18R1304-AMD5.pdf

PDF 24 KB Posted

Attached to
JFY10 GOJ J-006 Apra Medical/Dental Clinic, Naval Base, Guam
Solicitation number
N6274218R1304
Issued by

About this file

18R1304-AMD5.pdf

View the file

Other files

File Type Posted
18R1304-AMD4.pdf PDF
18R1304-AMD3.pdf PDF
N6274218R1304-AMD2.pdf PDF
18R1304_AMD1.pdf PDF
N6274218R1304_NCIS_Foreign_Natl_form.pdf PDF
N6274218R1304_SECNAV_Form_5512-1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N62742-18-R-1304, JFY10 GOJ J-006 Apra Medical/Dental Clinic, Naval Base, Guam.

Amendment 0005 is continued on Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6274218R1304

X 9B. DATED (SEE ITEM 11)

20-Dec-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Mar-2018

CODE

NAVFAC PACIFIC

A-E/CONSTR CONTRACTS BRANCH (CODE ACQ31)

258 MAKALAPA DR STE 100

JBPHH HI 96860-3134

N62742 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6274218R1304

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

TECHNICAL SPECIFICATIONS

The following changes shall be made part of these specifications:

DOCUMENT 00 01 15 LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS: The following drawings are revised as of 02/28/18. These revised drawings accompany this amendment. The following is the summary of the changes:

SHEET NAVFAC DWG NO. Description of Change E-003 17211572 Deleted General Note 44.

EP304 17211661 Added IMC Conduit and PVC Coated Metal Conduit for branch circuits.

Added Feeder #56.

SECTION 07 54 50, FLUID-APPLIED ROOFING

1.2 Submittals

Add the following to the above paragraph:

SD-07 Certificates Sample Warranty; G

SD-11 Closeout Submittals

Warranty; G Instructions to Government Personnel; G Information Card; G

SECTION 07 54 50, FLUID-APPLIED ROOFING

Add the following paragraphs to this section:

1.7 WARRANTY

Provide roof system material and workmanship warranties. Provide revision or amendment to standard roofing manufacturer warranty as required to comply with the specified requirements. Minimum manufacturer warranty shall have no dollar limit, cover full system water-tightness, and shall have a minimum duration of 15 years. Submit sample certificate.

1.7.1 Roofing Manufacturer Warranty

Furnish the roofing manufacturer's 15-year, no-dollar-limit roof system materials and installation workmanship warranty, including flashing and accessories necessary for a watertight roof system construction. Provide warranty

N6274218R1304 directly to the Government and commence warranty effective date at time of Government's acceptance of the roof work. The warranty must state that:

a. If within the warranty period the roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, splits, tears, cracks, delaminates, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the roof system assembly and correction of defective workmanship are the responsibility of the roofing manufacturer. All costs associated with the repair or replacement work are the responsibility of the roofing manufacturer.

b. When the manufacturer or his approved applicator fail to perform the repairs within 72 hours of notification, emergency temporary repairs performed by others does not void the warranty.

1.7.2 Roofing System Installer Warranty

The roof system installer shall warrant for a minimum period of two years that the roof system, as installed, is free from defects in installation workmanship, to include the roofing materials, flashing, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. Write the warranty directly to the Government. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected materials. The roof system installer is responsible for all costs associated with the repair or replacement work.

1.7.3 Continuance of Warranty

Approved repair or replacement work that becomes necessary within the warranty period and accomplished in a manner so as to restore the integrity of the roof system assembly and validity of the roofing manufacturer warranty for the remainder of the manufacturer warranty period.

(End of Summary of Changes)