19R0012-0002.pdf
PDF 165 KB Posted
- Attached to
- AN/SWG-5(V)6 Tactical Tomahawk Weapon Control System Manufacturing Federal contract opportunity
- Solicitation number
- N63394-19-R-0012
About this file
This is a solicitation for an Indefinite Delivery/Indefinite Quantity contract to provide manufacturing of AN/SWG-5(V)6 Tactical Tomahawk Weapon Control System assemblies. The Naval Sea Systems Command seeks to award a firm fixed price IDIQ contract with a five year ordering period and six month performance period. The contractor shall manufacture materials at their facility for delivery to the Naval Surface Warfare Center in Port Hueneme, California within six weeks after receipt of order. The estimated value is over $10 million. The opportunity is 100% set aside for small businesses. The incumbent, ACE Electronics, currently performs the work under contract number N63394-16-D-0002. Proposed responses are due by 1 June 2019 to the Naval Sea Systems Command for award.
Not Listed
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purposes of this amendment are to: (1) update contract clause 52.211-8 to ensure consistency in delivery requirements throughout the solicitation; (2) reserve CLINs 0224 and 0381 for possible future use; (3) increase the quantity for CLINs 0223 and 0380; (4) change the proposal due date to 2:00 PM PDT, May 13, 2019; (5) update Section C 3.3.1.4, Section L 2.3.2, Section L 2.4.1, and Section L 2.7.3.5A; (6) provide responses to offeror questions received follow ing issuance of the solicitation; (7) update contract clause 52.209-4; and (8) update contract attachment J-1 and solicitation attachment JS-1.
An updated Technical Data Package w ill be provided to each prospective offeror w ho has requested a copy via the instructions provided in the solicitation. For reference a fully conformed copy of the solicitation is included here.
In the event a prospective offeror's question w as inadvertantly omitted here, please contact nicholas.deselle@navy.mil.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Apr-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6339419R0012
X 9B. DATED (SEE ITEM 11)
29-Mar-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Apr-2019
CODE
N63394
PORT HUENEME DIVISION 4363 MISSLE WAY
PORT HUENEME CA 93043-4307
N63394 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6339419R0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
Statement of Work for
AN/SWG-5(V)6 Tactical Tomahawk Weapon Control System Manufacturing
1 Scope
This Indefinite Delivery Indefinite Quantity (IDIQ) contract provides for build-to-print manufacturing of AN/SWG-5(V)6 Tactical Tomahawk Weapon Control System (TTWCS) assemblies.
2 Applicable Documents
The following documents of issue in effect on the execution date of the contract are applicable to this Statement of Work and attached appendices to the extent specified herein or as modified under the contract. In the event of a conflict between the documents listed in Section 2, the
Contractor shall contact the Government and the Government will adjudicate on a case-by-case basis.
2.1 Government Furnished Information
See contract attachment J-S5 for the Government Furnished Information (GFI) to be provided to facilitate contract performance.
2.2 Contract Data Requirements List
See Exhibit A, below, for the Contract Data Requirements List associated with this contract.
2.3 Contract Attachments
See Section J, below, for attachments to this contract.
2.4 Department of Defense Specifications and Standards
Document Number Title Effective Date
MIL-STD-129R Military Marking for Shipment and Storage 18 Feb 2014
MIL-STD-130N, Change 1 Identification Marking of U.S. Military
Property 16 Nov 2012
MIL-STD-881C
Work Breakdown Structure for Defense
Material Items 03 Oct 2011
MIL-STD-882E System Safety 11 May 2012
MIL-STD-1472G Human Engineering 11 Jan 2012
MIL-STD-1629A
Procedures for Performing a Failure Mode, Effects, and Criticality Analysis (FMECA) 24 Nov 1980
MIL-STD-1839D Calibration and Measurement Requirements 12 May 2010
MIL-STD-3034A
