N6339419R0008-Amendment_0004.pdf

PDF 677 KB Posted

Attached to
MK 235 LCU Federal contract opportunity
Solicitation number
N6339419R0008
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document summarizes an amendment to a solicitation for a launch control unit for a naval weapons system. The amendment provides responses to additional industry questions, revises Attachment J-3 to reflect a government-furnished part, replaces one FAR clause with another, and updates Sections L and M. Key details include the solicitation number, a description of the launch control unit and weapons system, and a proposal due date that remains unchanged. The amendment summarizes changes to the solicitation and responses provided to industry questions on topics such as configuration management, engineering changes, quality assurance, and facilities for production and testing.

N6339419R0008-Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to MK 235 LCU, newest first.
File Type Posted
N6339419R0008_(Conformed_Copy_Through_Amendment_0016).pdf PDF
N6339419R0008-Amendment_0016.pdf PDF
N6339419R0008-Amendment_0015.pdf PDF
N6339419R0008_(Conformed_Copy_Through_Amendment_0015).pdf PDF
N6339419R0008-Amendment_0014.pdf PDF
N6339419R0008_(Conformed_Copy_Through_Amendment_0014).pdf PDF
N6339419R0008_(Conformed_Copy_Through_Amendment_0013).pdf PDF
N6339419R0008-Amendment_0013.pdf PDF
N6339419R0008-Amendment_0012.pdf PDF
N6339419R0008_(Conformed_Copy_Through_Amendment_0011).pdf PDF
N6339419R0008-Amendment_0011.pdf PDF
Attachment_J-3_-_N6339419R0008_(Revised_as_of_Amendment_0010).xlsx XLSX spreadsheet
N6339419R0008-Amendment_0010.pdf PDF
N6339419R0008_(Conformed_Copy_Through_Amendment_0010).pdf PDF
N6339419R0008_(Conformed_Copy_Through_Amendment_0009).pdf PDF
N6339419R0008-Amendment_0009.pdf PDF
N6339419R0008_(Conformed_Copy_Through_Amendment_0008).pdf PDF
N6339419R0008-Amendment_0008.pdf PDF
N6339419R0008_(Conformed_Copy_Through_Amendment_0007).pdf PDF
N6339419R0008-Amendment_0007.pdf PDF
N6339419R0008_(Conformed_Copy_Through_Amendment_0006).pdf PDF
Attachment_J-3_-_N6339419R0008_(Revised_as_of_Amendment_0006).xlsx XLSX spreadsheet
N6339419R0008-Amendment_0006.pdf PDF
N6339419R0008-Amendment_0005.pdf PDF
N6339419R0008_(Conformed_Copy_Through_Amendment_0005).pdf PDF
J-3_-_GFP_Attachment_-_N6339419R0008_(Revised_as_of_Amendment_0005).xlsx XLSX spreadsheet
J-3_-_GFP_Attachment_-_N6339419R0008_(Revised_as_of_Amendment_0004).xlsx XLSX spreadsheet
N6339419R0008-Amendment_0003.pdf PDF
N6339419R0008-Amendment_0002.pdf PDF
N6339419R0008_P00001.pdf PDF
Attachment_J-2_-_DD_Form_1423_-_CDRLs_A001-A009_-_N6339419R0008.pdf PDF
Attachment_J-S-1_-_Past_Performance_Questionnaire_-_N6339419R0008.doc DOC document
N6339419R0008.pdf PDF
J-3-GFP_Attachment_19R0008_LCU.xlsx XLSX spreadsheet
Draft_SOW_MK235_19Feb2019_CA.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to: (1) provide responses to additional industry questions received to date; (2) provide missing draw ings/test procedures; (3) revise Attachment J-3; (4) replace FAR 52.209-3 (Alternate I) w ith FAR 52.209-3 (Alternate II); and (5) revise Sections L and M.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6339419R0008

X 9B. DATED (SEE ITEM 11)

19-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Aug-2019

CODE

NSWC PHD 022

4363 MISSILE WAY

PORT HUENEME CA 93043

N63394 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6339419R0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004 Q&A

QUESTION #1: In reference to Solicitation Number: N6339419R0008, MK 235 LCU, it has been identified that the below required part cannot be obtained from the approved Manufacturer. Would the Navy be willing to either provide (a) this part as Government supplied or (b) provide a letter of authorization that could be utilized for us to procure direct?

Control No: 7572012-1 Manufacturer: Vishay Hirel Part No: 92701

RESPONSE: The Government will furnish the reference part to the contract awardee. Attachment J-3 has been revised to reflect this.

QUESTION #2: For clarification the offeror requests the CLIN type to Not Separately Priced (NSP) consistent with including costs in other CLINs.

RESPONSE: CLIN 0002 is Not Seperately Priced (NSP) as stated: "The cost for all data/tech generated by the contractor directly or indirectly in its performance of this effort is included in the price paid by the Government under CLINS 0001, 0003, 0004, 0005 and 0006."

QUESTION #3: Offeror requests FAR 52.209-3 Alt II be included in the solicitation.

