Released_AMD0003_24R6716.pdf
PDF 2 MB Posted
- Solicitation number
- N6274224R6716
About this file
This document appears to be a Request for Proposal (RFP) amendment for a design-build contract to repair two taxiways at Basa Air Base in the Philippines. The key details are:
The contractor will be required to perform a minimum 50 mm (2 inch) milling and 50 mm (2 inch) overlay of the taxiways, totaling approximately 2,250 meters long by 15 meters wide. The work includes improving drainage, pavement markings, and protecting existing airfield utilities. The period of performance has been increased from 240 to 400 calendar days. The design submittal requirements and schedule have also been updated. The contractor must use Unified Facilities Criteria (UFC) and Unified Facilities Guide Specifications (UFGS) as the primary design and construction standards, with the option to utilize Philippine Department of Public Works and Highways (DPWH) standards if determined to be more stringent. Disposal locations for the milled asphalt are provided. The proposal submission deadline remains August 27, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Released amd2_n6274224R6716.pdf | ||
| N6274224R6716_0001 w.attachments.pdf | ||
| Exhibit A_24R6716_PPI_Fillable.xlsx | XLSX spreadsheet | |
| Exhibit A_24R6716_PPI_Fillable.docx | DOCX document | |
| RELEASED RFP 24R6716.pdf | ||
| Exhibit D - BOQ 24R6716_fillable.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6062742
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N6274224R6716 D/B UFC Repair of Taxiw ays D-E and C-E, Basa Air Base, Floridablanca, Pampanga, Philippines
Amendment 0003 begins on the next page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274224R6716
X 9B. DATED (SEE ITEM 11)
22-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2024
CODE
NAVFAC ROICC THAILAND (US EMBASSY)
7 SATHORN TAI ROAD
BANGKOK 10120
N62742 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6274224R6716
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMD 0003 PPIS AND CHANGES
The following changes will be considered part of this solicitation:
A. The period of performance, SF1442 under block#11, is changed from 240 to 400 calendar days.
B. The following changes are hereby incorporated to Parts 1 and 3 under this solicitation.
-Attachment-01: Answers to the PPIs -Attachment-02: Summary of Changes under Parts 3, 4, and 6 -Attachment-03: Revised Parts 3 -Attachment-04: Revised Parts 4 -Attachment-05: Revised Parts 6
The due date of proposal submission is unchange & remains on August 27, 2024 at 1100am, ThailandTime.
All other paragraphs, provisions, and conditions remain unchanged.
The offeror must acknowledge receipt of this amendment.
SECTION 00 10 00 - SOLICITATION
The contractor period of performance end date has increased by 160 days from 240 days to 400 days.
(End of Summary of Changes)
D/B UFC Repair of Taxiways, Basa Air Base Floridablanca, Pampanga, Philippines
Amendment 0003 - N62742246716 Attachment 01- Answers to Pre-Proposal Inquiries
No. Reference (Part/Sec/Para/Page) QUESTION GOVERNMENT RESPONSE
001 Part 3/Section 1/Paragraph 4/Page 1 of 11 In order to keep runoff from flooding and running over the runway or taxiway, the stormwater drainage system must be developed in accordance with UFC 3- 201-01. To ensure positive drainage, the unpaved shouldering slope of the taxiway must be enhanced. In this instance, the installation of the storm drainage system will have an impact on the existing taxiway lighting systems that are now in place on the unpaved shoulder. Will the contractor be responsible of replacing the current lighting systems on the taxiway?
Given that a separate contract is underway for the paving of the taxiway shoulders.
The contractor will not be responsible for the replacement of the existing taxiway lighting systems unless the lighting systems are directly damaged by the contractor's operations. The contractor will be responsible for protecting existing lighting systems during construction activities and for restoring them to their original condition or better, unless otherwise directed by the Contracting Officer.
Installation of a storm drainage system is not a requirement.
Per RFP Part 3, Sec 1, para. 6: The project elements listed above must not damage the existing airfield utilities already in place.
Part 3, Sec 1, para 3, has been revised to read:
Stormwater management measures shall be designed per UFC 3- 201-01 to prevent stormwater from flooding and flowing over the runway and causing hydroplaning conditions. Correct localized drainage issues and improve pavement grades for positive drainage. To prevent pavement damage, the finished pavement grades and cross-slope shall be improved to accommodate a minimum flow rate of 0.8 cubic meters per second (or 28 cubic feet per second) within each internal area.
002 Part 3, section 1 CLIN 0001 says (FROM TW-D TO TW-C) CLIN 0002 says (FROM TW-C TO TW-B)
Is this a mistake? (Y/N)
The complete description of the CLINs are as follows:
CLIN 0001, BASE BID ITEM 001: REPAIR AND
RESURFACING OF PERPEDICULAR TAXIWAY D AND
PARALLEL TAXIWAY E (FROM TW-D TO TW-C)
CLIN 0002, BASE BID ITEM 002: REPAIR AND
RESURFACING OF PERPEDICULAR TAXIWAY C AND
PARALLEL TAXIWAY E (FROM TW-C TO TW-B)
Refer to Amend 0001, Part 6, Attachment 1 which illustrates the parts of the taxiway included in the RFP.
003 Part 3 section 1 The SOW states that the contractor shall consider at least fourteen (14) days of work interruption due to base operations.
Are the 14 days of work interruption included in the 240-calendar-day completion date in addition to weather delays and USG design review? (Y/N)
Yes, the 14-day work interruption due to base operations, weather delays and USG design review are all inclusive in the period of performance (PoP).
