ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK008_0002.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- USNS WALLY SCHIRRA (T-AKE 8) VRA KR
- Solicitation number
- N6264926RK008
About this file
This is a Contractor Price Breakdown template for a Voyage Repair Availability (VRA) project on the USNS WALLY SCHIRRA (T-AKE 8) ship. The pricing sheet is structured to capture labor hours, labor costs, material costs, and other expenses for both prime contractors and subcontractors across multiple work item categories.
The document outlines ten specific work items totaling Category A, including general requirements, technical representation, utilities and general services, testing and quality assurance, high voltage electrical safety procedures, solid cargo deck non-skid repairs, exterior platform structural repairs, sounding tube cap repair, kick pipes and stuffing tubes repairs, pilothouse window removal/repair/installation, AC No. 3 troubleshooting and repair, fork truck 18-month recertification, miscellaneous interior drain piping renewal, and shaft alley bilge preservation. All line items currently show zero labor hours, zero labor costs, and zero material costs, indicating this is an unfilled template awaiting contractor input. The solicitation (N6264926RK008) is issued by the Department of the Navy Naval Supply Systems Command for work to be performed in South Korea in accordance with work specification MSCOK 26-008, with the pricing valid from April 1-14, 2026. Amendment 0002 (dated March 4, 2026) specifically added the fork truck recertification work item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schirra Equipment List.xlsx | XLSX spreadsheet | |
| ATTACHMENT_J_1_Work_Spec_MSCOK 26-008revA_N6264926RK008.docx | DOCX document | |
| Solicitation Amendment N6264926RK0080002 SF 30.pdf | ||
| 0502 MHE Recert Maint.docx | DOCX document | |
| Solicitation Amendment N6264926RK0080001 SF 30.pdf | ||
| ATTACHMENT_J_4_IRS_FORM_W_14_N6264926RK008.pdf | ||
| ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK008.xlsx | XLSX spreadsheet | |
| Solicitation - N6264926RK008.pdf | ||
| ATTACHMENT_J_3_Contractor_Data_Sheet_N6264926RK008.pdf | ||
| ATTACHMENT_J_1_Work_Spec_MSCOK 26-008_N6264926RK008.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| USNS WALLY SCHIRRA VRA KR | ||||||
| 1 - 14 APR 2026 | PRIME CONTRACTOR | SUBCONTRACTOR | Prime Labor Rate : | $0.00 | ||
| Work Item No. | Title | Labor hrs. | Labor |
Price US$ Material Price
(CFM)
US$ Labor hrs. Labor Price US$ Material Price
(CFM)
US$ Other (specify in Remarks)
| US$ | Total Price | ||||||||||
| US$ | CAT | ||||||||||
| 1 | TAKE-SWI-Scope General Requirements and Definitions | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 2 | TAKE-SWI-Technical and Manufacturers Representative | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 3 | Utilities and General Services for Ship and Port Engineer | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 4 | TAKE-SWI-Testing and Quality Assurance | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 5 | TAKE-SWI-High Voltage Electrical Safety Procedure Requirements | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 104 | Solid Cargo Deck Non-Skid Repairs | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 116 | Exterior Platforms Structural Repairs | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 117 | Sounding Tube Cap Repair | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 118 | Kick Pipes Stuffing Tubes Repairs | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 405 | Removal Repair Installation Pilothouse Window | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 501 | AC No.3 Troubleshoot and Repair | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 502 | Fork Truck 18 months Recertification | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 503 | Misc. Interior Drain Piping Renewal | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 629 | Shaft Alley Bilge Preservation | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A |
TOTAL CAT A 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00
Remarks: (provide the information in space below. Use separate sheet of paper if necessary.)
N40345-17-R-0038 ATTACHMENT J-5
Sheet2
Sheet3
File details come from the government source that posted it. Updated .