24C6720 Released.pdf
PDF 1000 KB Posted
- Attached to
- D/B UFC Entry Control Point, Perimeter Wall, and Access Roads, Basa Air Base, Philippines Federal contract opportunity
- Solicitation number
- N6274224C6720
About this file
This document is a contract award for project N6274224C6720, a design-build contract for constructing an entry control point, perimeter wall, and access roads at Basa Air Base in the Philippines.
The contract was awarded on September 19, 2024 to R.V. Dagalea Construction for a total of $2,102,436.80. The contract includes five contract line items for different components of the construction project, with varying contract completion dates and liquidated damages amounts. The contract utilizes low-price technically acceptable source selection procedures, and the contractor must perform at least 12% of the work with its own organization. The contract incorporates numerous FAR and DFARS clauses, including those related to paperless contracting, host nation requirements, biosecurity, and Contracting Officer authority.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6065299
REQUEST FOR PROPOSAL N6274224R6720
Project Title: D/B UFC Construct Entry Control Point, Perimeter Wall, and Access Roads, Basa Air Base, Floridablanca, Pampanga, Philippines.
a. This project is being solicited utilizing Low est Price Technically Acceptable (LPTA) Source Selection procedures. Offers are required to submit both price and technical proposals for this solicitation per instructions w ithin.
b. Part 1: Proposal Form and Documents
(1) Section 001000 – Section Form 1442
(2) Section 002100 – Instructions
(3) Section 002200 – Supplementary Instructions
(4) Section 004500 – Representations and Certif ications
(5) Section 007000 – Condition of the Contract
(6) Section 007300 – Supplementary Conditions
c. Standard Form (SF) 1442 Attachments:
(1) Part 2: General Requirements
(2) Part 3: Statement of Work/Project Program
(3) Part 4: Minimum Materials, Engineering and Construction Requirement
(4) Part 6: Attachments
ARTITAR UDIT 66-2287-1036 X 124
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
19-Sep-2024
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________340 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________09 Sep 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
N6274224C6720
7. ISSUED BY CODE
NAVFAC ROICC THAILAND (US EMBASSY)
7 SATHORN TAI ROAD
BANGKOK THAILAND 10120
N62742
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N6274224R67200003 21
See Item 7
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE
SKM23
FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
SEE SCHEDULE
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
$2,102,436.80 See Schedule
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE N6873227. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
DEFENSE FINANCE AND ACCOUNTING SERVICE
DFAS-CLEVELAND
PACIFIC ACCOUNTS PAYABLE
PO BOX 998023
CLEVELAND OH 44199
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR
R.V. DAGALEA CONSTRUCTION
DON TORIBIO ST. TETUAN
ZAMBOANGA CITY PHILIPPINES
15. TELEPHONE NO. (Include area code) 6362-9922782
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
X 29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract. REF: N6274224R6720_0003
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print) Rondel G. Williams / Contract Specialist
TEL: 66-2-287-1036 EMAIL: rondel.g.williams.civ@us.navy.mil
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY 19-Sep-2024
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N6274224C6720
Section 00 10 00 - Solicitation
CONTRACT NOTE
A. Items offered in the contractor's proposal (e.g., key personnel, subcontractors, materials, etc.) are binding on the contractor and shall be provided for the duration of the contract. Substitutions will require prior Contracting Officer's approval and shall be equal or better, in the judgment of the Contracting Officer, than the items originally proposed.
B. The offeror agrees to perform the work required by the solicitation issued July 26, 2024, Amendment 0001 issued August 23, 2024, Amendment 0002 issued August 24, 2024, and Amendment 0003 issued September 4, 2024, at the price proposed on September 9, 2024, in the total amount of $2,102,436.80 that was confirmed on September 15, 2024.
C. Award is made U.S. Dollar in the total amount of $2,102,436.80 for the CLINs listed below:
CLIN0001: Construction of ECP and Reinforced CMU Perimeter Wall East of Gate 25 - $1,212,913.80.
CLIN0002: Construction of Reinforced CMU Perimeter Wall West of Gate 25 - $206,324.00.
CLIN0003: Construction of Reinforced Concrete Access Roads - $468,256.00.
CLIN0004: Construction of Additional Reinforced CMU Perimeter Wall West of Gate 20 - $214,942.00.
CLIN0005: Construction of Additional Gate, West of Gate 25 - $1.00 included per the proposal confirmation.
