This solicitation requests proposals for the manufacture, assembly, test and delivery of Vertical Launching System Programmable Power Supply components. Offerors are sought to produce the MK 179 Mod 0 Power Supply, Maintenance Assistance Module kit, Onboard Repair Part kit, Installation and Checkout spares kit, Depot spares kit, and Lowest Replaceable Unit kit in accordance with provided specifications. The Naval Surface Warfare Center Port Hueneme Division is the issuing agency. Interested parties must submit questions by 10 calendar days from issuance, with proposals due based on details in the provided specifications package. Manufacturing must follow quality standards and environmental compliance procedures as outlined in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6339420R0012 Programmable Power Supply - Amendment 4 - Summary of Changes.pdf | ||
| N6339420R0012 Programmable Power Supply - Solicitation Amendment 4 Conformed Copy.pdf | ||
| N6339420R0012 Programmable Power Supply - Amendment 3 - Summary of Changes.pdf | ||
| N6339420R0012 Programmable Power Supply - Amendment 3 Conformed Copy.pdf | ||
| N6339420R0012 Programmable Power Supply - Amendment 2 Conformed Copy.pdf | ||
| N6339420R0012 Programmable Power Supply - Amendment 2 Summary of Changes.pdf | ||
| J-2 CDRL__A001_through_A009_20R0012_PPS 4.20.2020.pdf | ||
| N6339420R0012 Programmable Power Supply - Amendment 1.pdf | ||
| J-3 NEW GFP MODULE Attachment_PPS.XLSX | XLSX spreadsheet | |
| J-S-1 - Past Performance Questionnaire.doc | DOC document | |
| J-2 CDRL__A001_through_A009_20R0012_PPS.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C X D
EX
X
G F 103 - 107
108 - 122 X H 123 - 127
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 127
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N63394 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 27
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
28 - 53 54 - 56
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
57 - 60 61 - 70
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 71 - 79 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 80 - 81 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
82 - 101
PART II - CONTRACT CLAUSES
NSWC PHD 022
4363 MISSILE WAY
PORT HUENEME CA 93043
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
06 Apr 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6339420R0012
Section A - Solicitation/Contract Form
CLAUSES INCORPORATED BY REFERENCE
52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment.
DEC 2019
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each PPS - First Article Testing
FFP
Procure, fabricate, assemble and conduct First Article Testing (FAT) resulting in the delivery of one (1) unit of the Programmable Power Supply (PPS). The MK 179 Mod 0 will be built in accordance with (IAW) the Statement of Work (SOW), and Technical Data Package (TDP). Refer to Contract Data Requirement Lists (CDRLs) for item and data requirements. Payment will be made as a result of successful acceptance of FAT inspection.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
DWG NR: 7104312-29
PSC CD: 5999
NET AMT
Data Deliverables
FFP
Prepare and maintain data IAW CDRLs A001 through A009 and Data Item Delivery (DID) schedule requirements. The Government shall have unlimited rights to all data generated under this effort IAW DFARS 252.227-7013 unless an assertion is provided and accepted by the Government with the offer IAW DFARS 252.227-7017. The price for all data generated by the contractor directly or indirectly in its performance of this procurement effort is included in the price paid by the Government under CLINs 0001 through 0021.
