This document contains questions and answers related to a solicitation for construction services. The solicitation is for construction of main and commercial gates to provide security at Marine Corps Base Guam, including entry canopies, guard booths, gatehouses, utility buildings, and visitor control centers. Services will include clearing, grubbing, paving, drainage, utilities, fencing and barriers. The Navy is the contracting agency, with oversight from the Government of Japan who is providing direct funding. The pre-proposal document addresses contractor questions on drawings, specifications and requirements to clarify the solicitation scope.

View the file

Other files

File Type Posted
Notice No. 6.pdf PDF
N6274220R1331 Amendment No. 0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING COMMAND, PACIFIC

258 MAKALAPA DR., STE. 100

PEARL HARBOR, HI 96860-3134

Notice No. 5

21 April 2020

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-20-R-1331

J017-II UTILITIES & SITE IMPROVEMENTS PHASE II MAIN AND COMMERCIAL

GATES, US NAVSUPPACT MARINE CORPS BASE, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

60. Project Specification, 01 91 00.15, Project Table of Contents. In the Project Table of Contents (page 1) under Division 01, General Requirements, Section 01 91 00.15 Total Building Commissioning was mentioned but it cannot be found in the body of the specification. The numbering jumps from 01 78 24 to 03 30 00 and it skipped 01 91 00.15.

Please clarify if Section 01 91 00.15 is included and provided the corresponding details for Total Building Commissioning Section if this was inadvertently omitted.

ANSWER: Section 01 91 00.15 is not part of the Project Specification. The Project Table of Contents has been revised. See Amendment 006.

61. Document 00100, Page 1 of 17, Proposal Due Date. Request a one-month extension from 1 May 2020.

ANSWER: The Government is rejecting the request for a one-month extension.

62. Section 01 14 00, paragraph 1.3, state that the Contract completion date is 900 calendar days after contract award while Standard Form 1442, state the contract completion is 900 calendar days after NTP, please clarify.

ANSWER: Section 01 14 00 will be revised to reflect construction completion date is 900 calendar days after NTP. See Amendment 006.

63. Reference to Section 01 14 00, paragraph 1.4.1.2, please advise if these temporary structures need telecommunication equipment, if yes, please advise if the Government will provide this telecommunication equipment.

ANSWER: No telecommunication equipment will be required.

64. Reference to Section 01 14 00, paragraph 1.3, please advise if the date 30 Dec 2020 is for both Main and Commercial Gates or the commercial will be available by time of the contract award.

ANSWER: Commercial Gate will be available by time of award. Main Gate will be available 30 Dec 2020.

65. Reference to Section 01 57 19.01 20, paragraph 3.4 and the Notice No. 2 site photos, the photos shows a Contractor already working at the same location. Please advise if the contractor still need to perform a UXO/MEC clearance for this location before construction.

ANSWER: MEC clearance will be performed by J-001B Utilities and Site Improvement project to a depth of 2 feet below rough grade. Note added to Sheet C-001. See Amendment 006.

66. Reference to Notice No. 2, Photos. The site photos shows a Contractor working at the same location of the project, please confirm that the Contractor will finish his scope before the award date.

ANSWER: Commercial Gate will be available by time of award. Main Gate will be available 30 Dec 2020. Reference Section 01 14 00, paragraph 1.3.

67. Please clarify the expected award date of the project.

ANSWER: Please monitor beta.sam.gov for the award.

68. Reference to question 11 answer in Notice No. 1, the temporary access for the commercial gate is not shown on the drawings, please advise.

ANSWER: There are no specific details for the temporary bypass road and the Contractor can use other space within the project limits to meet the requirements in Section 01 14 00, Subsection 1.4.1.2. Road 1 may be used for site access while construction is ongoing. Any outages required for paving, overlays and markings can be completed within the allowable roadway closure procedures in the construction documents.

69. Reference to drawing A-602 door schedule for building “D”, door 104 is a double-door;

while on drawing A-101D, door 104 is a single door, please clarify modify the door schedule to match the plan.

ANSWER: Door 104 at drawing A-101D should be single door Type F, size 3’-0” W x 7’0” H.

70. Reference to drawing A-601 finish schedule, please provide specification for Resilient Base B1.

ANSWER: Resilient Base (B1): Conform to ASTM F1861, Type TS (Vulcanized thermoset rubber) or Type TP (thermoplastic rubber), Style B (cove). Provide 4” high and a minimum 1/8” thick wall base.

71. Reference to Specification Section “09 67 23.14 – CHEMICAL RESISTANT RESINOUS FLOORING,” please locate the material used in this section on the drawings.

ANSWER: Spec 09 67 23.14 is for F2.1 floor finish.

72. Reference to Specification Section “08 71 00 – DOOR HARDWARE,” the hardware for doors # D105 and J10 are missing, please advise.

ANSWER: Door Hardware set for D105 and J105 is Set 13.0, refer to spec section 0871 00.

73. Reference to drawing A-602 door schedule for building “E” door #101 is type “C” hollow metal door while on drawing A-603, door type “C” is aluminum door, please advise.

ANSWER: Door 101 for Building “E” should be aluminum door with anodized finish and anodized aluminum frames.

74. Reference to drawing A-601 finish schedule, please provide specification for electrostatic discharge sealer finish “ESD” state in floor finish F2.2.

ANSWER: Water vapour permeable thick-layer coating. Complies with TRBS 2153, EN 61340-

5-1/ANSI/ESD 520.20-2017.

75. Reference to Specification Section “10 44 16 – FIRE EXTINGUISHERS,” please provide the location of the fire extinguishers.

ANSWER: See Sheets G-007 and G-009.

76. Reference to drawing A-102G the dark bronze anodized aluminum trellis is shown on the North and South side of the canopy while drawing A-201G & 301G the aluminum trellis is also shown on the West and East side of the canopy. Please advise which length of the aluminum trellis will be used.

ANSWER: The aluminum trellis should be on the East and West sides of the building in between concrete columns. In between concrete columns is approximately 63’-0”.

77. Reference to Specification Section 01 11 00, para 1.5

“COMPUTER/TELCOMMUNICATION/ACCESS CONTROL/IDS COORDINATION

REQUIREMENTS,” please confirm that the Telecom work, only active components and telephone sets will be under another contract, but all other components as per the drawings and specification is under this contract.

ANSWER: Refer to electrical/telecommunication drawings and specifications (Division 26 and

27) for scope of work. Active components and telephone sets are confirmed as provided (furnished and installed) by Others.

78. As per drawing T-511, details C2, C4 and A2 refers to ESS cabling, please confirm that it is not required under this contract.

ANSWER: The wiring indicated (18 AWG-6 conductor) is required as per the detail. See Amendment 006.

79. Referring to drawing T-101B, note 5, please advise as the conduits is not appearing in drawing TS101 duct bank schedule or the site plans.

ANSWER: The telecom ductbank schedule only covers the backbone OSP telecom system and OSP telecom system in between the buildings. It does not include the conduit and cabling to devices. As indicated on note 5 and 4, these homeruns must be dedicated straight homeruns between the devices and the indicated termination point and should not be routed through the telecom handholes shown on the site plans.

80. Referring to drawing T-105B, note 5, please advise the meaning of “do not route through HH of the OSP telecom system.”

ANSWER: The homerun should not be routed through the handholes of the OSP telecom system, which are the handholes shown on the site plans.

81. Referring to legend drawing E-001, please state the difference between weather resistant and the weatherproof receptacles.

ANSWER: Refer to National Electrical Code (NEC) Articles 406.9 (A) and (B).

82. Please confirm that no lighting protection system or grounding system needed for the Gatehouse building, Overwatch and Guard Booth in both main and commercial gates.

ANSWER: Confirmed. It is not required.

83. Referring to drawing T-603, detail A5 regarding ICS in VCC building, please confirm that the contractor scope of work is only cabinets, outlets and cabling, while any active components and software are not required under this contract.

ANSWER: Confirmed. Contractor to provide cabinets, outlet, cabling, and other infrastructure to support the installation of the system. Refer to telecom drawings and specifications for scope of work. Software and active components will be provided by Others.

84. Referring to drawing T-603, detail A5, regarding ICS in VCC building, please clarify if the telecom cabinet in the mechanical room is under the contractor’s scope as it is not appearing on the building plan, and advise as well for the utility building.

ANSWER: The ICS wall mounted telecom cabinet indicated in A5/T-603 must be provided by the Contractor. See sheet T-101C for the location of ICS wall mounted cabinet at the VCC. At the Utility Building, only ICS telecom outlets are required as shown in drawing T-101E.

85. Can sand be added on the grout mix?

ANSWER: Yes, at 1:1 sand/cement ratio, use clean sand like 3/8” fine aggregate.

86. Can the grout be poured directly into the holes without cavities since the holes are very shallow (15 ft)?

ANSWER: Yes, but pour slowly and only at one side of the hole to avoid trapping air, at no more than 1/2 of the hole opening.

87. CU102. 4” sewer lateral is shown between Gate house and Guard booth with POC to Building. But doesn’t show where this line is connected to. Provide details showing the connection point of this lateral to main line.

ANSWER: Lateral shown is point of connection of Fan Coil unit condensate drain at Guard Booths. See revised P-101D and P-101J, Amendment 006.

88. CU103. 6” DI Fire water lateral for overwatch tower doesn’t show “DCDA fire backflow preventer” assembly. Confirm DCDA backflow preventer is not needed for overwatch tower fire lateral.

ANSWER: Backflow preventer is at base of riser shown on sheet F-501, Detail B4.

89. T-509. Detail C5 shows the fire rated pathway wall penetration but doesn’t show any dimension. Provide the dimension of the opening.

ANSWER: Revised drawing will be issued indicating the size of the fire rated pathway, see Amendment 006.

90. A-101G & A-301G. Drawing A-101G and A-301G shows plan and section of Security screen wall. Please provide foundation dimension and rebar details of the screen wall.

ANSWER: Revised drawing C1/A-301G by adding foundation details of the screen wall, see Amendment 006.

91. A-102G & A-201G. Drawing A-102G (Sheet 268 of 426) and A-201G (Sheet 70 of 426). The suspended trellis appears to be under the north/south (long) girders on A- 102G, but is shown suspended from the east/west (short) girders on A-201G. Please clarify.

ANSWER: The suspended trellis shall be at the East and West sides of the building in between concrete columns. Drawings A-201G and A-301G are correct.

92. S-101G, A-102G, & A-201G. Please refer to Drawings S-101G (Sheet 223 of 426), and Drawings A-102G (Sheet 268 of 426) and A-201G (Sheet 70 of 426). A security screen wall is shown on A-102G and A-201G drawings. There is no indication more than a light outline of this wall in the structural drawings as to footing size, etc. Please advise.

ANSWER: Revised drawing C1/A-301G by adding foundation details of the screen wall, see Amendment 006.

93. Spec 32 12 13. Section 2.2 calls for the use of SS-1h emulsified asphalt primer. Can we substitute CSS-1h in lieu of that specified, for reasons that for the past 30 years, we have been using Type CSS-1h emulsified asphalt primer and this has been an acceptable primer to all federal agencies of the base and tack coats.

ANSWER: The use of Type CSS-1h emulsified asphalt primer is acceptable.

94. Spec 32 12 16. Section 2.3 Asphalt cement binder, calls for the use of AR16000 Viscosity Grade Asphalt, please confirm the use of AR8000 in lieu of the specified, for the reasons that we have been using this binder in our design mixes for over 15 years and this has been acceptable to all federal agencies.

ANSWER: AR8000 asphalt cement binder may be used, with an additive, upon approval of the government. The additive shall be a Warm Mix or Polymer that shall modify the properties of AR8000 to meet or exceed AASHTO M 320, Standard Specifications for Performance-Graded Asphalt Binder for PG 70-10. The equivalent PG Grade and True Performance Grade of the AR8000 with the additive shall be submitted with the Laboratory Job Mix Formula.

95. A5/A-803. Please provide a specification for the aluminum trellises.

ANSWER: Refer to specification section 05 50 13, para 2.2.7 and detail A5/A-803.

96. Notice 1, RFI #8. Response to RFI #8 in Notice 1 states that the staging and access roads will be cleared, grubbed and graded by the J-001B contractor. Drawing CD103 and CD104 indicate that clear and grub operations in the main gate area are included within this contract.

Please reissue drawing in an amendment to clarify if this scope of work is being removed from this project.

ANSWER: The entire project area including the staging area and access road will be cleared and grubbed by the J-001B contractor. Depending upon the timing of this activity, the timing of the start of the J-017-II contractor’s work, and the condition of the ground surface, certain areas may need to be cleared and grubbed again by the J-017-II Contractor. For the access road, Bidders shall follow the requirements of Section 01 14 00, Subsection 1.4.1.2. and make their own determination on how they will comply with these requirements.

97. CD101-CD112. The CD drawings show areas where clearing and grubbing is required, however based on the aerial photo provide in notice 1 (site visit cancelled), it appears that large portions, if not all areas have been cleared by the J-001B contractor. Please provide extents of clearing and grubbing operations that will be required this project for fair bidding purposes.

ANSWER: Revised drawings to reflect area to be cleared and grubbed by J001B. See Amendment 006.

98. 01 57 19.03. The CD drawing set shows areas where clearing and grubbing is required, however based on the aerial photo provided in notice 1 (site visit cancelled), and the presence of Road 3 and Road 1, it appears that large portions, if not all areas have been cleared by the J- 001B contractor. Has MEC operations also been completed by the J-001B contractor in these areas, and if so to what depth? Please indicate areas that will required MEC operations under this project.

ANSWER: MEC clearance will be performed by J-001B Utilities and Site Improvement project to a depth of 2 feet below rough grade. See Amendment 006.

99. 01 57 19.03. The Main Gate site limits will not allow access to the proposed temporary access road while MEC operations are being conducted due to the 450’ Exclusion Zone requirements. Will work restrictions be placed on the contractor, such as limited work hours, when the temporary access area falls within the MEC Exclusion Zone.

ANSWER: Response deferred.

100. 01 14 00.1.3.d. 01 14 00.1.3.d states that the Mail Gate Entry Control point will be available on Dec 30, 2020. Section 1.4.1.2 of the same specification states that the temporary access control point and bypass roads must be open within 60 calendar days after NTP. If this project bids on May 1 as currently indicated, NTP would be issued by that latest in November 2020. At this point in time the area would not be ready for the contractor to construct the temporary access road. 60 days is already a very narrow window for this construction, and it would be reduced further if the contractor did not have access to the area when the NTP was issued. Please consider increasing the number of days required to construction the temporary access to 90 days, increasing the award period from 180 days to 210 days, or moving the bid date by one month.

ANSWER: Section 1.4.1.2 does not state that the bypass road must be open within 60 calendar days after NTP. The opening paragraph of this section is only referring to the connection of Road 3 to Route 3 and Road 1 to Route 3A to open the gates to through traffic.

The second paragraph requires that these must be provided with temporary access control point for ID checks. The intent is to allow other construction contractors, workers, and government personnel to access their sites through the main and commercial gate access roads. The construction and timing of the bypass road(s) are based upon the Contractor’s means and methods and should be detailed in the Temporary Access Control Point & Bypass Road Plan required in the last sentence of the second paragraph of this section.

101. 01.14.00.1.4.1.2. Specification section 01 14 00.1.4.1.2 states that the Main Gate temporary access point will be required to be opened within 60 days of NTP. Based on passed experience MEC clearance plans take approximately 5 months for approval. Also considering, safety plans, submittals and other deliverables must be submitted and approved prior to construction taking place on site, it does not seem realistic to assume a contractor would be able to construct the temporary access within 60 days from NTP. Please consider revising this requirement or provide a solution to expedite submittal and approval requirements.

ANSWER: Response deferred.

102. Please confirm that bidders are required to provide the competent staff to check DBIDS at the temporary guard booths for the duration of this project.

ANSWER: Yes, confirmed.

103. Please provide the definition of “competent staff” as it relates to checking DBIDS.

ANSWER: For this role on this project the definition of Competent Person (CP) is as follows:

The CP is a person designated in writing, who, through training, knowledge and experience, is capable of identifying, evaluating, and determining the validity of identification documents; and redirecting visitors who are not authorized to enter; and if required notifying the appropriate authorities in the event of a breach or other security concerns of a vehicle or person(s) trying to enter the facility. The CP will not be required to be armed or required or expected to manage aggressive or violent behavior, or engage in use of force or restraint.

104. Spec 32 12 13. Section 2.2 calls for the use of SS-1h emulsified asphalt primer. Can we substitute CSS-1h in lieu of that specified, for reasons that for the past 30 years, we have been using Type CSS-1h emulsified asphalt primer and this has been an acceptable primer to all federal agencies of the base and tack coats.

ANSWER: The use of Type CSS-1h emulsified asphalt primer is acceptable.

105. Spec 32 12 16. Section 2.3 Asphalt cement binder, calls for the use of AR16000 Viscosity Grade Asphalt, please confirm the use of AR8000 in lieu of the specified, for the reasons that we have been using this binder in our design mixes for over 15 years and this has been acceptable to all federal agencies.

ANSWER: AR8000 asphalt cement binder may be used, with an additive, upon approval of the government. The additive shall be a Warm Mix or Polymer that shall modify the properties of AR8000 to meet or exceed AASHTO M 320, Standard Specifications for Performance-Graded Asphalt Binder for PG 70-10. The equivalent PG Grade and True Performance Grade of the AR8000 with the additive shall be submitted with the Laboratory Job Mix Formula.

106. A5/A-803. Please provide a specification for the aluminum trellises.

ANSWER: Refer to specification section 05 50 13, para 2.2.7 and detail A5/A-803.

107. Notice No. 1, RFI #8. Response to RFI #8 in Notice 1 states that the staging and access roads will be cleared, grubbed and graded by the J-001B contractor. Drawing CD103 and CD104 indicate that clear and grub operations in the main gate area are included within this contract. Please reissue drawings in an amendment to clarify if this scope of work is being removed from this project.

ANSWER: The entire project area including the staging area and access road will be cleared and grubbed by the J-001B contractor. Depending upon the timing of this activity, the timing of the start of the J-017-II contractor’s work, and the condition of the ground surface, certain areas may need to be cleared and grubbed again by the J-017-II Contractor. For the access road, Bidders shall follow the requirements of Section 01 14 00, Subsection 1.4.1.2. and make their own determination on how they will comply with these requirements.

108. CD101-CD112. The CD drawings show areas where clearing and grubbing is required, however based on the aerial photo provided in notice 1 (site visit cancelled), it appears that large portions, if not all areas have been cleared by the J-001B contractor. Please provide extents of clearing and grubbing operations that will be required under this project for fair bidding purposes

ANSWER: Revised drawings to reflect area to be cleared and grubbed by J001B. See Amendment 006.

109. 01 57 19.03. The CD drawing set shows areas where clearing and grubbing is required, however based on the aerial photo provided in notice 1 (site visit cancelled), and the presence of Road 3 and Road 1, it appears that large portions, if not all areas have been cleared by the J- 001B contractor. Has MEC operations also been completed by the J-001B contractor in these areas, and if so to what depth? Please indicate areas that will require MEC operations under this project.

ANSWER: MEC clearance will be performed by J-001B Utilities and Site Improvement project to a depth of 2 feet below rough grade. See Amendment 006.

110. 01 57 19.03. The Main Gate site limits will not allow access to the proposed temporary access road while MEC operations are being conducted due to the 450’ MEC Exclusion Zone requirements. Will work restrictions be placed on the contractor, such as limited work hours, when the temporary access area falls within the MEC Exclusion Zone.

ANSWER: Response deferred.

111. 01 14 00.1.3.d. 01 14 00.1.3.d states that the Main Gate Entry Control point will be available on Dec 30, 2020. Section 1.4.1.2 of the same specification states that the temporary access control point and bypass roads must be open within 60 calendar days after NTP. If this project bids on May 1 as currently indicated, NTP would be issued at the latest in November 2020. At this point in time the area would not be ready for the contractor to construct the temporary access road. 60 days is already a very narrow window for this construction, and it would be reduced further if the contractor did not have access to the area when the NTP was issued. Please consider increasing the number of days required to construct the temporary access to 90 days, increasing the award period from 180 days to 210 days, or moving the bid date by one month.

ANSWER: Section 1.4.1.2 does not state that the bypass road must be open within 60 calendar days after NTP. The opening paragraph of this section is only referring to the connection of Road 3 to Route 3 and Road 1 to Route 3A to open the gates to through traffic. The second paragraph requires that these must be provided with temporary access control point for ID checks. The intent is to allow other construction contractors, workers, and government personnel to access their sites through the main and commercial gate access roads.

112. 01 14 00.1.4.1.2. Specification section 01 14 00.1.4.1.2 states that the Main Gate temporary access point will be required to be opened within 60 days of NTP. Based on passed experience MEC clearance plans take approximately 5 months for approval. Also considering, safety plans, submittals and other deliverables must be submitted and approved prior to construction taking place on site, it does not seem realistic to assume a contractor would be able to construct the temporary access within 60 days from NTP. Please consider revising this requirement or provide a solution to expedite submittal and approval requirements.

ANSWER: Response deferred.

113. 01 14 00.1.4.1.2. Please confirm that bidders are required to provide the competent staff to check DBIDS at the temporary guard booths for the duration of the project.

ANSWER: Yes confirmed.

114. 01 14 00.1.4.1.2. Please provide the definition of “competent staff” as it relates to checking DBIDS.

ANSWER: For this role on this project the definition of Competent Person (CP) is as follows: The CP is a person designated in writing, who, through training, knowledge and experience, is capable of identifying, evaluating, and determining the validity of identification documents; and redirecting visitors who are not authorized to enter; and if required notifying the appropriate authorities in the event of a breach or other security concerns of a vehicle or person(s) trying to enter the facility. The CP will not be required to be armed or required or expected to manage aggressive or violent behavior, or engage in use of force or restraint.

115. Spec Table of Contents. Table of contents lists specification 01 91 00.15, however this specification is not provided. If full building commissioning is required, please provide this specification. In addition, if building commissioning is required we respectfully request an additional three weeks be added to the bid date, as we currently would not have enough time to solicit Cx contractors and expect to receive their proposals by the current bid date.

ANSWER: Full building commissioning is not required. Spec section 01 91 00.15 is not applicable. The Project Table of Contents has been revised. See Amendment 006.

116. Fire Sprinkler. Drawing F-001 Fire Sprinkler Note 4 Only lists the Comm/Elec Room & Generator Room both or which are associated with the Utility Building. It also lists the Overwatch Tower. Drawing F-101 only shows Fire Alarm for the Visitor Control Center and no Sprinkler Piping. Drawings F-102 & F-501 have notes stating that Sprinklers are to be provided for “Main Gate Utility Building Only”. Drawing CU-101 does not show a firewater point of connection for Overwatch Tower, Building F, associated with the Main Gate. Drawing CU-102 only shows one firewater point of connection for the Utility Building, Building E1, associated with the Main Gate. Drawing CU-103 only shows one firewater point of connection for the Overwatch Tower, Building K, associated with the Commercial Gate. Please confirm the intention is to provide Fire Sprinklers at the Utility Building, Building E1, associated with the Main Gate and the Overwatch Tower, Building K, associated with the Commercial Gate only and not in any other building.

ANSWER: Confirmed only Main Gate Utility Building and Commercial Gate Overwatch Tower are only buildings to provide fire sprinkler protection.

117. C2/A-401C. Per Detail C2/A-401C, the backsplash is called out to be W4.2, which is a porcelain wall tile per A-601. Per the section cuts on A-804, this is a Solid Surface Backsplash with no Porcelain shown. Please confirm what is required.

ANSWER: Backsplash at Breakroom is glazed porcelain tile (W4.2). Refer to A-601 for color and sizes.

118. A-402C. No specifications provided for Resin Panels as indicated on Elevations on A- 402C. Please provide.

ANSWER: Resin Panel is RP1, Refer to List of Material on A-601.

119. A-401J, A-401D. Countertops in Details A4/A-401J & B4/A-401D exceed the allowable length without supports. Please provide additional information on intermediate supports.

ANSWER: Provide 1 ½”x 8” x 6”x ¼” thk metal support 3’-0” o.c.. Painted to match adjacent wall color.

120. Sheet EC 502. Detail 2 Shows Fiber Roll but does not mention size. Please provide size of Fiber Roll.

ANSWER: The size of the fiber roll and additional requirements has been added to Drawing EC502 Detail 2, see Amendment 006.

121. Detail 2-Sheet CS-513. Please provide concrete strength to use for the Median Barrier.

ANSWER: Concrete shall have a minimum 28-day compressive strength of 4000 psi. Drawing CS513 Detail 2 has been revised, see Amendment 006.

122. Structural Drawing Sheets (S-201 to S-701). All Structural Foundation, Footing and Slab detail does not show any base course requirement and subgrade preparation. Please provide thickness of base course and subgrade preparation.

ANSWER: Thickness of base course is 6 inches compacted to at least 95% relative compaction.

Subgrade preparation to have either moderately hard to hard limestone bedrock or maximum 2 feet thick of 3” maximum size nonexpansive (liquid limit 35 maximum, plasticity index 12 maximum) limestone sand/gravel with silt (30% maximum) compacted in 6-inch thick compacted layers with at least 95% relative compaction. On-site soils meeting these criteria may be left in-place.

123. Sheet S-101H, S-202. On Sheet S-101H Detail 1 Guard Booth, shows 18” thk Mat Foundation however plan drawings refers to Section A3 on Sheet S-202 and shows Overwatch Section with a wall footing and Section B1 on Sheet S-202 is Typ. Conc. Column with Isolated Footing. Please confirm Foundation of Guard Booth is 18” thk Mat Foundation.

ANSWER: Confirmed, 18” thick mat foundation for Guard Booth.

124. Spec 07 24 00, Architectural Drawings. We would like to clarify if all Buildings (including the Entry Canopy, Inspection Canopy and Primary Canopy) will have an Exterior Insulation and Finish System (with insulation) or just Exterior Finish System (without the insulation).

ANSWER: Confirmed just Exterior Finish System (EFS) without insulation.

125. Spec 07 24 00, Architectural Drawings. On the topic of EIFS/EFS, we would like to know the Architect’s Required R-Value for each building.

ANSWER: EFS only, no insulation.

126. Amendment No. 04 Spec Section 31 32 23. On the revised Spec Section 31 32 23 Foundation Drilling and Grouting, we would like to inquire on the size (diameter) of foundation probe holes requirement.

ANSWER: Minimum 3-inch outside diameter.

127. Sheet CR-108 to CR-115/CR-501. On Drawing Sheets CR-108 to CR-115 Road 1 calls for 1.5” Friction Course overlay (Keynote No. 3) and CR-108 Keynote No 05 “ Pavement Conform” refers to Transition from existing Friction Course to new 1.5” thk course overlay (Detail 3 in Sheet CR-501), does the Existing Road 1 have an existing Friction Course? If it does, does it need to mill & removed throughout Road 1?

ANSWER: No, Road 1 does not have an existing friction course within the project paving limits.

There is no milling work on Road 1. Drawing CR501 Detail C3 is revised to clarify the Road 1 pavement tie-in (conform) work.

128. CS-513. On Sheet CS-513, we would like to know the Concrete Strength required for the Median Barrier.

ANSWER: Concrete shall have a minimum 28-day compressive strength of 4000 psi. Drawing CS513 Detail 2 has been revised, see Amendment 006.

129. Will a Passive Post and Beam system with a M50/P2 crash rating that is listed on the DoD Anti-Ram Vehicle Barrier List be acceptable for this project in lieu of a passive cable barrier system?

ANSWER: Response deferred.

130. All of the Passive Cable barrier system listed on the DoD Anti-Ram Vehicle Barrier List do not integrate to a chain link fence. Can the passive cable barrier be installed next to the chain link fence but not connected or integrated to the chain link fence?

ANSWER: Response deferred.

131. E-608 shows that there is a Main Control Panel at the Gatehouse and the Overwatch Tower. Spec Section 2.5.2 Main Control Panel references only 1 Main Control Panel per ACP.

Typically, there can only be one main control panel. It is generally in the gatehouse and the overwatch only has a remote “slave” desktop console that consists of an audible alarm, Audible Silence Button, A Wrong Way Light, and an EFO mushroom button. An additional EFO push button is on the exterior of the overwatch structure. This wouldn’t be a Main Control Panel as shown on E-608 for the overwatch tower.

ANSWER: Response deferred.

132. Can you provide the project site visit sign in sheet?

ANSWER: A project site visit sign in sheet was not provided. The in person site visit was canceled and pictures were provided via Notice No. 2.

133. The passive vehicle barrier system has been stated in the RFI responses that it needs to have a M50/P2 crash rating and be listed on the Dod Anti-Ram Vehicle Barrier List. The concrete filled bollards called out as key note #38, drawing detail C4/CS508 are located on the project in the passive vehicle barrier perimeter opening at sidewalks, at generator fuel tank and by the vehicle inspection booths. Do we provide the bollard as shown on drawing detail C4/CS508 or do we need to provide a bollard with a M50/P2 crash rating and listed on the Dod Anti-Ram Vehicle Barrier List?

ANSWER: Response deferred.

134. 34 71 13.19 – Active Vehicle Barrier specification, section Part 2 – Product, 2.1 – Retractable Barriers states that when in the raised position, the total retractable barrier heights shall be no less than 38 inches above the roadway surface and shall be 144 inches (12 ft) wide.

Layout drawing CS404 shows the active vehicle wedge barriers for both the Main and Commercial Gates. Scaling and measuring the wedge barrier widths on CS404, the main gate wedges are 15’ wide and the commercial gate wedges are 14’ and 11’ wide. Should the wedge barrier widths be per the spec of 144”(12ft) or per the CS404 drawing?

ANSWER: Response deferred.

135. What is the minimum required gap between the active vehicle wedge barriers and the passive vehicle barrier or concrete median barrier?

ANSWER: Response deferred.

136. 34 71 13.19 – Active Vehicle Barrier specification, section 2.6.1.1.3-Speed Loops states that Two inductive loops whose output is used to signal the barrier controller of a vehicle approaching at a speed greater than the posted speed (25 mph or less (recommended)). The speed loops shall cause the barrier control panel to annunciate a warning sound alerting the guard to make a decision as to whether the barrier should be raised or not. The drawings do not show or call out “speed loops” for over speed vehicle detection. Please confirm if speed loops are required for both the main and commercial ACP gates?

ANSWER: Response deferred.

137. 34 71 13.19 – Active Vehicle Barrier specification, section 2.6.1.1.4- Wrong Way Loops states that Two inductive loops whose output is used to signal the barrier control panel to annunciate a warning sound if a vehicle is attempting to enter the facility through the exit lane.

The warning sound will alert the guard to make a decision as to whether the barrier should be raised or not. The drawings do not show or call out “Wrong Way Loops” for wrong way vehicle detection. Please confirm if wrong way loops are required for both the main and commercial ACP gates?

ANSWER: Response deferred.

138. 34 71 13.19 – Active Vehicle Barrier specification, section 2.4.2 – AVBCS Processor states that the AVBCS processor shall be a Traffic Controller Unit (TCU) with a real time operating system and mappable inputs and outputs (I/O). The latest version of UFGS Standard Specification Section 34 71 13.19 (2/20) states that an AVBCS processor will be a Programmable Logic Controller (PLC) and NOT a TCU. TCU’s are only used when the traffic signals for the Active Vehicle Barriers are co-located at a roadway intersection. Please verify that that AVBCS processor will be a Programmable Logic Controller (PLC) and NOT a TCU?

ANSWER: Response deferred.

139. 31 31 16.196 para 2.1.2. Paragraph 2.1.2 of spec section 31 31 16.9 called for Basaltic Sand system as termite barrier. Confirm it is NAVFAC intention to use BTB (basalt termite barrier) in addition to chemical termite treatment. If yes, provide location and thickness of basaltic sand system.

ANSWER: Response deferred.

140. 01 50 00 para 3.3.2b. ‘Reasonable amounts of the following utilities will be made available to the Contractor at the prevailing rates: Electricity & Water.’ Can the Government provide the prevailing rates the contractor will pay for Water and Electricity?

ANSWER: Response deferred.

141. 08 81 00, 31 31 16.13, 31 32 11, 31 32 11. The documents are unclear on responsibility for the following warranties; Will Government please amend the documents to ensure the following are pass-through warranties from the manufacture or installer?

•Section 08 81 00 ~ Insulating Glass Units ~ 10 year warranty •Section 31 31 16.13 ~ Termite infestation ~ 5 year warranty •Section 31 32 11 ~ Temp Erosion Control Material ~ 1.5 year warranty •Section 31 32 11 ~ Perm Erosion Control Material ~ 3 year warranty

142. Reference contract clause FAR 52.249-10, DEFAULT (FIXED - PRICE CONSTRUCTION) (APR 1984). Does the Government consider the COVID-19 pandemic to be an unforeseen event for the purposes of the referenced clause?

143. Reference the current COVID-19 pandemic. Should the Contractor factor into his bid price the cost of current COVID-19 restrictions, impacts, shortages, and delays?

ANSWER: Response deferred.

144. Plan Sheet CG302, Profile A3 – SD-M-10 – The invert and top of structure elevations appear to be incorrect. Please advise.

ANSWER: Response deferred.

145. Plan Sheet CG302, Profile A1 – SD-M-9 – A portion of the proposed grade is missing.

Please provide the complete profile.

ANSWER: Response deferred.

146 Plan Sheet CG302, Profiles C1 & C4 – SD-M-7 and SD-M-8 – SD-I-15 is replicated on both lines, but the inlet elevation for the 24” line on SD-M-8 is omitted. Are we to assume the inlet elevations for the 18” and 24” lines are the same?

ANSWER: Response deferred.

147. Plan Sheet CG301 – Profiles C3 and C5, Inlets 14-4-3 and 14-4-4 are apparently at the low point in runs with no outlet. Is this correct?