N6274227R1801_Amd0001.pdf
PDF 646 KB Posted
- Solicitation number
- N6274227R1801
About this file
Amendment 0001 to Solicitation N6274227R1801 – Marine Resources Technical Services
This document is Amendment 0001 to an Indefinite Delivery Indefinite Quantity (IDIQ) solicitation for marine resources management and technical services issued by Naval Facilities Engineering Systems Command (NAVFAC) Pacific. The proposal due date has been extended from November 23, 2026 at 12:00 AM to December 7, 2026 at 2:00 PM Hawaii Standard Time. The amendment revises Sections C, G, I, L, and M, plus attachments J-2, J-13 through J-17, and J-21, with all other sections remaining unchanged. The Government intends to award no more than six IDIQ contracts with an estimated not-to-exceed aggregate value of $99 million across an Unrestricted Division and a partial Small Business Set-Aside Division, with a minimum of two contracts per division. Awards will be based on evaluation of non-price factors (Experience, Sample Project, Safety, Small Business Utilization, and Past Performance), all weighted equally and significantly more important than price, with the specific evaluation methodologies detailed in Section M.
The contractor shall provide marine species monitoring, habitat mitigation, and associated technical services throughout the NAVFAC Pacific area of responsibility, with majority work expected in Hawaii, Guam, and the Commonwealth of the Northern Mariana Islands. Required services include scientific field work and analyses (visual surveys, diving surveys, passive acoustic monitoring, tagging and tracking, photo identification, behavioral studies); supporting services and technical analyses (event reconstruction, ecological analysis, outreach); biosecurity and aquatic invasive species management; Integrated Natural Resources Management Plan development; NEPA and environmental planning documentation; and GIS mapping. The contractor must obtain necessary federal, state, and territorial permits, maintain a physical office in Honolulu, Hawaii, employ personnel meeting minimum qualifications detailed in Attachment J-2, and comply with all applicable health and safety regulations including OSHA standards. Proposals must be submitted electronically through PIEE in three separate volumes: Price Proposal, Technical Proposal (Factors 1, 2, 3, and 5), and Technical Proposal (Factor 4 and Subcontracting Plan). The minimum small business participation requirement is 18 percent of total contract value.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-19_SBPCD.docx | DOCX document | |
| J-15 Key Personnel Experience.pdf | ||
| J-21_SampleProject_PriceSheet_MR.xlsx | XLSX spreadsheet | |
| J-18_HistoricalSmallBusinessUtilization.docx | DOCX document | |
| J-13 SB Subcontracting Plan Mar 2026.docx | DOCX document | |
| J-16_Sample Project PWS.pdf | ||
| QA_1-73.pdf | ||
| J-14 Contract Experience Form.pdf | ||
| J-2 Minimum Professional Qualifications.pdf | ||
| J-17 Sample Project Key Personnel_final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On:
13 Nov 2026, 01:47 AM Greenwich Mean Time
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): PLEASE REVIEW THE AMENDMENT, COMPLETE BLOCKS 8 AND 15A THROUGH
15C TO ACKNOWLEDGE RECEIPT AND SUBMIT WITH YOUR PROPOSAL.
The following items are applicable to this amendment:
A. Provide Government responses to questions/clarifications received in response to the solicitation. See attached questions and answers for Amendment 0001.