Reliability-Centered Maintenance (RCM)
Process 29 Apr 2014
MIL-STD-31000A Technical Data Packages 26 Feb 2013
2.5 Department of Defense Manuals
MIL-HDBK-61A Configuration Management Guidance 07 Feb 2001
MIL-HDBK-189C Reliability Growth Management 14 Jun 2011
MIL-HDBK-217F, Notice 2 Reliability Prediction of Electronic
Equipment 28 Feb 2014
MIL-HDBK-470A
Designing and Developing Maintainable
Products and Systems 16 Nov 2012
MIL-HDBK-472, Notice 1 Maintainability Prediction 12 Jan 1984
MIL-HDBK-502A Product Support Analysis 08 Mar 2013
MIL-HDBK-781A
Reliability Test Methods, Plans, and
Environments for Engineering, Development, Qualification and Production
01 Apr 1996
MIL-HDBK-1390 Level of Repair Analysis 29 Jan 2015
MIL-HDBK-1839A Calibration and Measurement Requirements 27 Nov 2000
MIL-HDBK-2036
Preparation of Electronic Equipment
Specifications 01 Nov 2011
MIL-HDBK-2155
Failure Reporting, Analysis and Corrective
Action System 11 Dec 1995
MIL-HDBK-2164A
Environmental Stress Screening Process for
Electronic Equipment 03 Nov 2011
MIL-HDBK-29612/3A
Development of Interactive Multimedia
Instruction 30 Jul 1999
2.6 Other Government Specifications, Standards, and Manuals
44 U.S.C. 35 Coordination Of Federal Information Policy
AS1390 Level of Repair Analysis 01 Apr 2014
DoDI 4151.22 Condition Based Maintenance Plus (CBM+) for Material Maintenance 16 Oct 2012
DoDI 5000.02 Operation of the Defense Acquisition System 07 Jan 2015
DoDI 5200.39 Critical Program Information (CPI) 28 May 2015
Identification and Protection within
Research, Development, Test and Evaluation
(RDT&E)
DoDI 8500.01 Cybersecurity 14 Mar 2014
DoDI 8510.01 Risk Management Framework (RMF) for
DoD Information Technology (IT) 12 Mar 2014
Not Assigned DoD IUID Guide DoD Guide to Uniquely
Identifying Items 02 Dec 2014
Not Assigned DOD Anti-Tamper Guidelines
Not Assigned DOD Defense Acquisition Guidebook 05 Aug 2010
Not Assigned Navy Anti Tamper Desk Reference 01 Apr 2011
Not Assigned Risk Management Guide for DOD
Acquisition, Sixth Addition, Version 1.0 Aug 2006
Not Assigned Condition Based Maintenance Plus (CBM+)
Guidebook May 2008
HSPD-12
U.S Office of Personnel Management
Memorandum, Final Credentialing Standards for Issuing Personal Identify Verification
Cards
31 Jul 2008
IEC 62288
Maritime Navigation and Radio
Communication Equipment and Systems-
Presentation of Navigation-Related
Information on Shipborne Navigational
Display – General Requirements, Methods of
Testing and Required Test Results, Revision
Jul 2014
IEC 62388
Maritime Navigation and Radio
Communication Equipment and Systems -
Shipborne Radar – Performance
Requirements, Methods of Testing and
Required Test Results, Revision 2
Jun 2013
MIL-D-23140D
Drawings, Installation Control for Electronic
Equipment 30 Apr 1992
MIL-DTL-24643/3E
Detail Specification Sheet Cable, Electrical, -o C to +90 o C 600 Volts, Types LSSHOF, LSDHOF, LSTHOF and LSFHOF
01 Oct 2009
NAVSEAINST
Implementation of Naval Sea Systems
Command (NAVSEA) Afloat Information
Assurance and Guidance
18 Aug 2010
NAVSEAINST 5000.8 Naval SYSCOM Risk Management Policy 21 Jul 2008
NAVSEAINST 5100.12B
Requirements for Naval Sea Systems
Command System Safety Program for Ships, Shipborne Systems And Equipment
03 Aug 2011
NAVSEAINST 8020.6E Department of the Navy Weapons Systems 11 Mar 2008
Explosive Safety Review Board
NAVSEAINST 9400.2A
NAVSEA Platform Information Technology-
Control Systems Cybersecurity Governance and Guidance
20 Sep 2016
NAVSEAINST 9700.2
Integrated Topside Safety and Certification
Program for Surface Ships 11 Sep 1998
NAVSEA S9AA0-AB-
GOS-010/GSO
General Specification for Overhaul of
Surface Ships, Revision 4 30 Nov 2004
NAVSEA S9081-AB-GIB-
010/MAINT
Reliability Centered Maintenance Handbook, Revision 1 18 Apr 2007
NAVSOP 6071 Best Practices for Manufacturing March 1986
NIST 800-18
Guide for Developing Security Plans for
Federal Information Systems Feb 2006
NIST 800-37
National Institute of Standards and
Technology (NIST) Special Publication 800-
37, Guide for Applying the Risk
Management Framework to Federal
Information Systems
Feb 2010
NIST 800-53A
Security and Privacy Controls for Federal
Information Systems and Organizations 18 Dec 2014
OPNAVINST 1500.76C
Naval Training Systems Requirements, Acquisition and Management 14 Aug 2014
OPNAVINST 5100.24B
Navy System Safety Program Policy Naval
Sea Systems Command Research & System
Engineering Warfare System
06 Feb 2007
PEOIWSINST 5239.1 Surface Navy Combat System Cybersecurity 31 May 2016
PEO IWS
Engineering and Human Systems Integration
Directorate Technical Review Manual 18 Dec 2009
SECNAVINST 5239.22
Department of the Navy Cybersecurity
Safety Program (CYBERSAFE) 15 Nov 2016
SECNAVINST 5400.15C
Department of the Navy (DON) Research and Development, Acquisition, Associated
Life-Cycle Management, and Logistics
Responsibilities and Accountability
15 Sep 2007
SECNAVINST 5510.30 Navy Personnel Security Program Manual 6 Oct 2006
SW020-AH-SAF-010
NAVSEA Weapons System Safety
Guidelines Handbook 01 Feb 2006
Not Assigned DoD Joint Software Systems Safety
Engineering Handbook 27 Aug 2010
Not Assigned NAVSEA Technical Review Manual
2.7 Commercial Specifications, Standards, and Manuals
ASME Y14.24
Types and Applications of Engineering
Drawings 01 Jan 2012
ASME Y14.34 Associated Lists 01 Jan 2013
ASME Y14.35
Revision of Engineering Drawings and
Associated Documents 24 Aug 2014
ASME Y14.38M
Abbreviations and Acronyms for Use on
Drawings and Related Documents 01 Jan 2007
ASME Y14.100M Engineering Drawing Practices 30 Jun 2013
IPC/WHMA-620C
Requirements and Acceptance for Cable and
Wire Harness Assemblies 27 Jan 2017
ISO/IEC 12207
Systems and software engineering, Software life cycle processes Feb 2008
ISO/IEC 15408 Common Criteria v3.1. Release 4 Sep 2012
ISO/IEC 15289
Systems and Software Engineering, Content of life-cycle information items
(documentation)
May 2017
ISO 9001-2008 Quality Management System – Requirements 15 Nov 2008
ISO 10007
Quality Management Systems – Guidelines for Configuration Management 15 Jun 2003
12207:2008 IEEE Standard, Systems and software engineering, Software Life Cycle Processes 07 Dec 2009
15289:2011
IEEE Standard, Systems and Software
Engineering, Content of Life Cycle
Information Productions (documentation)
01 Nov 2011
SAE EIA-649-B
National Consensus Standard for
Configuration Management 01 Apr 2011
SAE EIA-649-1
Configuration Management requirements for
Defense Contracts 24 Nov 2014
SAE EIA-748C Earned Value Management Systems Oct 2006
SAE GEIA-HB-0007B Handbook for Logistics Product Data 10 Feb 2014
SAE GEIA-STD-0007B Logistics Product Data 10 Feb 2014
NFPA70E
Standard for Electrical Safety in the
Workplace 31 Aug 2011
3 Requirements
3.1 General Requirements
3.1.1 The Contractor shall manufacture all materiel in strict accordance with the specifications and technical data provided by the Government as GFI. The Contractor shall adhere to all applicable standards, specifications, and requirements referenced in the technical data package.
3.1.2 The Contractor shall ensure all materials delivered to the Government strictly comply with the specifications and technical data provided as GFI. No deviation from the specifications and technical data provided will be accepted without prior written approval of the
Contracting Officer. The Contractor shall not substitute, change, or modify any specification or technical data without written permission from the Contracting Officer.
3.1.3 If the Contractor determines any materiel cannot be procured or manufactured due to obsolescence, the Contractor shall notify the Contracting Officer and Contracting Officer’s
Representative immediately by electronic mail.
3.1.4 The Contractor shall build all cables using IPC/WHMA-620C and the workmanship compliance within this standard. The cables built shall pass the strictest classification (Class 3) required by the IPC/WHMA-620C standard. In the event the
IPC/WHMA-620C standard conflicts with a specification or technical data, the specification or technical data shall take precedence.
3.2 First Article Testing
3.2.1 First Article Testing shall be accomplished in accordance with FAR 52.209-4, Alt
I, below.
3.3 Functional Testing
3.3.1 The Contractor shall conduct Functional and Burn-In Tests for all Rack Mounted
Processor (RMP) assemblies identified in the table below:
PART NUMBER DESCRIPTION DRAWING
NUMBER
COMPONENTS
TO BE TESTED
REQUIRED TESTS
8749500-01 Rack Mounted
Processor
Assembly RT
8749500 1. Power Supply
2. Motherboard
3. RAM
4. Hard Drives
5. Ethernet Ports
6. Serial Port
Interfaces
7. Video interfaces
8. USB Interfaces
9. Unused Drive
Bays
10. Asynchronous
Serial Card
Interface
11. NTDS-A Card
Interface
12. NTDS-E Card
Interface
1. Verify all power indicators are enabled and the assembly boots up
2. Verify Basic Input Output System (BIOS) accessible and installed components register
3. Verify Memory size; Verify read and write
4. Verify Memory size; Verify read and write
5. Verify interface operational (ping test to external device acceptable)
6. Verify interface operational by loopback test
7. Verify interface operational with external source
(monitor)
8. Verify interface operational with external source
(keyboard)
9. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly
10. Verify interface operational by loopback test
11. Verify interface operational by loopback test
12. Verify interface operational by loopback test
8749500-02 Rack Mounted
Processor
Assembly TTWCS
8749500 1. Power Supply
2. Motherboard
3. RAM
4. Hard Drives
1. Verify all power indicators are enabled and the assembly boots up
2. Verify BIOS accessible and installed components register
PART NUMBER DESCRIPTION DRAWING
NUMBER
COMPONENTS
TO BE TESTED
REQUIRED TESTS
5. Ethernet Ports
6. Serial Port
Interfaces
7. Video interfaces
8. USB Interfaces
9. Unused Drive
Bays
3. Verify Memory size; Verify read and write
4. Verify Memory size; Verify read and write
5. Verify interface operational (ping test to external device acceptable)
6. Verify interface operational by loopback test
7. Verify interface operational with external source
(monitor)
8. Verify interface operational with external source
(keyboard)
9. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly and verify hard drive registers in
BIOS correctly
8749500-03 Rack Mounted
Processor
Assembly TMPC
8749500 1. Power Supply
2. Motherboard
Status
3. RAM
4. Hard Drives
5. Ethernet Ports
6. Serial Port
Interfaces
7. Video interfaces
8. USB Interfaces
9. Unused Drive
Bays
10. Asynchronous
Serial Card
Interface
11. Synchronous
Serial Card
Interface
1. Verify all power indicators are enabled and the assembly boots up
2. Verify BIOS accessible and installed components register
3. Verify Memory size; Verify read and write
4. Verify Memory size; Verify read and write
5. Verify interface operational (ping test to external device acceptable)
6. Verify interface operational by loopback test
7. Verify interface operational with external source
(monitor)
8. Verify interface operational with external source
(keyboard)
9. Test all unused drive bays by installing a temporary hard drive and verify hard drive registers in BIOS correctly and verify hard drive registers in
BIOS correctly
10. Verify interface operational by loopback test
11. Verify interface operational by loopback test
3.3.1.1 The Contractor shall verify the assembly passes all “REQUIRED TESTS” identified in the table above.
3.3.1.2 The Contractor shall perform a minimum 6-hour Burn-In Test with all CPU’s running at 80% or greater capacity after the assembly passes all Functional Tests. All RMP assemblies delivered to the Government must pass all Functional Tests and Burn-In Test prior to delivery. The Functional Tests require installation of a diagnostics tool set to verify hardware components identified are operational. Diagnostics tools will not be provided by the
Government. The Functional Tests shall also verify and record the size of all Random Access
Memory (RAM) and hard drives.
3.3.1.3 The Contractor shall record any component that fails during Functional or Burn-
In Test, and record the repair(s) made to the assembly. The Contractor shall repeat all Functional and Burn-In tests until all testing passes without any component failures.
3.3.1.4 The Contractor shall deliver a final report for each assembly indicating the unit has passed all tests required by Statement of Work paragraph 3.3.1. The report shall also record the final configuration of the delivered assembly that includes serial numbers, part numbers, model number, Basic Input Output System (BIOS) and firmware versions installed on applicable components (Hard Drives, Power Supply, NTDS-A Card, NTDS E Card, Motherboard, Asynchronous Card and Synchronous Card). (CDRL A001)
SECTION I - CONTRACT CLAUSES
52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)
(Contracting Officer shall insert details)
(a) The Contractor shall deliver One(1) unit(s) of Lot/Item CLIN 9800 within 120 calendar days from the date of this contract to the Government at NAVSEA PHD Port Hueneme, CA 93043 for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within 90 calendar days after the Government receives the first article, the Contracting Officer shall notify the
Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The
Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The
Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor--
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraphs (b) or (c) of this clause, the Contracting
Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
HQ J-2-0002 CONTRACT LANGUAGE FOR SECTION J
The following document(s), exhibit(s), and other attachment(s) form a part of this contract:
HQ J-2-0002 CONTRACT LANGUAGE FOR SECTION J
Documents, exhibits and other attachments that are part of the solicitation and will be part of the contract are as follows:
Attachment #: Description Date: Number of pages:
J-1 TTWCS Manufacturing Drawing Revision List 12 Apr 19 14
J-2 TTWCS Manufacturing Master Kit List 14 Jan 19 11
J-3 TTWCS Manufacturing Data Item Description 14 Nov 06 2
J-S1 TTWCS Manufacturing Pricing Matrix 19 Mar 19 56
J-S2 TTWCS Manufacturing Contractor Award Information 19 Mar 19 1
J-S3 TTWCS Manufacturing TDP and GFI Request 19 Mar 19 1
J-S4 TTWCS Manufacturing Question Submittal Form 19 Mar 19 3
J-S5 TTWCS Manufacturing Technical Data Package 12 Apr 19 286(files)
Exhibit A Contract Data Requirements List
(End of Text)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .