About this file

N6274219R1303_AMD04.pdf

View the file

Other files

File Type Posted
N6274219R1303_Amd06.pdf PDF
N6274219R1303_AMD05.pdf PDF
N6274219R1303_Amd0003_NECO.pdf PDF
N6274219R1303_JA_P946_REDACTED.pdf PDF
N6274219R1303_Amd02.pdf PDF
N6274219R1303_AMD01.pdf PDF
N6274219R1303_Attach1_Site_Visit_Map.docx.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

18RXXXX

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RFP N62742-19-R-1303, NAVFAC WORK ORDER NUMBER 1569648, FY 19 MCON P-946, CORROSION CONTROL HANGAR (CCH) &

PARKING FACILITY, MARINE CORPS BASE HAWAII, KANEOHE, HAWAII.

Amendment 0004 continued on page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274219R1303

X 9B. DATED (SEE ITEM 11)

20-Nov-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jan-2019

CODE

NAVFAC PACIFIC

CONSTR CONTRACTS BRANCH (CODE ACQ33)

258 MAKALAPA DR STE 100

JBPHH HI 96860-3134

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6274219R1303

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

DOCUMENT 00100 INSTRUCTIONS TO PROPOSERS

Paragraph 1.1 NUMBER OF COPIES/TIME OF RECEIPT:

At a. and b. delete “10 January 2019” and replace it with “17 January 2019”.

At c. delete “11 January 2019” and replace it with “18 January 2019”.

PROJECT TABLE OF CONTENTS

Section 33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS is deleted, and Section 33 56 13 UNDERGROUND INDUSTRIAL HOLDING TANKS is added to the Project Table of Contents and accompanies this Amendment.

Section 33 58 00 LEAK DETECTION FOR FUELING SYSTEMS is deleted, and Section 33 58 13 LEAK DETECTION FOR INDUSTRIAL SYSTEMS is added to the Project Table of Contents and accompanies this Amendment.

SECTION 01 33 00 SUBMITTAL PROCEDURES

Delete Submittal Register (120 pages) and replace with the attached Submittal Register, (122 pages).

SECTION 03 53 14.00 20 LIGHT REFLECTIVE NONFERROUS METALLIC AGGREGATE FLOOR

SYSTEM

2.2 NON-FERROUS, NON-OXIDIZING METALLIC AGGREGATE, DRY-SHAKE SURFACE HARDENER

Delete the following sentence:

“Lumiplate" as manufactured by ChemRex, a subsidiary of Master Builder Technologies and "Diamond Plate" as manufactured by The Euclid Chemical Company comply with these specifications.”

SECTION 05 50 13 MISCELLANEOUS METAL FABRICATIONS

2.7 CORNER GUARDS

Delete the following sentence:

“Provide galvanized corner guards on exterior.”

SECTION 10 28 13 TOILET ACCESSORIES

2.27 Recessed Soap Dish (SD-2))

After this paragraph, add the following:

“2.2.8 Toilet Tissue Dispenser (TTD-1)

Furnish Type II - surface mounted toilet tissue holder with two rolls of standard tissue stacked vertically. Provide stainless steel, satin finish cabinet.”

SECTION 13 21 15 DECONTIMINATION AIR SHOWERS

1.2 SUBMITTALS

Revise to read as follows:

“SD-02 Shop Drawings Air Shower; G Fan Unit; G”

Revise to read as follows:

“SD-02 Operation and Maintenance Data Air Shower; G Fan Unit; G”

2.1.3 Supply Air Plenums

In the first sentence of this paragraph, delete “air handling” and replace with “fan”

2.1.6 Doors

In the second sentence of this paragraph delete “3/8” and replace with “1/4”.

2.2 Air Handling Unit

Revise Title of Paragraph to read as follows:

“2.2 FAN UNIT”

2.2.2.5 Filtration

Revise this paragraph to read as follows:

“2.2.2.5 Filtration

a. First Stage: Coalescent Filter with safe change, case constructed of stainless steel with EPDM seal.

b. Second Stage: High capacity fine H14 HEPA filter with safe change.

c. Efficiency: EN1822, 99.99 (typical MPPS - DEHS value).

d. Classification: EN1822, 99.997 percent (typical NaCI value).”

SECTION 22 00 00 PLUMBING GENERAL PURPOSE

3.13 Tables

Add Item 21 as below:

“Fiberglass Reinforced Plastic (FRP) pipe for industrial waste. Refer to Section 33 30 00 SANITARY SEWERS

AND INDUSTRIAL WASTE.”

SECTION 31 62 13.20 PRECAST/PRESTRSSED CONCRETE PILES

3.3.6 Predrilling of Piles

Delete the following sentence:

“Discontinue drilling when the pile tip is approximately 5 feet above the indicated pile tip elevation.”

SECTION 32 13 11.01 CONCRETE FOR HANGAR FLOORS

2.11 INSULATION AND VAPOR/BARRIER RETARDER

Delete this paragraph and its subparagraphs in their entirety.

SECTION 33 11 00 WATER UTILITY DISTRIBUTION PIPING

3.2.1.7 Flanged Pipe

After this paragraph, add the following:

“3.2.1.8 Ferrous Metals

Completely encase buried ferrous metal pipes and fittings with polyethylene tube or sheet, using Class C polyethylene film, in accordance with AWWA C105/A21.5.”

DOCUMENT 00 001 15 LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS

The following drawings are revised as of 04 January 2019:

NAVFAC DWG NO. TITLE

19076146 CD103 - PF - DEMOLITION PLAN, Revised 04 Jan 19 19076149 CS103 - PF - SITE PLAN, Revised 04 Jan 19 19076175 CU102 - PF - UTILITY PLAN, Revised 04 Jan 19 19076204 SB110 - PF - OVERALL FOUNDATION PLAN, Revised 04 Jan 19 19076207 SF201 - CCH - PARTIAL BOTTOM CHORD FRAMING PLAN - AREA A, Revised 04

Jan 19 19076214 SF220 - PF - OVERALL FRAMING PLAN – LEVEL 2, Revised 04 Jan 19 19076215 S-200 - CCH - TRUSS ELEVATIONS, Revised 04 Jan 19 19076216 S-201 - CCH - TRUSS ELEVATIONS, Revised 04 Jan 19 19076218 S-210 - CCH - BRACE FRAME ELEVATIONS, Revised 04 Jan 19 19076219 S-211 - CCH - BRACE FRAME ELEVATIONS, Revised 04 Jan 19 19076220 S-212 - CCH - BRACE FRAME ELEVATIONS, Revised 04 Jan 19 19076221 S-213 - CCH - BRACE FRAME ELEVATIONS, Revised 04 Jan 19 19076231 S-311 - PF - CONCRETE SHEAR WALL ELEVATIONS, Revised 04 Jan 19 19076237 S-502 - CCH - TYPICAL CONCRETE DETAILS, Revised 04 Jan 19 19076245 S-521 - PF - FOUNDATION SECTIONS, Revised 04 Jan 19 19076260 S-560 - CCH - CONNECTION DETAILS, Revised 04 Jan 19 19076265 S-570 - CCH - BASE PLATE DETAILS AND SCHEDULE, Revised 04 Jan 19 19076266 S-571 - CCH - BASE PLATE DETAILS, Revised 04 Jan 19 19076267 S-572 - CCH - BASE PLATE DETAILS, Revised 04 Jan 19 19076268 S-573 - CCH - BASE PLATE DETAILS, Revised 04 Jan 19 19076270 S-600 - CCH - FOUNDATION SCHEDULES, Revised 04 Jan 19 19076290 AE133 - CCH - PARTIAL ROOF PLAN - AREA B, Revised 04 Jan 19 19076295 A-201 - CCH - EXTERIOR ELEVATIONS, Revised 04 Jan 19 19076296 A-202 - CCH - EXTERIOR ELEVATIONS, Revised 04 Jan 19 19076311 A-402 - CCH - RESTROOM ACCESSORIES, Revised 04 Jan 19 19076399 P-113 - CCH - FLOOR PLAN - LEVEL 1 - AREA B, Revised 04 Jan 19 19076400 P-114 - CCH - FLOOR PLAN - MEZZANINE - AREA B, Revised 04 Jan 19 19076404 P-401 - CCH - PLUMBING ENLARGED PLANS, Revised 04 Jan 19 19076434 M-502 - HVAC DETAILS, Revised 04 Jan 19 19076420 MH102 - CCH - HVAC PLAN - LEVEL 1 - AREA A, Revised 04 Jan 19

19076442 MI801 - HVAC CONTROLS, Revised 04 Jan 19 19076458 EL102 - CCH - LIGHTING PLAN - LEVEL 1 – AREA A, Revised 04 Jan 19 19076459 EL103 - CCH - LIGHTING PLAN - LEVEL 1 – AREA B, Revised 04 Jan 19 19076487 E-621 - LUMINAIRE SCHEDULE & CONTROL MATRIX, Revised 04 Jan 19

On NAVFAC DWG NO. 19076175 (CU102)

PF - UTILITY PLAN

Add Keynote 100 to read “RELOCATED WATER LINE.”

On NAVFAC DWG NO. 19076182 (CU503)

UTILITY DETAILS

Revise Note 3 to read “REFER TO SPECIFICATION SECTIONS 33 56 13 AND 33 58 13 FOR ADDITIONAL

REQUIREMENTS”

Revise Note 8 to read “REFER TO MECHANICAL PLANS AND SPECIFICATION SECTION 33 56 13 FOR

ALARM

CONTROLS.”

On NAVFAC DWG NO. 19076284 (AE111)

CCH - OVERALL REFLECTED CEILING PLAN

Delete General Note G in its entirety.

On NAVFAC DWG NO. 19076285 (AE112)

CCH – PARTIAL REFLECTED CEILING PLAN - LEVEL 1 - AREA A

Delete General Note G in its entirety.

On NAVFAC DWG NO. 19076286 (AE113)

CCH – PARTIAL REFLECTED CEILING PLAN - LEVEL 1 - AREA B

Delete General Note G in its entirety.

On NAVFAC DWG NO. 19076287 (AE114)

CCH – PARTIAL REFLECTED CEILING PLAN – MEZZANINE - AREA B

Delete General Note G in its entirety.

On NAVFAC DWG NO. 19076295 (A-201)

CCH - EXTERIOR ELEVATIONS

Delete Keynote 172 in its entirety.

On NAVFAC DWG NO. 19076296 (A-202)

CCH - EXTERIOR ELEVATIONS

Delete Keynote 172 in its entirety.

Delete Keynote 251 in its entirety.

Add Keynote 150 to read “FIRE PROTECTION EQUIPMENT, REFER FIRE PROTECTION”.

On NAVFAC DWG NO. 19076303 (A-305)

PF - BUILDING CROSS SECTIONS

Revise Keynote 705 to read “EXTERIOR LIGHT FIXTURE, REFER ELECTRICAL”.

On NAVFAC DWG NO. 19076420 (MH102)

CCH - HVAC PLAN - LEVEL 1 - AREA A

Add Keynote 168 to read “PAINT BOOTH MANUFACTURER TO PROVIDE SOUND ATTENUATORS AS

REQUIRED TO MAINTAIN A MAXIMUM NOISE LEVEL OF 75 DBA.”.

On NAVFAC DWG NO. 19076455 (EG101)

CCH – GROUNDING PLAN - OVERALL

Delete Keynote 003 in its entirety.

On NAVFAC DWG NO. 19076458 (EL102)

CCH - LIGHTING PLAN - LEVEL 1 – AREA A

Add Keynote 160 to read, “PROVIDE EXPLOSION PROOF LIGHT SWITCH.”.

On NAVFAC DWG NO. 19076459 (EL103)

CCH - LIGHTING PLAN - LEVEL 1 – AREA B

Add Keynote 160 to read, “PROVIDE EXPLOSION PROOF LIGHT SWITCH.”.