RESPONSE: FAR 52.209-3 (Alternate I) has been removed and replaced with FAR 52.209-3 (Alternate II). The contract awardee is authorized to commence production to the extent essential to meet the delivery schedules in accordance with FAR 52.209-3 (Alternate II).

QUESTION #4: Will the Government include the option to have an in person Post Award Meeting (PAM) at the Government's location?

RESPONSE: The contract awardee may opt for an in-person post-award kickoff meeting vice the suggested teleconference. However, the Offeror must include any and all costs associated with this meeting in their firm-fixed-price proposal.

QUESTION #5: Will the Government also be purchasing CLINS 0001 and 0003 in the same manner? Or should those CLINs/SLINs be priced separately of one another?

RESPONSE: Yes, the Government intends to fully fund SLINs 0001AA, 0001AB, 0002 (NSP), 0003AA, and 0003AB at contract award. The remaining SLINs are options.

QUESTION #6: The following documents specified in Section 2.1 on Document 8650634 (ACCEPTANCE TEST REQUIREMENT, CIRCUIT CARD ASSEMBLY, FIBER OPTIC TRANSMITTER) are needed to determine the required testing of this assembly. Will the Government provide the listed drawings?

- 8571105 – Test Station, Operating Procedure, VLS CCA (S9100)

- 8571106 – Software Directory, Test Station, VLS CCA (S9100)

- 8571104 – Test Station, VLS CCA (S9100)

- 8571124 – Interface Test Assembly, Fiber Optic Transmitter (S9100)

RESPONSE: The Government will provide the referenced test procedures to all JCP-registered requestors via

AMRDEC SAFE.

QUESTION #7: Section 2.0 is missing and not found on page 69. Will the Government provide information contained in Sections 2.0?

RESPONSE: Section 2.0 does not exist. The paragraph numbering begins at 2.1.

QUESTION #8: Referenced Sections 2.1.1 and 2.1.2 are missing for detailed instructions for paper and electronic files are not found. Should this read "2.2.1" and "2.2.2" or will the Government provide information contained in missing Sections , 2.1.1 and 2.1.2?

RESPONSE: Section L has been updated to reference the correct paragraphs (i.e., 2.2.1 and 2.2.2).

QUESTION #9: Please clarify the Government instructions for submission of electronic files format.

Are all electronic files to be submitted in the Microsoft Office applications and Adobe Acrobat 9.0 format?

Or are all electronic files to be submitted in the Microsoft Office Application and only if the data is beyond the capability of Microsoft Word or Microsoft PowerPoint then the electronic files are to be submitted in Adobe Acrobat 9.0 formats?

RESPONSE: Offerors shall only submit electronic files in Adobe Acrobat 9.0 format if the data is beyond the capability of Microsoft Word, Excel, or PowerPoint.

QUESTION #10: For any solicitation sections with "Offer Fill-ins" or request for other information or data, should Offeror include in the Volume II Price Proposal only the specific RFP page as filled-in or the complete Section containing such RFP page as filled in?

RESPONSE: Offerors only need to submit the specific RFP page with fill-ins completed. Offerors do not need to submit the complete RFP section.

QUESTION #11: In the Solicitation Factor 3 is defined as Price and Factor 2 is defined as Past Performance. As used in in this section b., please clarify what is "Factor 3, Past Performance."

Section L does not instruct or define Volume III. Volume I is not listed. Please define appropriate Volumes.

RESPONSE: Section L has been updated to reference the correct factor (i.e., Factor 2, Past Performance).

QUESTION #12: Please provide clarification of the Evaluation Methodology for Factor 3 – TOTAL EVALUATED PRICE (Volume III).

1) Section M 2.0 does not indicate or define a Factor 3 as an Evaluation Factor.

2) Solicitation Section L does not instruct or define Volume III. Please define appropriate Volume and instructions."

RESPONSE: Sections L and M have been updated to reference the correct factors and volumes (i.e., Factors 1 through 3 and Volumes I and II).

QUESTION #13: Solicitation does not provide for instructions for submission of the Small Business Subcontracting Plan. Should the Small Business Subcontracting Plan be submitted as a standalone document or included in Volume I or included in Volume II? If to be submitted in Volume I, will the document be counted within the noted page limited requirement.

RESPONSE: Section L has been updated to include submission instructions for the Small Business Subcontracting Plan (i.e., submit with Volume II).

QUESTION #14: Section L does not instruct or define Volume III. Volume I is not listed. Please define appropriate Volumes.

RESPONSE: Sections L and M have been updated to reference the correct volumes (i.e., Volumes I and II).

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0002

The contract type FFP has been deleted.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Data Deliverables

Prepare, maintain, and deliver data IAW CDRLs A001 through A009 and applicable Data Item Description (DID). Government shall have unlimited rights to all data/tech data IAW DFARS 252.227-7013, unless an assertion is accepted by the Government IAW DFARS 252.227-7017. The cost for all data/tech generated by the contractor directly or indirectly in its performance of this effort is included in the price paid by the Government under CLINs 0001, 0003, 0004, 0005, and 0006.

