SOW_POSTING.doc

DOC document 41 KB Posted

Attached to
Fabrication of Drill Fixture
Solicitation number
N64267-14-T-0239
Issued by

About this file

Scope of Work

View the file

Other files

File Type Posted
WS19185B_-_Process_Specification_for_Marking_of_Items.pdf PDF
5599024_-_Table_Plate.pdf PDF
WS20174A_SCN_1_MVLS2-815.pdf PDF
WS19143B_SCN_2.pdf PDF
5598168_-_Table_Plate.pdf PDF
5497478nor001.pdf PDF
5497609revd.pdf PDF
5597854_NOR_007_(MVLS2-2449R1).pdf PDF
5497482_NOR_001_(VRN0491-01).pdf PDF
WS19185_SCN_006.pdf PDF
WS19185_SCN_003.pdf PDF
5599096_NOR_001_VR11355.pdf PDF
N64267-14-T-0239.pdf PDF
5599096_-_Table_Plate.pdf PDF
5599023nor001.pdf PDF
5597854_NOR_008_(MVLS2-3754).pdf PDF
5223030_NOR_031_FVLS2_2179.pdf PDF
5597854_Parts_List_B.pdf PDF
WS20174_-_Process_Spec_for_Bonding_with_Structural_Epoxy_Adhesive.pdf PDF
5597854_Drwg.pdf PDF
5497609revdpl.pdf PDF
5496971_NOR_002.pdf PDF
5223030_NOR_029_FVLS_2158.pdf PDF
5496971A_(PL).pdf PDF
5597854_NOR_006.tif TIF image
WS19176A.pdf PDF
WS19185_SCN_004.pdf PDF
WS194143B_SCN7_1.pdf PDF
WS19143B_SCN_5.pdf PDF
WS19143revb.pdf PDF
5497609revd_(2).pdf PDF
WS19143B_SCN_1.pdf PDF
5223030_NOR_028_FVLS_2146.pdf PDF
5497476_NOR_001_(VRN0483-01).pdf PDF
WS19143B_SCN_3.pdf PDF
5496688_NOR_002.pdf PDF
5597854_NOR_005.tif TIF image
5597854B.TIF TIF image
5223030_NOR_030_FVLS2_2176.pdf PDF
5496996_NOR_003.pdf PDF
WS19143B_SCN_6.pdf PDF
5497482_-_Headless_Liner.pdf PDF
5496971A.pdf PDF
5599023_-_Table_Plate.pdf PDF
WS19185B_SCN_007_MVLS2-3261.pdf PDF
6388443_53711_NULL_-_0001_-_NULL_0001_49998_U_N_N_N1.pdf PDF
5496996_NOR_005_(NSWC-0377).pdf PDF
5223030G.pdf PDF
WS20174A_SCN_2_FVLS-1990.pdf PDF
5497476_NOR_002_(VR14688-01).pdf PDF
Show 40 more

Latest 50 of 124 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FABRICATION AND INSTALLATION OF DRILL FIXTURE, PE12

MATERIAL

SOLICITATION NUMBER: N64267-14-T-0239

SALES TAX EXEMPTION: The Contractor is hereby advised that the United States Government and Agencies thereof are exempt from State and Local Government tax by virtue of Article 6 of the United States Constitution. No exemption certificate is required.

1.0 INTRODUCTION

The Naval Surface Warfare Center (NSWC), Corona Division, Product Engineering Department, Code PE 12 requires manufacture of a Drill Fixture used on the Vertical Launching System (VLS) for installation of the Launcher Module.

2.0 BACKGROUND

The MK41 Launcher is capable of firing several missiles and is fitted to ships in modules. MK41 VLS adopts modular design concept, which results in different versions that vary in size and weight due to different "canisters" in various modules. The height (missile length) of the launcher comes in three sizes: 209 inches (5.3 m) for the self-defense version, 266 inches (6.8 m) for the tactical version, and 303 inches (7.7 m) for the strike version. The empty weight for an 8-cell module is 26,800 pounds for the self-defense version, 29,800 pounds for the tactical version, and 32,000 pounds for the strike version. The VLS Program has a requirement for an additional drill fixture for installation of the VLS Module.

In order to meet this requirement, NWSC Corona Division requires the Manufacturer to meet or exceed the requirements for the drill and Installation fixture listed in the attached technical drawings, specifications and revision documents, including Module Assembly Install and Drill Fixture Drawing 5497609, as well as the Module Assembly Install and Drill Fixture Weldment Drawing 5597854. The fixture is used by government personnel, government contracted personnel and is intended for use during the installation of a module to drill holes in order to secure the module in place.

3.0

SPECIFICATIONS

Quantity
Part Number
Part Description
1
Drawing Number 5497609 Rev D

(-9 configuration ) The fixture is machined steel Weldment/ assembly with sub-components and hardware in accordance with technical specification Drawing 5497609 Rev D (-9 configuration) and lower level Drawings and specifications listed in the technical Drawings.

· NSWC Corona government personnel will perform periodic inspections at the contractor’s facility during manufacture of the drill fixture.

· Final Inspection and Acceptance to be performed at NSWC Corona prior to payment.

· If the delivered drill and installation fixture does not meet the drawing specifications, it will be returned to the vendor for repair at no additional cost to the government.

· Any deviations from the drawing must be approved by NSWC Corona government PE 12 personnel before manufacturing of the drill and installation fixture.

4.0

REQUIRED DELIVERY DATE:

Drill Fixture to be delivered NLT 7 November 2014