B. The following sections of the solicitation have been revised. Changes to each section are annotated in track changes.
(1) Section C
(2) Section G
(3) Section I
(4) Section L
(5) Section M
(6) Attachment J-2
(7) Attachment J-13
(8) Attachment J-14
(9) Attachment J-15
(10) Attachment J-16
(11) Attachment J-17
(12) Attachment J-21
C. The proposal due date has been extended to 2:00 PM, HST on Monday, 7 December 2026.
D. All other sections/attachments remain unchanged.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Time 12:00 AM 02:00 PM Response Due Date 23 Nov 2026 07 Dec 2026
N6274227R18010001
Section C - Description/Specifications/Statement of Work
Miscellaneous text in this section has been modified to:
Contents
1.0 GENERAL
1.1 GENERAL REQUIREMENTS
1.2 LAWS, REGULATIONS, AND REFERENCE DOCUMENTS
1.3 REGULAR WORKING HOURS
1.4 HOLIDAYS
2.0 GOVERNMENT FURNISHED DATA
3.0 SPECIFIC TASKS
3.1 PROGRAM MANAGEMENT AND COORDINATION
3.2 SCIENTIFIC FIELD WORK AND ASSOCIATED ANALYSES
3.3 SUPPORTING SERVICES AND TECHNICAL ANALYSES
3.4 BIOSECURITY AND ACQUATIC INVASIVE SPECIES MANAGEMENT
3.5 INTEGRATED NATURAL RESOURCES MANAGEMENT PLANS (INRMPs)
3.6 NEPA, ENVIRONMENTAL PLANNING AND SUPPORTING STUDIES
3.7 GIS MAPPING
3.8 MISCELLANEOUS MARINE RESOURCE SERVICES
4.0 PROFESSIONAL STANDARDS AND PROCEDURES
4.1 GEOGRAPHICAL INFORMATION SYSTEMS (GIS)
4.2 LEGIBLE AND ACCESIBLE DATA
4.3 OBJECTIVE AND DISPASSIONATE REPORTING
4.4 MINIMUM PERSONNEL REQUIREMENTS
4.5 STATISTICAL METHODS AND PROGRAMS
4.6 ELECTRONIC GRAPHICS
5.0 HEALTH AND SAFETY
5.1 DESCRIPTION
5.2 REGULATIONS
5.3 EXPLOSIVE SAFETY
5.4 IMPLEMENTATION
5.5 REPORTING OF ACCIDENTS
5.6 HEALTH AND SAFETY MANAGER
5.7 PROTECTIVE EQUIPMENT FOR GOVERNMENT VISITORS
6.0 STIPULATIONS
7.0 CONTRACTOR SUBMITTALS
7.1 SURVEY PLAN OR WORK PLAN
7.2 PROGRESS REPORT
7.3 DRAFT SURVEY REPORT
7.4 FINAL SURVEY REPORT
7.5 REPORT FORMAT
8.0 CONTRACTOR QUALITY CONTROL
PART I - THE SCHEDULE
SECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
1.0 GENERAL
1.1 GENERAL REQUIREMENTS. The Contractor shall provide marine resources management services throughout the Naval Facilities Engineering Systems Command (NAVFAC) Pacific area of responsibility (AOR), and other areas in the NAVFAC AOR worldwide as needed. The majority of the work is expected to occur in Hawaii, Guam, and the Commonwealth of the Northern Mariana Islands (CNMI). The contractor may also, on occasion, be tasked to provide services described herein to any Department of Defense or other Federal Agency Worldwide. The Contractor shall provide all labor, transportation, tools, equipment, materials, supplies, supervision, coordination, and management necessary to provide safe and effective natural resources management services within the NAVFAC Pacific AOR.marine
1.2 LAWS, REGULATIONS, AND REFERENCE DOCUMENTS. The Contractor shall execute each Contract Task Order's (CTO) request in compliance with all references in Attachment J-1 and other laws, rules and regulations as applicable to each project. The Contractor's personnel performing all contract services shall meet the minimum education and experience qualifications described in Attachment J-2 and as specified in each
CTO.
1.3 REGULAR WORKING HOURS. The Government's regular working hours vary by activity and are normally between the hours of 7:00 a.m. and 4:30 p.m., Mondays through Fridays except Federal holidays and other days specifically designated by the Contracting Officer.
1.4 HOLIDAYS. Federal holidays are as follows: New Year's Day, Dr. Martin Luther King Jr. Birthday, Presidents Day, Memorial Day, Juneteenth Holiday, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.
2.0 GOVERNMENT FURNISHED DATA
Pertinent data in possession of or readily available to the Government, but not to the Contractor, that is needed and requested by the Contractor to perform the work, will be made available to the Contractor, subject to security restrictions if applicable. The Contractor shall ensure a competent and knowledgeable staff is assigned to interpret and utilize the information furnished. Government furnished data shall be returned to the Government no later than the completion of the task order or contract.
3.0 SPECIFIC TASKS
The general scope of work is to conduct marine species monitoring and habitat mitigation services. Baseline data collection and monitoring needs vary by region, depending on the current level of knowledge and data availability. The contractor must be capable of providing, procuring, or sub-contracting all personnel, permits, equipment, materials, facilities, and management services necessary to support multiple concurrent field studies (typically ten or more) across several geographical areas; performing data analysis and reporting of results; and conducting program administration, budget tracking, sub-contractor management, and general program oversight. Successful candidates will possess high levels of experience in both project management and technical field skills, as well as have significant experience with and access to a broad pool of researchers and equipment to meet the program needs.
Marine resources management services required under this contract are tasks commonly associated with the monitoring, management, and protection of biological resources in marine and nearshore environments. Many of the tasks result from the issuance of permitting requirements or impact analysis within Endangered Species Act (ESA) Biological Opinions, National Environmental Policy Act (NEPA) documents, Magnuson Stevens Fishery Conservation and Management Act (MSA) Essential Fish Habitat (EFH) Assessments or an installation's Integrated Natural Resource Management Plan (INRMP). The INRMP is a planning tool and explains the military installation's base-wide conservation program.
The Contractor shall be responsible for obtaining any necessary Federal, State or Territorial government permits and work plan approvals to conduct the services required in the CTO. Permits may include, but are not limited to, 10(a)(1)(A) permit(s) for threatened and endangered species. Copies of permit(s) shall be submitted to the task order contracting officer representative (TOCOR) prior to initiating threatened/endangered species inventory /surveys or, as practicable, copies of permit(s) shall be provided with the submittal of the draft work plan.