On NAVFAC DWG NO. 19076478 (E-502)

DETAILS

Delete Detail B4 in its entirety.

On NAVFAC DWG NO. 19076486 (E-605)

GROUDING RISER DIAGRAM

Delete note “ESD FLOOR BONDING FOR TELECOMMUNICATION ROOM.” Form detail A1 in its entirety.

Delete Keynote 032 in its entirety.

On NAVFAC DWG NO. 19076505 (T-401)

CCH – ENLARGED PLANS

Delete Keynote 003 in its entirety.

On NAVFAC DWG NO. 19076509 (T-601)

COMM/SECURITY DIAGRAMS/SCHEDULES

Delete note “ESD FLOOR BONDING FOR TELECOMMUNICATION ROOM.” Form detail B1 in its entirety.

(End of Summary of Changes)

18RXXXX

RFP N62742-19-R-1303, NAVFAC WORK ORDER NUMBER 1569648, FY19 MCON P-946, CORROSION CONTROL HANGAR (CCH) &

PARKING FACILITY, MARINE CORPS BASE HAWAII, KANEOHE, HAWAII

GENERAL DESCRIPTION: SEE SECTION 01 11 00, Paragraph 1.1.1 Project Description

THIS PROCUREMENT IS UNRESTRICTED. North American Industry Classification System (NAICS) Code 236220 Commercial and Institutional Building Construction - Average Annual Receipts for the Past 3 Years - $36.5M.

ESTIMATED COST: BETWEEN $25,000,000 AND $100,000,000

DPAS RATING: DO-C2

ENFORCEABILITY OF PROPOSAL: The proposal must set forth full, accurate and complete information as required by this solicitation. The Government will rely on such information in the award of a contract. The awardee’s proposal will be incorporated into the contract and all items proposed will become binding requirements of the contract. By submission of the offer, the offeror agrees that all items proposed (e.g., technical approach, subcontractors with teaming agreements, etc.) will be enforced for the duration of the contract. Any substitutions after contract award will be equal or better than as proposed and shall require Contracting Officer’s approval prior to implementation.

Leslie Takayama-Ho B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(808) 471-3416

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

20-Nov-2018

(RFP)

(IFB)

X

CALL:

HAND DELIVER

NAVFAC PACIFIC

CONSTRUCTION CONTRACTS BR (AC33)

4256 RADFORD DR, BLDG 62

HONOLULU HI 96818-3296

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______ 15 calendar days and complete it within ________800 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Document 00700

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the work required are due at the place specified in Item 8 by 2:00 p.m. HST shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 180 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC PACIFIC

CONSTR CONTRACTS BRANCH (CODE ACQ33)

258 MAKALAPA DR STE 100

JBPHH HI 96860-3134

N62742

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour) local time See Doc 00100 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX: TEL: TEL: FAX:

N6274219R1303 5

See Doc 00100

N62742

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE 27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO.

Office: Fax:

(Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.

governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(Must be fully completed by offeror) OFFER

DUNS NO.:

TIN NO.: CAGE CODE:

SOLICITATION, OFFER AND AWARD (SF 1442), CONTINUED

PRICE PROPOSAL SCHEDULE

FOR

RFP NO. N62742-19-R-1303

FY19 MCON PROJECT P-946, CORROSION CONTROL HANGAR & PARKING STRUCTURE,

MARINE CORPS BASE HAWAII, KANEOHE, HAWAII

Block 17, continued:

RFP N62742-19-R-1303

SF1442 Continued

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE AMOUNT

0001 Base Bid

0001AA

BASE ITEM: The basis for CLIN 0001AA is the price for all work complete in accordance with the drawings and specifications but not including work specified under CLINs 0001AB, 0001AC, 00201 or 00202

1.00

Lump Sum

0001AB BASE ITEM: The basis for

CLIN 0001AB is the price for all work complete in accordance with the drawings and specifications to furnish and deliver precast/prestressed concrete piles, but not including work specified under any other CLIN. See Section 31 62 13.20

PRECAST/PRESTRESSED

CONCRETE PILES.