D. Contract completion dates (CCD) (FAR 52.211-10) per each CLIN and Liquidated Damages (FAR 52.211-12) for each calendar day of delay are as follows:
CLIN0001: CCD is August 24, 2025, and LD is $365 / calendar day CLIN0002: CCD is August 24, 2025, and LD is $115 / calendar day CLIN0003: CCD is August 24, 2025, and LD is $130 / calendar day CLIN0004: CCD is April 16, 2025, and LD is $50 / calendar day CLIN0005: CCD is April 16, 2025
E. Part 2 through 6 were previously provided and hereby made part of this award.
F. The Contracting Officer Representative (COR) for this contract is Djarell Buenavente, email buenaventedp@state.gov. The Contract Specialist (CS) for this contract is Artitar Udit, email artitar@state.gov.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Project $1,212,913.80 $1,212,913.80 ECP n REINFORCED CMU PERIMETER WALL G25
FFP
This is a Design-Build project. The contractor shall provide complete design and construction of ENTRY CHECK POINT(ECP) and REINFORCED CMU PERIMETER WALL EAST OF GATE 25, BASA Air Base, Floridablanca, Pampanga, Philippines in accordance with the Parts 2-6 attached here within.
FOB: Destination
PURCHASE REQUEST NUMBER: ACQR6065299
PSC CD: Y1PZ
NET AMT $1,212,913.80
000101 $0.00
FUND ACRN AA
FFP
Funding Doc. No. N0003824RXJPM06 Customer ACRN: AA
MILSTRIP: N0003824RXJPM06
NET AMT $0.00
ACRN AA
CIN: 000000000000000000000000000000
$1,212,913.80
0002 1 Project $206,324.00 $206,324.00
REINFORCED CMU PERIMETER WALL G25
FFP
This is a Design-Build project. The contractor shall provide complete design and construction of REINFORCED CMU PERIMETER WALL WEST OF GATE 25, BASA Air Base, Floridablanca, Pampanga, Philippines in accordance with the Parts 2-6 attached here within.
FOB: Destination
NET AMT $206,324.00
000201 $0.00
FUND ACRN AA
FFP
$206,324.00
0003 1 Project $468,256.00 $468,256.00
REINFORCED CONCRETE ACCESS ROAD
FFP
This is a Design-Build project. The contractor shall provide complete design and construction of REINFORCED CONCRETE ACCESS ROADS, BASA Air Base, Floridablanca, Pampanga, Philippines in accordance with the Parts 2-6 attached here within.
FOB: Destination
NET AMT $468,256.00
000301 $0.00
FUND ACRN AA
FFP
$468,256.00
0004 1 Project $214,942.00 $214,942.00
EXERCISED
OPTION
REINFORCED CMU PERIMETER WALL G20
FFP
OPTION ITEM 0001
This is a Design-Build project. The contractor shall provide complete design and construction of ADDITIONAL REINFORCED CMU PERIMETER WALL WEST OF GATE 20, BASA Air Base, Floridablanca, Pampanga, Philippines in accordance with the Parts 2-6 attached here within.
FOB: Destination
NET AMT $214,942.00
000401 $0.00
FUND ACRN AA
FFP
$214,942.00
0005 1 Project $1.00 $1.00
EXERCISED
OPTION
ADD,L GATE, WEST OF GATE 25
FFP
OPTION ITEM 0002
This is a Design-Build project. The contractor shall provide complete design and construction of ADDITIONAL GATE, WEST OF GATE 25, BASA Air Base, Floridablanca, Pampanga, Philippines in accordance with the Parts 2-6 attached here within.
FOB: Destination
NET AMT $1.00
000501 $0.00
FUND ACRN AA
FFP
$1.00
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 24-AUG-2025 1 NAVFAC PACIFIC SITE PHILIPPINES
HERNANDO BLACER
CAMP AGUINALDO
MANILA
63 2 912 2423 EXT. 308
N62742
000101 N/A N/A N/A N/A
0002 24-AUG-2025 1 NAVFAC PACIFIC SITE PHILIPPINES
HERNANDO BLACER
CAMP AGUINALDO
MANILA
63 2 912 2423 EXT. 308
000201 N/A N/A N/A N/A
0003 24-AUG-2025 1 NAVFAC PACIFIC SITE PHILIPPINES
DJARELL P. BUENAVENTE
CAMP AGUINALDO
MANILA
632 301 2000 EXT. 5760
000301 N/A N/A N/A N/A
0004 16-APR-2025 1 NAVFAC PACIFIC SITE PHILIPPINES
DJARELL P. BUENAVENTE
CAMP AGUINALDO
MANILA
632 301 2000 EXT. 5760
000401 N/A N/A N/A N/A
0005 16-APR-2025 1 NAVFAC PACIFIC SITE PHILIPPINES
DJARELL P. BUENAVENTE
CAMP AGUINALDO
MANILA
632 301 2000 EXT. 5760
000501 N/A N/A N/A N/A
ACCOUNTING AND APPROPRIATION DATA
AA: 1741804 11CM 320 07411 0 050120 2D 000000
COST CODE: A00008400969
AMOUNT: $2,102,436.80
ACRN CLIN/SLIN CIN AMOUNT
AA 000101 000000000000000000000000000000 $1,212,913.80
000201 000000000000000000000000000000 $206,324.00 000301 000000000000000000000000000000 $468,256.00 000401 000000000000000000000000000000 $214,942.00 000501 000000000000000000000000000000 $1.00
Section 00 70 00 - Conditions of the Contract
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 000101 N/A N/A N/A N/A 0002 Destination Government Destination Government 000201 N/A N/A N/A N/A 0003 N/A N/A N/A Government 000301 N/A N/A N/A N/A 0004 N/A N/A N/A Government 000401 N/A N/A N/A N/A 0005 N/A N/A N/A Government 000501 N/A N/A N/A N/A
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab Covered Entities
DEC 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.215-2 Audit and Records--Negotiation JUN 2020 52.215-21 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data -- Modifications
NOV 2021
52.222-50 Combating Trafficking in Persons NOV 2021
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission Outside the United States
MAY 2020
52.226-8 Encouraging Contractor Policies To Ban Text Messaging While Driving
MAY 2024
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Products and Commercial
Services
FEB 2024
52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2020 52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
JAN 2023
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7008 Compliance With Safeguarding Covered Defense Information Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
MAY 2024
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements JAN 2023 252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7048 Export-Controlled Items JUN 2013 252.227-7002 Readjustment Of Payments SEP 2019 252.227-7033 Rights in Shop Drawings APR 1966 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.232-7010 Levies on Contract Payments DEC 2006 252.233-7001 Choice of Law (Overseas) JUN 1997 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2022 252.247-7023 Transportation of Supplies by Sea JAN 2023
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Contract Award Document (SF1442), (b) prosecute the work diligently, and (c) complete the entire work for both Base Bid and Option items ready for use not later than below calendar days after Contract Award. The time stated for completion shall include final cleanup of the premises.
CLIN0001 Base Bid Item 0001: 340 calendar days.
CLIN0002 Base Bid Item 0002: 248 calendar days.
CLIN0003 Base Bid Item 0003: 218 calendar days.
CLIN0004 Option Item 0001: 120 calendar days, concurrent with the Base Bid Item 0001, not to exceed contract completion date.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount for each calendar day of delay until the work is completed or accepted.
CLIN 0001: $365 per day CLIN 0002: $115 per day CLIN 0003: $130 per day
CLIN 0004: $50 per day
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.211-13 TIME EXTENSIONS (SEP 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option unilaterally by modification to the Contractor within ninety (90) calendar days from contract award for Option Item 0001. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least twelve percent (12%) of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://acquisition.gov/ - or -https://www.acq.osd.mil/dpap/dars/about.html
252.225-7041 CORRESPONDENCE IN ENGLISH (JUNE 1997)
The Contractor shall ensure that all contract correspondence that is addressed to the United States Government is submitted in English or with an English translation.
252.229-7001 TAX RELIEF (APR 2020)
(a) Prices set forth in this contract are exclusive of all taxes and duties from which the United States Government is exempt by virtue of tax agreements between the United States Government and the Contractor's government. The following taxes or duties have been excluded from the contract price:
NAME OF TAX: Not Applicable for this Project, DOD has been unable to obtain VAT waivers for contractors performing in this area. All offers should include VAT as applicable.
RATE (PERCENTAGE): Not Applicable for this Project, DOD has been unable to obtain VAT waivers for contractors performing in this area. All offers should include VAT as applicable.
(b) Invoices submitted in accordance with the terms and conditions of this contract shall be exclusive of all taxes or duties for which relief is available. The Contractor's invoice shall list separately the gross price, amount of tax deducted, and net price charged.
(c) When items manufactured to United States Government specifications are being acquired, the Contractor shall identify the materials or components intended to be imported in order to ensure that relief from import duties is obtained. If the Contractor intends to use imported products from inventories on hand, the price of which includes a factor for import duties, the Contractor shall ensure the United States Government's exemption from these taxes. The Contractor may obtain a refund of the import duties from its government or request the duty-free import of an amount of supplies or components corresponding to that used from inventory for this contract.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
NAVCON
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N68732
Issue By DoDAAC N62742
Admin DoDAAC** N62742/THAI
Inspect By DoDAAC N62742/THAI
Ship To Code N62742/THAI
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N62742/THAI
Service Acceptor (DoDAAC) N62742/THAI
Accept at Other DoDAAC N/A
LPO DoDAAC N62742/THAI
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(g) WAWF point of contact.
NAVFAC_PAC_WAWF_THAI@us.navy.mil
Mr. Rondel Williams Contracting Officer Email: williamsrg@state.gov
Ms. Artitar Udit Contract Specialist Email: artitar@state.gov
Ms. Kannikar Pakkhunthot Admin Associate Email: Kannikar@state.gov
Ms. Djarell Buenavente Contracting Officer’s Representative Email: buenaventedp@state.gov
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
Mr. Jason Ho Procurement Analyst jason.w.ho.civ@us.navy.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
252.246-7004 SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY
OPERATIONS (OCT 2010)
(a) Definition. Discipline Working Group, as used in this clause, means representatives from the DoD Components, as defined in MIL-STD-3007F, who are responsible for the unification and maintenance of the Unified Facilities Criteria (UFC) documents for a particular discipline area.
(b) The Contractor shall ensure, consistent with the requirements of the applicable inspection clause in this contract, that the facilities, infrastructure, and equipment acquired, constructed, installed, repaired, maintained, or operated under this contract comply with Unified Facilities Criteria (UFC) 1-200-01 for--
(1) Fire protection;
(2) Structural integrity;
(3) Electrical systems;
(4) Plumbing;
(5) Water treatment;
(6) Waste disposal; and
(7) Telecommunications networks.
(c) The Contractor may apply a standard equivalent to or more stringent than UFC 1-200-01 upon a written determination of the acceptability of the standard by the Contracting Officer with the concurrence of the relevant Discipline Working Group.
Section 00 73 00 - Supplementary Conditions
PAPERLESS CONTRACTING
The U.S. Navy (hereafter referred to as the Government) intends to administer any contract awarded under this solicitation using paperless contracting methods to the greatest extent practicable. Paperless contracting involves the use of an electronic medium such as the Internet, computer diskettes, CDROM, DVDROM, or electronic mail (email) in place of paper documents to award, solicit, or administer a contract.
In order to facilitate the use of paperless contracting methods, the Contractor shall possess the capability to communicate and exchange authenticated documents with the Government electronically during the contract performance period. Such capability shall include the ability to receive, acknowledge, reply to, and send documents via electronic mail. Additionally, such capability shall not require or be contingent upon any modification or upgrade to existing Government software. The Contractor also agrees to maintain such capability notwithstanding any changes or modifications to existing Government software during the contract performance period so long as the Government provides reasonable notice and any equipment and/or software required to maintain such capability is commercially available.
The Contractor shall utilize the paperless contracting capability described above as directed by the contracting officer during the contract performance period. Documents, which may be required to be exchanged electronically, include, but are not limited to, task orders, modifications, requests for cost proposals, and other routine correspondence. Exceptions to the contracting officer's direction may be granted in unusual circumstances with the prior approval of the contracting officer.
Both the Contractor and the Government agree to share all such technical information as is necessary to facilitate efficient and reliable electronic communications during the period of contract performance. Such information may include such data as e-mail addresses, available software, and mutually agreed procedures, but shall not include any information the disclosure of which would violate any applicable licenses or other agreements. In case of any technical difficulties precluding the use of electronic communications, both the Government and the Contractor agree to work in good faith to resolve any such difficulties.
For informational purposes, the Government anticipates that its contracting personnel will utilize the following computer software programs during the administration of this contract: Microsoft Office (Excel, Word, and Project), Adobe Acrobat, and AutoCAD.
HOST NATION REQUIREMENTS
Contractor Licensing and Hiring Requirements Contractors must be duly authorized to operate and conduct business in any host country and must fully comply with all laws, decrees, labor standards, and regulations of the host country during the performance of the contract. The United States has established international agreements with the Philippines that include provisions relating to the procurement of supplies, employment preferences and use of local and U.S. contractors, as well as restrictions on hiring of third country nationals or utilization of third country contractors. Offerors are expected to comply with all controlling international agreements and with the laws of host nations whether the United States Government provides notice of the existence of such requirements. The contractor will not be permitted use of third country personnel or contractors in the performance of this contract without a demonstration that reasonable efforts to employ citizens, nationals, and permanent residents of host nation and the United States, or contractors of the host nation and the United States, have been made and that wages competitive with or higher than those being paid for similar work performed in the host nation by citizens of the host nation or of the United States are being offered.
The contractor shall not employee third country personnel or contractors without written notification of United States approval from the Contracting Officer.
Permit Compliance The United States does not directly hold environmental permits in the host nation. The contractor shall comply with environmental permits held by the host nation for the benefit of a DoD project even if the contractor is not named in the permit. Contractor shall document general procedures and their implementation for compliance with permit conditions, Best Management Practices, and required mitigations. Contractor shall be responsible for any required corrective actions. Contractor shall provide permit compliance and corrective action documentation to the COR and any additional Government and Host Nation representatives as requested by the COR.
Temporary Construction Facilities Physical Appearance Be aware of local sensitivities and cultural values. Temporary facilities and visible components thereof shall be of solid color without visible markings, graphics, and/or text.
Biosecurity for Construction Contracts Invasive species can be purposefully or inadvertently moved with construction equipment, personal protective equipment and hand tools, foot traffic, vehicles and vessels, raw construction materials, and packing materials.
Invasive species can become pests and affect the economy, ecology, and human health. It is critically important to be aware of ways to prevent the movement of invasive species and implement best management practices. The Contractor shall take all practicable measures to prevent introduction or spread of invasive species in association with contract performance, including importation of supplies, equipment or personnel and movement of supplies, equipment, or personnel between locations. At a minimum, all activities shall comply with U.S. and host nation biosecurity laws and regulations, shall include 100 percent inspection of equipment and supplies. If the contract performance results in introduction or spread of invasive species, the contractor shall be responsible for taking appropriate measures, in consultation with appropriate authorities, to contain and prevent contract related spread of such species at no additional cost to the government. In addition, the Contractor shall:
a. Comply with all necessary inspections of raw construction materials, equipment, and vehicles for invasive and pest species prior to entering of the project site and prior to moving equipment offsite. The Contractor is responsible for any cleaning or inspection fees.
b. Non-native invasive species can be inadvertently moved with construction equipment, Personal protective equipment, hand tools, foot traffic, vehicles, vessels, raw construction materials, and packing materials.
c. Conduct vehicle washdown and inspection for soil and other material to prevent the inadvertent movement of invasive species from the project site to other locations. Establish appropriate facilities that comply with all environmental laws and regulations, and promptly take corrective or preventative actions for noncompliance. Include these details in a biosecurity/Hazard Analysis and Critical Control Point (HACCP) plan and environmental briefs.
d. Submit a biosecurity/HACCP Plan, prepared in accordance with USFWS HACCP Manual for all imported equipment and imported construction materials and supplies. The HACCP plan must address, as a minimum, the identification and control of invasive and non-native species in construction equipment and construction materials and supplies.
e. Implement and update the HACCP plan accordingly to reduce the risk of spreading invasive species. The HACCP development team should include at least two members, one member with biological expertise with invasive species and one member from the project team who has a clear understanding of the project activities and requirements. Contractor is responsible for training all personnel on the project specific HACCP requirements once the plan is approved by the Government.
f. The Contractor must compile all supporting documentation (e.g. reports, checklists and logs) required under their HACCP Plan and submit such documents to the Contracting Officer on a monthly basis. Once all HACCP plan activities are complete, bound hardcopies of the plan and all supporting documentation and submit to the Contracting Officer.
CONTRACTING OFFICER AUTHORITY
1. No person other than the Contracting Officer has authority to bind the Government with respect to this contract.
2. No action or omission of any government employee or representative other than the Contracting Officer shall increase or decrease the scope of this contract or shall otherwise modify the terms and conditions of this contract.
3. In no event shall any of the following be effective or binding on the Government or imputed to the Contracting Officer with respect to this contract:
(a) An understanding or agreement between the Contractor and anyone other than the Contracting Officer;
(b) A purported modification or change order issued by anyone other than the Contracting Officer;
(c) A promise by anyone other than the Contracting Officer to provide additional funding or make payments; or
(d) An order, direction, consent, or permission from anyone other than the Contracting Officer to:
(i) Incur costs in excess of a specified estimated cost, allotment of funds, or other ceiling; or
(ii) Expend hours in excess of a specified level of effort.
4. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed with the changes and shall immediately notify the Contracting Officer.
(End of NAVFAC language)
File details come from the government source that posted it. Updated .