About this file

This solicitation seeks proposals for in-service engineering and life cycle support for the Independence variant of the Littoral Combat Ship combat system equipment. The contractor will provide overall support including critical engineering, design, integration, testing, software development, logistics product development, and training systems support. The support covers shipboard equipment, components, software, training equipment and addresses configuration changes, failures analysis, reliability improvements, and certification requirements. The contractor must have facility security clearance and will require access to classified information. The Navy intends to award a cost-plus-fixed-fee contract on a sole-source basis to General Dynamics Mission Systems due to its responsibility as the original equipment manufacturer and design agent. Proposals are due by the closing date listed in the solicitation.

View the file

Other files

File Type Posted
N6339420R0035 0002 Conformed.pdf PDF
N6339420R0035 0001.pdf PDF
N6339420R0035 Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to the do the follow ing:

1.) Addition of DFARS Provision and Clause, respectively, DFARS 252.24-7019 in Section K and DFARS 252.204-7020 in Section I;

2.) In Section C, SOW w as replaced w ith revised SOW (See Amend. No. 0002: Pages 43-67): Revisions are notated in Bold/Italics/Underline as applicable;

3.) Revision of the CLINs/SLINs;

4.) Addition of (Estimated) Not-To-Exceed (NTE) Amounts in the Extended Description sections of the CLINs/SLINs for (FFP) SUBCONTRACTOR (SUB-KTR) COST CLINs/SLINs and (COST) Materials CLINs/SLINs;

5.) Addition/Updates of CDRL A061 information for Welding Procedures references;

6.) Removal of E-246-W006 SAMPLING OF RECEIVED MATERIAL – ORDNANCE MATERIAL AND ORDNANCE COMPONENT PARTS (NAVSEA) (OCT 2018); and 7.) Corrections/Updates on information prior listed on the Solicitation.

To review entire revisions, refer to the Modification Copy and Conformed Copy of this (Solicitation) Amendment No. 0002.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 54

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6339420R0035

X 9B. DATED (SEE ITEM 11)

06-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Dec-2020

CODE

NSWC PHD 023

4363 MISSILE WAY

PORT HUENEME CA 93043

N63394 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6339420R0035

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN description has changed from Design Agent Support (DAS)(Prime)-BaseYr to Design Agent Support(DAS)-Labor Base Yr..

The CLIN extended description has changed from:

Provide overall in-service engineering and life cycle support for C5I (Command, Control, Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) with the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and Hours).

To:

Provide overall in-service engineering and life cycle support for C5I (Command, Control, Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and Hours).

SUBCLIN 0001AA

The CLIN description has changed from DAS (Prime)-BaseYr-HOLDING SLIN to DAS - Labor Base Yr. - HOLDING SLIN.

The CLIN extended description has changed from:

Provide overall in-service engineering and life cycle support for C5I systems critical engineering; design; integration; test and evaluation; software development, testing, and load;

system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. IAW the SOW in Section C. Estimated Cost and Fee are NTE Amounts. See Section B, TABLE 1 (Labor Categories and Hours).

Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and

CLIN 0002

The CLIN description has changed from DAS-SUB-KTR COST-BaseYr to DAS- SUBCONTRACTOR (SUB-KTR)COST-Base Yr..

The CLIN extended description has changed from:

DAS-Subcontractor Cost IAW the SOW in Section C. The Government will provide a NTE amount at time of award.

Subcontractor Firm-Fixed-Price tasks in accordance with the Statement ofWork in Section C.

Estimated Cost is a Not-To-Exceed (NTE) Amount.

SUBCLIN 0002AA

The CLIN description has changed from DAS-SUB-KTR COST-BaseYr-HOLDING SLIN to DAS-SUB-KTR COST-Base Yr. -HOLDING SLIN.

The CLIN extended description has changed from:

Estimated Cost is a Not-To-Exceed Amount. (Estimated) NTE amount: $888,053.24.

CLIN 0003

The CLIN description has changed from Materials-Base Yr to Materials-Base Yr..

The CLIN extended description has changed from:

Material Items IAW the Master Material List (MML), J-4: Attachment 4 (MML also known as (aka) Bill of Materials or BOM), in Section J. Ordering procedure IAW clause C-217-H001 PROVISIONED ITEMS ORDERS--BASIC in Section C. Estimated Cost is NTE Amount.

Consumable Materials and Materials IAW the Master Material List (MML), J-4: Attachment 4 (MML also known as (aka) Bill of Materials or BOM), in Section J, required for task performance. Ordering procedure IAW the SOW and Clause C-217-H001 PROVISIONED ITEMS ORDERS--BASIC in Section C. Estimated Cost is Not-To-Exceed (NTE) Amount.

SUBCLIN 0003AA

The CLIN description has changed from Materials-Base Yr (HOLDING SLIN) to Materials-Base Yr.-HOLDING SLIN.

The CLIN extended description has changed from:

Provisioned Items Orders IAW MML, J-4: Attachment 4, in Section J; Includes Material Handling Cost if applicable.

(MML also known as (aka) Bill of Materials or BOM), in Section J, required for task performance. Ordering procedure IAW the SOW and Clause C-217-H001 PROVISIONED ITEMS ORDERS--BASIC in Section C. Estimated Cost is NTE Amount.: $2,840,000.00 (Provided NTE Amount does not include Material Handling Costs - Offeror shall include Material Handling Costs if applicable for this Materials SLIN).

