ATTACHMENT_J_1_Work_Spec_MSCOK 26-008revA_N6264926RK008.docx
DOCX document 68 KB Posted
- Attached to
- USNS WALLY SCHIRRA (T-AKE 8) VRA KR
- Solicitation number
- N6264926RK008
About this file
This is a Corrective Maintenance Engineering Report and Work Item Index for the USNS WALLY SCHIRRA (T-AKE 8) Voyage Repair Availability (VRA). The document outlines the scope of maintenance and repair work to be performed during April 2026, organized into six primary sections. Section 0000 addresses general services and requirements including scope, technical specifications, utilities, testing and quality assurance, and high voltage electrical safety. Section 0100 covers hull and structural repairs including solid cargo deck non-skid repairs, exterior platform repairs, sounding tube cap repair, and kick pipes stuffing tube repairs. Section 0400 addresses communication and navigation systems with pilothouse window removal, repair, and installation. Section 0500 involves auxiliary machinery work including AC No. 3 troubleshooting and repair, fork truck 18-month recertification, and miscellaneous interior drain piping renewal. Section 0600 addresses habitability outfitting and furnishings with shaft alley bilge preservation work.
The contractor is required to provide all labor, materials, tools, and equipment to accomplish the Voyage Repair Availability in accordance with Work Specification MSCOK 26-008. This solicitation (N6264926RK008), issued by the Department of the Navy Naval Supply Systems Command, is restricted to sources duly authorized to operate and conduct business in South Korea per DFARS 252.225-7042. The solicitation was amended on March 3, 2026, and again on March 4, 2026, to incorporate the fork truck recertification work item (WI 0502_A).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schirra Equipment List.xlsx | XLSX spreadsheet | |
| ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK008_0002.xlsx | XLSX spreadsheet | |
| Solicitation Amendment N6264926RK0080002 SF 30.pdf | ||
| 0502 MHE Recert Maint.docx | DOCX document | |
| Solicitation Amendment N6264926RK0080001 SF 30.pdf | ||
| ATTACHMENT_J_4_IRS_FORM_W_14_N6264926RK008.pdf | ||
| ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264926RK008.xlsx | XLSX spreadsheet | |
| Solicitation - N6264926RK008.pdf | ||
| ATTACHMENT_J_3_Contractor_Data_Sheet_N6264926RK008.pdf | ||
| ATTACHMENT_J_1_Work_Spec_MSCOK 26-008_N6264926RK008.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Print Date:
03/03/2026
MSC Corrective Maintenance
Engineering Report
USNS SCHIRRA
(TAKE 8)
April VR
2026-04-01 - VRA
WORK ITEM INDEX REPORT
| Item Number |
| Title |
| Category |
| SECTION 0000 |
| GENERAL SERVICES AND REQUIREMENTS |
| 0001 |
| TAKE-SWI-SCOPE GENERAL REQUIREMENTS AND |
| NSP |
| 0002 |
| TAKE-SWI-TECHNICAL AND MANUFACTURERS |
| NSP |
| 0003 |
| UTILITIES AND GENERAL SERVICES FOR SHIP AND PORT |
| A |
| 0004 |
| TAKE-SWI-TESTING AND QUALITY ASSURANCE |
| NSP |
| 0005 |
| TAKE-SWI-HIGH VOLTAGE ELECTRICAL SAFETY |
| NSP |
| SECTION 0100 |
| HULL AND STRUCTURAL |
| 0104 |
| Solid Cargo Deck Non-Skid Repairs |
| A |
| 0116 |
| Exterior Platform Exterior Repairs |
| A |
| 0117 |
| Sounding Tube Cap Repair |
| A |
| 0118 |
| Kick Pipes Stuffing Tube Repairs |
| A |
| SECTION 0400 |
| COMMUNICATION AND NAVIGATION |
| 0405 |
| Removal, Repair, and Installation Pilothouse Windows |
| A |
| SECTION 0500 |
| AUXILIARY MACHINERY |
| 0501 |
| AC No 3 Troubleshoot and Repair |
| A |
| 0502 |
| Fork truck 18 months Recertification |
| A |
| 0503 |
| Misc Interior Drain Piping Renewal |
| A |
| SECTION 0600 |
| HABITABILITY OUTFITTING AND FURNISHINGS |
| 0629 |
| Shaft Alley Bilge Preservation |
| A |
| Page 1 of |
| 1 |