PPS Production (Non-FMS)
FFP
Programmable Power Supply (Non-FMS): Production Phase: Fabricate, assemble and deliver PPS and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
0003AA 24 Each PPS Shipset 1 (Non-FMS)
FFP
Programmable Power Supply Shipset 1 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0003AB 24 Each PPS Shipset 2 (Non-FMS)
FFP
Programmable Power Supply Shipset 2 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0003AC 24 Each PPS Shipset 3 (Non-FMS)
FFP
Programmable Power Supply Shipset 3 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0003AD 24 Each PPS Shipset 4 (Non-FMS)
FFP
Programmable Power Supply Shipset 4 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0003AE 24 Each PPS Shipset 5 (Non-FMS)
FFP
Programmable Power Supply Shipset 5 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0003AF 24 Each PPS Shipset 6 (Non-FMS)
FFP
Programmable Power Supply Shipset 6 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
PPS Production (FMS)
FFP
Programmable Power Supply Production (FMS) Production Phase: Fabricate, assemble and deliver PPS and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
0004AA 36 Each PPS Korea (FMS)
FFP
Programmable Power Supply Korea (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0004AB 8 Each PPS Finland (FMS)
FFP
Programmable Power Supply Finland (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0004AC 8 Each PPS Germany (FMS)
FFP
Programmable Power Supply Germany (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
PPS MAM (Non-FMS)
FFP
Maintenance Assistance Module (MAM) (Non-FMS) Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
0005AA 1 Set PPS MAM Shipset 1 (Non-FMS)
FFP
Maintenance Assistance Module (MAM) Shipset 1 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0005AB 1 Set PPS MAM Shipset 2 (Non-FMS)
FFP
Maintenance Assistance Module (MAM) Shipset 2 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0005AC 1 Set PPS MAM Shipset 3 (Non-FMS)
FFP
Maintenance Assistance Module (MAM) Shipset 3 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0005AD 1 Set PPS MAM Shipset 4 (Non-FMS)
FFP
Maintenance Assistance Module (MAM) Shipset 4 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0005AE 1 Set PPS MAM Shipset 5 (Non-FMS)
FFP
Maintenance Assistance Module (MAM) Shipset 5 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0005AF 1 Set PPS MAM Shipset 6 (Non-FMS)
FFP
Maintenance Assistance Module (MAM) Shipset 6 (Non-FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
PPS MAM (FMS)
FFP
Maintenance Assistance Module (MAM) (FMS).
Production Phase: Fabricate, assemble and deliver PPS MAM and associated
0006AA 4 Set PPS MAM - Finland (FMS)
FFP
Maintenance Assistance Module (MAM) Finland (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0006AB 1 Set PPS MAM - Germany (FMS)
FFP
Maintenance Assistance Module (MAM) Germany (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0006AC 3 Set PPS MAM - Korea (FMS)
FFP
Maintenance Assistance Module (MAM) Korea (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
PPS OBRP (FMS)
FFP
Onboard Repair Part (OBRP) (FMS) Production Phase: Fabricate, assemble and deliver PPS MAM and associated
0007AA 3 Set PPS OBRP - Korea (FMS)
FFP
Onboard Repair Part (OBRP) Korea (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0007AB 4 Set PPS OBRP - Finland (FMS)
FFP
Onboard Repair Part (OBRP) Finland (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0007AC 1 Set PPS OBRP - Germany (FMS)
FFP
Onboard Repair Part (OBRP) Germany (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
PPS INCO Spares (FMS)
FFP
Installation and Checkout (INCO) Spares (FMS) Production Phase: Fabricate, assemble and deliver PPS MAM and associated
0008AA 1 Set PPS INCO Spares - Korea (FMS)
FFP
Installation and Checkout (INCO) Spares - Korea (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0008AB 1 Set PPS INCO Spares - Finland (FMS)
FFP
Installation and Checkout (INCO) Spares - Finland (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0008AC 1 Set PPS INCO Spares - Germany (FMS)
FFP
Installation and Checkout (INCO) Spares - Germany (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
PPS Depot Spares (FMS)
FFP
Production Phase: Fabricate, assemble and deliver PPS MAM and associated
0009AA 1 Set PPS Depot Spares - Korea (FMS)
FFP
PPS Depot Spares - Korea (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0009AB 1 Set PPS Depot Spares - Finland (FMS)
FFP
PPS Depot Spares - Finland (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0009AC 1 Set PPS Depot Spares - Germany (FMS)
