ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK008_0002.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
USNS WALLY SCHIRRA (T-AKE 8) VRA KR
Solicitation number
N6264926RK008
Issued by

About this file

This is a Contractor Price Breakdown template for a Voyage Repair Availability (VRA) project on the USNS WALLY SCHIRRA (T-AKE 8) ship. The pricing sheet is structured to capture labor hours, labor costs, material costs, and other expenses for both prime contractors and subcontractors across multiple work item categories.

The document outlines ten specific work items totaling Category A, including general requirements, technical representation, utilities and general services, testing and quality assurance, high voltage electrical safety procedures, solid cargo deck non-skid repairs, exterior platform structural repairs, sounding tube cap repair, kick pipes and stuffing tubes repairs, pilothouse window removal/repair/installation, AC No. 3 troubleshooting and repair, fork truck 18-month recertification, miscellaneous interior drain piping renewal, and shaft alley bilge preservation. All line items currently show zero labor hours, zero labor costs, and zero material costs, indicating this is an unfilled template awaiting contractor input. The solicitation (N6264926RK008) is issued by the Department of the Navy Naval Supply Systems Command for work to be performed in South Korea in accordance with work specification MSCOK 26-008, with the pricing valid from April 1-14, 2026. Amendment 0002 (dated March 4, 2026) specifically added the fork truck recertification work item.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

USNS WALLY SCHIRRA VRA KR
1 - 14 APR 2026PRIME CONTRACTORSUBCONTRACTORPrime Labor Rate :$0.00
Work Item No.TitleLabor hrs.Labor

Price US$ Material Price

(CFM)

US$ Labor hrs. Labor Price US$ Material Price

(CFM)

US$ Other (specify in Remarks)

US$Total Price
US$CAT
1TAKE-SWI-Scope General Requirements and DefinitionsNSPNSPNSPNSPNSPNSPNSPNSPNSP
2TAKE-SWI-Technical and Manufacturers RepresentativeNSPNSPNSPNSPNSPNSPNSPNSPNSP
3Utilities and General Services for Ship and Port Engineer0$0$00$0$0$0$0A
4TAKE-SWI-Testing and Quality AssuranceNSPNSPNSPNSPNSPNSPNSPNSPNSP
5TAKE-SWI-High Voltage Electrical Safety Procedure RequirementsNSPNSPNSPNSPNSPNSPNSPNSPNSP
104Solid Cargo Deck Non-Skid Repairs0$0$00$0$0$0$0A
116Exterior Platforms Structural Repairs0$0$00$0$0$0$0A
117Sounding Tube Cap Repair0$0$00$0$0$0$0A
118Kick Pipes Stuffing Tubes Repairs0$0$00$0$0$0$0A
405Removal Repair Installation Pilothouse Window0$0$00$0$0$0$0A
501AC No.3 Troubleshoot and Repair0$0$00$0$0$0$0A
502Fork Truck 18 months Recertification0$0$00$0$0$0$0A
503Misc. Interior Drain Piping Renewal0$0$00$0$0$0$0A
629Shaft Alley Bilge Preservation0$0$00$0$0$0$0A

TOTAL CAT A 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00

Remarks: (provide the information in space below. Use separate sheet of paper if necessary.)

N40345-17-R-0038 ATTACHMENT J-5

Sheet2

Sheet3

File details come from the government source that posted it. Updated .