Per Amendment 0002, the period of performance for CLIN 0001 and CLIN 0002 have been changed from 240 days to 400 days.
004 Part 3 section 4.2 The due date to submit a 15% design is 20 days after the award. The design will be reviewed in at least 14 days. The earliest the 35% design can be submitted is 35 days after the award date. The math does not add up.
Will the USG consider changing this requirement?
(Y/N)
Per RFP Part 3, Section 4.2, 35% design is not a required deliverable. After 15% design, the next required deliverable is 50% design development.
Amendment 0002: RFP Part 3, Section 4.2 Design Requirements, due dates for deliverables have been changed to:
005 Part 3 section 4.2 The due date to submit a 100% pre-final design is 60 days after the award. The design will be reviewed in at least 14 days. The earliest the 100% final design can be submitted is 100 days after the award date. The math does not add up.
Will the USG consider changing this requirement?
(Y/N)
Refer to answer to #004.
D/B UFC Repair of Taxiways, Basa Air Base Floridablanca, Pampanga, Philippines
Amendment 0003 - N62742246716 Attachment 01- Answers to Pre-Proposal Inquiries
No. Reference (Part/Sec/Para/Page) QUESTION GOVERNMENT RESPONSE
007 Part 3 G2060.1.1 All HMA work requires the use of a Material Transfer Vehicle (MTV) and profilograph. However, this equipment is unavailable locally or even in the Philippines.
Is it possible to remove or change this requirement?
(Y/N)
No, the requirement for use of MTV and profilograph remains.
Use of UFC and UFGS first is required. Use of host nation equivalent criteria such as DPWH criteria shall be subject to USG review and concurrence.
Amendment 0002. Per RFP Part 4, Section 2, G201001 BASES
& SUBBASES,
Paragraph 1 has been revised to read:
Prepare subgrade in accordance with Section G10, Site Preparation. Geotextiles may be used for separation or reinforcement in accordance with manufacturer’s instructions, if required by contractor design. Provide base course under paved areas in accordance with UFC and UFGS. Use of host nation equivalent, such as Department of Public Works and Highways (DPWH), whichever isupon determination by DOR as more stringent in the locality where the project is located, shall be subject to USG review and concurrence. Include in basis of design submittal.
paragraph 3 has been revised to read:
Where DPWH or host nation equivalent are not available or applicable, tThe Designer of Record shall utilize the applicable UFC and UFGS Specification Sections referenced under paragraph 1.2 entitled Applicable Codes and Standards for the project specification. Submit these specifications in edited form as a part of the design submittal for the project.
G201003 PAVED SURFACES
Where DPWH are not available or applicable, tThe Designer of Record shall utilize the applicable UFGS Specification Sections referenced under paragraph 1.1.2 entitled "Government Standards" for the project specification. Submit these specifications in edited form as a part of the design submittal for the project.
It requires UFC, FAA, or host nation when placing base courses, subbases, and paved surfaces, whichever is stringent. However, the RFP also requires the utilization of the DPWH or host nation equivalent first before using UFC or UFGS. See figure 2
Should the KTR use the DPWH or Host nation standard first before utilizing UFC or UFGS? (Y/N)
Part 4, sections G201001 and G201003006
Amendment 0003 Attachment 2 -Summary of Changes
SENSITIVE BUT UNCLASSIFIED
Summary of Changes
The following changes will be considered part of this Solicitation:
1. Changes in PART 3, Project Program
(1) Section 1, PROJECT DESCRIPTION, Paragraphs 2, 3, and 4 have been revised to read:
Remove existing airfield pavement markings. Resurface taxiways by mill and overlay with airfield asphalt pavement for full length and full width of existing pavement from TW D-E and TW C-E and up to the newly surfaced TW B and south portion of TW E and in accordance with the boundaries shown in Part 6 of this RFP.
Total area to be resurfaced is approximately a minimum of 2,250 meters long by approximately 15 meters wide. Perform minimum of 50 mm [2 in] depth asphalt pavement milling and reconstruction in compliance with code requirements. Apply prime and tack coats. Overlay with airfield asphalt concrete pavement in accordance with existing taxiway profiles, improving grades where needed to maintain water shedding capability and blending with runway and taxiway surface profiles.
Stormwater management measures shall be designed per UFC 3-201-01 to prevent stormwater from flooding and flowing over the runway and causing hydroplaning conditions. Correct localized drainage issues and improve pavement grades for positive drainage. To prevent pavement damage, the finished pavement grades and cross-slope shall be improved to accommodate a minimum flow rate of 0.8 cubic meters per second (or 28 cubic feet per second) within each internal area.
(2) Section 1, paragraph 8, Period of Performance has been revised to read:
Period of Performance (PoP) for complete design and construction: 240 400 calendar days
CLIN 0001, BASE BID ITEM 001: REPAIR AND RESURFACING OF PERPEDICULAR
TAXIWAY D AND PARALLEL TAXIWAY E (FROM TW-D TO TW-C)
Period of Performance (PoP): 240 400 calendar days
CLIN 0002, BASE BID ITEM 002: REPAIR AND RESURFACING OF PERPEDICULAR
TAXIWAY C AND PARALLEL TAXIWAY E (FROM TW-C TO TW-B)
Period of Performance (PoP): 240 400 calendar days concurrent with base bid item 0001, not to exceed contract completion date.
SENSITIVE BUT UNCLASSIFIED
(3) Section 2.1 APPLICABLE CODES AND STANDARDS. The last sentence of paragraph 1 has been revised to remove the reference to local design codes and standards, and revised to read:
In the absence of specific local design codes and standards, tThe contractor shall refer to the following design codes and standards at a minimum:
(4) Section 4. PROJECT REQUIREMENTS has been revised to read:
CLIN 0001, BASE BID ITEM 001: REPAIR AND RESURFACING OF
PERPEDICULAR TAXIWAY D AND PARALLEL TAXIWAY E (FROM TW-D TO
TW-C)
PoP: 240 400 calendar days
CLIN 0002, BASE BID ITEM 002: REPAIR AND RESURFACING OF
PERPEDICULAR TAXIWAY C AND PARALLEL TAXIWAY E (FROM TW-C TO
TW-B)
PoP: 240 400 calendar days concurrent with base bid item 001, not to exceed contract completion date
(5) Section 4.2 DESIGN REQUIREMENTS. Table of deliverables has been revised to change due dates for each required design deliverable:
R Duration
After Award
Deliverable
ROICC
KO
ROICC
COR
ROICC User
X 2065 days Basis Design & Concept Design (15%) X 28 days
N/A Design Development (35%)
X 4580 days 50% Design Development X X
X 6095 days 100% Pre-Final Design X X
X 65110 days
100% Final Design X X
(6) Section 5, 5.2 DEMOLITION AND REMOVAL
List item c. has been revised to read:
c. Remove existing asphalt pavement, minimum of 51mm [ 2”] by milling/cold planing and disposal of demolished bituminous asphalt pavement off base within the base. The removed asphalt material (millings) shall be disposed of at designated locations within a 4-kilometer radius of the taxiway as directed by the base. Refer to Part 6, Attachment 8 for specific disposal locations. The contractor is responsible for transporting, spreading, and compacting the milled material at the disposal sites.
List item e. has been revised to read:
e. All other construction debris shall be disposed of properly at an approved off base disposal site location at no additional cost to the Government.
SENSITIVE BUT UNCLASSIFIED
2. Changes in PART 4, MINIMUM MATERIALS, ENGINEERING AND CONSTRUCTION
REQUIREMENTS
(1) Section 2, G201001 BASES & SUBBASES
Paragraph 1 is revised to read as follows:
Prepare subgrade in accordance with Section G10, Site Preparation. Geotextiles may be used for separation or reinforcement in accordance with manufacturer’s instructions, if required by contractor design. Provide base course under paved areas in accordance with UFC and UFGS.
or Use of host nation equivalent, such as Department of Public Works and Highways (DPWH), whichever is upon determination by DOR as more stringent in the locality where the project is located, shall be subject to USG review and concurrence. Include in basis of design submittal.
Paragraph 3 is revised to read as follows:
Where DPWH or host nation equivalent are not available or applicable, t The Designer of Record shall utilize the applicable UFC and UFGS Specification Sections referenced under paragraph 1.2 entitled Applicable Codes and Standards for the project specification. Submit these specifications in edited form as a part of the design submittal for the project.
(2) Section 2, G201003 PAVED SURFACES is revised to read as follows:
Where DPWH are not available or applicable, t The Designer of Record shall utilize the applicable UFGS Specification Sections referenced under paragraph 1.1.2 entitled "Government Standards" for the project specification. Submit these specifications in edited form as a part of the design submittal for the project.
(3) Section 2, G201003 1.1.1.1 Bituminous Concrete Placement is revised to remove reference to DPWH criteria.
Bituminous concrete placement, including minimum temperature during placement, joints, and maximum lift thickness shall be in accordance with the UFC and DPWH. Compact bituminous concrete in accordance with the DPWHUFC, modified to 96 percent of maximum laboratory density.
(4) Section 2, G201003 1.1.2 Portland Cement Concrete Pavement is deleted from the RFP.
(5) Section 2, G201003 1.2 JOINTS FOR PORTLAND CEMENT CONCRETE PAVEMENT
Sentence 1 is revised to read: Joints shall be in accordance with DPWH UFC, UFGS and the applicable portions of TM 5-822-5, Pavement Design for Roads, Streets, Walks, and Open Storage Areas.
(6) Section 2, G201003 1.4 TACK COAT is revised to read as follows:
Tack coat is required for bituminous pavement overlays and on vertical cut faces of pavement patches. Tack coat shall be in accordance with applicable UFCs and DPWH codes UFGS criteria.
3. Changes in PART 6, ATTACHMENTS
(1) Attachment 8 - Disposal sites for milled asphalt is added to Part 6.
**NOTE: ALL OTHER PARAGRAPHS, PROVISIONS, AND CONDITIONS
to Solicitation N6274224R6716 REMAIN UNCHANGED. **
D/B UFC Repair of Taxiways D-E and C-E, Basa Air Base N6274224R6716_0002
Floridablanca, Pampanga, Philippines Part 3
PART 3
PROJECT PROGRAM
1. PROJECT DESCRIPTION
This is a Design-Build (DB) project to provide Unified Facilities Criteria (UFC) compliant design and repair of taxiways at Basa Air Base (BAB), Floridablanca, Republic of the Philippines (RP). Taxiways
Delta-Echo (TW D-E) and Charlie-Echo (TW C-E) at Basa Air Base (BAB) require repair to meet safety and operational standards.
Remove existing airfield pavement markings. Resurface taxiways by mill and overlay with airfield asphalt pavement for full length and full width of existing pavement from TW D-E and TW C-E and up to the newly surfaced TW B and south portion of TW E and in accordance with the boundaries shown in
Part 6 of this RFP.
Total area to be resurfaced is approximately a minimum of 2,250 meters long by approximately 15 meters wide. Perform minimum of 50 mm [2 in] depth asphalt pavement milling and reconstruction in compliance with code requirements. Apply prime and tack coats. Overlay with airfield asphalt concrete pavement in accordance with existing taxiway profiles, improving grades where needed to maintain water shedding capability and blending with runway and taxiway surface profiles.
Stormwater management measures shall be designed per UFC 3-201-01 to prevent stormwater from flooding and flowing over the runway and causing hydroplaning conditions. Correct localized drainage issues and improve pavement grades for positive drainage. To prevent pavement damage, the finished pavement grades and cross-slope drainage system shall be improved to accommodate a maximum minimum flow rate of 0.8 cubic meters per second (or 28 cubic feet per second) in each internal area.
The taxiway centerline stripes, and edge-line stripes shall be repainted as per criteria UFC 3-260-05.
The project elements listed above must not damage the existing airfield utilities already in place. Existing conditions of the taxiways are shown in Part 6. For bidding purposes, Contractor shall assume minimum
50-mm [2-inch] milling and 50-mm [2-inch] airfield asphalt pavement replacement thicknesses are required.
After award, this Statement of Work (SOW) may be modified as determined by the Contracting Officer to address unforeseen conditions or further refine the requirements to better accomplish the project objectives based on new information realized during the administration of the contract.
Period of Performance (PoP) for complete design and construction: 240 400 calendar days
CLIN 0001, BASE BID ITEM 001: REPAIR AND RESURFACING OF PERPEDICULAR
TAXIWAY D AND PARALLEL TAXIWAY E (FROM TW-D TO TW-C)
Period of Performance (PoP): 240 400 calendar days
CLIN 0002, BASE BID ITEM 002: REPAIR AND RESURFACING OF PERPEDICULAR
TAXIWAY C AND PARALLEL TAXIWAY E (FROM TW-C TO TW-B)
Period of Performance (PoP): 240 400 calendar days concurrent with base bid item 0001, not to exceed contract completion date.
Once final design has been approved by the Contracting Officer, the design package will be delivered to the Armed Forces Philippines (AFP) for their review and acceptance. AFP design review is scheduled for
30 calendar days after the design package is delivered to the AFP. Mobilization and construction shall not begin until the AFP accepts the final design and the local installation commander authorizes the contractor permission to access the site for mobilization and construction. The Contractor shall schedule work accordingly.
Amendment 0003
Contractor shall consider at least fourteen (14) days of work interruption due to base operations.
2. PROJECT OBJECTIVES
The objective of this project is to repair and resurface taxiways TW D-E and TW C-E to meet Unified
Facilities Criteria (UFC) standards, including UFC 3-260-04, UFC 3-260-02-2001, UFGS 32 12 15.13, and EM 1110-3-142. The project shall improve the airfield drainage to prevent flooding and hydroplaning on runways and taxiways. The repaired airfield surfaces will mitigate foreign object debris (FOD) generation when heavy aircraft operate at Basa and will reduce the risk of aircraft safety incidents from uneven paved surfaces and accelerated pavement degradation due to weathering and wear on airfield surfaces with high pass counts. The improved taxiways will enhance operational efficiency and safety at
Basa Air Base and support the Armed Forces of the Philippines’ (AFP) flight operations in the West
Philippines Sea and conduct of Joint US-Philippines Exercises.
2.1 APPLICABLE CODES AND STANDARDS
In addition to the codes and standards listed in Part 4, the design and construction shall be in accordance with the latest revision/edition of the following referenced codes and standards. The term "Latest
Revision/Edition" is defined as the version as of the project award date. It is the Contractor’s responsibility to carry out the work such that the final completed facilities are structurally sound, safe, able to perform their intended function, and built according to local and/or International Building Codes
(IBC) and subject to final acceptance by the Contracting Officer’s Representative (COR). In the absence of specific local design codes and standards, tThe contractor shall refer to the following design codes and standards at a minimum:
1. Unified Facilities Criteria (UFC) and Facilities Criteria (FC)
a. FC 1-300-09N Navy and Marine Corps Design Procedures
b. UFC 1-200-01 DoD Building Code General Requirements
c. UFC 3-201-01 Civil Engineering
d. UFC 3-220-01 Geotechnical Engineering
e. UFC 3-250-03 O&M Manual: Standard Practice for Flexible Pavements
f. UFC 3-260-01 Airfield and Heliport Planning and Design
g. UFC 3-260-02 Pavement Design for Airfields
h. UFC 3-260-03 Airfield Pavement Evaluation
i. UFC 3-260-04 Airfield and Heliport Marking
j. UFC 3-301-01 Structural Engineering
2. Unified Facilities Guide Specifications
a. UFGS 01 33 16.00 10 Design Data (Design After Award)
b. UFGS 01 32 01.00 10 Project Schedule
c. UFGS 01 33 00 Submittal Procedures
d. UFGS 01 45 00.05 20 Design and Construction Quality Control
e. UFGS 32 11 16.16 [Base Course for Rigid] [and Subbase Course for Flexible] Paving
f. UFGS 32 11 24 Graded Crushed Aggregate Base Course for Flexible Pavement
g. UFGS 32 12 15.13 Asphalt Paving for Airfields
h. UFGS 32 12 17 Hot Mix Bituminous Pavement
i. UFGS 32 13 14.13 Concrete Paving for Airfield and Other Heavy-Duty Pavements
j. UFGS 32 13 13.16 Portland Cement Concrete Pavement for Roads and Site Facilities
3. International Building Code as referenced in the applicable UFC.
4. National Fire Protection Standards (NFPA) 10
5. International Civil Aviation Organization (ICAO)
6. AASHTO M 156 - Standard Specification for Requirements for Mixing Plants for Hot-Mixed, Hot-Laid Bituminous Paving Mixtures
7. FAA Advisory Circular 150/5320-6G, Airport Pavement Design and Evaluation
8. FAA Advisory Circular 150/5370-2E, Operational Safety on Airports During Construction
9. Civil Aviation Authority of the Philippines (CAAP) Manual of Standards for Aerodromes
10. Relevant ASTM standards
11. National Electrical Code (NEC)
12. American Concrete Institute (ACI)
13. Underwriters Laboratories (UL)
14. All applicable standards and building codes required by the Government of the Philippines
These standards and codes listed provide the minimum requirements that the contractor and its design agent must comply with in the absence of specific local design codes and standards. Other standards or codes shall be applied as required. Standards and codes of the locality must be met at a minimum in all cases. All other design, material, industrial, and testing standards and codes mentioned in this document also provide the minimum requirements that the contractor and its design agent must comply with in the absence of specific local design, material, industrial, and testing standards and codes. The more stringent of the requirements will apply in the case of a conflict in guidance between the various standards (local and US).
(NCEES) registration issued from a state within the United States of America (USA) or one of its territories who shall stamp all design drawings, specifications, and calculations. The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings and other services furnished by the Contractor under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its designs, drawings, and other deliveries.
3. SITE ANALYSIS
3.1 EXISTING SITE CONDITIONS
The project is located in Antonio Basa Air Base in Floridablanca, Pampanga. Coordinates: IVO
14°59'26.46"N, 120°29'52.24"E. The current conditions of taxiways Delta-Echo (TW D-E) and Charlie-
Echo (TW C-E) were observed to have weathering and raveling across its entirety and produce FOD. The pavement materials and approximate depths are indicated in Basa Air Base Runway As-Built Drawings
(RFP Part 6, A4).
Currently, a separate contract to construct taxiways shoulders is underway with estimated completion by
22 May 2025. Should the construction of shoulders begin within this period, contractor shall include it its plan to work concurrently with the other contractor.
Contractor shall minimize interruption to the on-going base operations. All other actions not involving interruption of services can be conducted during regular working hours. In the event work/project activities other than what is indicated in this project program is to occur simultaneously, contractor shall verify, coordinate and may be required to phase such work/project activities.
The asphalt surfaced taxiway sections displayed low, medium and high levels of weathering (see photos 1
-22 in Part 6, A-1) across its entirety.
The contractor shall obtain necessary local and national permits to include construction permits required by the local government and the Armed Forces of the Philippines (AFP). Because project site is located in an active aerodrome, work shall be in accordance with requirements of the Philippine Air Force (PAF).
1) Runway
Single runway with paved shoulders and unpaved taxiway shoulders. Construction of 7-meter paved taxiway shoulders are underway.
Width of runway = 44.2 m to 45 meters
Length of runway = 2800 meters
Overrun = 50 meters at each end Existing airfield edge lights and NAVAIDS; see Part 6 Attachment 3 for layout and approximate location.
2) Taxiways
The current condition of taxiways Delta-Echo (TW D-E) and Charlie-Echo (TW C-E) TW D-E was observed as being rutted with longitudinal cracks, unpaved shoulders, nearby adjacent overgrown vegetation, a lack of storm drain systems, and inoperable taxiway lighting systems which could cause significant issues during operations at the airfield. Existing taxiways have a full width of approximately 14.6 m [48 ft] to 15m [49 ft] with no paved shoulders. Paving of taxiways shoulders is underway via a separate contract. See Part 6 Attachment 10 for approximate locations and existing pavement surface conditions. As-built drawings for these taxiways are not available.
Width of taxiways = 14.6 m to 15 m
Length of TW D-E = approximately 1,140 m
Length of TW C-E = approximately 1,100 m Existing taxiway edge lights approximately 3 m [10 ft] from the taxiway edge; see Part 6
Attachment 3 for layout and approximate location.
The airfield's current stormwater runoff system is ineffective, causing water to flow over the runway and taxiway surfaces, leading to further deterioration. Additionally, the edge of the taxiway pavement and shoulders are breaking away, with block cracks and vegetation growing in the cracks.
Contractor shall provide minimum of 51mm (2”) new asphalt concrete overlay for Taxiways C, D and E in accordance with UFC 3-250-03, UFC 3-260-01, UFC 3-260-02, and UFGS Section 32
12 15.13, Asphalt Paving for Airfields.
3) Utilities
Contractor is allowed to connect to nearby existing primary power line, with coordination with the
Basa Air Base (BAB) Civil Engineer Staff Office (CESO). Note that contractor will have to provide their own step-down transformer and facilitate actual connection with supervision from the base engineer. It shall be contractor responsibility to pay for connection, metering, usage, disconnection and all other associated costs.
4) Temporary Construction Facilities and Controls
Workers' barracks are not allowed to be built in the vicinity of the project site, but the BAB shall allow the contractor use of selected existing structures outside the airfield but within the base to use as barracks and storage. Contractor shall be responsible for paying for use of facilities and consumption of base utilities.
5) Surveys
The Contractor is responsible for making the necessary site visits, engineering surveys and investigations during the Proposal and Design phases to assess existing conditions and to obtain all detailed information that is required to develop a complete Proposal and Design.
The Contractor shall be responsible for providing the services of a geotechnical engineer to conduct any subsurface exploration, investigation, testing, and analysis that the Designer of Record deems necessary for the design and construction of the proposed project and site improvements. The geotechnical engineer shall be registered as a Professional Engineer and experienced with soil conditions in the region where the project site is located. The geotechnical engineer shall prepare a report addressing any elements of the work requiring his services. The report shall be submitted to the
Contracting Officer accompanied by a letter from the Designer of Record certifying that the
Geotechnical Engineer has reviewed the construction documents and that the design reflects the recommendations of the geotechnical report.
The contractor shall conduct topographic survey of existing site in accordance with Chapter 4 of FC
1-300-09N. Topographic Surveys must indicate significant site elements, including, but not limited to, utility points of connection, natural resource boundaries, fish and wildlife habitats (including buffer zones), rookeries, wetlands, and other environmentally sensitive areas. A registered surveyor’s endorsed plan showing existing ground profile with contours and spot levels at 5m spacing (closer at great differences in levels > 1m), existing buildings, facilities, utilities and other existing topographic features of the site shall be submitted upon completion of the site survey work. The contractor shall be responsible for verifying the site and topographical surveys, and other information/conditions, prior to beginning any work.
The results of all contractor surveys, investigations and evaluations shall be included in the
Contractor-furnished Design Analysis and be included in the first design submittal. The criteria for all
Contractor-furnished surveys are included in FC 1-300-09N Navy & Marine Corps Design
Procedures.
All site investigations by the Contractor shall be coordinated with the Base Civil Engineer Staff
Office (CESO). The exact location of any geotechnical excavation, whether by drilling or digging, shall be approved by the Contracting Officer or by a company hired by the geotechnical engineering firm to locate utilities. During the execution of the field investigation work, the Contractor shall be responsible for obtaining necessary permits and complying with applicable laws, codes and regulations, including OSHA regulations. The Contractor shall be responsible for all damages to persons and property, which occur as a result of the Contractor’s fault or negligence. The Contractor shall take proper safety precautions to protect the public and the Government from physical hazards and unsafe conditions. Upon completion of field investigations, the Contractor shall return the property to its original condition except as released in writing by the Government.
Existing As-Built Drawing. “As-built” documents pertinent to the facilities involved in the project are provided in Part 6. These documents, however, may not show existing conditions accurately. It is the responsibility of the Contractor to verify the accuracy of existing “as-built” documents and obtain all other data as required to assure the complete and proper design and construction of the project.
6) Special Scheduling Requirements
The Contractor shall coordinate daily with the base and provide its work schedule so as to cause the least possible interference with normal operations of the activity.
The work under this contract requires special attention to the scheduling and conduct of the work in connection with base and aerodrome operations. The Contractor will develop a construction plan in coordination with the Base Operations Office and any other contractors working in the area. This plan will detail work schedules, staging areas, and communication protocols to ensure efficient use of airspace and minimize conflicts.
Regular working hours are Mondays to Saturdays, from 08:00 to 17:00. Work beyond these hours and on Sundays are not allowed except with prior approval from the base.
4. PROJECT REQUIREMENTS
CLIN 0001, BASE BID ITEM 001: REPAIR AND RESURFACING OF PERPEDICULAR
TAXIWAY D AND PARALLEL TAXIWAY E (FROM TW-D TO TW-C)
PoP: 240 400 calendar days
CLIN 0002, BASE BID ITEM 002: REPAIR AND RESURFACING OF PERPEDICULAR
TAXIWAY C AND PARALLEL TAXIWAY E (FROM TW-C TO TW-B)
PoP: 240 400 calendar days concurrent with base bid item 001, not to exceed contract completion date
Engineering requirements are detailed in Section 6 Engineering System Requirements.
Please refer to the conceptual layout shown in Part 6, Attachment for reference only.
The RFP sets forth the minimum project requirements, which shall be used by the DB Contractor to design, document, and construct a complete and useable facility. The concept drawings in PART 6 of this
RFP package are preliminary in nature and are not intended to be final, complete, and coordinated designs. As the Designer of Record (DOR), the DB Contractor shall be responsible to provide a final, complete, and fully coordinated design in accordance with all applicable codes, regulations, and contract requirements. The DOR shall be responsible for professional quality, technical accuracy, and the coordination of all final designs, drawings, and specifications.
Note: Applicable codes and regulations in Parts 3 and 4 of the RFP will govern when there are conflicts with the concept design per Part 2, Order of Precedence Paragraph.
The plans, systems, and the associated details shown in Part 6 only show the approximate installation and system concepts. Dimensions and conceptual layouts shown are not warranted by the Government to completely meet the requirements of the end-user. The selected Contractor shall carry out detailed surveys of the site and prepare full basis of designs for each aspect of the project and final drawings for approval by the Contracting Officer’s Representative (COR) before commencing construction. Some adjustments to the final arrangement, size and layout of the installations may be allowed or required if site constraints, good engineering, or construction practice deem it necessary. Each bidder shall provide enough detail in their proposal to show the Government exactly what the bidder is proposing to provide.
Any significant deviations from the information provided in the concept drawings and the following pages must be clearly identified and explained to ensure the bidder demonstrates a firm understanding of what they are proposing compared to what the government is requesting. The materials specified herein are strict requirements for the construction however, specific deviations may be approved after award of the project if the proposed substitution meets or exceeds performance of the specified material still meeting the objectives of the project.
The contractor and their design consultants shall be competent and knowledgeable in the type of engineering disciplines required by this project and shall be fully licensed to practice design and construction in the location of the project. The contractor shall have an understanding of the end use of the facilities being constructed and will take a reasonable approach to anticipating the total requirement.
Contractor shall consider space and functional requirements of facilities, natural heat load reduction through facility placement and orientation, maximizing natural ventilation, elimination of water intrusion into the facilities, transportation of rainwater runoff around and off the site and facility, capacity and numbers of potential users of the facility, utility capacities and requirements, and other pertinent design concepts.
Prior to commencing construction, the Contractor shall submit a complete design package for review and concurrence by the COR. Construction drawings shall be prepared only after a complete basis of design or calculations have been developed for all required aspects of the project. All design work shall be completed under the supervision of professional architects and engineers licensed for practice in the location of the project. These design professionals shall properly endorse/approve each portion of the design applicable to their disciplines prior to the COR review.
4.1 KEY PERSONNEL:
This project will require the following management personnel (check one):
Dedicated Superintendent, Dedicated Quality Control Manager, and Dedicated Site Safety
Health Officer (3 different people on site during production at all times)
Dedicated Superintendent and Dedicated Quality Control Manager; Superintendent may serve as Site Safety Health Officer if qualified but not Quality Control Manager (2 different people on site during production at all times)
Triple-Hat Superintendent, Quality Control Manager, and Site Safety Health Officer (1 person on site during production at all times)
4.2 DESIGN REQUIREMENTS:
Design drawings or sketches, specifications, calculations, and manufacturer’s data shall be submitted in order to demonstrate compliance with contract requirements. The Contractor is encouraged to prepare design drawings more like shop drawings to minimize constructions submittals. The final design submittal must be professionally signed and sealed by the DOR and forwarded to the Contracting Officer prior to the start of construction.
Provide hard and electronic copies of design submittal package, to include half-size sketches/shop drawings and manufacturer cut sheets, to the following reviewers 1 week prior to the in-progress review meeting:
R
Duration
After
Award
Deliverable
ROICC
KO
ROICC
COR
ROICC User
X 20 65 days
Basis Design & Concept Design
(15%) X daysN/A Design Development (35%)
X 45 80 days 50% Design Development X X
X 60 95 days 100% Pre-Final Design X X
X 65 110 days 100% Final Design X X
Refer to FC 1-300-09N Navy and Marine Corps Design Procedures for requirements and description of each deliverable.
* N/A - Not Applicable
** R - Required Deliverable
*** X under reviewers is equals 1 copy, any other number is that many copies
**** General guidance for preparation of design submittals is provided in FC 1-300-09N.
*****Mix design, job mix formula (JMF) and other airfield requirements are provided in UFGS 32
12 15.13.
4.3 PROJECT RENDERING:
Not required
5. WORK REQUIREMENTS
5.1 DESIGN:
a. Provide design for the taxiway repair in accordance with US Department of Defense, U.S. Air
Force, and Unified Facilities Criteria guidance and policies.
b. Design plans must be reviewed and signed by a registered Professional Engineer licensed in the
United States and/or United States Territories and Commonwealth.
5.2 DEMOLITION AND REMOVAL:
a. Saw-cut edges of existing asphalt pavement.
b. Remove existing airfield pavement markings.
c. Remove existing asphalt pavement, minimum of 51mm [ 2”] by milling/cold planing and disposal of demolished bituminous asphalt pavement off basewithin the base. The removed asphalt material (millings) shall be disposed of at designated locations within a 4-kilometer radius of the taxiway as directed by the base. Refer to Part 6, Attachment 8 for disposal sites. The contractor is responsible for transporting, spreading, and compacting the milled material at the disposal sites.
d. Other airfield features not specifically mentioned above but required to be removed or demolished to accommodate construction of this contract.
e. All other construction debris shall be disposed of properly at an approved off base disposal site location at no additional cost to the Government.
5.3 REPAIR AND CONSTRUCTION WORK:
a. Prepare surface, by applying tack coat between the underlying existing asphalt pavement and new asphalt pavement layer in accordance with UFC 3-250-03, UFC 3-260-02 and UFGS 32 12 15.13 prior to placing new asphalt cement pavement overlay.
b. Provide new asphalt cement pavement for taxiway in accordance with UFC 3-250-03, UFC 3-
260-01, UFC 3-260-02, and UFGS Section 32 12 15.13, Asphalt Paving for Airfields.
c. Provide taxiway markings per UFC, Host Nation, and Philippine Air Force standards.
6. ENGINEERING SYSTEMS REQUIREMENTS (ESR)
6.1 GENERAL INFORMATION
The following considerations shall be incorporated with design, construction, and scheduling of the project:
a. ICAO Annex 14
b. Time constraint as a result of Basa Air Base’s operations
c. Specific Basa Air Base’s safety requirements
d. Specific Basa Air Base’s base access and security requirements. See Part 6.
Topographical and geotechnical data of the airfield are provided in Part 6 as reference. However, upon award, the DB contractor shall perform its own engineering surveys as needed including topographical and geotechnical surveys to aid and support contractor design.
Any included subsurface information is only for the Contractor's information and is not guaranteed to fully represent all subsurface and groundwater conditions. The Government and its representatives will not be responsible for any interpretation or conclusion drawn by the Contractor from the data or information. The Government and its representatives do not warrant that such data fully represents subsurface and groundwater conditions at the site. Any subsurface information including the geotechnical data accompanying the subsurface information is provided only to better convey data (boring logs, testing, and other data) or to document observed site conditions. The assumptions, analysis, and recommendations of any accompanying report were developed for the Government’s preliminary planning purposes only and may not reflect present project site conditions and/or requirements.
Anticipate minor variations in subsurface conditions between borings. The Contractor is responsible for costs associated with the site preparation, ground improvement and foundations except as allowed by
Contract Clause Federal Acquisition Regulation (FAR) 52.236-2, "Differing Site Conditions". The
Contractor's Geotechnical Engineer must perform additional subsurface investigation/testing as required to adequately determine geotechnical factors including the type and capacity of the project foundations.
The Contractor's Geotechnical Engineer is required to evaluate the provided information and any additional information obtained and prepare a report as described in other portions of this RFP. The minimum requirements for the subsurface investigation and report are as required by FC 1-300-09N with associated references.
Review and acceptance of the Contractor’s Geotechnical Report, drawings, or specifications by the
Government shall not relieve the Contractor of its responsibility to meet the requirements of this RFP, applicable standards and codes, technical specifications, and performance criteria.
G10 SITE PREPARATION
Perform a topographic survey of the project area that will be impacted by the work in accordance with FC
1-300-09N, Navy and Marine Corps Design Procedures. Physically verify the location and capacity of all existing utilities. This information shall be provided and included in a formal report/assessment together with the topographic survey report.
G1020 SITE DEMOLITION & RELOCATION
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements:
a. Structures and/or pavements shall be demolished at locations and within the limits described in this
RFP.
b. Before constructing overlay, remove top layer of existing asphalt taxiway pavement by milling.
Perform milling in accordance with contract plans and specifications. If, due to the Contractor’s operations, any surfaces, or pavements to remain are damaged, they shall be repaired as directed at no additional cost to the Government.
c. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which will remain such as, but not limited to, airfield lighting. If deemed necessary by the contractor, and subject to approval of the base, existing airfield edge lights may be temporarily removed during construction and shall be restored to original working conditions.
d. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
G20 SITE IMPROVEMENTS
G2060 AIRFIELD PAVING
G2060 1.1 RESURFACING TAXIWAYS
a. Provide resurfacing of existing pavement with minimum 51mm (2”) thick asphalt concrete overlay in accordance with UFGS 32 12 15.13. Pay factor based on in-place density and the use of Material
Transfer Vehicle (MTV) are required.
b. Perform full depth pavement repair to correct localized water pond problems.
c. Provide tack coat to improve bonding between new and old AC pavements.
d. The new AC pavement should match elevations of existing runway and existing taxilane at edge of
Taxiway D and Taxiway E.
e. The new AC pavement profile and cross slope should follow the requirements of UFC 3-260-01 and
UFGS 32 12 15.13.
f. Provide taxiway pavement markings in accordance with UFC 3-260-01 and UFC 3-260-04.
G206002 PAVED SURFACES
G206002 1.1 Bituminous Concrete Pavement
a. Provide hot-mix asphalt (HMA) pavement. Warm-mix asphalt pavement will not be allowed.
b. Provide coarse aggregate with a percentage loss not greater than 40 percent after 500 revolutions when tested in accordance with ASTM C131/131M.
c. Provide a Marshall HMA mix design based on 75 blow Marshall hammer compaction.
d. Provide a combined aggregate gradation conforming to Gradation 2 in Table 5 of UFGS Section
32 12.15.13.
e. Provide an asphalt cement binder that conforms to AASHTO M 320 Performance Grade (PG) 70-
22 and Penetration Grade 60-70.
f. Recycled and reclaimed asphalt will not be allowed.
G206004 NAVIGATION AIDS
a. Relocate underground electrical cables and conduits as required by construction.
G206005 AIRFIELD MARKINGS
a. Provide surface marking in accordance with UFC 3-260-04 and FAA AC 150-5340-1M
Standards for Airport-Markings.
Z10 GENERAL REQUIREMENTS
a. Obtain all appropriate permits and clearances required by the Philippine Air Force and Host Nation.
Refer to Part 6 for list of permit requirements.
b. Protect existing airfield utilities throughout construction.
c. Perform mobilization and demobilization. At a minimum, this work shall include the following:
1. Temporary fence and gate (for contractor temporary facilities and staging areas, subject to approval of the base)
2. Project identification signboard
3. Temporary site office
4. Temporary storage facility
5. Temporary toilets
6. Workers’ accommodations
d. It shall be contractor responsibility to perform underground utilities survey to determine existing underground utilities that will be affected by the construction. The survey shall be performed to cover the areas affected by construction of this project. Submit a complete survey report to the
COR for consideration prior to commencing excavation work. At a minimum, the underground utilities survey report shall include the following:
1. Layout plan of the surveyed area showing utility lines
2. Depth of utilities
3. Type of utilities (electrical system, water supply system, sewer system, or fuel piping system)
4. Material (i.e. cable, concrete pipe, PVC pipe)
5. Size of utilities (size of cable, or diameter of the pipe)
e. Perform soil investigations as required by UFC design to verify actual soil condition including but not limited to field and laboratory CBRs.
f. Repair damages caused by construction activities and restore the project site to existing working conditions or better.
g. Work Phases. Prior to start of construction, contractor…