FFP
PPS Depot Spares - Germany (FMS) NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0010 96 Each OPTION PPS Production OY1
FFP
PPS OY1 Production Quantities Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0011 10 Set OPTION PPS MAM Components OY1
FFP
PPS Maintenance Assistance Module (MAM) Components Production Phase:
Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0012 4 Set
OPTION PPS OBRP OY1
FFP
PPS Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0013 3 Set OPTION PPS INCO Spares OY1
FFP
PPS Installation and Checkout (INCO) Spares Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0014 2 Set OPTION PPS Depot Spares OY1
FFP
PPS Depot Spares Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0015 8 Set OPTION PPS LRU Set OY1
FFP
Lower Replaceable Unit (LRU) Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0016 136 Each OPTION PPS Production OY2
FFP
PPS Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0017 14 Set OPTION PPS MAM Components OY2
FFP
PPS Maintenance Assistance Module (MAM) Components Production Phase:
Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0018 8 Set
OPTION PPS OBRP OY2
FFP
PPS Onboard Repair Part (OBRP) Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0019 2 Set OPTION PPS INCO Spares OY2
FFP
PPS Installation and Checkout (INCO) Spares Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0020 2 Set OPTION PPS Depot Spares OY2
FFP
PPS Depot Spares Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
0021 8 Set
OPTION PPS LRU OY2
FFP
Lowest Replaceable Unit (LRU) Production Phase: Fabricate, assemble and deliver PPS MAM and associated equipment IAW the SOW and TDP. Refer to CDRLs for item and data requirements.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK
VERTICAL LAUNCHING SYSTEM
PROGRAMMABLE POWER SUPPLY N63394-20-R-0012
1.0 SCOPE
The Contractor shall be responsible for the satisfactory and timely performance of all tasks defined in the Statement of Work (SOW). This SOW, with its supporting attachments and referenced documentation, describes the total requirement for the manufacture, assembly, test and delivery of Vertical Launching System (VLS) Programmable Power Supply (PPS) MK 179 Mod 0, Part Number 7104312-29, Maintenance Assistance Module (MAM) kit, Onboard Repair Part (OBRP) kit, Installation and Checkout (INCO) spares kit, Depot spares kit, and Lowest Replaceable Unit (LRU) kit.
2.0 PROGRAM AUTHORITY
Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD) is the program authority for this contract.
3.0 APPLICABLE DOCUMENTS
The following documents, of the issue indicated, form a part of this SOW to the extent specified herein, including all applicable terms, conditions, clauses, attachments and exhibits. The exact revisions of the documents are not cited in the text of this SOW. The Contractor shall apply the latest version of the documents in effect at the time of award of the contract. In the event of a conflict between the documents referenced herein and the contents of this SOW, the SOW shall be considered the superseding requirement.
3.1 Government Documents
Document Number Document Title MIL-STD-109C Quality Assurance Terms and Definitions
MIL-STD-1686C
Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, I Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)
WS 20130 Production Environmental Test Requirements for VLS
TL130-AD-PLN-010-VLS
Configuration Management Program Plan for the MK 41 VLS, Volume 1, Equipment (Hardware) Configuration Management
MK 41 VLS Standing Instruction 94-1F, Attachment 6
Marking for technical data
TL130-AD-PLN-030-VLS, Firmware Configuration Management NAVSEA Drawing 7104312-29 PPS
3.2 Industry Documents
Document Number Document Title ANSI/ISO/ASQC Q9001 Quality Systems - Model for Quality Assurance in Design, Development, Production, Installation and Servicing ANSI/EIA-649 2011 National Consensus Standard for Configuration Management
ANSI/ASQC Q9004 Quality System Elements ISO 9001 Quality Program Requirements SAE Aerospace Standard AS9102 Rev A
Aerospace First Article Inspection
ISO 14000 Environmental Management Systems Standards
4.0 REQUIREMENTS
The Government requires manufacturing of VLS PPS MK 179 Mod 0, MAM, OBRP, INCO, Depot and LRU kits in accordance with the documents specified in SOW and the technical data package (TDP). All PPS and associated components kits shall meet all form, fit, and function requirements in accordance with the TDP and associated specifications.