CTO solicitations will be performance based, describing the requirement in terms of desired outcome with provision of precise details and/or scientific objectives of work to be done. The contractor shall provide access to professional expertise, research facilities, equipment, tools, instrumentation, materials, labor, supervision, and transportation to provide marine resources monitoring and program management services described herein. These services may include and are not limited to marine resource and biological services in accordance with National Marine Fisheries Service (NMFS) and U.S. Fish and Wildlife Service (USFWS) regulations, as well as regulations from other federal and state agencies to include but not limited to field surveys, consultations, and general studies related to the following resources: marine mammals, sea turtles, fish, marine invertebrates, marine habitats, shorelines, coastal zones, threatened and endangered species, and other marine resources. Specialized services may include, but are not limited to, habitat restoration, coral translocation, orthomosaic images and analysis, fish surveys, coral habitat stabilization, visual surveys (e.g. aerial, shipboard, and land-based), passive acoustic monitoring, tagging and tracking, behavioral monitoring, biopsy sampling, photo identification, data management, and coordinating/managing complex research projects and programs related to these services and requirements. The services may also include preparation of management plans and reports such as Marine Mammal Protection Act (MMPA) authorization requests, ESA Biological Assessments, and EFH Assessments. Any or all of the above services may be required during the term of this contract.
The following are major categories of tasks required under this contract, but are not intended to represent all of the types of services which may be requested. The specific services and objectives will be detailed in the performance work statement (PWS) contained within each task order.
3.1 PROGRAM MANAGEMENT AND COORDINATION. The primary contractor will be responsible for management, coordination, and oversight of Navy-wide monitoring efforts. In support of this initiative, the contractor should be prepared to establish, manage, and coordinate multiple monitoring efforts simultaneously across broad geographic regions of the Pacific Ocean. To successfully accomplish the objectives and requirements of Navy permits and authorizations, the contractor is expected to assemble and/or have access to a large team of researchers and scientists with extensive experience developing and performing complex studies of marine species including bioacoustics, behavior, ecology, density/abundance, and habitat use. Expertise in identifying and working with species from both Atlantic and Pacific oceans will be required, and previous experience conducting monitoring and research on Navy ranges or installations is highly desired. The contractor is expected to maintain physical office locations in Honolulu, Hawaii.
3.1.1 COORDINATION OF MONITORING PROJECTS AND SUBJECT MATTER EXPERTS.
The scope and magnitude of marine resources tasks under this contract requires significant collaboration among universities, research institutions, and other regional marine scientists, as well as potential leveraging of efforts and resources from a variety of federal and state agencies. The contractor is expected to effectively communicate and work collaboratively with various scientific organizations and individuals, and facilitate coordination among these groups to provide required services and products.
The Contractor shall conduct coordination meetings and prepare minutes as required by the CTO. Coordination meetings may include, but are not limited to, project kick-off meetings, team meetings, site visits, and project report meetings. The Contractor will contact the TOCOR to coordinate and arrange meeting dates, venue, and agenda. Coordination meetings are intended to be working-level meetings with the purpose of tracking progress, exchanging information and identifying data needs, discussing requirements contained in the CTO, and obtaining copies of existing environmental planning documents, past surveys, and other documents to be referenced. Contractor may also request that the TOCOR authorize meetings to problem solve or fix coordination issues. Minutes shall include, but are not limited to, attendees, relevant discussion topics, decisions, and action items.
3.1.2 DATA MANAGEMENT. Large quantities of data (e.g., visual observation, passive acoustics, ecological, and environmental) will be collected and generated through various monitoring efforts. It is essential that data be organized, cataloged, and stored in accordance with established protocols to facilitate analysis and meet reporting requirements. Data from visual and passive acoustic surveys may need to be processed and prepared in specific formats to be submitted to existing databases such as OBIS-SEAMAP. Tracking and movement data from tagging studies must be managed efficiently and contributed to the Animal Telemetry Network, or integrated into other systems developed specifically to manage marine resource and monitoring data. The contractor shall establish protocols to ensure that all data and information generated under this contract is efficiently cataloged and managed in order to facilitate analysis and reporting as well as to ensure consistency among individual monitoring efforts. The contractor shall be prepared to supply copies of all data, products, and deliverables (MS Excel, MS Access, other databases, GIS, etc.) to Navy technical representatives involved with the monitoring program in a timely manner as required.
3.1.3 ANALYSIS AND REPORTING. Results of monitoring efforts will need to be analyzed appropriately and reported in a format (i.e., written reports, tables, figures, maps, databases, etc.) consistent with requirements established through coordination with the TOCOR. Data analysis may include, but is not limited to, the following: assessment of observation data for trends in species health, distribution and abundance; evaluation of acoustic, behavioral, and tagging data to examine potential changes in animal behavior; assessments of mitigation and monitoring effectiveness; as well as addressing other questions that may be raised as part of the Navy's environmental compliance and monitoring program.
Periodic, short-timeframe reports may include summaries of field monitoring effort and preliminary data/results immediately following individual monitoring events such as "quick-look" summary reports. All reports and deliverables will be prepared in standard MS Office format for both draft review and final version, as well as in Adobe pdf for final distribution. These reports will be prepared for audiences including the Navy and regulatory agencies such as NMFS, as well as the general public.
3.2 SCIENTIFIC FIELD WORK AND ASSOCIATED ANALYSES. The contractor shall be responsible for performing and/or coordinating multiple monitoring elements designed to support the Navy's short and long-term monitoring objectives. Specific monitoring activities under this Contract may include, but are not limited to the following sections.
