Questions_and_Answers_of_N6426719R0034.docx

DOCX document 12 KB Posted

Attached to
VLS Drill Fixtures
Solicitation number
N6426719R0034
Issued by

About this file

Questions and answers about the Solicitation.

View the file

Other files

File Type Posted
Questions_and_Answers_of_N6426719R0034.docx DOCX document
Solicitation_Amendment.pdf PDF
N6426719R0034_.pdf PDF
https://www.fbo.gov/notices/92acbda295dfb5fd06e30f49b6484b9c HTML file
SOW_VLS_Drill_Fixture_Draft.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers of N6426719R0034 Question: For VLS Drill Fixtures, the SOW states the first two fixtures are due 4 months after contract date and the solicitation document states 6 months. Which of these time periods is correct?

Answer: Refer to the solicitation for delivery dates and all specifications. The Draft SOW that was used in the Pre-solicitation phase has since been modified. The most current version of the SOW can be found in Section C of the Solicitation.

Question: Would the Navy consider proposals offering greater lead times than (6) months?

Answer: Delivery timeframe is a requirement for technical acceptability. Each offer should contain the offeror’s best terms from a technical and price standpoint.