The MAM kit contains the following:
Nomenclature Part Number Quantity Power Supply Control Module (PSCM) Assy 8652156-9 1 Housekeeping Power Assy 7104325-9 1 Relay Assy 7104330-9 1
The OBRP kit contains the following:
PSCM Assy 8652156-9 1 Synchronous Bridge Rectifier (SBR) Assy 7104320-19 1 Fuse Block/Electro-Magnetic Interference (EMI) Assy 7104335-9 1
The INCO spares kit contains the following:
PSCM Assy 8652156-9 1 Housekeeping Power Assy 7104325-9 1 Relay Assy 7104330-9 1 SBR Assy 7104320-19 1 Fuse Block/EMI Assy 7104335-9 1 29V Assy 7104205-19 1
The Depot spares kit contains the following:
PPS 7104312-29 1
PSCM Assy 8652156-9 2 Housekeeping Power Assy 7104325-9 2 Relay Assy 7104330-9 2 SBR Assy 7104320-19 2 Fuse Block/EMI Assy 7104335-9 1 29V Assy 7104205-19 2
The LRU spares kit contains the following:
PSCM Assy 8652156-9 12 Housekeeping Power Assy 7104325-9 12 Relay Assy 7104330-9 12 SBR Assy 7104320-19 84 Fuse Block/EMI Assy 7104335-9 12 29V Assy 7104205-19 12 Harness Assy, PPS 7104169-9 12 Enclosure, PPS 7104215-9 12 Cover Assy, Access, PPS 7104404-9 12
4.1 Automatic Test Equipment
PPS Automatic Verification Equipment (PAVE) Automated Test Equipment (ATE), Power Supply Control Module (PSCM) ATE, SBR & 29V ATE, and EMI & House Keeping ATE, Universal Cable Tester, and associated interface cables, software, operator manual, test tools and calibration tools will be provided as Government-Furnished Property (GFP) to perform the PPS assembly electrical and digital data acceptance tests that are required by NAVSEA Drawing 7104312-29.
The Government has certified the PPS and associated equipment ATEs, along with test program sets for use.
The Contractor shall be responsible for maintaining and calibrating the necessary test capability including ATE, associated interface cables, test tools and calibration tools.
Changes to certified ATE shall be submitted to the Government for approval and certification.
4.2 First Article Inspection
The Contractor shall perform First Article Inspection (FAI) of all assemblies, subassemblies, components and detail parts including castings and forgings in accordance with SAE Aerospace Standard AS9102 Rev A. The purpose of FAI is to provide objective evidence that all TDP and specification requirements are correctly understood, accounted for, verified, and recorded. An FAI is not required for standard catalog items, commercial-off-the-shelf items, raw materials or items procured in accordance with source control drawings.
The Contractor shall submit all FAI requirement waivers to the NSWC PHD for approval. The waiver shall identify, at a minimum, the part description, part number, manufacturer, date last built, location last built, FAI report summary (if applicable), FAI discrepancies and corrective actions (if applicable), and waiver justification.
The Government reserves the right to witness all FAI activities. The Contractor shall submit a comprehensive schedule of FAI events prior to the first event in accordance with CDRL A001. The schedule shall include date, time, expected duration and location.
The Contractor shall generate FAI reports in accordance with AS9102 Rev A. The Contractor shall retain the FAI reports for at least seven years. The Government reserves the right to examine all FAI reports. The Contractor shall submit a report copy via digital means in accordance with CDRL A002.
All deficiencies discovered during the FAIs that affect form, fit, function or performance shall be corrected at Contractor’s expense prior to unit delivery to the Government.
4.3 First Article Test (FAT) (Option item )
Contractor shall perform a First Article Test (FAT) of designated assemblies and subassemblies to demonstrate the as-built units under test will pass the applicable Prime Item Development Specification, WS 20313, or other specified performance requirements.
The Contractor shall be responsible for all aspects of test planning, conduct and reporting including, as a minimum a test plan, a test report, fixtures, support equipment and apparatus, instrumentation, test site, test equipment, personnel, safety and post test asset disposition.
The Contractor shall convene a Test Readiness Review (TRR) at least 5 working days prior to each FAT event.
Multiple FAT events may be reviewed during a single TRR. The TRR shall be chaired by the Contractor and co-chaired by the Government. Additional Government subject matter experts will attend each TRR.
The Government reserves the right to witness all FAT activities. The Contractor shall provide a comprehensive schedule of FAT events that includes date, time, expected duration and location to the Government in accordance with CDRL A001.
The Contractor shall provide a comprehensive test plan to the Government for each FAT in accordance with CDRL A003.
The Contractor shall provide a quick look test report to the Government after a FAT event in accordance with CDRL A004. The quick look report shall provide initial assessment of the unit under test performance and describe all apparent anomalies.
The Contractor shall provide a final report to the Government after a FAT event in accordance with CDRL A004.
The report shall include the Contractor’s detailed plan to resolve all performance discrepancies revealed during the
FAT.
All deficiencies discovered during the FATs that affect form, fit, function or performance shall be corrected at Contractor’s expense prior to any production unit delivery to the Government.
5.0 TECHNICAL DATA REVIEWS, QUALITY AUDITS
During the performance of the contract, the Government shall have the right to perform technical data reviews and quality audits consisting of evaluation of records, processes and products to verify the Contractor's compliance with the respective quality programs. The Government audits may include evaluation of effectiveness in implementing the Contractor's and Subcontractors' or suppliers' audit programs to promote prevention of defects, which includes schedule of audits, evaluation of operations, notification of required corrective action with follow-up and means of notification to top management concerning audit results.
6.0 FOLLOW-ON PHYSICAL CONFIGURATION AUDIT
During the performance of the contract, the Government shall have the right to perform a Physical Configuration Audit (PCA). The PCA may include an evaluation of the effectiveness of the Contractor, Subcontractor and/or supplier audit programs to promote prevention of defects. This includes scheduling of audit, evaluation of operations, and notification of required corrective action with follow-up and means of notification to top management concerning audit results. The PCA will be conducted in accordance with Section 7 of TL130-AD-PLN- 010-VLS, Configuration Management Program Plan for the MK 41 VLS, Volume 1, Equipment (Hardware) Configuration Management.
One PCA shall be conducted over the course of the contract on the PPS MK 179 Mod 0. The PPS MK 179 Mod 0 shall be selected by the Government and the Contractor from the initial production run.
The Contractor shall provide qualified engineering, technical, manufacturing, administrative, management and other support as necessary for the PCA. The Contractor shall provide all tools, measuring devices and other equipment required for equipment disassembly, dimensional and tolerance verification and performance verification. The Contractor shall provide an area to conduct PCA that is well illuminated, temperate and low noise level. The PCA work area shall contain worktables, print copies of all pertinent drawings, telephone and easy access to a copy machine.
During the PCA, the Contractor shall provide, at a minimum, individual parts that make up the configuration item, completed assemblies, an as-built list delineating all Engineering Change Proposal (ECP) (either requested or approved), deviations and waivers, hardcopies of production specifications and technical drawings, complete shortage list, manufacturing instructions, acceptance test procedures and data, purchase order documents and associated certificates of conformance from suppliers or appropriate documents indicating compliance with material or drawing requirements in accordance with CDRL A005.
The PCA will be conducted at the Contractor's, Subcontractors' and suppliers' facilities by the Government team.
The Government will notify the Contractor seven to 14 business days prior to performance of the PCA. This notice will include identification of assemblies, subassemblies and/or piece parts to be audited. The PCA will be approximately one to two weeks in duration.
Following conduct of the PCA, the Contractor shall generate the necessary documentation to resolve all audit findings and provide these to the Government audit team within the timeframe specified by the Government in accordance with CDRL A007. The Government audit team will evaluate the documentation to assess corrective action(s) taken to close any and all audit finding(s). Necessary documentation may include, but not be limited to, revised manufacturing processes, ECPs, notice of revisions, SCN and revised TDP drawings.
Government and Contractor pre-and post-PCA activities are described in Sections 7.4 through 7.7 of the VLS Configuration Management Plan TL130-AD-PLN-010-VLS.
7.0 GOVERNMENT INSPECTION
The Contractor shall provide technical, administrative, and management support for Government source inspection for purposes of inspection and acceptance of supplies and services provided by the Contractor, Subcontractor and suppliers. Government source inspection will be conducted at the convenience of the Government.
8.0 PRODUCTION ENVIRONMENTAL TESTS
The Contractor shall perform production environmental testing as specified by the TDP or production environmental test requirements for VLS Specification WS 20130.
9.0 TECHNICAL DATA RIGHTS
The Government will maintain the Government-owned TDP. The Contractor shall submit proposed changes to the TDP to the Government. The Government shall retain unlimited rights to all versions of and changes to all drawings, specifications and other documents for the VLS components produced under this contract.
10.0 MARKING FOR TECHNICAL DATA
The Contractor shall mark all technical data in accordance with MK 41 VLS Standing Instruction 94-1F, Attachment
6. This instruction is applicable to new documents, revised documents or documents from file in response to a request for copy.
11.0 MANUFACTURING PROCESSES
The Contractor shall maintain and control manufacturing processes to fabricate, assemble, inspect, test, and deliver VLS PPS as described in the SOW. The processes shall cover all phases from the ordering of raw materials to Government acceptance of the finished product. All hardware components shall be manufactured in accordance with the drawings and specifications referenced in the TDP and this SOW.
12.0 CONFIGURATION MANAGEMENT
The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to assure configuration identity with the PPS produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA- 649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:
12.1 Configuration Identification
The Contractor shall maintain identification of the product baselines throughout fabrication, testing, and delivery.
The Contractor shall ensure that equipment is assigned identifying numbers, designators, and serial numbers in accordance with the TDP.
Serialized items shall be traceable to source of manufacture and production contract year. This information may be incorporated as a formal part of the Contractor's serialization system or otherwise be annotated on the affected item.
Serial number assignments shall be requested in writing from the COR. The request for serial number assignment shall contain the following minimum information:
(a) Officially assigned item name
(b) Officially assigned type designation
(c) Officially assigned model number
(d) Top drawing number and list of drawings or parts list
(e) Exact quantity to be delivered under the contract including pre-production samples and spares required by the contract.
(f) Contract number
(g) National Stock Number
(h) NAVSEA cognizant office code
The Contractor shall submit a configuration definition data package describing the detailed configuration of each end item as delivered to the designated destination in accordance with CDRL A007. The Contractor shall maintain a system to monitor engineering release and correlation of manufactured products.
12.2 Military Specifications and Standards:
The Government shall maintain the Government owned Technical Data Package(s) (TDP). Proposed changes to the TDP shall be submitted by the Contractor to the Government. The Government shall retain unlimited rights to all versions of and changes to all drawings, specifications and other documents for the PPS and associated parts produced under this contract.
The Contractor shall prepare the updated drawings, specifications and all related documents with revisions, including the Request for Variance.
12.3 Qualification of Substitute Sources of Supply
The TDP contains source control or vendor item drawings that specify approved, or suggested sources of supply.
The Contractor may qualify other sources for these items. Qualification of new sources selected by the Contractor shall be at the Contractor’s expense.
The Contractor shall submit all proposed changes to approved, or suggested sources of supply as indicated in the source control or vendor item drawings in accordance with SOW. The package of information that is submitted for Government review shall contain all applicable drawings, test plans, procedures and qualification reports. An extended Government review period of 20 business days applies to all proposed changes to approved or suggested sources of supply.
12.4 Configuration Status Accounting
The Contractor’s configuration status accounting shall be in accordance with ANSI/EIA-649, the Configuration Management Plan for the VLS, Volume 1, Equipment (Hardware) Configuration Management, TL130-AD-PLN- 010-VLS, and the Configuration Management Plan for the VLS, Volume 3, Firmware Configuration Management, and TL130-AD-PLN-030-VLS.
The Contractor shall provide a system that documents the exact delivered configuration of each unit. The Contractor, or Subcontractor at the appropriate tier, shall identify the "as-built" production configuration of each NAVSEA nomenclature item by means of permanent markings on the appropriate ORDALT/ Ship Change Installation Procedure (SCIP) label plate on the equipment to identify the specific ORDALTs/SCIPs installed in the equipment being delivered. For Class I ECPs, which are not assigned an ORDALT number, the ORDALT label plate shall be marked with the applicable Class I ECP number as assigned by the Government. For purposes of this requirement, markings may be etched, steel stamped or affixed by other suitable means which results in the permanent identification of the equipment configuration. Ink stamping is not permitted.
12.5 Failure/Defect Reporting and Corrective Action System (FACAR)
The Contractor shall have a FACAR system established and maintained for both manufacturing and test processes.
Level of assembly for failure reporting shall be consistent with the requirement for recording defect history.
FACAR system information required to be recorded or reported by this SOW paragraph shall be submitted in accordance with CDRL A006.
The Contractor shall implement an effective system for evaluation and disposition of supplies and services that exhibit nonconformance, including those furnished by suppliers (Subcontractors and vendors). The Contractor shall ensure that the personnel staffing the FACAR system have the authority to coordinate and implement the necessary failure and problem reporting, analysis, and related corrective action. The Contractor shall ensure that nonconformance data is adequately analyzed, distributed to appropriate organizations and personnel, and that appropriate management decisions are based on this data. Analysis must target root cause corrective action. The Contractor shall take appropriate actions to improve or change processes that do not meet requirements. All use-as-is and repair dispositions shall include a determination of whether or not a change is required to the product database (drawing, specifications, work instructions, tooling, etc.). Determination that such a change is not required shall be recorded and shall be available to the Government for review. Acceptance of the nonconformance corrective action and disposition is the prerogative of the Government and can be revoked whenever the Contractor’s system fails to demonstrate effective root cause corrective action or when repeated nonconformance indicate an overall quality system degradation.
13.0 TESTING, INSPECTION AND ACCEPTANCE
Testing and inspection of the VLS PPS shall be performed at the Contractor's facility in accordance with the applicable drawings, standards and specifications and factory test and inspection plans. The Contractor shall prepare specific written inspection and test procedures for each inspection and test operation to be performed by the Contractor. These inspection and test procedures shall be reviewed by the quality assurance organization and maintained current in accordance with the change control system requirements. The inspection and test procedures shall clearly identify the item through part number with revision and nomenclature, and include detail instructions and/or operations to be performed.
The Contractor shall maintain records of inspection results and quantitative test data for each deliverable end item and make them available to the Government upon request.
14.0 PARTS RE-SCREENING
The Contractor is not required to implement the TDP requirements to conduct re-screening of electrical components.
Remarking of parts to the re-screened part number will not be required and the existing base part number shall remain intact. Programmable parts shall require re-identification.
15.0 COUNTERFEIT PARTS AND MATERIALS
The following minimum processes shall be implemented and flowed down by the Contractor to all Subcontractors in order to minimize the risk of use of counterfeit parts in VLS components.
The Contractor shall establish processes to minimize the risk of procuring and using counterfeit parts and materials.
The Contractor shall document these processes and provide those documented processes to Government upon request. These processes shall include:
The Contractor shall maximize the use of authentic, originally designed and/or qualified parts.
The Contractor shall assess potential sources of supply to minimize the risk of receiving counterfeit parts or materials.
The Contractor shall have purchasing procedures which confirm whether a selected supplier is authorized for each purchase.
The Contractor shall define minimum inspection and test requirements for parts being procured and shall ensure that in-house, third-party, and/or supplier inspection and test procedures and facilities comply with these requirements. These minimum inspection and test requirements shall specify appropriate test methods to detect potential counterfeit parts and materials.
The Contractor shall require a certificate of compliance and supply chain traceability for all electronic part purchases.
The Contractor shall use government or industry services such as the Government-Industry Data Exchange Program (GIDEP) and other commercially available services to identify part or supplier quality or authenticity problems.
The Contractor shall notify the Government of the occurrence of a confirmed counterfeit part or material and the actions taken to identify, contain, and impound all product from the lot, within seven business days of confirmation of the counterfeit status. The Contractor shall flow down a requirement for similar notification from Subcontractors to the Contractor. The Contractor shall initiate and submit an alert to the GIDEP within 30 calendar days of knowledge of the counterfeit part or material.
Counterfeit parts may be electronic or mechanical in nature. Counterfeit electronic parts may typically be used parts which have been refurbished and represented as new. Commonly counterfeited electronic parts include parts such as microcontrollers or specially screened devices, or common parts, which have several pin-compatible versions from multiple manufacturers, such as memory devices and operational amplifiers. Counterfeit mechanical parts are typically improperly made, marked, or treated products. Examples are improper anodization or heat treatments, falsified data, mismarked parts sold as a higher grade steel, or used/fake parts such as valves or circuit breakers.
An authorized supplier is a supplier authorized by the original component manufacturer to buy parts or materials directly from the manufacturer. Parts provided from authorized suppliers typically have never left the manufacturer’s authorized supply chain, and are accompanied by full manufacturer support and warranty.
16.0 REVIEWS
16.1 Program/Production Reviews
The Contractor shall hold program reviews commencing after contract award which shall cover progress, schedules and problems. These reviews will be used to assess the Contractor’s progress and status. During these reviews, the Contractor shall provide, at a minimum, overall comprehensive status of:
Production, procurement and material issues;
Risk analysis activities;
Quality program status;
Defect reduction program status;
Safety program status;
Configuration management activities;
GFP status; and Delivery schedules.
For planning purposes, the program review location will be at the Contractor’s facility.
The Contractor shall also conduct management meetings regarding delivery on a regular basis (to be mutually agreed upon between the Government and Contractor) between the program reviews. The meetings will be conducted via teleconference or at the Contractor’s facility.
The Contractor shall provide presentation material in accordance with CDRL A008. The Government shall reserve and exercise the right to hold additional informal reviews at mutually convenient times to follow progress and problems, which may exist. Attendance at program reviews may include Government personnel, Government support service Contractor personnel, and other Government representatives as appropriate (Contractor personnel are not permitted for all reviews addressing matters pertaining to competitive contracting and actual pricing).
16.2 Defect Reduction
The Contractor shall establish a statistically-based process control and defect reduction program to control and improve product quality. The Contractor shall present the progress of the process control and defect reduction program at the program reviews and/or periodic production reviews of SOW paragraph 16.1.
17.0 GENERAL REQUIREMENTS
17.1 Program Management
The Contractor shall follow its internal Program Management Plan in the production of VLS PPS and shall submit Progress, Status and Management Reports in accordance with CDRL A006.
17.2 Manufacturing Planning
The Contractor shall update their Manufacturing Plan to include VLS PPS being produced by the Contractor under this contract. The Contractor shall develop manufacturing and test procedures. The Contractor shall identify key production processes and shall establish process capability and process control requirements for each. The Contractor shall submit Progress, Status, and Management reports to cover progress, schedule performance, technical and quality problems and other issues as may be appropriate to facilitate program management by the Government in accordance with CDRL A006.
17.3 Risk Assessment and Management
The Contractor shall perform risk assessment and management. The Contractor shall use its own established Risk Management Program; however, the Risk Management Program shall at a minimum contain the following:
Risk management shall be a continuous process, analyzing program risks and individual mitigation plans on a sufficiently frequent basis to be proactive in preventing major Program problems. Major problems include, but are not limited to, not meeting delivery dates and nonconformance to specifications and drawings. The analysis shall identify the risks associated with each area, assess the probability of occurrence, identify the impact of each risk on the overall program, and develop and implement risk mitigation plans for identified risks. The risk analysis shall use metrics from the Contractor’s Risk Management Program. Risk analysis status and metrics shall be reported in the Contractor’s Progress, Status and Management Report in accordance with CDRL A006 and presented during Program and Technical Reviews.
17.4 Right of Access
The Government shall have right of access to all facilities in which storage of raw materials, purchased parts, either finished or unfinished, and finished equipment may be established. Right of access shall include all areas in which VLS PPS are stored, manufactured, processed, aligned, assembled, and tested. Right of Access shall be interpreted to include, access to records and documentation concerning the VLS PPS. Access includes specifications, purchase orders and subcontract documentation, receiving, inspection and test records for such purchase parts. Right of access shall include access at all tiers to vendors, Subcontractors and suppliers in accordance with FAR 46.405 and FAR clauses 52.245-1(g) and FAR 52.246-1.
The Government may perform any necessary inspections, verifications and evaluations to ascertain conformance to requirements, and the adequacy of the implementing procedures.
18.0 SUBCONTRACTOR AND VENDOR MANAGEMENT
The Contractor shall identify and monitor Subcontractor and vendor technical, quality, schedule, and milestone achievement on a continuing basis, according to the Contractor’s established subcontract and vendor management techniques. Notwithstanding the above, at a minimum the Contractor’s subcontract and vendor management system shall comply with ANSI/ISO/ASQC Q9001 provisions for purchasing and supplier management. The Contractor shall:
Establish, document, and maintain a purchasing system and develop a self-assessment program to ensure adequate controls;
Acquire quality products at fair and reasonable prices, using best in class commercial purchasing practices and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .