Questions_and_Answers_of_N6426719R0034.docx

DOCX document 12 KB Posted

Attached to
VLS Drill Fixtures
Solicitation number
N6426719R0034
Issued by

About this file

Additional Questions

View the file

Other files

File Type Posted
Questions_and_Answers_of_N6426719R0034.docx DOCX document
Solicitation_Amendment.pdf PDF
N6426719R0034_.pdf PDF
https://www.fbo.gov/notices/92acbda295dfb5fd06e30f49b6484b9c HTML file
SOW_VLS_Drill_Fixture_Draft.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers of N6426719R0034 Question: For VLS Drill Fixtures, the SOW states the first two fixtures are due 4 months after contract date and the solicitation document states 6 months. Which of these time periods is correct?

Answer: Refer to the solicitation for delivery dates and all specifications. The Draft SOW that was used in the Pre-solicitation phase has since been modified. The most current version of the SOW can be found in Section C of the Solicitation.

Question: Would the Navy consider proposals offering greater lead times than (6) months?

Answer: Delivery timeframe is a requirement for technical acceptability. Each offer should contain the offeror’s best terms from a technical and price standpoint.

Question: Is there CAD available to support this requirement?

Answer: CAD or other model will not be available; only available drawings.