3.2.1 VISUAL SURVEYS. The primary purpose of visual surveys is to monitor, locate, and report on the distribution, numbers, and behavior of marine species. Surveys may support active Navy training exercises by providing before, during, and/or after monitoring and may also be conducted for more synoptic purposes such as establishing spatial-temporal distribution, abundance, and habitat associations. Surveys may be conducted from vessels, aircraft, UAVs, and land in a number of formats appropriate to the specific purpose including systematic line-transects and focal follows. It shall be the responsibility of the contractor to ensure that all necessary safety regulations are followed and appropriate permits have been obtained.
3.2.2 DIVING AND MARINE RESOURCE SURVEYS. Contractor shall perform dive surveys for marine organisms and habitats, to include benthic organisms on natural and man-made surfaces, threatened and endangered species or species of concern, critical habitats, and EFH. Marine species to be surveyed may include but are not limited to coral, seagrass, sponges, biofouling communities, oysters, sea turtles, seals, marine mammals, and other important organisms relative to EFH, and the ESA and the MMPA. These surveys would support ESA, EFH, and Sikes Act requirements.
Survey areas may include the Outer Defensive Sea Area, any harbor or near shore areas including some locations where no benthic data exists or for which updated survey data are required to support the planning process for Navy or DoD actions. The Contractor shall propose survey methodology and data collection and analysis techniques to the TOCOR prior to field work or as specified by the CTO.
3.2.3 MARINE SPECIES OBSERVERS. Monitoring obligations may require trained marine species observers. For example, marine species observers may be stationed onboard Navy ships during a sampling of training exercises for the purpose of providing detailed data on encounters with marine species including species identification and behavioral observations. In addition, marine species observers may be required to keep constant vigilance for the presence of ESA-listed marine species during in-water construction activities, such as vessel operations, dredging, operating pre-drilling and pile driving equipment, and deployment of the silt curtain, anchors, or mooring lines.
Competent observers will be able to identify marine species, at minimum, to type of animal (e.g. shark, seal, dolphin, whale, turtle, ray, etc.), if sightings are brief or viewing conditions are poor, or to species if positive identification is possible. The observers will understand marine species behavior enough to be able to observe direction of movement, know diving patterns, and be able to determine when an observed species has departed or remained close to the project area. The observers will know enough about evaluating group size to state with high certainty how many animals were observed when they are seen in a group.
3.2.4 PASSIVE ACOUSTIC MONITORING. Passive acoustic monitoring will be performed either in coordination with other monitoring techniques or as a primary means of monitoring for the presence of marine mammals, as well as anthropogenic sound sources such as pile driving, sonar and explosives. Acoustic monitoring may be accomplished through a variety of real-time and archival methods including, but not limited to, deployment of moored autonomous instrument packages/buoys, towed passive acoustic arrays, free-floating sensors such as sonobuoys, autonomous underwater vehicles and gliders, and instrumented ranges. Acoustic monitoring may be used as a means of complementing visual observation data by providing real-time monitoring capabilities below the surface and/or during poor sighting conditions (e.g., weather and daylight limitations) or provide continuous longer-term monitoring capabilities through post-analysis of recordings at specific fixed locations.
In addition to collecting passive acoustic data, access to individuals with extensive experience in developing analysis protocols, detection, classification, and localization algorithms, and conducting sophisticated, complex analysis of passive acoustic data will also be required. Primary investigators with considerable previous experience reviewing and identifying recorded marine mammal vocalizations, acoustic impacts to ESA and MMPA animals from construction activities, underwater acoustic propagation, digital signal processing, automated detection, programming, and potentially means to work with classified data, are also required.
3.2.5 MARINE SPECIES TAGGING AND TRACKING. Marine species tagging and tracking will be performed either in coordination with other monitoring techniques or as a primary means of monitoring movements and behaviors of marine mammals, fish, and sea turtles. Tagging data can provide information about dive profiles, habitat utilization, large- and fine-scale movements as well as many other aspects of an individual's life history and ecology. Experts that have experience in the application of various tagging methods will be required, as well as individuals who are trained in the processing and analysis of data streams generated by various tag technologies. Specific expertise using a variety of tag types and associated attachment methodologies is necessary to evaluate the best use of tagging assets.
3.2.6 PHOTO IDENTIFICATION. Photographic identification of individual animals may be performed in coordination with other monitoring techniques as a means of cataloging the presence of marine mammals and creating a photographic database to analyze population parameters.
Undertaking photo-identification studies will require the use of experienced photographers who have worked with wildlife or other fast-moving subjects. Expertise in photo-matching, the use of automated photo-identification software, and photo catalog management may also be required to analyze and report results.
Image analysis may also be performed to analyze coral reef species, evaluating factors such assize class, bleaching, living tissue coverage, and other biodiversity indicators. Orthomosaic or photogrammetric imagery should include a size reference (ruler) and color scale (such as a coral health chart).
These images enable long-term comparison across different sites and may be incorporated into benthic surveys, translocations, monitoring studies, or other reef-related studies.
3.2.7 BEHAVIORAL STUDIES. Behavioral studies may be performed in coordination with other monitoring techniques as a means of assessing the effects of exercises and other stressors on the normal behavior of marine mammals and sea turtles. Observations of behaviors will be made through analysis of visual, tagging, and passive acoustic data. Visual survey methodologies may include focal follows, continuous observations, and other standard surveillance techniques. A variety of platforms can be utilized to observe behavioral patterns such as shore-based, ship-based, and/or aerial observations. Tagging, remote biopsies or passive acoustic data can also be used to interpret behavior (e.g., dive time or patterns, habitat utilization, stress hormones, swim speed, and direction). Implementation of controlled exposure experiments and analysis of incidental exposures is expected to be a considerable focus of the monitoring program.