FOB: Destination

PSC CD: 6130

NET AMT

SECTION I - CONTRACT CLAUSES

The following have been added by full text:

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989) - ALTERNATE II (SEP 1989)

(a) The Contractor shall test one unit of Lot/Item 0001AA as specified in this contract. At least 10 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within seven calendar days from the date of this contract to Naval Surface Warfare Center Port Hueneme Division, Code A07 (bonnie.nguyen@navy.mil) marked "FIRST ARTICLE TEST REPORT: Contract No. N6339419R0008, Lot/Item No. 0001AA." Within 10 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.

A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph

(b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(End of clause)

The following have been deleted:

52.209-3 Alt I First Article Approval--Contractor Testing (Sep 1989) -

Alternate I

JAN 1997

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

SECTION L

INSTRUCTIONS

1.0 GENERAL

The Offeror shall submit all information required by this solicitation. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being removed from consideration for award. The Offeror’s proposal shall be based on the requirements contained in this solicitation (including those documents, exhibits, and other attachments to the solicitation identified in Section J). All proposals submitted in response to this solicitation become property of the Government and will not be returned.

The Government may schedule Pre-Award Site Surveys of the facilities identified in any or all Offerors' proposals following the proposal submission date using the SF 1405 (Production) and/or SF 1406 (Quality Assurance).

2.1 INSTRUCTIONS FOR SUBMISSION OF OFFERS:

The solicitation response will be contained in two separate volumes:

Volume I: Technical (Non-Price) Proposal (Factors 1-2)

Volume II: Price Proposal (Factor 3)*

*Offerors required to submit a Subcontracting Plan in accordance with L-219-H001 SUBMISSION OF SMALL BUSINESS SUBCONTRACTING PLAN (NAVSEA) (JAN 2019) shall include the Subcontracting Plan as a separate tab under Volume II of their proposal.

For each volume, the number of copies required and the page limits are shown in the table below. Instructions for paper and electronic files are detailed below in sections 2.2.1 and 2.2.2, respectively. Offerors are hereby notified that the content of electronic copies of the proposal must be identical to the original hard copy proposal submitted in response to this solicitation. In the event of discrepancies between the two, the content of the original hard copy will prevail. All data submitted shall be marked unclassified.

2.2 PROPOSAL FORMAT AND DELIVERY:

Volume Title Page Limit Paper Copies (Org/Copy)

Electronic Copies on CD-ROM

I Technical (Non-Price) Proposal 100 1/0 3

II

Price Proposal

None 1/0 3 Small Business Subcontracting Plan (Large Businesses Only)

Offerors must comply with the detailed instructions for the format and content of the proposals. Proposals that do not comply shall be considered nonresponsive and shall render the Offeror ineligible for award. In order to maximize efficiency and minimize the effort involved in the proposal evaluation process, all Offerors shall submit their proposals in accordance with the format presented below.

The title page of each volume shall contain:

Cover and title page Title of proposal and proposal number as applicable Offeror’s name, address, and POC Date of Submittal Solicitation No. N6339419R0008 Launch Control Unit (LCU) MK 235 MOD 11 and MK 235 MOD 12 for

MK 41 Vertical Launching System (VLS) Volume Number and Title (e.g., Volume I – Technical (Non-Price) Proposal)

DUNS Number and CAGE Code of the Offeror

The proposal volumes shall include the following information (as well as using tabs and dividers), which is not included in the page limit:

Title Page Table of Contents List of Figures List of Tables Glossary of Abbreviations and Acronyms

Duplicated information within a given factor may be included in full once and referenced thereafter, as long as there is a clear reference to the duplicated information.

2.2.1 Paper Format:

Each volume shall be bound separately and shall not exceed the page limitation cited above. Each volume of the proposal shall be bound in three ring binders to permit removal of sections with each major part tabbed. The Offeror’s company name shall appear at the top of each page in the header section. Legibility, clarity, and compliance with the requirements of the solicitation are essential. Failure to provide the requested information may adversely affect the Government’s evaluation of the Offeror.

The material in all volumes of the Offeror’s proposal shall be typed or printed in a font with the type no smaller than size 12 Times New Roman font on standard 8-1/2 by 11-inch paper. Text line spacing shall be one line.

One-inch margins on each side, including top and bottom are required. Text within tables, diagrams, pictorial charts, or graphic material may use 8-point font. Fold-out pages may be used for diagrams, charts or graphic material only and may not exceed 11 inches by 17 inches. Fold-out pages will be counted as two pages; double-sided fold-out pages will be counted as four pages.

Unless otherwise specified, fold out pages may only include narrative sufficient to describe the diagram, chart or graphic material. Every figure and table shall be numbered. Paragraphs shall be clearly formatted. Proposal material shall be presented on double-sided pages only. Each double-sided page counts as two pages.

