ATTACHMENT_J_1_Work_Spec_MSCOK 26-001_N6264926RK001.docx

DOCX document 22 KB Posted

Attached to
USNS RICHARD E. BYRD Voyage Repair Availability KR
Solicitation number
N6264926RK001
Issued by

About this file

This document is a Work Item Index Report for the USNS RICHARD E. BYRD (T-AKE 4) Voyage Repair Availability. The report outlines detailed repair and maintenance work across four primary sections: General Services and Requirements, Hull and Structural, Habitability Outfitting and Furnishings, and Drydocking. Key work items include exterior fire station cabinet repairs, deck preservation, metal steel renewal, HVAC room preservation, AC repair, lagging and insulation repair, jettison ready service lockers maintenance, and underwater hull cleaning and inspection.

The repair work is scheduled for January 5, 2026, in the port of Chinhae, South Korea, under solicitation N6264926RK001 issued by the Department of the Navy Naval Supply Systems Command. The comprehensive work specification (MSCOK 26-001) covers various technical categories with specific attention to electrical safety procedures, structural integrity, and ship habitability, indicating a thorough and systematic approach to vessel maintenance and repair.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Print Date: 10/27/2025

USNS BYRD

( TAKE 4 )

Nxxxxxx

VRA-01/05/2026

WORK ITEM INDEX REPORT

Item Number
Title
Category
SECTION 0000
GENERAL SERVICES AND REQUIREMENTS
0001
General Requirement and Definitions
NSP
0002
Utilities and General Services for Ship and Port Engineer
A
0004
Testing and Quality Assurance
NSP
0005
High Voltage Electrical Safety Procedure Requirements
NSP
SECTION 0100
HULL AND STRUCTURAL
0106
Exterior Fire Station Cabinet Repairs
A
0109
Exterior Deck Preservation
A
0110
Metal Steel Renewal
A
0114
Main Deck Machinery HVAC Room 2-66-1 Preservation
A
SECTION 0600
HABITABILITY OUTFITTING AND FURNISHINGS
0609
AC 941 Reapir (VRR 25-0016)
A
0641
Lagging and Insulation Repair (VRR23-0020) Rev1
A
0665
Jettison Ready Service Lockers
A
SECTION 0900
DRYDOCKING
0901
Underwater Hull Cleaning and Inspection
A

image1.png

File details come from the government source that posted it. Updated .