QUESTION # QUESTION GOVERNMENT RESPONSE
1 Is an incumbent contract or contractor associated to the requirement. If any, please provide the contractor's name and contract number.
No. This is a new requirement.
2 Would NAVFAC reconsider the requirement for hardcopy submissions and allow all Electronic submittal?
No. The requirement remains unchanged.
3 For firms forming a JV, but haven't received their UEI and/or CAGE Code yet, can individual firm's codes be provided and followed up with the JV information when the JV has been processed by SAM.gov? All the submission requirements listed in the solicitation for a JV will still be provided with the proposal.
Yes.
4 On past NAVFAC PAC A/E IDIQ solicitations for design services, we have not seen the requirement for construction completion of the project.
The current requirement precludes several relevant projects from being included in the SF330. Can you please revise the requirement to remove construction completion and require that design completion within the last 12 years?
No. The requirement remains unchanged.
5 Would NAVFAC consider reducing the relevant construction value of a project from $20M to $10M considering that some projects may include all of the relevant features but not be as large?
No. The requirement remains unchanged.
6 Since the preparation of DB RFP solicitation documents are a potential service, can the preparation of DB RFP documents be considered as a relevant project?
No. The requirement remains unchanged.
7 Since the preparation of programming documents such as 1391's, FACD, site development and planning,, etc. are a service listed in the RFP, can the preparation of these documents be considered as a relevant project?
No. The requirement remains unchanged.
8 For Criterion 2, KEY PERSONNEL PROFESSIONAL QUALIFICATIONS, AND SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE, please clarify if a Section E resume required for the Principal(s) in Charge?
For Pincipals in Charge complete only Blocks 12 through 18; and leave Block19, Relevant Projects, blank
N62742-23-R-0009
9 Criterion 2, KEY PERSONNEL PROFESSIONAL QUALIFICATIONS, AND
SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE, Submission Requirements. We request clarification for the Project Managers, Project Architects, and Project Engineers Section E resumes. Please confirm that these resumes require SF330 Section E Blocks 12 through 19 be completed (full resume).
Yes, confirmed
10 Criterion 2, KEY PERSONNEL PROFESSIONAL QUALIFICATIONS, AND SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE, Submission Requirements. For the "Senior Level" discipline resumes (Civil Engineer, Architect, Structural Engineer, Mechanical Engineer, Electrical Engineer, Communications Engineer, Fire Protection Engineer, and Cost Estimator), please confirm that ONLY Blocks 12 through 18 be completed for these discipline resumes. Please confirm that Block 19 is NOT to be completed for these disciplines.
Yes, confirmed unless proposed Subject Matter Experts on the two proposed design teams with specialized expertise on facilities or infrastructure that are shielded from High Altitude Electromagnetic Pulse (HEMP) e ects, or facilities or infrastructure that have been designed for Structural Engineering Risk Category IV or V, or facilities or infrastructure that feature seismic base isolation systems for buildings or equipment.
11 Criterion 2, KEY PERSONNEL PROFESSIONAL QUALIFICATIONS, AND SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE . Please confirm that Section E resumes are NOT required for Environmental Engineer, Geotechnical Engineer, and Topographic Surveyor.
Yes, confirmed
12 For Criterion 2, KEY PERSONNEL PROFESSIONAL QUALIFICATIONS, AND SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE, Submission Requirements, please confirm that if we include additional Subject Matter Experts as key personnel then NAVFAC Pacific requires full Section E resumes (Blocks 12 through 19).
Complete Section E (blocks 12 through 19) for Subject Matter Experts on the two proposed design teams with specialized expertise on facilities or infrastructure that are shielded from High Altitude Electromagnetic Pulse (HEMP) e ects, or facilities or infrastructure that have been designed for Structural Engineering Risk Category IV or V, or facilities or infrastructure that feature seismic base isolation systems for buildings or equipment.
13 Selection Criterion 1 Firm’s Specialized Experience: In the interest of demonstrating highly relevant experience to support NAVFAC’s program, please confirm that offerors may include projects other than missile defense in Section F to demonstrate specialized expertise—HEMP Shielding, Structural Engineering Risk Category IV or V, or Seismic Base Isolation Systems— on design of facilities or infrastructure.
Yes, confirmed
14 Selection Criterion 2 Key Personnel Professional Qualifications, and
Specialized Experience and Technical Competence: In the interest of providing highly qualified personnel, please confirm that offerors may include projects other than missile defense in Block 19 of Section E resumes to demonstrate specialized expertise—HEMP Shielding, Structural Engineering Risk Category IV or V, or Seismic Base Isolation Systems—on design of facilities or infrastructure.
Yes, confirmed