspection over the activities of its welders, burners, riveters, painters, pipe fitters, and similar workers, and of its subcontractors, particularly where such activities are undertaken in the vicinity of the vessel's magazines, fuel oil tanks, or store rooms containing inflammable materials. All ammunition, fuel oil, motor fuels, and cleaning fluids shall have been off-loaded and the tanks cleaned, except as may be mutually agreed upon between the Contractor and the Supervisor prior to work on the vessel by the Contractor. Fire hose lines shall be maintained by the Contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the Contractor's pier or in dry dock. All tanks under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe to the extent necessary, and the Contractor shall furnish the vessel's Gas Free Officer and the Supervisor with a "Gas Chemists' Certificate" before any hot work is done. The Contractor shall maintain a fire watch aboard the vessel in areas where the Contractor is working. All other fire watches aboard the vessel shall be the responsibility of the Government.
(b) Except as otherwise provided in contractually invoked technical specifications or NAVSEA furnished directives, while the vessel is at the Contractor's plant and when the temperature becomes as low as thirty-five degrees Fahrenheit, the Contractor shall assist the Government when requested in keeping all pipe-lines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected by the Contractor from frost damage by applied heat through the use of a salamander or other proper means.
(c) The work shall, whenever practicable, be performed in such manner as not to interfere with the work performed by military personnel attached to the vessel, and provisions shall be made so that personnel assigned shall have access to the vessel at all times, it being understood that such personnel will not unduly interfere with the work of the Contractor's workmen.
(d) The Contractor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by its employees, or the work performed by the Contractor in accordance with this contract, and at the completion of such work shall remove all rubbish from and about the site of the work, and shall leave the work in its immediate vicinity "broom clean", unless more exactly specified by the Supervisor.
(End of Text)
C-222-H001 ACCESS TO THE VESSELS BY NON-U.S. CITIZENS (NAVSEA) (APR 2019)
(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by COMNAVSEA or his designated representative that such access should be permitted in the best interest of the United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST 5510.2D.
(b) If the Contractor desires to employ non-U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non-U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control Plan (ACP) which shall contain as a minimum, the following information:
(1) Badge or Pass oriented identification, access, and movement control system for non-U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.
(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.
(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.
(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.
(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.
(2) Contractor's plan for ascertaining citizenship and for screening employees for security risk.
(3) Data reflecting the number, nationality, and positions held by non-U.S. citizen employees, including procedures to update data as non-U.S. citizen employee data changes, and pass to cognizant CAO.
(4) Contractor's plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.
(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.
(c) To request approval for non-U.S. citizens of hostile and/or communist-controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22-M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for the above group. Approval of ACP's for access of non-U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non- U.S. citizens of hostile and/or communist-controlled countries.
(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S. citizens on this contract or agreement until such time as the compliance with an approved ACP is demonstrated and upon a determination by the CAO that the Government's interests are protected. Further, the Government reserves the right to cancel previously granted authority when such cancellation is determined to be in the Government's best interest. Use of non-U.S. citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated or default in accordance with the clause entitled "Default (Fixed-Price Supply and Service)" (FAR 52.249-8), "Default (Fixed-Price Research and Development)" (FAR 52.249-9) or "Termination (Cost Reimbursement)" (FAR 52.249- 6), as applicable.
(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.
(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.
(g) The same restriction as in paragraph (f) above applies to other non-U.S. citizens who have access to the Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.) except that, with respect to access to the vessel and worksite, the restrictions shall not apply to uniformed U.S.
Navy personnel who are non-U.S. citizens and who are either assigned to the ship or require access to the ship to perform their duties.
C-222-H002 DEPARTMENT OF LABOR SAFETY AND HEALTH STANDARDS FOR SHIPBUILDING
Attention of the Contractor is directed to Public Law 91-596, approved December 29, 1970 (84 Stat. 1590, 29 USC
655) known as the "Occupational Safety and Health Act of 1970" and to the "Occupational Safety and Health Standards for Shipyard Employment" promulgated thereunder by the Secretary of Labor (29 CFR. 1910 and 1915).
These regulations apply to all shipbuilding and related work, as defined in the regulations. Nothing contained in this contract shall be construed as relieving the Contractor from any obligations which it may have for compliance with…
This is the start of the file's text. The full file is on GovTribe.