A date shall be placed on each page of the proposal corresponding to the date of the initial proposal in the footer section. Any pages that may be revised as a result of discussions or correspondence (if required) shall contain revision numbers and dates.

The page count shall include all material (printed matter and figures) except where explicitly stated and does not include cover pages, title pages, Table of Contents (TOC), lists of figures and tables, tab pages, index pages, Integrate Master Schedule, Glossary of Abbreviations and Acronyms, and the Cross Reference Matrix (CRM).

Pages excluded from the page count must contain only material pertinent to the page heading or be blank and marked "Intentionally Left Blank." Index pages and Tabs are required and shall be cross-referenced to the TOC.

Every page, except those marked as blank, shall be numbered. Pages exceeding the page count shall be removed from the end of the volume that exceeds the page count and will not be evaluated.

The Offeror shall submit a CRM for the Technical Volume, similar to the example below to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the Offeror’s proposal. The CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific solicitation requirements, as well as other parts of the proposal that contain relevant information. The Offeror’s CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located, or provide other comments.

Each factor and volume shall be written to the greatest extent possible on a stand-alone basis so that its content may be evaluated with a minimum of cross-referencing to other factors and volumes of the proposal. Cross-referencing within a given factor is permitted where its use would conserve space without impairing clarity. In the event an

Offeror decides to cross reference information, it is the responsibility of the Offeror to include the information in full and provide clear references to that information in other portions of the factor where the Offeror would like the evaluators to consider any duplicated information. Nevertheless, Offerors are reminded of their burden to present its capability in a manner that is clear for evaluators.

EXAMPLE OF A CROSS REFERENCE MATRIX (CRM)

Section L - Proposal

Instructions

SOW Section M - Evaluation

Factor

Offeror's Proposal Reference

CLIN

Reference

Volume I / Technical (Non- Price)

Example: Section C, SOW, Para 3.10.4, First Article Test

Factor 1, Subfactor 2

Provide reference to Offeror's Proposal Volume I - Technical.

Note: This column shall address applicable paragraphs within the

SOW.

Example: Refer to appropriate page number in Offeror's written proposal.

2.2.2 Electronic Files:

The electronic files shall be uncompressed and shall be submitted on Compact Disc – Read Only Memory (CD-ROM) formatted for Microsoft Office; text shall be prepared using Microsoft Word compatible applications; and spreadsheets, worksheets, or workbooks shall be prepared using Microsoft Excel compatible applications. Electronic files shall consist of the following extensions:

….docx for Microsoft Word 2016 files ….xlsx for Microsoft Excel 2016 files ….pptx for Microsoft PowerPoint 2016 files ….pdf for Adobe Acrobat 9.0 files

Graphics, tables, photographs, and other data beyond the capability of Microsoft Word; or Microsoft PowerPoint may be submitted in Adobe Acrobat 9.0 format. Directory listing of the disk shall accompany the submission with a listing of file names and content of each file. Pricing data and technical data must be provided on separate CD-ROMs. A separate folder shall be used for each proposal volume. One electronic submission of each volume shall be provided on CD-ROM. Each disk shall be labeled as follows:

Solicitation Number Date Volume # Offeror Company Name, City, State Offeror POC Offeror POC Phone # Date of Submission Appropriate Security Classification markings and handling instructions.

The electronic spreadsheets shall not be compiled or password protected; all cells and formulas shall be visible, editable, and unprotected. Offerors shall not establish links referencing other spreadsheet files not included with the proposal.

2.2.3 Proposal Submission:

Proposals are due to the following address on or before the date and time in Block 9 of the Standard Form (SF) 33:

Commanding Officer Naval Surface Warfare Center Port Hueneme Division Contracts Department/Code 022 Attention: Ciara Allison, Contract Specialist 4363 Missile Way Port Hueneme, CA 93043-4307 Solicitation Number: N6339419R0008

Proposals shall not be submitted via fax or email. No pricing information shall be included in Volume I.

Although legible, neat, orderly, and comprehensive proposal(s) are required, elaborate brochures or other presentations beyond that to present a complete and effective explanation are not desired. Elaborate artwork, expensive visual or other presentation aids are neither necessary nor desired.

The proposal shall contain all the pertinent information in sufficient detail to permit evaluation. Information shall be confined to the appropriate volume to facilitate independent evaluation. The proposal shall be detailed and complete as to clearly demonstrate that the Offeror has a thorough comprehension of all management, technical, and other requirements. The proposal should be clear and concise, logically assembled and indexed and cross-indexed to applicable parts of this solicitation as appropriate.

Offerors that opt to hand deliver the proposals shall email Ciara Allison at ciara.allison@navy.mil or call (805) 228-8807 at least 48 hours prior to arriving at the Naval Base Ventura County to make timely delivery arrangements. Packages may be subject to inspection.