3.2.8 HABITAT RESTORATION. The contractor may offset unavoidably lost ecosystem function and services provided by coral and other benthic biota through habitat conversion and ecological uplift at or near to mitigation sites. By restoring the benthic habitat at mitigation sites, the contractor will be performing habitat improvements for the invertebrate community that will restore the site to a level similar or equivalent to nearby areas where coral naturally occurs. The potential habitat restoration actions that will compensate for the functions and services that will be unavoidably lost from the permanent removal of corals and the benthic community may include (but is not limited to):
- Remove anthropogenic debris scattered within the restoration area prior to stabilization
- Stabilize the substrate to create a consistent, stable surface to which marine fauna may attach and thrive
- Increase rugosity and habitat complexity on the newlystabilized area on seafloor
- Develop methods to optimize placement and stability by working with coastal engineers to determine best methods to withstand current and wave stresses
- Consider new and innovative technologies to optimize habitat uplift and transplant survival
- Design a habitat restoration plan to ensure optimal and available habitat to potentially receive future coral transplants.
3.2.9 CORAL TRANSLOCATION. The Contractor shall collect appropriate, healthy coral colonies that meet the translocation criteria (as in the U.S.
Coral Reef Task Force and as approved by the Navy) and transport them to an adequate, Navy-approved coral recipient site. The contractor shall prioritize collecting larger coral colonies (greater than 10 cm) and species suitable for translocation. Prior to coral removal, contractor divers will inspect each coral colony for potential signs of disease, predation, recent mortality or tissue paling, thereby ensuring the translocation of only healthy colonies that are not pale or bleached. This will ensure that the less abundant and smaller colonies are completely removed from the site prior to the movement of the larger species. All encrusting corals are considered as an unavoidable loss because their encrusting morphology is unable to be successfully translocated, are typically very small, and provide limited ecological services and function, unless the entire substrate on which they exist can be moved. Additionally, all corals less than 10 cm, regardless of species, are also considered as an unavoidable loss due to their inability to survive the translocation.
During the coral translocation, the Contractor will implement Navy-approved BMPs, including avoidance of physical contact with organisms not transplanted (especially coral). The Contractor will stabilize and secure materials that are staged on the bottom, while also avoiding movement during inclement weather. The Contractor will use experienced coral biologists for the coral transplantation, especially divers who are experienced in translocating corals and knowledgeable about the risks of disease to damaged corals. To the best of their ability, the divers will avoid exposing corals directly or indirectly to toxicopathological agents. All divers and crew will wear gloves and minimize contact with living coral tissue. Divers and crew will also enact appropriate gear and equipment maintenance to minimize potential transport of unwanted species and diseases.
Translocation may require a temporary coral cache site. Divers may initially concentrate on coral collection and movement of the colonies to the coral recipient site to build-up a stockpile or cache of coral colonies for placement and attachment. A large enough coral cache or backlog of colonies may be maintained at the coral recipient site to allow several days of coral reattachment activities without the need to bring additional colonies. The cache area shall not negatively impact the existing current conditions at the recipient site.
Prior to attachment, divers shall gently clean the corals of biofouling organisms (such as sponges, tunicates, and bivalves), thus maximizing the bonding ability of the cement to the base of the coral and promoting the coral health. Colonies of highly branching species often have individual branches that fracture from the main colony. If chosen for transplantation, divers shall keep the detached individual branches with the parent colony during transport to the recipient site. During the reattachment process, divers shall cement the fractured branches closely together with the parent colony, creating a distinct cluster. The Navy recommends keeping branches with the parent colony within all practical means, but this is not a requirement. The divers shall prepare a final inventory and assessment of all translocated corals, including species, orientation, maximum length, and width perpendicular to the axis of maximum length.
3.2.10 ANOMALY AVOIDANCE SURVEYS. The Contractor may undertake an anomaly avoidance survey of coral removal and mitigation areas.
Unexploded ordnance (UXO) qualified divers (per DDESB Technical Paper 18) will perform anomaly avoidance through an instrument-aided, visual inspection of the mitigation areas. Depending on the amount of metallic debris submerged, the Navy may or may not anticipate finding munitions and explosives of concern (MEC) or material potentially presenting an explosive hazard (MPPEH). The UXO-qualified divers will survey the corals and the benthic substrate to which they are attached. Structures or anomalies that cannot be confirmed to be non-MPPEH will be clearly marked, and these corals will remain in place. Structures and/or anomalies that are confirmed non-MPPEH (e.g. pilings, railways, etc.) may have coral removed from them.
During the anomaly avoidance surveys, the team will use a geo-referenced camera for photographing significant anomalies with GPS data, with an accuracy of 1-3 m. Divers will survey the coral removal and mitigation areas by swimming along a transect that covers an area of approximately 2-3 m in width while recording the track and noting any anomalies. Divers will use visual inspection procedures with assistance from adequate metal detectors while using a navigational system to track their movement. Divers will use appropriate equipment to search for and quantify any metal debris. The diver will have topside communication with a recorder who will describe anomalies, size, surface/subsurface, and any physical description of material identified. With the geo-referenced photos, the contractors will prepare a final map showing the locations of anomalies and observations, as well as a final inventory/spreadsheet of metal objects found with time and date stamps, GPS coordinates, and diver notes.
If divers discover MEC and/or MPPEH while employing anomaly avoidance techniques, the divers will avoid the item and report its location and description to the responsible Explosives Safety Officer and the COR. If appropriate, the divers may request an emergency response from the cognizant Explosive Ordnance Disposal detachment. All personnel will receive MEC awareness training, including Recognize, Retreat, and Report procedures, prior to performing any work on-site.
3.3 SUPPORTING SERVICES AND TECHNICAL ANALYSES.
3.3.1 EVENT RECONSTRUCTION AND ENVIRONMENTAL DATA INTEGRATION. In order to assess potential behavioral responses to active sonar and underwater detonations, it will be necessary to correlate marine mammal movements and behaviors with Navy training data including active sonar use and ship tracks. These data will likely be sensitive and may be classified. This analysis will provide a key component of interpreting the monitoring data in an operational context. Methods for this analysis and reconstruction will need to be developed with Navy operators and adapted as data needs require. Analysis will need to be crafted to integrate data from varied sensors used for monitoring including vertical and horizontal movements from tags, passive acoustic detections, behavioral observations from visual observers, and operational data related to the movements and actions of navy assets. Analyses involving operational data may be restricted to classified environments and will require an appropriate level of clearance for both facilities and personnel involved.
3.3.2 ECOLOGICAL ANALYSIS. In order to provide an integrated natural resources perspective relative to monitoring and management services, studies to enhance the understanding of ecosystem structure, function, and services may be required. These may include, but are not limited to, tropical coral reef and temperate ecosystem studies related to the following topics.
- Habitat structure and mapping: Substrate type, water depth and current speed, and spatial and temporal complexity of physical habitat;
- Water quality: Temperature, sedimentation, turbidity, dissolved oxygen, salinity, organic and inorganic chemicals, total suspended solids, and nutrients;
- Flow regime: Water direction, volume, and flow timing;
- Food (energy): Type, amount, and size of organic source particles entering the ecosystem; seasonal pattern of energy availability; and light intensity;
- Reproduction: Fecundity, settlement, recruitment, and persistence over time;
- Biotic interactions: Changes in competition and predation stimulated by fishing, disease, parasitism, mutualism, and introduction of alien taxa;
- Biological assessments: Surveys of the distribution, diversity and abundance of organisms; assessments of community and assemblage structure, demographics, taxonomic identification and composition, individual condition, and biological processes;
- Biochemical and genetic analysis: species identification, ecotype or biotype identification, detection of stress indicators, and eDNA analysis.
3.3.3 OUTREACH. In order to make the public and other stakeholders aware of the broad range of activities which the Navy engages in on behalf of marine resource monitoring and management, presentations and graphic displays (brochures, pamphlets, posters, etc.) for various audiences may need to be prepared. The contractor may be required to prepare items such as, but not limited to, brochures, guides, slides, overheads, and computer presentations to support reporting requirements or facilitate dissemination of information and data. The contractor will also be expected to support maintenance of the monitoring program's online web portal. This will include expertise with web design and programming, content management, social media management, and interactive data presentation that supports dissemination of data, information, reports, and other documents to the general public as well as regulators and specific stakeholders.
Educational outreach tasks encompass a variety of outreach activities and resources designed to bring awareness to rces marine natural resou management stewardship and invasive species issues. Target audience may include, but is not limited to, the general public, contractors, active duty DoD members and their families, civilians, and other workforce interacting with the DoD. The Contractor may be required to prepare outreach material in the form of websites, information kiosks, trail signs, warning signs, information signs, brochures, guides, slides, posters, flyers and computer presentations.
3.3.4 MISCELLANEOUS MARINE AND BIOLOGICAL RESOURCE SURVICES. The contractor may be requested to provide miscellaneous biological resources planning, evaluation, management, and related services that may be required of the Navy as a condition of compliance with federal natural resources regulations and Navy natural resources policies. These services may include, but are not limited to, the preparation of assessments, evaluations, engineering evaluations, maintenance plans, management plans for conservation areas, baseline assessment surveys, training programs and workshops, and compliance assistance.
3.3.5 BIOMONITORING. This task may include but is not limited to biological monitoring to identify, flag, and record species identified in the CTO.
GIS track logs may be required to document survey areas.
3.4 BIOSECURITY AND ACQUATIC INVASIVE SPECIES MANAGEMENT. Biosecurity refers to measures aimed at preventing the introduction and/or spread of harmful organisms. This task refers to all aspects of biosecurity related to military construction, training and other proposed DoD actions. The Contractor may be required to evaluate military construction and training missions for invasive species incursion risk probabilities, in addition to identifying mitigation actions, which can be taken to reduce such incursion risk. Other risk analysis and invasive species management guidance that the Contractor shall prepare may include: rapid response plans, pathway identification, cost benefit analysis of different incursion mitigation, and analyzing the efficacy of existing plans, biosecurity measures, and programs. The Contractor shall also place a focus on educational outreach about biosecurity for the general public, Contractors, active duty DoD members, civilians, and other workforce interacting with the DoD.
This task refers to a variety of management activities related to the control or eradication of aquatic invasive species. Tasks may include but are not limited to identifying treatment methods for target aquatic invasive plant/animal species occurring on DoD installations. The Contractor shall utilize literature and lessons learned from the applied biologists in the region, as it applies to identifying the most effective control or eradication tool for the target. All compound and delivery techniques shall abide by current EPA labels. Target aquatic invasive species would include but are not limited to:
octocorals, sea anenomes, orange keyhole sponge or aquarium fish species. In the event that the removal of aquatic invasive species via mechanical method is the preferred prescription, the Contractor shall provide the required equipment and qualified equipment operators/technicians to meet the requirements as specific in the CTO.
3.5 INTEGRATED NATURAL RESOURCES MANAGEMENT PLANS (INRMPs). This task may include but is not limited to the development and preparation of an installation's new INRMP, or an update or revision to an existing INRMP. An INRMP supports the environmental reviews of the installation's military projects and their compliance with all applicable Federal, State and Local statutes and regulations, DoD policies, instructions and guidance. An INRMP will include identification of significant natural resources, recent studies on the resources, and an inventory of these resources, as well as the installation's proposed projects over a five-year period. INRMPs shall follow all Navy and DoD guidance and any other applicable service specific INRMP policies related to preparation of INRMPs. Natural resources data shall be incorporated into a geographical information system in accordance with requirements in the CTO.
3.6 NEPA, ENVIRONMENTAL PLANNING AND SUPPORTING STUDIES. This task refers to the preparation of NEPA and other Environmental Planning studies and documents. Contractor tasks may include but are not limited to preparation, updating, and review of National Environmental Policy Act (NEPA) documents in support of resources management projects or actions. NEPA documents prepared may include marine natural Record of Categorical Exclusions (RCEs), Environmental Assessments (EAs), or Environmental Impact Statements (EISs). The primary tasks anticipated under this contract are the preparation, update, and review of RCE or EA. Secondary tasks may include, but are not limited to, the development or review of Endangered Species Act (ESA) Section 7 Biological Assessment (BA) or Biological Evaluation (BE) (see Attachment J-7), Essential Fish Habitat Assessments, and Coastal Zone Management Act (CZMA) filings and preparing or updating flora/fauna inventories, soils conservation studies, and environmental outreach materials. Additionally, the Contractor may be required to perform ancillary work involving word processing, graphics/GIS products/maps, reproductions, manuscript editing, and other services related to NEPA documents as directed in the CTO.
3.7 GIS MAPPING. The Contractor shall provide all equipment and service required to conduct photographic surveys and mapping services to document significant marine resources, including but not limited to endangered species locations or critical habitat, essential fish habitats, coastal areas of concern, and marine management sites. Support services for photogrammetrically-derived mapping include: digital ortho-photography; RTK GPS/conventional survey crews to locate endangered species locations and other significant marine resources requiring survey-level accuracy of location for photogrammetric capture. The Contractor may also be required to develop Spatial Data Standard (SDS) compliant GIS vector data files of digitized planametric features captured from ortho photos, and convert AutoCADD files to SDS compliant datasets using ESRI compatible products (ArcGIS). If drones are used for aerial photography of DoD installations, the Contractor will be required to meet specific security restrictions and registration requirements prior to operating the drone in restricted areas.
3.8 MISCELLANEOUS MARINE RESOURCE SERVICES. The Contractor may be requested to provide miscellaneous marine resources planning, evaluation, management, and related services that may be required of the DoD as a condition of complying with federal natural resources regulations and Navy or other DoD natural resources policies. These services may include but are not limited to preparation of condition assessments, evaluations, engineering evaluations, maintenance plans, management plans for conservation areas, natural disaster preparedness planning database development, erosion surveys, baseline assessment surveys, training programs and workshops and compliance assistance. Biological monitoring may be executed to ensure compliance with environmental laws, Terms and Conditions of Biological Opinions, and avoidance, minimization and mitigation measures included in relevant NEPA documents, Biological Assessments, and Storm Water Prevention Plans. Miscellaneous marine resource services tasks encompass a variety of support services designed to augment marine resource studies and assessments that support the management and stewardship of marine resources.
4.0 PROFESSIONAL STANDARDS AND PROCEDURES
All aspects of work under the contract shall conform to prevailing professional standards and procedures, which include, but are not limited to the following:
4.1 GEOGRAPHICAL INFORMATION SYSTEMS (GIS). The CTO requirements may include the development of a GIS, or integration into an existing GIS, and must use the current version of ESRI ArcGIS used by the Government or as otherwise specified. The Contractor will adhere to report writing and GIS stipulations provided in the CTO into an Enterprise Geodatabase (formerly referred to as ArcSDE), compatible with the geospatial data standards set forth by the Activity (installation). The resulting product shall be in a format that allows the layering and linking of all geographically associated data into a format that includes all databases (e.g., GPS, site numbers, descriptions, analyses, etc.), maps, plan views, profiles, photographs, reference materials, text, geographically referenced aerial photographs, topographic maps, metadata, shape files, polygons, and other documentation, such as user's and technical manuals, data dictionaries, etc., as needed to fully understand the content of the GIS. Digital geographic maps and the related data sets shall be delivered in the format describe in Attachment J-4.
4.2 LEGIBLE AND ACCESIBLE DATA. All data collected shall be recorded in a legible and accessible manner and stored in a relational data base program.
4.3 OBJECTIVE AND DISPASSIONATE REPORTING. Objective and Dispassionate Reporting Each Task Order under the contract shall be executed and its results reported in an objective and dispassionate manner clearly delineating fact and opinions. Interpretations of, and inferences from data along with assumptions, premises, and reasoning used shall be clearly and explicitly stated.
Technical terms shall be used in a way that is consistent with current usage in the professional literature or shall be explicitly defined when introduced in the report.
4.4 MINIMUM PERSONNEL REQUIREMENTS. Personnel employed under the contract shall meet the requirements presented in Attachment J-2, Minimum Personnel Requirements.
4.5 STATISTICAL METHODS AND PROGRAMS. All statistical methods and programs shall be cited and described and data used to derive statistics that appear in the report shall be included as an appendix so that the results can be replicated.
4.6 ELECTRONIC GRAPHICS. Maps, graphics, and drawings shall be of professional quality and incorporated into the hard copy report and digital deliverable, as required by each task order. The program used to generate these products shall be compatible with Government systems, and products shall be submitted in a manner that enables the Government to reproduce and manipulate the contents. Photographs must be of good quality (minimum resolution of 300 dots per inch (dpi) to be used for identification of species. If the Contractor is not able to obtain good quality photographs of the species in the field during surveys, photographs of that species may be obtained from other sources. In that case, the Contractor must allow the Government to make hard and/or electronic copies of the photographs for non-commercial use in future. Latitude/longitude coordinates and maps of all surveyed locations shall be included in the Draft and Final reports.
5.0 HEALTH AND SAFETY
5.1 DESCRIPTION. This part describes in general terms, the minimum Contractor health and safety requirements associated with the contract. The Contractor shall prepare, implement, and enforce for each site described in contract task orders, a Site Health and Safety Plan (SHSP). The Contractor shall ensure that health and safety provisions are followed by their subcontractors, suppliers, and support personnel.
5.2 REGULATIONS. The Contractor's Health and Safety Program and SHSPs shall comply with and reflect appropriate requirements of the Occupational Safety and Health Administration (OSHA), specifically 29 CFR 1910 (especially 29 CFR 1910.120) and 29 CFR 1926; the U.S. Army Corps of Engineers (COE) "Safety and Health Requirements Manual," EM-385-1-1, latest revision; and any other relevant Federal, State, and local regulations.
5.3 EXPLOSIVE SAFETY. The Contractor, upon discovery of munitions or explosives of concern, propellant, ordnance waste, or pyrotechnic materials larger than 50-caliber rounds, shall cease operations and notify the Contracting officer or designated representative for further directions.
When applicable the Contractor shall comply with the applicable portions of DoD 4144.26-M, "Contractors Safety Requirements for Ammunition and Explosives", NAVSEA OP 5, Volume 1, Sixth Revision, "Ammunition and Explosives Ashore Safety Regulations for Handling, Storing, Production, Renovation and Shipping", and NOSSA 8020.15C (or latest version) Explosive Safety Review, Oversight and Verification of Munitions Response in lieu of EM 385-1-1 for safety requirements for all explosive operations.
5.4 IMPLEMENTATION.
5.4.1 CORPORATE HEALTH AND SAFETY PLAN. After contract award, the Contractor will be tasked to submit a current Corporate Health and Safety Plan to the Contracting Officer for review by the Government for use as the Health and Safety Program Plan. Any additions or revisions required as a result of this review shall be made by the Contractor.
5.4.2 SITE HEALTH AND SAFETY PLAN. For each CTO, prepare a written Site Health and Safety Plan (SHSP) that complies with the respective CTO and above referenced regulations (5.2).
5.4.3 SHSP ACCEPTANCE. Acceptance of the Contractor's SHSP is required prior to start of field activities on each contract task order. Acceptance is conditional and will be predicated on satisfactory performance during field activities. No change in the approved plan shall be implemented without written concurrence by the Contracting Officer or designated representative. The Government reserves the right to require the Contractor to make changes in their SHSP and operations as necessary to ensure the health and safety of persons on or near the site.
5.4.4 DIVE PLAN. For each CTO that requires diving (including snorkel, hookah, SCUBA, etc.) a dive plan that complies with the above referenced regulations (5.2) shall be prepared. Depending on the CTO language this may be incorporated into the SHSP (5.4.2).
5.5 REPORTING OF ACCIDENTS.
5.5.1 CONTRACTOR SIGNIFICANT INCIDENT REPORT. In the event of an accident or mishap, regardless of the severity, the Contractor shall notify the Navy technical representative immediately and fill out and submit a Contractor Significant Incident Report on form CSIR-1 to the Contracting officer or designated representative for review within one work day after the event.
5.6 HEALTH AND SAFETY MANAGER. The Contractor shall use a Certified Safety…