19,630 Linear Feet

0001AC BASE ITEM: The basis for

CLIN 0001AC is the price for all work complete in accordance with the drawings and specifications to drive precast/prestressed concrete piles, but not including work specified under any other CLIN. See Section 31 62 13.20

PRECAST/PRESTRESSED

CONCRETE PILES.

19,630 Linear Feet

0002 ADDITIVE ITEM NO. 1:

The basis for additive item

no. 1 is the provision of all work as annotated in the drawings to provide precast concrete wainscot at Corrosion Control Facility

1 Lump Sum

FOR

RFP NO. N62742-19-R-1303

FY19 MCON PROJECT P-946, CORROSION CONTROL HANGAR & PARKING STRUCTURE,

000301 PLANNED

MODIFICATION: Furniture, Fixtures and Equipment

Gov’t Estimated Budget

=$ 56,650.00

000302 Handling and Administrative

Rate (HAR) NTE 5%

Notes:

1. See Document 00202, paragraph 2.2. for Price Evaluation.

2. The Offeror SHALL include a price for ALL CLINs.

3. Multiple awards will not be made.

4. Payment for SLIN 0001AB and 0001AC shall be for actual quantities only. The unit prices will be used to adjust the contract price for any increase or decrease in the estimated quantities subject to the clause FAR 52.211-

18, VARIATION IN ESTIMATED QUANTITY (APR 1984)

5. It is the Government’s objective to award CLIN 0001 and 0002 within the Military Construction funds available for award. The following will apply:

a. The price proposed for CLIN 0001 will be evaluated to determine if it is within the funds available for award of a contract. If the price proposed for CLIN 0001 is within the funds available for award, the price proposal for CLIN 0002 will be added to CLIN 0001 to determine if it is within the funds available for award of a contract.

b. All offers will be evaluated on the same CLINs.

6. The following notes apply to CLIN 0003, Furniture, Fixtures and Equipment (FF&E):

a. Government Estimated Amount for FF&E. The Government Estimate for FF&E, as shown above (SLIN 000301), includes the material cost, freight and installation charges. The Government Estimate has been identified to provide offerors with the projected magnitude of effort for FF&E. The Government Estimate includes the actual material cost including freight and installation charges and Prime Contractor’s proposed Handling and Administrative Rate (HAR).

b. Prime Contractor Handling and Administration Rate (HAR). Offerors may propose a HAR fee in SLIN 000302, up to but not to exceed 5%, for the handling and administration of the FF&E. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontractors, profit and any other costs associated with and related to the coordination and processing of the procurement and installation of the FF&E. The prime contractor’s proposed HAR mark-up shall be applied to the Government Estimate to derive a total proposed price for

CLIN 0003.

c. The prime contractor’s HAR percentage rate will be incorporated into the contract as proposed and will not be adjusted regardless of fluctuations in the Government Estimate. The HAR is a fixed percentage rate. When the final FF&E package is priced, the contractor’s HAR percentage rate, as incorporated into the contract, shall be

FOR

RFP NO. N62742-19-R-1303

FY19 MCON PROJECT P-946, CORROSION CONTROL HANGAR & PARKING STRUCTURE,

applied to the supplier/vendor quotes to derive a total proposed price for final negotiation of the planned modification.

d. The modification will be awarded at least six months prior to the contract completion date after receipt of appropriate funding. A minimum of six months is required for the contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project. No schedule extensions will be granted if the modification is executed at least six months prior to the contract completion date. If the Government decides to negotiate and award the modification with less than six months prior to the contract completion date, the contractor may be entitled to a contract extension.

7. DFARS 252.247-7023, TRANSPORTATION OF SUPPLIES BY SEA. Within 30 days of each shipment, the Contractor is required to provide an electronic copy of the carrier's bill of lading to the Contracting Officer and to MARAD via e-mail. MARAD email: Marguerite.Speights@dot.gov. In addition, the Contractor shall notify the Contracting Officer when oceanic shipments have been initiated within 3 working days of shipment.

N6274219R1303 Amendment 0004