2.3 PROPOSAL CONTENT:

Proposal shall demonstrate an understanding of the requirements and the proposed method of completing the SOW. Technical and management information shall be prepared in such a manner as to enable source selection personnel to make a thorough and complete evaluation and arrive at a sound determination as to whether or not the solution proposed and described will satisfy the requirements of the Government. To facilitate the evaluation, the proposal should be sufficiently detailed and complete to clearly demonstrate that the prospective Offeror has a thorough understanding of the requirements and the technical and management problems inherent therein. It should also contain sufficient detail to indicate the proposed means for complying with all applicable specifications. Statements that the prospective Offeror understands and can or will comply with all specifications, statements paraphrasing the specifications or parts thereof, and phrases such as “standard procedures will be employed” or “well known techniques will be used”, etc., will be considered insufficient and potentially “Unacceptable.”

Offerors shall comply with all solicitation requirements, terms, and conditions. Any exceptions shall be identified to the Government prior to receipt of the Offeror’s proposal. Failure to comply with all solicitation requirements may result in the Offeror being considered ineligible for award.

2.3.1 The below shall be included in Volume II Price Proposal:

SF 33, “Solicitation, Offer, and Award,” with blocks 12 through 18 completed by the Offeror. Block 12 shall be filled in with 180 days to allow for sufficient time to evaluate proposals.

SF33 Section B, “Supplies or Services and Prices,” with all prices for all line items completed by the Offeror.

SF33 Section K, “Representations, Certifications, and Other Statements of Offerors,” completed by the Offeror.

SF33: Offeror must fill in all areas of the solicitation listed as “Offeror fill-ins” and provide any other information or data required by the solicitation.

Volumes I through Volume II in accordance with the requirements identified herein. See Section 2.2 in Section L for the number of copies to submit.

RFP: Offeror must fill in all areas of the RFP listed as “Offeror fill-ins” and provide any other information or data required by the solicitation.

Disposition of Technical Data Package (TDP) and Technical Drawings

All Offerors, except the winning Offeror, must destroy all copies/media of TDP and Technical Drawing List within 30 days after contract award, whether electronic or hard copy format. Offerors must provide the Contracting Officer a statement certifying that all data is destroyed. Offeror shall not make additional copies, paper or electronic, of the provided data with this solicitation, nor should Offerors transfer the data by any means to a third party. Offerors shall not download any files from the CD-ROM onto any local area network or integrated digital environment.

2.4 VOLUME I – TECHNICAL (NON-PRICE) PROPOSAL

No price information shall be included in this volume.

Volume I – Technical (Non-Price) Proposal shall consist of the following binder tabs:

Factor 1 – Technical Approach

Subfactor 1 - Production Assembly in Accordance With the SOW and TDP Subfactor 2 - First Article and Factory Acceptance Testing in A ccordance With TDP Subfactor 3 - Physical Assets to be Used in Production and Testing

Factor 2 – Past Performance

FACTOR 1: TECHNICAL APPROACH

Subfactor 1: Production Assembly in Accordance With the SOW and TDP

Volume I shall include the Offeror’s detailed plan to accomplishing the technical tasks specified in the SOW and meeting the following minimum requirements described below:

a. The Offeror shall discuss its proposed Configuration Management (CM) plan and how it complies in accordance with the SOW 3.10.1.3 (Section C). The Offeror shall demonstrate an understanding of the CM requirements for this acquisition and describe how it will implement a CM Program. The Offeror shall provide examples of how it has successfully initiated CM on a previous program of similar size and complexity, as compared to the TDP of this solicitation.

b. The Offeror shall discuss its process on managing engineering changes or deviations to the TDP that are either requested by the Contractor, or changes provided by the Government in accordance with the SOW

3.10.2.3. The Offeror shall provide examples of instances it has received updated production requirements in accordance with the SOW 3.10.2.3. Examples should describe how the Offeror’s team successfully dealt with updating production line(s) and processes, interfaced with vendors, met required delivery dates, and ensured quality was maintained.

c. The Offeror shall describe its proposed Quality Assurance Plan (QAP) and address how it intends to ensure the manufacturing quality of its subcontractors and other vendors in accordance with the SOW

3.10.1.3. The Offeror shall ensure that its approach adheres to the requirements of the SOW. The Offeror shall include a discussion of the proposed Failure Analysis and Corrective Action Reporting (FACAR) system.

d. The Offeror shall describe the proposed Diminished Manufacturing Sources and Material Shortages

(DMSMS) process, as it relates to SD-22, the DoD DMSMS Guidebook, including disclosure of any and all known DMSMS items in the production baseline and the planned action to mitigate impacts in accordance with the SOW 3.6. The Offeror shall describe the proposed Counterfeit Prevention Plan in sufficient detail to demonstrate that its approach adheres to the requirements of the SOW.

Subfactor 2: First Article and Factory Acceptance Testing in Accordance With TDP

a. The Offeror shall describe its approach in conducting first article and factory acceptance testing in accordance with the associated Government Furnished Information (GFI) test plans and procedures (Section J, TDP). The Offeror shall address facilities, fixtures, software, and test equipment required to successfully conduct first article testing.

