CDRL_A001_-_Project_Planning_Chart_V3.1_signed.doc

DOC document 281 KB Posted

Attached to
SWTTR UWNSS UPGRADE
Solicitation number
N64267-16-T-0044
Issued by

About this file

CDRL A001

View the file

Other files

File Type Posted
CDRL_A004_-_Acceptance_Test_Plan_V3_1_signed.doc DOC document
CDRL_A005_-_Acceptance_Test_Report_V3.0_signed.doc DOC document
DI-QCIC-80553A_Acceptance_Test_Plan.pdf PDF
CDRL_A006_-_Engineering_Drawings_V3.0_signed.doc DOC document
CDRL_A002_-_Site_Survey_Report_V3.0_signed.doc DOC document
SOW-RFQ_PWS_-_SWTTR_UWNSS_V5_0.docx DOCX document
DI-DRPR-80651_Engineering_Drawings.pdf PDF
DI_80507C_Project_Planning_Chart.pdf PDF
DID_OT-16-20065_Implementation_Plan.pdf PDF
DID_OT-16-20064_Site_Survey_Report_(SSR).pdf PDF
DI-QCIC-81891_Acceptance_Test_Report.pdf PDF
CDRL_A003_-_Site_Prep_and_Installation_Plan_(Implementation_Plan)_V3.0_signed.doc DOC document
CDRL_A004_-_Acceptance_Test_Plan_V3_1_signed.pdf PDF
CDRL_A001_-_Project_Planning_Chart_V3.1_signed.pdf PDF
DI-DRPR-80651_Engineering_Drawings.pdf PDF
CDRL_A002_-_Site_Survey_Report_V3.0_signed.pdf PDF
CDRL_A005_-_Acceptance_Test_Report_V3.0_signed.pdf PDF
CDRL_A003_-_Site_Prep_and_Installation_Plan_(Implementation_Plan)_V3.0_signed.pdf PDF
DID_OT-16-20064_Site_Survey_Report_(SSR).pdf PDF
DID_OT-16-20065_Implementation_Plan.pdf PDF
SOW-RFQ_PWS_-_SWTTR_UWNSS_V5_0.docx DOCX document
DI-QCIC-81891_Acceptance_Test_Report.pdf PDF
DI_80507C_Project_Planning_Chart.pdf PDF
CDRL_A006_-_Engineering_Drawings_V3.0_signed.pdf PDF
DI-QCIC-80553A_Acceptance_Test_Plan.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

MGMT

ATDP
TMOTHER
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
SWTTR UWNSSSolic# N64267-16-T-0044
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A001Project Planning ChartSWTTR UWNSS Upgrade
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-80507CSOW Paragraph 7.1NSWC Corona (RS31)

DD 250 REQ

LT

APP CODE

DIST STATEMENT REQUIRED

FREQUENCY

ONE/R

AS OF DATE

DATE OF FIRST SUBMISSION

See BLK 16

DATE OF SUBSEQUENT

DISTRIBUTION

ADDRESSEE

COPIES

Final A See BLK 16 N/A

SUBMISSION

See BLK 16 Draft

Reg Repro

16. REMARKS

BLK 8: Government will review the schedule and submit comments and changes to contractor up to 5 business days after receipt of first draft from contractor.

Contractor has up to 5 business days to resubmit.

BLK 9: Affix the following distribution statement on all documents: "DISTRIBUTION STATEMENT C: Distribution authorized to US Government Agencies and their contractors, Administrative and Operational Use, 1 Jan 2016. Other requests for this document shall be referred to Naval Surface Warfare Center, Corona Division, ATTN: Neal Nakafuji, RS31, P.O. Box 5000, Corona, CA 92878-5000."

BLK 12: First draft provided no more than 5 business days after Initial Planning Meeting is completed. Government will review for accuracy and content, then submit comments/changes to contractor no more than 5 days after receipt of first draft.

BLK 13: Final provided no more than business 5 days after Government comments/changes are submitted to contractor.

BLK 14: If the contractor elects to send an electronic copy of this documentation, it shall be sent by e-mail in a Microsoft Office application format, such as Microsoft Word, Excel, Project, Visio, and PowerPoint. Electronic and hard copies shall be provided to: E-mail: neal.nakafuji@navy.mil Address: NSWC Corona Division Attn: Neal Nakafuji (RS31) P.O. Box 5000 Corona, CA 92878-5000 NSWC Corona 1 1

15. TOTAL

1 1 0

OLEA.MARIA.M.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

NAKAFUJI.NEAL. Digitally signed by NAKAFUJI.NEAL.N.1231993602 ou=USN, cn=NAKAFUJI.NEAL.N.1231993602 Digitally signed by OLEA.MARIA.M.1251908121 DN: c=US, o=U.S. Government, ou=DoD, cn=OLEA.MARIA.M.1251908121 01/25/2016 N.1231993602 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, Date: 2015.11.05 13:44:43 -08'00' 01/25/2016 1251908121 ou=PKI, ou=USN, Date: 2016.01.25 16:04:33 -08'00'

DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE USED.

of 1 Pages