CLIN 0004

This CLIN has been renumbered to CLIN 0006.

The contract type COST has been deleted.

The CLIN description has changed from ODC-Materials-Base Yr to N/A - WILL

REMOVE FOR CONTRACT AWARD.

The CLIN extended description has changed from:

Incidental miscellaneous materials required in performance of the services and as identified by Technical Instruction (TI). Includes Material Handling Cost if applicable. Estimated Cost is NTE Amount.

The cost constraint NTE has been deleted.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

N/A - WILL REMOVE FOR CONTRACT AWARD

ESTIMATED COST

SUBCLIN 0004AA

This SUBCLIN has been renumbered to SUBCLIN 0006AA.

The contract type COST has been deleted.

The CLIN description has changed from ODC-Materials-Base Yr (HOLDING SLIN) to N/A - WILL REMOVE FOR CONTRACT AWARD.

The CLIN extended description has changed from:

Incidental miscellaneous materials required in performance of the services and as identified by TI. Includes Material Handling Cost if applicable. Estimated Cost is NTE Amount.

The pricing detail quantity 1.00 has been deleted.

The unit of issue Lot has been deleted.

0006AA

N/A - WILL REMOVE FOR CONTRACT AWARD

FOB: Destination

PSC CD: R425

CLIN 0005

This CLIN has been renumbered to CLIN 0004.

The CLIN description has changed from ODC: Travel-Base Yr to ODC: Travel-Base Yr..

SUBCLIN 0005AA

This SUBCLIN has been renumbered to SUBCLIN 0004AA.

The CLIN description has changed from ODC: Travel-Base Yr (HOLDING SLIN) to ODC: Travel-Base Yr. - HOLDING SLIN.

The CLIN extended description has changed from:

Travel Amount listed is a NTE Amount, Cost-Reimbursable, and No Fee Amount. Travel will be reimbursed IAW the JTR and FAR 31.205-46. Travel is IAW the SOW in Section C Para. 3.14 Travel Requirements. Also, see Section J, J-3: Attachment 3 (Trip Information Form) and in Section J, Appendix B for Trip Destination and Information.

Travel Amount listed is a NTE Amount, Cost-Reimbursable, and No Fee Amount. Travel will be reimbursed IAW the JTR and FAR 31.205-46. IAW the SOW in Section C Para. 3.14 Travel Requirements. Also, see Section J, J-3: Attachment 3 (Trip Information Form) and in Section J, Appendix B for Trip Destination and Information.

CLIN 0006

This CLIN has been renumbered to CLIN 0005.

CLIN 1001

The CLIN description has changed from DAS (Prime) to Design Agent Support-Labor Option Yr. 1.

The CLIN extended description has changed from:

Provide overall in-service engineering and life cycle support for C5I systems critical engineering; design; integration; test and evaluation; software development, testing, and load;

system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training

Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and

SUBCLIN 1001AA

The CLIN description has changed from DAS (Prime)-HOLDING SLIN to DAS - Labor Option Yr. 1 - HOLDING SLIN.

The CLIN extended description has changed from:

Provide overall in-service engineering and life cycle support for C5I systems critical engineering; design; integration; test and evaluation; software development, testing, and load;

system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training

Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and

CLIN 1002

SUBCONTRACTOR COST-Option Yr. 1.

The CLIN extended description has changed from:

Subcontractor Firm-Fixed-Price tasks in accordance with the Statement of Work in Section C.

SUBCLIN 1002AA

SLIN to DAS-SUB-KTR COST-OptionYr.1-HOLDING SLIN.

The CLIN extended description has changed from:

Estimated Cost is a Not-To-Exceed (NTE) Amount. (Estimated) NTE amount: $888,053.24.

CLIN 1003

The CLIN description has changed from Materials to Materials-Option Yr. 1.

The CLIN extended description has changed from:

Material Items IAW the MML, J-4: Attachment 4, in Section J. Ordering procedure IAW clause C-217-H001 PROVISIONED ITEMS ORDERS--BASIC in Section C. Estimated Cost is NTE

(MML also known as (aka) Bill of Materials or BOM), in Section J, required for task performance. Ordering procedure IAW the SOW and Clause C-217-H001 PROVISIONED

SUBCLIN 1003AA

The CLIN description has changed from Materials (HOLDING SLIN) to Materials Option Yr. 1- HOLDING SLIN.

The CLIN extended description has changed from:

(MML also known as (aka) Bill of Materials or BOM), in Section J, required for task performance. Ordering procedure IAW the SOW and Clause C-217-H001 PROVISIONED ITEMS ORDERS--BASIC in Section C. Estimated Cost is NTE Amount: $7,740,454 .00 (Provided NTE Amount does not include Material Handling Costs - Offeror shall include

CLIN 1004

This CLIN has been renumbered to CLIN 1005.

The contract type COST has been deleted.

The CLIN description has changed from ODC-Materials to N/A - WILL REMOVE

FOR CONTRACT AWARD.

OPTION N/A - WILL REMOVE FOR CONTRACT AWARD

SUBCLIN 1004AA

This SUBCLIN has been renumbered to SUBCLIN 1005AA.

The contract type COST has been deleted.

The CLIN description has changed from ODC-Materials (HOLDING SLIN) to N/A -

WILL REMOVE FOR CONTRACT AWARD.

The CLIN extended description has changed from:

1005AA

CLIN 1005

This CLIN has been renumbered to CLIN 1004.

The CLIN description has changed from ODC: Travel to ODC: Travel Option Yr. 1.

SUBCLIN 1005AA

This SUBCLIN has been renumbered to SUBCLIN 1004AA.

The CLIN description has changed from ODC: Travel (HOLDING SLIN) to ODC:

Travel Option Yr. 1 - HOLDING SLIN.

The CLIN extended description has changed from:

Travel Amount listed is a NTE Amount, Cost-Reimbursable, and No Fee Amount. Travel will be reimbursed IAW the JTR and FAR 31.205-46. Travel is IAW the SOW in Section C Para. 3.14 reimbursed IAW the JTR and FAR 31.205-46. IAW the SOW in Section C Para. 3.14 Travel Requirements. Also, see Section J, J-3: Attachment 3 (Trip Information Form) and in Section J, CLIN 2001

Option Yr. 2.

The CLIN extended description has changed from:

Provide overall in-service engineering and life cycle support for C5I systems critical engineering; design; integration; test and evaluation; software development, testing, and load;

system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. IAW with the SOW in Section C. Estimated Cost and Fee are NTE Amounts. See Section B, TABLE 1 (Labor Categories and Hours).

Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and

SUBCLIN 2001AA

Labor Option Yr. 2- HOLDING SLIN.

The CLIN extended description has changed from:

Provide overall in-service engineering and life cycle support for C5I systems critical engineering; design; integration; test and evaluation; software development, testing, and load;

system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training

Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and

CLIN 2002

SUBCONTRACTOR COST-Option Yr. 2.

SUBCLIN 2002AA

SLIN to DAS-SUB-KTR COST-OptionYr.2-HOLDING SLIN.

The CLIN extended description has changed from:

CLIN 2003

The CLIN description has changed from Materials to Materials-Option Yr. 2.

The CLIN extended description has changed from:

Material Items IAW the MML, J-4: Attachment 4, in Section J. Ordering procedure IAW clause

(MML also known as (aka) Bill of Materials or BOM), in Section J, required for task performance. Ordering procedure IAW the SOW and Clause C-217-H001 PROVISIONED

SUBCLIN 2003AA

The CLIN description has changed from Materials (HOLDING SLIN) to Materials Option Yr. 2 - HOLDING SLIN.

The CLIN extended description has changed from:

(MML also known as (aka) Bill of Materials or BOM), in Section J, required for task performance. Ordering procedure IAW the SOW and Clause C-217-H001 PROVISIONED ITEMS ORDERS--BASIC in Section C. Estimated Cost is NTE Amount.: $4,680,454.00 (Provided NTE Amount does not include Material Handling Costs - Offeror shall include

CLIN 2004

This CLIN has been renumbered to CLIN 2005.

The contract type COST has been deleted.

The CLIN description has changed from ODC-Materials to N/A - WILL REMOVE

FOR CONTRACT AWARD.

The CLIN extended description has changed from:

SUBCLIN 2004AA

This SUBCLIN has been renumbered to SUBCLIN 2005AA.

The contract type COST has been deleted.

The CLIN description has changed from ODC-Materials (HOLDING SLIN) to N/A -

WILL REMOVE FOR CONTRACT AWARD.

The CLIN extended description has changed from:

2005AA

CLIN 2005

This CLIN has been renumbered to CLIN 2004.

The CLIN description has changed from ODC: Travel to ODC: Travel - Option Yr. 2.

SUBCLIN 2005AA

This SUBCLIN has been renumbered to SUBCLIN 2004AA.

The CLIN description has changed from ODC: Travel (HOLDING SLIN) to ODC:

Travel - Option Yr. 2 -HOLDING SLIN.

reimbursed IAW the JTR and FAR 31.205-46. Travel is IAW the SOW in Section C Para. 3.14 reimbursed IAW the JTR and FAR 31.205-46. IAW the SOW in Section C Para. 3.14 Travel Requirements. Also, see Section J, J-3: Attachment 3 (Trip Information Form) and in Section J, CLIN 3001

Option Yr. 3.

The CLIN extended description has changed from:

Provide overall in-service engineering and life cycle support for C5I systems critical engineering; design; integration; test and evaluation; software development, testing, and load;

system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training

Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and

SUBCLIN 3001AA

Labor Option Yr. 3 - HOLDING SLIN.

Provide overall in-service engineering and life cycle support for C5I systems critical engineering; design; integration; test and evaluation; software development, testing, and load;

system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training

Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and

CLIN 3002

SUBCONTRACTOR COST-Option Yr. 3.

The CLIN extended description has changed from:

SUBCLIN 3002AA

SLIN to DAS-SUB-KTR COST-OptionYr.3-HOLDING SLIN.

CLIN 3003

The CLIN description has changed from ODC-Materials to Materials-Option Yr. 3.

The CLIN extended description has changed from:

Material Items IAW the MML, J-4: Attachment 4, in Section J. Ordering procedure IAW clause

(MML also known as (aka) Bill of Materials or BOM), in Section J, required for task performance. Ordering procedure IAW the SOW and Clause C-217-H001 PROVISIONED

SUBCLIN 3003AA

The CLIN description has changed from ODC-Materials (HOLDING SLIN) to ODC- Materials-Option Yr. 3-HOLDING SLIN.

The CLIN extended description has changed from:

(MML also known as (aka) Bill of Materials or BOM), in Section J, required for task performance. Ordering procedure IAW the SOW and Clause C-217-H001 PROVISIONED ITEMS ORDERS--BASIC in Section C. Estimated Cost is NTE Amount.: $4,680,454.00

(Provided NTE Amount does not include Material Handling Costs - Offeror shall include

CLIN 3004

This CLIN has been renumbered to CLIN 3005.

The contract type COST has been deleted.

The CLIN description has changed from ODC-Materials to N/A - WILL REMOVE

FOR CONTRACT AWARD.

The CLIN extended description has changed from:

SUBCLIN 3004AA

This SUBCLIN has been renumbered to SUBCLIN 3005AA.

The contract type COST has been deleted.

The CLIN description has changed from ODC-Materials (HOLDING SLIN) to N/A -

WILL REMOVE FOR CONTRACT AWARD.

The CLIN extended description has changed from:

3005AA

CLIN 3005

This CLIN has been renumbered to CLIN 3004.

The CLIN description has changed from ODC: Travel to ODC: Travel - Option Yr. 3.

SUBCLIN 3005AA

This SUBCLIN has been renumbered to SUBCLIN 3004AA.

The CLIN description has changed from ODC: Travel (HOLDING SLIN) to ODC:

Travel-Option Yr. 3 - HOLDING SLIN.

The CLIN extended description has changed from:

Travel Amount listed is a NTE Amount, Cost-Reimbursable, and No Fee Amount. Travel will be reimbursed IAW the JTR and FAR 31.205-46. Travel is IAW the SOW in Section C Para. 3.14 reimbursed IAW the JTR and FAR 31.205-46. IAW the SOW in Section C Para. 3.14 Travel Requirements. Also, see Section J, J-3: Attachment 3 (Trip Information Form) and in Section J, CLIN 4001

Option Yr. 4.

The CLIN extended description has changed from:

Provide overall in-service engineering and life cycle support for C5I systems critical engineering; design; integration; test and evaluation; software development, testing, and load;

system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training

Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and

SUBCLIN 4001AA

Labor Option Yr. 4- HOLDING SLIN.

The CLIN extended description has changed from:

Provide overall in-service engineering and life cycle support for C5I systems critical engineering; design; integration; test and evaluation; software development, testing, and load;

system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training

Communications, Computers, Combat Systems and Intelligence) systems critical engineering;

design; integration; test and evaluation; software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. In Accordance With (IAW) the Statement of Work (SOW) in Section C. Estimated Cost and Fee are Not-To-Exceed (NTE) Amounts. See Section B, TABLE 1 (Labor Categories and

CLIN 4002

SUBCONTRACTOR COST-Option Yr. 4.

The CLIN extended description has changed from:

SUBCLIN 4002AA

SLIN to DAS-SUB-KTR COST-OptionYr.4-HOLDING SLIN.

The CLIN extended description has changed from:

CLIN 4003

The CLIN description has changed from Materials to Materials-Option Yr. 4.

Material Items IAW the MML, J-4: Attachment 4, in Section J. Ordering procedure IAW clause

(MML also known as (aka) Bill of Materials or BOM), in Section J, required for task performance. Ordering procedure IAW the SOW and Clause C-217-H001 PROVISIONED

SUBCLIN 4003AA

The CLIN description has changed from Materials (HOLDING SLIN) to Materials - Option Yr. 4 - HOLDING SLIN.

The CLIN extended description has changed from:

(MML also known as (aka) Bill of Materials or BOM), in Section J, required for task performance. Ordering procedure IAW the SOW and Clause C-217-H001 PROVISIONED ITEMS ORDERS--BASIC in Section C. Estimated Cost is NTE Amount.: $4,680,454.00 (Provided NTE Amount does not include Material Handling Costs - Offeror shall include

CLIN 4004

This CLIN has been renumbered to CLIN 4005.

The contract type COST has been deleted.

The CLIN description has changed from ODC-Materials to N/A - WILL REMOVE

FOR CONTRACT AWARD.

The CLIN extended description has changed from:

SUBCLIN 4004AA

This SUBCLIN has been renumbered to SUBCLIN 4005AA.

The contract type COST has been deleted.

The CLIN description has changed from ODC-Materials (HOLDING SLIN) to N/A -

WILL REMOVE FOR CONTRACT AWARD.

The CLIN extended description has changed from:

4005AA

CLIN 4005

This CLIN has been renumbered to CLIN 4004.

The CLIN description has changed from ODC: Travel to ODC: Travel Option Yr. 4.

SUBCLIN 4005AA

This SUBCLIN has been renumbered to SUBCLIN 4004AA.

The CLIN description has changed from ODC: Travel (HOLDING SLIN) to ODC: Travel - Option Yr. 4 -

HOLDING SLIN.

The CLIN extended description has changed from:

Travel Amount listed is a NTE Amount, Cost-Reimbursable, and No Fee Amount. Travel will be reimbursed IAW the JTR and FAR 31.205-46. Travel is IAW the SOW in Section C Para. 3.14 Travel Requirements. Also, see Section J, J-3: Attachment 3 (Trip Information Form) and in Section J, Appendix B for Trip Destination and Information.

Travel Amount listed is a NTE Amount, Cost-Reimbursable, and No Fee Amount. Travel will be reimbursed IAW the JTR and FAR 31.205-46. IAW the SOW in Section C Para. 3.14 Travel Requirements. Also, see Section J, J-3:

Attachment 3 (Trip Information Form) and in Section J, Appendix B for Trip Destination and Information.