Subfactor 3: Physical Assets to be Used in Production and Testing

a. The Offeror shall describe the proposed production and test facilities and capital assets in sufficient detail as to demonstrate adequate infrastructure, capability, and capacity for the production and test of the proposed sets, as identified by the TDP, at the rates per the delivery requirements identified in Section F. Proposal shall specifically discuss availability of facilities and assets during the contract period of performance. The Offeror shall describe availability of necessary facility capabilities including access to physical plant facilities, required production and test equipment, special test ranges or facilities and skilled production, test and engineering support personnel.

FACTOR 2: PAST PERFORMANCE

a. Offerors shall provide a maximum of three Past Performance references with their proposal for like or similar efforts within the last five years, considering the issue date of the solicitation. This includes ongoing and completed projects. Offerors must also submit one Past Performance reference for each proposed subcontractor effort valued at 10% or more of their total offer. Past Performance references may consist of Past Performance Questionnaires (PPQ) and/or Contractor Performance Assessment Reporting System (CPARS) evaluations. The contracts identified shall demonstrate in-depth knowledge and successful implementation of contracts, of similar scope and complexity to this solicitation. Similar scope and complexity means having performed most of the types of efforts identified in the SOW for this solicitation.

The identified contracts can be with Federal, commercial or other customers.

b. The PPQ, included as an attachment to the solicitation is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor 2, Past Performance.

Include with your proposal submission a copy of the PPQ Cover Sheet. In order to expedite the assessment process, the Offeror may complete the “Contract Information” portion of the PPQ for the convenience of the client POC. The Offeror shall not, however, complete any other section of the PPQ. Completed PPQs are to be emailed from the client directly to ciara.allison@navy.mil and michael.d.thompson4@navy.mil by the closing date and time specified on the cover page of the Solicitation, Block 9. PPQs are NOT to be submitted via the Offeror.

c. The Government reserves the right to limit or expand the number of references it decides to contact and to contact other references than those provided by the Offeror. The Government reserves the right to consider any surveys received after the due date and to contact those offices that do not respond to the questionnaire.

The Government also reserves the right to use contract performance data provided in the Offeror’s proposal and additional contract performance data obtained from other sources, such as the Government’s Past Performance Information Retrieval System (PPIRS) data base, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and personnel knowledge.

Previous Contracting Effort Narratives

The Offeror shall also provide a Previous Contracting Effort Narrative detailing the following information for each past performance reference:

a. Description of how the scope for this past contract/task order relates to this effort in scope and complexity;

b. Description of the significant achievements, challenges or obstacles that were encountered during contract performance and the measures taken to overcome challenges and obstacles; and

c. Description of achievements for the most recent period for which performance measures have been applied to each contract. The performance measures should be specific and show the target performance levels that are set forth under the applicable contracts as well as the level of performance achieved. The Offeror shall describe the tools and/or methods used to collect metrics data and the frequency of data collection and reporting.

If the Offeror cites as a past performance reference a contract that was not awarded to the Offeror as a Prime Contractor but is nevertheless cited by the Offeror as "past performance information regarding predecessor companies, Key Personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement [FAR 15.305(a)(2)(iii)]," the proposal shall demonstrate the relevance of the efforts of such predecessor company, Key Personnel and subcontractor both to the overall performance rating of the cited reference contract or Task Order as well as to the instant requirement.

2.5 VOLUME II – PRICE PROPOSAL

Volume II – Price Proposal shall consist of Factor 3, Total Evaluated Price as detailed below.

FACTOR 3: TOTAL EVALUATED PRICE

Offerors shall submit a complete price proposal, which addresses all information required to evaluate the pricing proposed for each Contract Line Item Number (CLIN), except CLIN 0002, including pricing within CLIN 0001, 0003 and Option CLINs 1001-4001 and 1002-4002. The price proposal shall be a separate volume from the technical (non-price) proposal. It is expected that the resulting contract will be awarded based upon a determination that there is adequate price competition; therefore, the Offeror is not required to submit or certify cost and/or pricing data with their proposal, however data other than certified cost data or pricing data is required to be submitted. If after receipt of proposals, the Contracting Officer determines that adequate price competition does not exist in accordance with FAR 15.403-1 or that only one offer is received, the Offeror shall provide certified cost and/or pricing data as requested by the Contracting Officer.

The price and cost summaries provided in Volume II must not conflict with the data submitted in Section B schedules. In the event of a discrepancy, prices found in the filled-out Section B shall be utilized.

Volume II shall contain the Offeror’s understanding of and approach to the pricing requirements of the solicitation.

The pricing portion of the proposal shall include:

a. Pricing spreadsheets for all CLINs, for all items (with options) as described in Section B. Spreadsheets shall be in Microsoft Excel format with cells containing working formulas that are visible for Government examination of price buildup and methodology.

b. Basis of Estimate (BOE) narrative in Microsoft Word for each CLIN. The BOE narrative shall include estimating methodologies for each proposed priced CLIN.

Pricing Support Information:

Offerors shall provide the following information in support of all Section B Firm-Fixed-Price (FFP) CLINs requiring pricing, inclusive of all option items:

a. The Offeror shall submit its price summaries in accordance with the Offeror’s accounting structure for the first unit of each FFP line item. The Offeror’s proposal shall provide complete visibility by calendar year

(or the Offeror’s calendar year) labor hours, labor costs, material costs, other direct costs, indirect costs, and profit. The Offeror shall provide detailed analysis to support the proposed FFP pricing at each quantity amount and the adjustments made from the first unit pricing (i.e. production labor learning reductions, quantity reductions, escalation.

b. For each major subcontract the Offeror shall provide a list which includes:

i. Subcontractor name, address, email, and telephone number;

ii. Subcontractor CAGE code;

iii. Description of supplies/services to be subcontracted;

iv. Information as to whether the subcontractor has held any Government contracts/subcontracts;

v. Place(s) of contract performance;

vi. Estimated dollar amount of the subcontract;

vii. Type of contract (FFP, Cost Plus Fixed Fee, etc.);

viii. Basis for determining that the proposed subcontractor pricing is fair and reasonable.

c. Provide any price estimating methodology applied to generate pricing. This includes, but is not limited to, price interpolation, escalation, curving, etc.;

d. Any inconsistency, whether real or apparent, between proposed performance and actual performance for similar work (cost and schedule), shall be explained in the proposal. For example, if the intended use of new and innovative production techniques is the basis for an abnormally low estimate or short manufacturing schedule, the nature of these techniques and their impact on cost shall be explained or, if a corporate policy decision has been made to absorb a portion of the estimated cost, that shall be stated in the proposal. Any significant inconsistency, if unexplained, may be grounds for determining that the proposal is unacceptable. The burden of proof as to cost credibility rests with the Offeror.

SMALL BUSINESS SUBCONTRACTING PLAN: Large Business Offerors under the applicable NAICS code are required to submit a Subcontracting Plan in accordance with L-219-H001 SUBMISSION OF SMALL BUSINESS SUBCONTRACTING PLAN (NAVSEA) (JAN 2019). Include the Subcontracting Plan as a separate tab under Volume II of the proposal.

2.6 REQUEST FOR DRAWINGS

This is a build-to-print requirement in accordance with the TDP. These drawings are restricted and can only be made available to DoD Contractors under the Joint Certification Program, upon request to the Contracting Office.

Drawings will be made available via www.fbo.gov.

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

SECTION M

EVALUATION FACTORS

1.0 GENERAL INFORMATION

The Government intends to award a single contract resulting from this solicitation to the responsible Offeror whose proposal offers the lowest total evaluated price while meeting or exceeding the acceptability standards for all non-price factors.

All, some, or none of the options may be exercised by the Government at its sole discretion. Offerors are required to price all Contract Line Item Number (CLINs) not categorized as Not Separately Priced (NSP).

The Government will evaluate each Offeror’s understanding of the Government’s requirements and ability to perform the work. It is the Offeror’s responsibility to provide information and evidence which clearly demonstrates its ability to satisfactorily perform the contract requirements as stated in the solicitation.

Each factor will be evaluated on a stand-alone basis; however, information contained in one factor of the proposal may be used to assist the Government in evaluating other factors of the proposal.

If it is determined that an offer is not in compliance with the page limitation of the volume of the proposal, Offerors are cautioned that pages above the specified page limit within each volume will be removed and will not be evaluated. Proposals that are not submitted in compliance to the hard-copy and electronic-copy requirements specified in Section L may also be subject to elimination.

2.0 EVALUATION FACTORS

The Government will evaluate each proposal in accordance with the below factors and subfactors.

Factor 1 – Technical Approach (Volume I)

Subfactor 1: Production Assembly in Accordance With the SOW and TDP Subfactor 2: First Article and Factory Acceptance Testing in Accordance With TDP Subfactor 3: Physical Assets to be Used in Production and Testing

Factor 2 – Past Performance (Volume I)

Factor 3 – Total Evaluated Price (Volume II)

3.0 EVALUATION METHODOLOGY

FACTOR 1 – TECHNICAL APPROACH (Volume I)

The following subfactors will be evaluated to determine acceptability for Factor 1.

Subfactor 1: Production Assembly in Accordance With the SOW and TDP

Offerors will be evaluated on their understanding of all aspects of the TDP and demonstrated ability to apply that knowledge toward meeting the requirements of this solicitation based on demonstrated technical expertise.

Evaluation will consider the following:

1. The Offeror’s proposed Configuration Management (CM) process will be evaluated to determine the level of process documentation and the application of CM in support of, at a minimum, SOW para 3.10.1.3; to determine the Offeror’s understanding of the CM requirements for this acquisition, and to determine whether the Offeror’s CM process and experience on programs of similar size and complexity to the requirements in this solicitation.

2. The Offeror’s proposed process and experience managing engineering changes or deviations to the TDP and controlling the insertion of those changes into the production line will be evaluated to determine the Offeror’s demonstrated ability to understand and address engineering changes and updated production requirements. In addition, the Offeror will be evaluated on its approach in updating production line and processes.

3. The Offeror’s proposed Quality Assurance (QA) Plan and FACAR system will be evaluated to verify that it is ANSI/ASQC Q9001 or ISO 9001 or equivalent, certified, to determine the level of process documentation and the level of compliance.

4. The Offeror’s proposed Diminishing Manufacturing Sources and Material Shortages (DMSMS) management process will be evaluated on its compliance with DoD Instruction (DoDI) 5000.02, “Operation of the Defense

Acquisition System, Enclosure 6; Public Law 113-66, the National Defense Authorization Act for Fiscal Year 2014, dated 26 December 2013; and SD-22 – DMSMS.

Subfactor 2: First Article and Factory Acceptance Testing in Accordance With TDP

Offerors will be evaluated on their complete understanding of all aspects of associated plans and procedures. The Offeror will be evaluated on the adequacy and availability of proposed human resources and their disciplines, facilities, physical test space area, test fixtures, test software and test equipment, as it pertains to the ability to understand test requirements and to successfully perform FAT and demonstrate the product meets TDP compliance.

Subfactor 3: Physical Assets to be Used in Production and Testing

Offerors will be evaluated on the adequacy and availability of proposed human resources and their disciplines, production and test facilities, physical production and test space work area, production and test fixtures, test software and test equipment, as it pertains to the ability to demonstrate an acceptable approach and plan for passing Production Readiness Reviews and infrastructure for manufacturing and testing capability and capacity to meeting the solicitation requirements at maximum production levels. Production and schedule requirements shall assume maximum quantities including all options.

FACTOR 1 – TECHNICAL APPROACH (Volume I)

Factor 1, Technical Approach (and related subfactors) will be characterized as “Acceptable” or “Unacceptable” as follows:

Adjectival Rating Description

“ACCEPTABLE” Proposal clearly meets the minimum requirements of the solicitation.

“UNACCEPTABLE” Proposal does not clearly meet the minimum requirements of the solicitation.

FACTOR 2-PAST PERFORMANCE (Volume II)

The Past Performance Evaluation is an assessment of the Offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the Offeror’s record of relevant and recent past performance information that pertain to the product and/or services outlined in the solicitation.

Past performance will be evaluated in accordance with FAR 15.305 and DFARS 215.305. However, the comparative assessment in FAR 15.305(a)(2)(i) does not apply. Therefore, past performance will be rated on an “Acceptable” or “Unacceptable” basis as follows:

Evaluation Determination Description

“ACCEPTABLE” Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown.

“UNACCEPTABLE” Based on the Offeror’s performance record, the Government does not have a reasonable expectation that the Offeror will be able to successfully perform the required effort.

Past performance will be initially evaluated to determine whether the Offeror’s present/past performance is recent, and relevant or not relevant, to the effort. For the purposes of this solicitation, recency is defined as projects completed within three years prior to the closing date of the solicitation. Common aspects of the relevancy include, but are not limited to, the following: similarity of the product/service/support, complexity, dollar value, contract type, and extent of subcontracting/teaming to the solicitation.

Second, the past performance evaluation will determine how well the Offeror performed on the prior contracts.

NOTE: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonable assigned, the Offeror may not be evaluated favorable or unfavorable on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown (“Neutral”) past performance. In the context of the acceptability, a neutral rating shall be considered “Acceptable.”

FACTOR 3 – TOTAL EVALUATED PRICE (Volume II)

The Total Evaluated Price Evaluation Factor will not be characterized as “Acceptable” or “Unacceptable”. The Government will perform cost/price analysis techniques on the Offeror’s proposed prices. For purposes of making an award decision, the Government will arrive at a Total Evaluated Price by adding the total price for all CLINs.

Priced offers will be evaluated for reasonableness and appropriateness of' proposed amounts and for the Offerors understanding of the proposal requirements.

The inclusion of option prices in arriving at a "Total Evaluated Price" does not obligate the Government to exercise all or any part of the options. The Government may reject an offer as materially unbalanced if prices for the basic requirement or prices for the option quantities are unreasonable in comparison to each other. An unbalanced offer or proposal is one that is based on prices significantly less than cost for some work and/or significantly overstated for other work.

SMALL BUSINESS SUBCONTRACTING PLAN: This applies to Large Business Offerors only. Offerors required to submit a Subcontracting Plan in accordance with L-219-H001 SUBMISSION OF SMALL BUSINESS SUBCONTRACTING PLAN (NAVSEA) (JAN 2019) will be reviewed to determine compliance with FAR 52.219-9 (Deviation 2018-O0018) and the five percent (5%) goal for small disadvantaged business concerns or a detailed explanation as to why the goal cannot be included in the plan. Proposals that fail to include a compliant Subcontracting Plan will be ineligible for contract award.

4.0 BASIS FOR AWARD

The Contract will be awarded to the technically acceptable Offeror with the lowest Total Evaluated Price or LPTA.

An “Unacceptable” determination for any factor or subfactor will result in an “Unacceptable” proposal.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .