1. Spec Section 5.1.1 and CLIN 0006 requires the contractor to provide As-Built drawings. Is this requirement only for the changes / upgrades performed by the contractor during the execution of this contract or should the contractor provide As-Built for all existing and previously installed IDS/AECS?
Second half to the question is correct: "he contractor provide As-Built for all existing and previously installed IDS/AECS" and as changes happen provide updated As-Built.
2. The Spec Section 5.1.1. requires the contractor to repair and maintain the wiring in NSWC, Corona Division bldg. 547. Please clarify the location of the wiring (underground, above ceiling, in conduit, etc) and the wiring's type?
The location of the wiring is immediately inside the secured space and is in conduit, CAT 5.
3. CLIN 0005 Free Spin for Turnstiles, please provide the manufacturer's name?
Manufactures name: Alvarado (Twin turnstiles).
4. Are the current Lenel system up-to-tdate (SW upgrades / SW licenses, etc)?
No.