The following have been modified:

TABLE 1

TABLE 1: LABOR CATEGORIES AND HOURS:

The following table, TABLE 1, provides the labor mixed and labor hours for each year. TABLE 1 provides the estimated annual usage of hours for each labor category under the contract.

The estimated hours in TABLE 1 does not necessarily represent what will be required since needs vary from period to period, but will be used to identify the quantity of hours procured over the life of the contract and to establish a ceiling.

Instructions to the Offeror for the Request for Proposal (RFP):

If there are any additional labor categories required that are not listed in TABLE 1, please allocate the hours accordingly (from the total hours proposed) on your Proposal with notation that additional labor categories are required with respective hours. Provide additional labor categories and hours if applicable; provide/validate eCRAFT Codes that correspond to the labor categories.

TABLE 1:

Labor Category Level eCRAFT Codes

YEAR1 (Base Year): Labor

Hours

YEAR 2

(Option Year 1):

Labor Hours

YEAR 3

(Option Year 2):

Labor Hours

YEAR 4

(Option Year 3): Labor Hours

YEAR 5

(Option Year 4):

Labor Hours

TOTAL FOR ALL

5 YEARS Per Each Labor Category:

Labor Hours

ANALYST,

MANAGEMENT I

I ANM1 2080.12 2080.12 2080.12 2080.12 2080.12 10400.60

ANALYST,

MANAGEMENT II

II ANM2 1448.08 1448.08 1448.08 1448.08 1448.08 7240.40

ANALYST,

MANAGEMENT III

III ANM3 301.76 301.76 301.76 301.76 301.76 1508.80

ASSISTANT,

ADMINISTRATIVE

*TBD *TBD 577.76 577.76 577.76 577.76 577.76 2888.80

DRAFTER/CAD

OPERATOR II

*TBD *TBD 1012.00 1012.00 1012.00 1012.00 1012.00 5060.00

ENGINEER I I E1 12309.60 12309.60 12309.60 12309.60 12309.60 61548.00

ENGINEER II II E2 8051.84 8051.84 8051.84 8051.84 8051.84 40259.20

ENGINEER III III E3 5534.72 5534.72 5534.72 5534.72 5534.72 27673.60

ENGINEER IV IV E4 2014.80 2014.80 2014.80 2014.80 2014.80 10074.00

ENGINEER, COMPUTER

I

I EC1 1391.96 1391.96 1391.96 1391.96 1391.96 6959.80

ENGINEER, COMPUTER

II

II EC2 1407.60 1407.60 1407.60 1407.60 1407.60 7038.00

ENGINEER, COMPUTER

III

III EC3 747.04 747.04 747.04 747.04 747.04 3735.20

ENGINEER, COMPUTER

IV

IV EC4 367.08 367.08 367.08 367.08 367.08 1835.40

ENGINEER,

ELECTRICAL/ELECTRON

ICS I

I EE1 2140.84 2140.84 2140.84 2140.84 2140.84 10704.20

ENGINEER,

ELECTRICAL/ELECTRON

ICS II

II EE2 1091.12 1091.12 1091.12 1091.12 1091.12 5455.60

ENGINEER,

ELECTRICAL/ELECTRON

ICS III

III EE3 248.40 248.40 248.40 248.40 248.40 1242.00

ENGINEER,

ELECTRICAL/ELECTRON

ICS IV

IV EE4 60.72 60.72 60.72 60.72 60.72 303.60

ENGINEER, SYSTEMS II II ESY2 1158.28 1158.28 1158.28 1158.28 1158.28 5791.40

ENGINEER, SYSTEMS III III ESY3 605.36 605.36 605.36 605.36 605.36 3026.80

ENGINEER, SYSTEMS IV IV ESY4 118.68 118.68 118.68 118.68 118.68 593.40

LABORER *TBD *TBD 3900.80 3900.80 3900.80 3900.80 3900.80 19504.00

LOGISTICIAN I I LGT1 3497.84 3497.84 3497.84 3497.84 3497.84 17489.20

LOGISTICIAN II II LGT2 1764.10 1764.10 1764.10 1764.10 1764.10 8820.50

LOGISTICIAN III III LGT3 1081.92 1081.92 1081.92 1081.92 1081.92 5409.60

MANAGER,

PROGRAM/PROJECT I

I MANP1 669.76 669.76 669.76 669.76 669.76 3348.80

MANAGER,

PROGRAM/PROJECT II

II MANP2 591.56 591.56 591.56 591.56 591.56 2957.80

SYSTEMS

ADMINISTRATOR

II SA2 766.36 766.36 766.36 766.36 766.36 3831.80

WELDER,

COMBINATION,

MAINTENANCE

*TBD *TBD 230.00 230.00 230.00 230.00 230.00 1150.00

Total Direct Labor Hours 55170.10 55170.10 55170.10 55170.10 55170.10 275850.50

*TBD = To Be Determined

(End of text)

B-216-H006 FEE TABLE (NAVSEA) (MAR 2019)

Labor CLIN Labor Hours

Cost Per Hour*

Fee Rate Per Hour*

Loaded Hourly Rate

0001 (Design Agent Support - Labor Base

Year)

*TBD *TBD *TBD *TBD

1001 (Design Agent Support - Labor Option

Year 1)

*TBD *TBD *TBD *TBD

2001 (Design Agent Support - Labor Option

Year 2)

*TBD *TBD *TBD *TBD

3001 (Design Agent Support - Labor Option Year 3)

*TBD *TBD *TBD *TBD

4001 (Design Agent Support - Labor Option Year 4)

*TBD *TBD *TBD *TBD

*The offeror shall divide the proposed fee for each CLIN by the quantity of labor hours indicated to complete the table. Fee is calculated based on cost less FCCOM; if FCCOM is proposed, necessary columns may be added.

In the event of any inconsistency between the above table and the CLIN pricing, the CLIN pricing shall take precedence.

(End of text)

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SOW

Statement of Work

1 SCOPE

1.1 General Dynamics is the sole manufacturer and Design Agent of the Austal variant Littoral Combat Ship (LCS); hereafter, known in this document as INDEPENDECE (INDY) variant. The INDY variant combat system consists of Integrated Combat Management System (ICMS), its interfaces, Command, Control, Communications, Computers, Combat Systems and Intelligence (C5I) elements, software applications, and the networking environment hardware.

1.2 This Statement of Work (SOW) will provide overall in-service engineering and life cycle support for C5I systems critical engineering; design; integration; test and evaluation;

software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products; as well as training systems. These activities will be executed in support of the shipboard LCS C5I equipment, components, software, training and support equipment developed by or for the Program Executive Office Unmanned and Small Combatants Program Office.

1.3 This SOW does not include support for the LCS planning services or planning yard services nor the Sustainment Execution Contract. Equipment and systems relevant to this SOW include:

1. ICMS; Combat Management System (CMS)

2. ICMS Hardware and Consoles; CMS

3. Total Ship Computing Environment (TSCE); Networking Environment Hardware

4. Host Based Security System (HBSS); Consolidated Security Suite

5. Video Distribution System and Above Deck Cameras; Closed Circuit Television

(CCTV System)

6. Sea Giraffe AN/SPS-77; Air Search Radar

7. Bridgemaster X&S Band; Navigation Radar

8. Sea Star Safire (SSS) III

9. MK 110 Mod 0; 57MM Gun Mount

10. MK 15 Mod 31 SEA RAM; Self Defense Missile

11. ES-3601 AN/SLD-4(V)1; Electronic Warfare (EW)

12. ALEX SRBOC MK 137 MOD 1; Decoy Launching System

13. AN/SYM-3 (ADEPT Distance Support Sensor Suite (ADSSS); Distance Support System

14. Replenishment at Sea Systems; Underway Replenishment

15. Multi-Data Link Management System (MDLMS) AN/USQ-242; Link

Management

16. Commercial Mobile Radio Service (CMRS); Communications Automation

Software

17. MD-1324 AN/PSC-5D (RT-1672D); Ultra High Frequency (UHF) Satellite

Communications (SATCOM)

18. AN/PSC-5D (RT-1672D), AN/ARC-210 (RT-1747D); VHF/UHF LOS

19. Global Command and Control System – Maritime (GCCS-M)

20. High Frequency Radio System (HFRS) (Thales); High Frequency (HF)

21. AN/USQ-219(V); Tactical Common Data Link (TCDL)

22. AN/USQ-155(V); Tactical Variant Switch (TVS)

23. SAAB R4/R5; Automatic Identification System (AIS)

24. MK 39 Inertial Navigation System (INS); Gyro

25. NAVIGAT; Digital Gyro Compass

26. Echosounder; Fathometer

27. Precise Time Management (PTM)

28. Magnetic Compass

29. Cryptography Equipment (KWR-46; KIV-19A; KIV-7 HSB; KGV-68B; KG-40A

(P); MT-4417; HNF-1 (KWR-46 ENCLOSURE); KSV-21; CV-3591; AN/ USC-

43 (V)1 (ANDVT); KVY-5; STE CABLE SET; STE; Mounting Bracket; Office STE; KSV-21; AN/CYZ-10(v)3; KYK-13; KOT-18-1; KIT-1C; KIR-1C; KG-175-

E-100 CRYPTO GEAR)

30. AN/ USQ-144(V); Automated Digital Network System (ADNS)

31. Inmarsat C SOLAS; Commercial Satellite Communications

32. AN/SSR-1; Fleet Broadcast Communications Satellite Transmitter (BCST)

33. AN/URC-141C (Low Power); Multifunctional Information Distribution System

(MIDS) On Ship (MOS) (Link 16)

34. AN/SYQ-26(V)3; Naval Modular Automated Communications System

(NAVMACS)

35. Sperry Integrated Bridge System (IBS); Navigation Sensor System Interface

(NAVSSI)

36. Navy Integrated Tactical Environment System (NITES)

37. Navy Tactical Command Support System (NTCSS)

38. AN/WSC-6(V)9; Wide Band SATCOM (WBS) Super High Frequency (SHF)

39. Sperry Integrated Bridge System (IBS); WSN-7 GDU

40. Engineering Control System (ECS)

41. Voyage Management System (VMS)

42. Machinery Plant Control Management System (MPCMS)

43. MK 48 Gun Weapon System (GWS)

44. Surface Electronic Warfare Improvement Program (SEWIP) – Lite – Electronic

Warfare System

45. NULKA Decoy Launching System

46. C2P (Command and Control Processor)

47. Naval Strike Missile (NSM)

48. LCS Surface Warfare, Mine Countermeasures and Anti-Submarine Warfare

Modules

49. Integrated Tactical Trainer (ITT) located at the Littoral Combat Ship Training

Facilities (LTFs) or other facilities

50. Common Data Link Management System (CDLMS)

51. AN/UQN-10 Navigation system

52. AN/UPX-46 (Mode 5/S) Identification Friend or Foe (IFF) System

2 APPLICABLE DOCUMENTS. The following documents are applicable to this SOW. All tasking, processes, performance, execution and documentation within this SOW shall be in accordance with the most current version of these documents as of the date of contract award:

2.1 COMUSFLTFORCOM/COMPACFLT INSTRUCTION 6320.3A

2.2 DIACAP/RMF

2.3 DoD Instruction 8510.01

2.4 FAR 31.205-46

2.5 Joint Travel Regulations (JTR)

2.6 MIL-STD-129R

2.7 MIL-STD-1662

2.8 MIL-STD-3034A

2.9 MIL-STD-31000B

2.10 NAVSEA S0420-AA-RAD-010 (latest revision)

2.11 NAVSEA technical specification TS9090-600A (or latest approved revision)

2.12 NAVSEA technical specification TS9090-400C (or latest approved revision)

2.13 NAVSEA technical specification TS9090-310G (or latest approved revision)

2.14 NSWC PHDINST 5100.1D Occupational Safety and Health Instruction

2.15 NAVSEAINST 5400.95

2.16 NAVSEA Standard Item (NSI)(latest approved revision)

2.17 NAVSEA Command Instruction 9410

2.18 SECNAVINST 5210.8D

2.19 COMFLTFORCOMINST 4790.3 Joint Fleet Forces Maintenance Manual (JFFM)

2.20 Navy Modernization Process Management and Operations Manual (NMP-MOM)

2.21 Requirements for Welding and Brazing Procedures and Performance Qualifications (S9074-AQ-GIB-010/248)

3 REQUIREMENTS

3.1 Post Award Meeting

3.1.1 The Contractor shall organize and conduct, in coordination with NSWC PHD stakeholders, Procuring Contracting Officer (PCO) and Contracting Officer’s Representative (COR), a post award meeting within 15 calendar days following award of this requirement or as agreed with NSWC PHD stakeholders and COR. The purpose of the meeting is for the Government and Contractor to review key areas and challenges, and to establish dates for near term meetings and actions. The Contractor shall provide via electronic mail (email) the proposed briefing agenda to the COR five (5) calendar days prior to meeting. The Contractor may conduct the meeting via telecommunication.

3.2 Program Management

3.2.1 The Contractor shall establish clear organizational lines of authority and responsibility and shall have a single point of contact between the PCO and COR to ensure effective management of resources and provide program and project management services in support of all scope defined in this SOW, including, but not limited to:

a. Program planning and control

b. Resource management

c. Rough Order of Magnitude (ROM) development

d. Cost and schedule control

e. Documentation preparation and transmittal

f. Reporting

g. Schedule, technical, program, status reports

3.2.2 The Contractor shall establish processes, manage, and coordinate all activity required to successfully execute tasking. The Contractor shall manage its resources to ensure all tasking is successfully completed within estimated budget and on-time.

3.2.2.1 The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.

3.2.3 The Contractor shall accomplish all work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience to provide quality workmanship, maintain schedule, and minimize rework.

3.2.4 The Government will neither supervise Contractor employees, train Contractor employees, nor control the method by which the Contractor performs the required tasks. The Government will not assign tasks to, or prepare work schedules for, individual Contractor employees. The Contractor shall manage its employees and guard against any actions that are, or perceived, as personal services. If the Contractor believes that any actions constitute, or perceived to constitute, personal services, the Contractor shall be responsible to notify the PCO within one (1) business day.

3.2.5 The Contractor shall have a successful corrective action system to address issues and provide immediate resolution and avoid repeat occurrences.

3.2.5.1 As part of continuous improvement process and quality management, the Government will issue a formal notification via a Corrective Action Request (CAR) (Form NAVSEA TS9090-310 Change 1, Attachment 6) when requirements do not conform to the SOW, policies, and standards and improvement is required within three (3) business days. The Contractor shall respond to the CAR and return to the COR within three (3) business days after receipt.

3.2.5.2 During performance of tasks, the Contractor shall complete and deliver a Condition Found Report (CFR) for deficiencies found, repairs required, and recommend corrective action(s). For conditions found to impact the critical path(s)/controlling item(s), the Contractor shall notify the COR via email within 24-hours of discovery. This initial notification need not include all content required for a CFR, but must include a description of the condition/deficiency and an estimated timeframe for the Contractor's professional recommendation for resolution, which shall not exceed three (3) business days. Review and resolution of the CFR will be completed by the Government’s technical team, COR and PCO.

Response to the CFR will be provided to the Contractor via email, unless a change to the contract is required, it will be done via a contract modification.

(CDRL A001) Condition Found Report

3.2.6 The Contractor shall develop and submit a monthly Contracting Officer’s report by the 10th day of each month. The final report for each contract period (base, option year 1, etc.) is due by no later than 60 calendar days after the end of each period of performance.

(CDRL A002) Contracting Officer’s Management Report

3.2.7 The Contractor shall complete and maintain a list of all personnel working on any requirement delineated in this SOW. The Personnel Roster shall be provided by the 10th of each month and within two (2) business days of when personnel changes are made. The COR shall be notified via email no later than two (2) business days after becoming aware that a Contractor employee is separating from the company and the personnel roster shall be updated.

(CDRL A003) Contractor’s Personnel Roster

3.2.8 The Contractor shall have procedures in place to assure that all personnel performing shipboard work maintain the required certifications for the work to be performed.

3.2.9 Normal hours of operation at NSWC PHD are from 0730-1700 Pacific Standard Time, Monday through Friday, except Federal holidays. The standard hours of operation for remote site and travel destination work places are determined locally and may vary.

3.2.9.1 The Contractor can expect to work eight (8) to ten (10) hours per day, five (5) days per week. Additional work, up to four (4) hours Monday through Friday and up to ten (10) hours per day, on weekends and US Federal Holidays may be required to maintain the project schedule.

3.2.9.2 The Contractor shall obtain the COR’s approval in advance of any work performed on weekends, holidays and during facility shut down.

3.2.9.3 Alternate work schedules used by the Contractor must not negatively impact SOW deliverables, project schedules, and efforts.

3.2.9.4 The Contractor shall maintain the currency of its employees by providing initial and refresher training as required to meet the SOW requirements.

3.2.9.5 The Contractor shall ensure that all required certification are current and take action in advance to avoid expiration of personnel’s certifications.

3.2.9.6 The Contractor shall facilitate safety and environmental training as required to enter or continue working on Government and non-Government facilities.

3.3 Operations Security

3.3.1 The Contractor shall develop an Operations Security (OPSEC) Plan. The Contractor is required to protect critical information associated with the contract to prevent unauthorized disclosure and shall observe OPSEC Requirements.

(CDRL A004) Operations Security Plan

3.4 Government Furnished Equipment and Material

3.4.1 The Contractor shall manage and deliver a report for all Government furnished and Contractor acquired property/equipment/material (GFP/GFE/GFM) in the custody of the Contractor by the 10th day of each month.

(CDRL A005) Government Property Inventory Report

3.4.2 The Contractor shall maintain a tracking system to track and manage material status, packaging, shipping and storage for all procured GFM and GFP.

3.4.2.1 The Contractor shall update the material tracking system within 24 hours or next business day of material receipt and issuance.

3.4.3 The Contractor shall comply with any hazardous material specifications and guidelines to support the handling and storage of hazardous material.

3.4.4 Classified matter shall be stored, packed and shipped in accordance with transmission instructions contained in the National Industrial Security Program (NISP) and any applicable security requirements guide identified in this requirement.

3.4.5 The Contractor shall ship, receive, and manage equipment and materials for all United States/Outside the contiguous United States (CONUS/OCONUS) locations.

3.4.6 The Contractor shall manage Government Furnished Information (GFI) and complete the GFI form (Attachment 5) for all GFI in the custody of the Contractor by the 10th day of each month.

(CDRL A006) Revisions to Existing Government Documents

3.5 Material Procurement

3.5.1 The Contractor shall procure material to respond to mission requirements as delineated by the Government in a Technical Instruction (TI) form. The procurement of material, any kind, which is not directly related to and necessary for contract performance may be determined to be unallowable costs pursuant to FAR Part 31. The term “material” includes supplies, parts, equipment, hardware and Information Technology (IT) resources including hardware, services and software.

3.5.2 The Contractor shall provide all consumable materials required for task performance as identified by TI. Consumable material includes, but is not limited to; bolts, screws, welding consumables, paint, cable hangers, straps, or other materials not otherwise listed. Consumable materials are required to complete a quality installation according to the TI and its reference documents.

3.5.3 The Contractor shall obtain the COR’s approval, prior to procurement, for all material with cost equal to or not exceed 5% of labor cost under this requirement. For all other material with cost exceeding 5% of labor cost, the Contractor shall submit a written request to the COR and PCO via email with the following information:

Complete description of the material to be procured;

Task (TI) the material will be used for;

An explanation of the need for the material;

Quantity;

Unit and Total Cost;

Delivery/Freight charges;

Any associated service charges such as assembly, configuration, packing, etc.;

Explanation of the determination of price reasonableness regarding the selected supplier costs;

List the competitive quotes received from potential suppliers; and The basis for the selection of the selected supplier.

After the PCO reviews the proposal and determined the cost to be fair and reasonable, the PCO will issue a modification to authorize the material purchase applicable to the Task Order.

3.6 Technical Instruction (TI) Form

3.6.1 The issuance of technical tasks required under SOW sections 3.7 through 3.14 will be provided by the COR via the TI form. The TI will outline the task requirements and detailed instructions and references for completing work.

3.7 Engineering, Integration and Test and Evaluation (T&E) Support

3.7.1 The Contractor shall conduct special INDY variant design studies, analyses, design, fabrication, and test, including but not limited to the following: assess engineering and production problems; identify cost; human systems integration (HSI); design, engineer, fabricate and/or procure and test new technology; design improvement; obsolescence issue resolutions;

and schedule risks associated with changes to the INDY variant ship design.

(CDRL A007) Status Report (CDRL A008) Subsystem Design Analysis Report (CDRL A009) Technical Report Studies (CDRL A061) Welding Procedures

3.7.2 The Contractor shall provide reports documenting Failure Reporting, Analysis and Corrective Action reporting to support the Program Office's overall metrics and readiness reporting including:

a. Tracking and documenting ship operational and performance metrics, to include Mean Time Between Failure, Mean Time To Repair, Mean Logistics Delay Time, and Operational Availability (AO).

b. Identifying and documenting recurring failures, conducting root cause failure analysis, drafting and submitting Failure Analysis Reports.

c. Participating in Government sponsored Failure Review Boards and working groups established to perform the analysis.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .