2.03 Amend 0005 N6264926RA048.pdf

PDF 620 KB Posted

Attached to
USS HIGGINS (DDG-76) 6C1 Farm Out Bundle# 4, Yokosuka Japan
Solicitation number
N6264926RA048
Issued by

About this file

This is a Standard Form 30 (SF 30) amendment to solicitation N6264926RA048, issued by the Naval Supply Systems Command (NAVSUP) Fleet Logistics Center Yokosuka on June 15, 2026, with an effective date of June 15, 2026. The amendment reopens the solicitation until June 17, 2026 at 10:00 AM Japan Standard Time, extending the original response deadline of May 28, 2026. The amendment revises multiple sections including Section A (Solicitation/Contract Form), Section E (Inspection and Acceptance), Section F (Deliveries or Performance), Section H (Special Contract Requirements), Section J (List of Attachments), and Section L (Instructions, Conditions, & Notices).

The solicitation seeks ship repair and maintenance services for USS HIGGINS (DDG 76) during 6C1 Farm Out Bundle 4 operations at Ship Repair Facility - Japan Regional Maintenance Center (SRF-JRMC) in Yokosuka. The contract includes four Contract Line Items (CLINs): CLIN 0001 covering seven Task Group Instructions (TGIs) including corrosion repairs, deck plate repairs, and piping replacements; CLIN 0002 providing a growth reservation of 9.73 percent of CLIN 0001's total cost; CLIN 0003 covering structural, sheet metal, and rigging work with two TGIs; and CLIN 0004 providing a growth reservation of 7.00 percent of CLIN 0003's total cost. Award will be made in Japanese Yen (JPY) using an FY26 budget exchange rate of 150.4415 JPY per USD 1.00. The contract requires offerors to hold active U.S. Navy MSRA/ABR (Master Ship Repair Agreement/Approved Builder Registry) certification, submit proposals electronically via email by the deadline, and complete a detailed price proposal breakdown form. Performance is scheduled from September 9, 2026 to April 13, 2027, with final acceptance occurring at SRF-JRMC in Yokosuka. Inspection, acceptance, and delivery locations are at N62758 SRF AND JRMC YOKOSUKA, with the project manager serving as the primary point of contact.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): The purpose of this solicitation amendment 0005 is as follows:

1. To reopen the solicitation until 17 Jun 2026 at 10:00 AM.

2. To provide revised TGI 38KB312258-A01.

3. To add CLIN 0003 and 0004.

4. To revise Section A, Section E, Section F, Section H Paragraph H-6.0 GROWTH CLIN, Section J, and Section L Paragraph 1.0 GENERAL

INSTRUCTION.

5. To provide new Proposal Breakdown Form (CLIN 0001 and CLIN 0002) and (CLIN 0003 and CLIN 0004) All other information remains unchanged.

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Response Due Date 28 May 2026 17 Jun 2026

N6264926RA0480005

Section B - Supplies or Services & Prices or Costs

Miscellaneous text in this section has been modified to:

The contractor is required to submit an itemized breakdown of the total price proposal using Attachment II Price Proposal Breakdown Sheet provided in Section J. Failure to properly complete and submit Attachment II by the specified closing date may cause rejection of the proposal.

Note - Award will be made in Japanese Yen (JPY).

The U.S. Dollar amounts shown are for the Government administrative purposes only. FY26 Budget Exchange Rate of JPY 150.4415 per USD 1.00 applies.

Below is the Contract Price in United States Dollar (USD):

CLIN 0001: _______________USD

CLIN 0002: _______________USD

CLIN 0003: _______________USD

CLIN 0004: _______________USD

TOTAL PRICE: ________________USD

The following CLIN(s) / SLIN(s) / ELIN(s) were added:

Item Supplies / Services Quantity Unit Unit Price Amount

The Contractor shall accomplish the work specification package requirements listed in ATTACHMENT

(I) of Section J onboard USS HIGGINS (DDG 76) during 6C1 Farm Out Bundle 4.Two (2) TGIs38KB349312-A0138KB349312-T01 Product Service Code: J999 Pricing Arrangement: Firm Fixed Price

1 Job

Item Supplies / Services Quantity Unit Unit Price Amount

Growth Reservation associated with CLIN 0003. This growth CLIN amount represents 7.00 percent of the total proposed cost for CLIN 0001.

Product Service Code: J999 Pricing Arrangement: Firm Fixed Price

1 Job

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description

The Contractor shall accomplish the work specification package requirements listed in ATTACHMENT (I) of Section J onboard USS HIGGINS (DDG 76) during 6C1 Farm Out Bundle 4.

The Contractor shall accomplish the work specification package requirements listed in ATTACHMENT (I) of Section J onboard USS HIGGINS (DDG 76) during 6C1 Farm Out Bundle 4.Seven (7) TGIs38KB312258-

A0138KB312259-A0138KB312259-T0138KB312260-

A0138KB312262-A0138KB359307-A0138KB359307-

T01

Product Service Code J999

INFORMATION FROM TO

Description Growth Reservation associated with CLIN 0001. This growth CLIN amount represents 7.87 percent of the total proposed cost for CLIN 0001.

Growth Reservation associated with CLIN 0001. This growth CLIN amount represents 9.73 percent of the total proposed cost for CLIN 0001.

Product Service Code J999

Section E - Inspection and Acceptance

The inspection and acceptance locations for the following CLIN(s) / SLIN(s) / ELIN(s) were added:

Inspection and Acceptance Location - N62758 - SRF AND JRMC YOKOSUKA

INFORMATION VALUE

Action Both Location Destination

Acceptance Location

N62758

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

Instructions Final acceptance by SRF-JRMC Project Manager POC Name Ryuuji Nakajima POC Email ryuuji.nakajima.ln@us.navy.mil POC Telephone 243-4817

Inspection and Acceptance Location - N62758 - SRF AND JRMC YOKOSUKA

INFORMATION VALUE

Action Both Location Destination

Acceptance Location

N62758

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

Instructions Final acceptance by SRF-JRMC Project Manager POC Name Ryuuji Nakajima POC Email ryuuji.nakajima.ln@us.navy.mil POC Telephone 243-4817

Section F - Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were added:

INFORMATION VALUE

Period of Performance 09 Sep 2026 to 13 Apr 2027

Place of Performance - N62758 - SRF AND JRMC YOKOSUKA

INFORMATION VALUE

Address

Place of Performance N62758

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

POC Name Ryuuji Nakajima POC Email ryuuji.nakajima.ln@us.navy.mil POC Telephone 243-4817 Delivery Delivery Period PeriodStart = 09 Sep 2026. PeriodEnd = 13 Apr 2027.

INFORMATION VALUE

Period of Performance 09 Sep 2026 to 13 Apr 2027

Place of Performance - N62758 - SRF AND JRMC YOKOSUKA

INFORMATION VALUE

Address

Place of Performance N62758

SRF AND JRMC YOKOSUKA

PSC 473 BOX 8, FPO AP 96349

FPO, AP 96349

UNITED STATES

POC Name Ryuuji Nakajima POC Email ryuuji.nakajima.ln@us.navy.mil POC Telephone 243-4817 Delivery Delivery Period PeriodStart = 09 Sep 2026. PeriodEnd = 13 Apr 2027.

Section H - Special Contract Requirements

H-1.0 OCCUPATIONAL AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT (29 CFR 1915)

The Contractor shall fully comply with 29 Code of Federal Regulations Part 1915, Occupational and Health Standards for Shipyard Employment (29 CFR 1915), as it is effective at the date of contract award, while performing any contract that is awarded from this solicitation. The provisions of 29 CFR 1915 shall apply to the same extent as if the ship repairing, shipbuilding, and shipbreaking employments and related employments to be performed under the contract are wholly accomplished on the navigable waters of the United States. The Contractor shall comply with applicable provisions of the laws and regulations where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed in addition to complying with the corresponding provisions of 29 CFR 1915 in instances in which those laws and regulations require compliance with more stringent safety standards.

The Contractor shall promptly notify the contracting officer if it becomes aware of any law or regulation that is applicable where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed that precludes compliance with any provision of 29 CFR 1915.

H-2.0 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)

The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.

H-3.0 CONTROL OF UNCLASSIFIED INFORMATION (SRF-JRMC Requirements Only)

The Contractor shall not provide Controlled Unclassified Information (CUI) U.S. Navy technical information (engineering drawings, technical manuals, system or equipment photographs or any other U.S. Navy engineering data in any form (orally, paper copy, film or digital file/image) to anyone except SRF-JRMC employees, other Department of Defense (DoD) employees or U.S. DoD Contractors requiring the data for accomplishment of an SRF-JRMC business processes unless the data is marked Distribution Statement "A" (Approved for public release: distribution is unlimited) or has been approved for unrestricted public release by the Commanding Officer of SRF-JRMC or Commander U.S. Naval Forces Japan (COMNAVFORJAPAN) Public Affairs Officer (PAO). The Contractor shall notify SRF-JRMC Code 700 (Code 950 in Sasebo) and request written permission to release CUI outside of SRF- JRMC, DoD Activities or U.S. DoD Contractors that are not involved in the SRF-JRMC business process if the Contractor believes that the release is required to support a SRF-JRMC business or Public Affairs requirement.

H-4.0 Lay Down Space

The Contractor may request the lay down space adjacent to the ship yard in Yokosuka Naval base. Upon the receipt of approval by the Government, the Contractor may obtain the applicable lay down space. The Contractor shall be responsible for all the cost, but not limited to, for maintaining the facility, utility, safety, and security.

H-5.0 Applicable to Contracts Performed in Japan:

HISTORIC AND CULTURAL RESOURCES

If ship repair work is being performed in and around potentially significant historic buildings and structures (cultural properties) such as Dry Docks 1 through 6 and Cave 682 in Yokosuka Base, the contractor shall avoid changing the original materials and finishes used in the properties.

If work is being performed to repair or change a historical building/structure, the contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work.

If work is being performed on a cultural or historical asset, such as a historical building/structure or archeological site, special precautions may be necessary. The contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work. The contractor shall contact the CFAY Cultural Resources Manager through the Contracting Officer to determine if the work involves any archaeological, historical or cultural assets.

The contractor must conduct an archaeological monitoring by a qualified archaeologist for the planned excavations. During the monitoring, use of flat bladed bucket is required for backhoe operations. If any cultural/historical artifacts/assets include brick structures, manufactures plates indicating years before 1945 on the machines and equipment are discovered during work, the contractor shall notify the Public Works Department (PWD) Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager (DSN 243-5136/COMM 046-816-5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area until further direction from the PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer.

If the items need to be temporarily removed, carefully protect them from disturbance, including weather conditions, unforeseen traffic, and pilfering. The PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer will provide further direction/guidance on how to protect the items. The Government retains ownership and control over historical and archaeological resources.

The contractor shall carefully protect in-place and report immediately to the Contracting Officer historical and archaeological items or human skeletal remains discovered in the course of work. Upon discovery, the contractor shall notify Cultural, Historical, and/or Natural Resources (CHNR) Manager (DSN 243-5136/COMM 046-816- 5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area. The Government retains ownership and control over historical and archaeological resources."

JAPANESE CONCILIATION PROCEDURES

(a) Except as otherwise provided in this contract any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the US-Japan Joint Committee for conciliation in accordance with paragraph 10, Article XVIII, of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between Japan and the United States of America. Request by the Contractor for conciliation shall be made in accordance with the procedures provided herein.

(b) In the event the Contractor desires conciliation after the decision of the Contracting Officer has been served upon him, he will first file his appeal from such findings of fact within the time limits described therein before filing request for conciliation with the Joint Committee and then request for appellate authority under the clause of this contract entitled Disputes to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.

(c) The request for conciliation will be submitted by the Contractor through the nearest local Japanese Defense Facilities Administration Bureau to the Contract Conciliation Panel of the Joint Committee. Upon the filing of the request with the Joint Committee, the Contractor will immediately notify the Contracting Officer in writing that the request for conciliation has been filed.

(d) In the event the disagreement submitted to the Joint Committee under subparagraph (b) above has been resolved through conciliation, it will be the responsibility of the Contractor to notify the appellate authority designated in the clause of this contract, entitled Disputes, of the settlement of the dispute and to withdraw his appeal.

(e) In the event the Contractor who has submitted a request for conciliation to the Joint Committee under subparagraph (b) above desires, notwithstanding the pending request for conciliation, that action by the appropriate authority under the clause of this contract entitled Disputes be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the Contractor of his action taken hereunder.

(f) No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled Disputes has been rendered. Pending the hearing of conciliation panel the Contractor shall proceed diligently with the performance of the contract and in accordance with the Contracting Officer's decision. The provisions of this clause shall not prejudice any right which the parties to the contract may have to file a civil suit.

CONSUMPTION TAX

(a) The Governments of the United States and Japan have agreed that this contract is exempt from the Japanese Consumption Tax. In accordance with paragraph (c) of the clause FAR 52.229-6, "TAXES -- FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)," the offerors or quoters shall not include the Consumption Tax (including underlying taxes) in their proposal or quotations.

By submission of your proposal or quotation, you are certifying that your proposal or quotation does not contain any such tax.

The following U.S. Government (USG) proof of purchase forms shall be used to claim the exemption at tax offices:

USG Standard Form 1034

USG Standard Form 1113

USG Standard Form 44

Department of Defense Form 1155

Navy Comptroller Form 2277

(b) The Contractor shall retain the appropriate USG proof of purchase forms set forth above for a period of seven (7) years. In addition, the Contractor shall maintain adequate records containing all pertinent information with regard to the claiming of Consumption Tax exemptions related to this contract. These records shall be subject to review by the Contracting Officer, or his or her designated representative, at any time up to seven (7) years from the date of final payment under this contract.

(c) Any questions concerning the applicability of the Consumption Tax should be directed to the appropriate local tax office.

CUSTOMS AND TAX EXEMPTION

(a) The Contractor shall, notwithstanding any other clause in this contract to the contrary, be required to submit a request in writing to the Contracting Officer for issuance of a Tax Exemption Certificate for any import duties and all taxes paid or to be paid from which the U.S. Government is entitled to an exemption. These taxes and duties are enumerated in Article XII of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between the Governments of the United States of America and Japan, regarding facilities areas and the status of United States Armed Forces in Japan. The Contractor's request shall include the following information:

(1) Name of contractor;

(2) Contract number and job order number (if applicable);

(3) Nomenclature of taxable material to be delivered and intended use;

(4) Quantity of taxable material used or to be delivered; and

(5) Period of taxable material use.

In the case of gasoline and other petroleum products, the Contractor shall be responsible for making every reasonable effort to determine the accuracy of his figures on consumption. In this regard, the Contractor shall, upon request of the Contracting Officer, present all available data used by the Contractor as the basis for determining such figures. The Contractor shall be required to maintain adequate records containing all pertinent information with regard to the above requirements. Further, these records shall be subject to review by the Contracting Officer at any time up to three years from the date of final payment under this contract.

H-6.0 GROWTH CLIN

(a) This contract will utilize a Growth CLIN (CLIN 0002 and CLIN 0004) which is pre-funded to accommodate the anticipated growth work that may arise during the performance of the specified Task Group Instructions (TGIs) under CLIN 0001 and CLIN

0003. The contractor shall provide (To Be Filled in upon Contract Award) man-hours and (To Be Filled in upon Contract Award) materials for CLIN 0002, and (To Be Filled in upon Contract Award) man-hours and (To Be Filled in upon Contract Award) materials for CLIN 0004 in the performance of the Growth CLIN in support of historically based growth under this contract. Upon negotiation of each growth work task, the agreed labor and material amount shall become a completion requirement. The total authorized growth work may not exceed the total dollar value of the Growth CLIN, however, the mix of labor hours and material provided above may be adjusted so long as the total does not exceed the dollar value of the Growth CLIN.

(b) GROWTH WORK - Growth is defined as any additional work that is identified and authorized after contract award that is within the scope of work of the TGIs defined in CLIN 0001 and 0003, and as attached under Section J. Any additional work determined by the Contracting Officer as not within the scope of any of the TGIs shall be considered NEW WORK and will not be covered by this Growth CLIN.

(1) After any inspection reports detailed in any of the Task Group Instructions (TGIs) are submitted to Ship Repair Facility - Japan Regional Maintenance Center (SRF-JRMC), the contractor will propose solutions, recommendations, material availability, and time impacts to the Period of Performance. This will be in the form of a Condition Found Report (CFR), which will be submitted to SRF-JRMC within twenty-four (24) hours after the conditions have been found and identified. This form (SRF-JRMC Form 4730-141) shall be submitted electronically and physically for record-keeping purposes. The contractor shall not begin work reported under a CFR until an agreement is reached between the contractor, SRF-JRMC and the Administrative Contracting Officer (ACO).

(2) The contractor shall submit any repair items outside of the scope of the TGIs via CFR (SRF-JRMC Form 4730-141) to SRF-JRMC to include schedule impacts.

(3) For any Government Furnished Material (GFM) or Contractor Furnished Material (CFM) that is part of any TGI and which is later identified to not arrive on time for the requirement's completion, the contractor shall submit a CFR (Form 4730-141) to SRF-JRMC to include schedule impacts.

(4) SRF-JRMC shall review the CFR and will determine further action. When determined by SRF-JRMC that the work detailed on the CFR is required and would require additional man-hours or materials, the CFR is returned to the contractor through the Contracting Office, as growth work together with a Deficiency Log (DL) detailing the corrective actions and additional work requirements. A Growth Management Request (GMR) Level of Effort (LOE) to completion will be utilized for each growth work request and approval.

(5) Upon receipt of a growth work requirement, the contractor shall submit a proposal with the estimated price within 3 working days, or as specified by the Contracting Office. Naval Supply Systems Command (NAVSUP) Fleet Logistics Center Yokosuka (FLCY) and SRF-JRMC will review and approve each proposal. Once an agreement has been reached between the contractor, SRF-JRMC and the ACO, a signed GMR by the ACO will be issued to enable the contractor to commence work. The price negotiated by the parties shall be a firm fixed price for the growth work requirement.

(6) The ACO will develop a growth work tracking log for the Growth CLIN to identify, record, and reconcile all the approved GMR-LOE to completion. The tracking log shall include but not limited to LOE number, TGI, Deficiency Log (DL) number, job description, and approved total price, labor hours, materials/other cost.

(c) Effort performed in fulfilling the obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee's usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations or other time and effort which does not have a specific and direct contribution to the tasks described in Sections B and C.

(d) (1) The Contractor shall schedule the performance of all items of the work package. The contractor agrees that these man-hours, if tasked, shall be performed concurrently with the other contracted for work items, during the contract period of performance, without impacting, accelerating, or causing delay or disruption to the work required by the other contracted for work items, to any other Government contract, or to any other work in progress for the Government.

(2) The growth, if required, shall be tasked during the contract period of performance, as may be modified, on the schedule in coordination with the Contracting Officer.

(e) (1) The Contractor's fully burdened labor rate that will be proposed in the original contract and included below will be used for negotiating growth work to be performed under this contract. The contractor agrees that the number of man-hours included in its price proposal for contract modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:

Abrasive cleaning/blasting

Fire Watch

Welding

Burning

Brazing

Carpentry

Machinists (inside and outside)

Electrical Work

Electronic Work

Engineering

Design Support

Lagging

Ship-fitting

Boiler-making

Painting

Sheet-metal

Pipefitting

Rigging

General Labor

Staging/Scaffolding

Labor Rate: (To be filled in upon Contract Award)

(2) The fully burdened ship repair labor rate proposed by the contractor listed in paragraph (e)(1) above shall include all costs associated with support functions (whether charged directly or indirectly by the offeror's accounting systems) provided in support of the direct production man-hour functions listed in paragraph (e)(1) above. Support functions shall be considered to be included in the offeror's fully burdened ship repair labor rate for direct production man-hours. Labor hours for the below support functions shall not be separately proposed in any circumstance, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:

Testing

Quality Assurance

Execution Planning

Cleaning

Supervision

Security

Surveying

Administration

Transportation

Purchasing Staff

Lofting

Other indirect support

Material handling & Warehousing

Safely/Environmental

(3) The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

(4) Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel.

Consumable material shall be included in the contractor's fully burdened ship repair labor rate and not separately priced.

(5) The contract fixed fully burdened ship repair labor rate shall be used for negotiating growth work during the entire availability regardless of how many labor hours and material dollars are procured and negotiated and irrespective of whether the growth and new work tasked exceeds the estimate in paragraph (a) above.

(6) The growth reservation man-hours and material dollar requirements listed above are part of this contract under the original solicitation and award. The man-hour reservation shall include both prime contractor and subcontractor efforts. Only actual production man-hours expended will be considered towards the contractor's obligation to provide the defined reservation man-hour effort. While supervision, quality assurance, and other nonproduction labor should be included in the pricing for reservation items in the original bid, they shall not count towards satisfying the contractor's obligation to provide reserved man-hours. The man-hour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically addressed in the individual TGI. Proposed material price shall be based on actual costs to the Contractor of acquiring the materials provided. Proposed material price may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the actual cost of materials expended toward the reservation. The reservation in the contract is not to be considered Time and Material or a Level of Effort. This reservation is Level of Effort to Completion.

Once the scope of work for a task has been listed and a mutually agreeable number of man-hours or materials has been agreed to, neither party will be entitled to an adjustment based on actual man-hours or material dollars required. The Contractor shall not commence work without approval from the ACO or receipt of the approved GMR.

(f) The balance of hours and material remaining on the Growth CLIN after negotiations have concluded and when it is evident that no additional growth work will be tasked is subject to a decrease change order. As a result, any unused funds on the Growth CLIN will be recouped by the ACO through a contract modification action as a decrease in price within 30 days after the end of the contract period of performance.

Section J - List of Attachments

Attachment (I) Work Specification(s) for TGI

CLIN 0001 and CLIN 002

38KB312258-A01 F/O - REPAIR CORROSION HOLE ON VENT SPOOL PLATING IN 1-378-0-Q

38KB312259-A01 F/O - REPAIR VERTICAL STIFFENER ON TRANSVERSE BULKHEAD FR 174 IN 02-174-0-Q

38KB312259-T01 FIREMAIN SYS (T & OP) - KTR

38KB312260-A01 F/O - REPAIR 02 LEVEL DECK PLATE IN 02-242-0-Q, FR 249 - 254, STBD

38KB312262-A01 F/O - REPAIR GENERAL CORROSION ON 01 LEVEL DECK PLATING IN 01-248-0-Q

38KB359307-A01 F/O - REPLACE VCHT PIPING IN 3-97-02-L

38KB359307-T01 SEWAGE SYS (T & OP) - KTR

CLIN 0003 and CLIN 0004

38KB349312-A01 F/O - S/A 95660K, ACCOMPLISH STRUCTURAL, SHEET METAL, AND RIGGING WORK

38KB349312-T01 POTABLE WATER SYS (T & OP) - KTR

Period of Performance HIG 6C1 B4 POP List

SRF Reference:

Drawings

Maintenance Procedure (MP)

Test Procedure (TP)

Engineering Liaison Memorandum

Liaison Action Report (LAR)

Attachment (II) Proposal Breakdown Form (CLIN 0001 and CLIN 0002)

Proposal Breakdown Form (CLIN 0003 and CLIN 0004)

Attachment (III) Request for Information Sheet

Attachment (IV) Government Furnished Property (GFP-GFM listings)

Attachment (V) Warranty Tracking Information

Attachment (VI) Source of Repair Instruction

Attachment (VII) Quality Assurance Surveillance Plan (QASP)

Attachment (VIII) Contracts Data Sheet

Exhibit (A) Contract Data Requirements List (CDRL)

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

L-1.0 GENERAL INSTRUCTIONS

The Task Group Instructions (TGIs), drawings and references will be provided via the Government's Department of Defense (DoD) Secure Access File Exchange (SAFE) web-based file transfer service. DoD SAFE is a secure Government repository which enables the sharing of large files which cannot be transmitted via email. The full user guide for DoD SAFE can be found in the following URL (https://safe.apps.mil/help/dod-safe-help.xml). Any offeror intending to provide a proposal to this solicitation shall request access by sending an email to the following personnel serving as the point of contact for this procurement:

Points of Contact (POC):

Peter Arrieta (peterjommel.s.arrieta.ln@us.navy.mil) Contracting Officer

Kumi Matsumoto (kumi.matsumoto.ln@us.navy.mil) Contract Specialist

The Offeror will be required to hold an active U.S. Navy MSRA/ABR Agreement by the proposal submission date in order for their offer to be considered. Non MSRA/ABR holders may request an application for an MSRA or an ABR certification by requesting an application package from: flcy_msra_abr_group@us.navy.mil. Please note that the MSRA/ABR Certification process may require a year to complete.

The following are the general instructions:

A. The Offeror must respond to all requirements of the solicitation and not alter or rearrange the solicitation.

Offerors shall provide information in the format and sequence identified in the solicitation. The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the Offerors capability.

Any exception to the Government's technical requirements/specifications must be resolved prior to the solicitation closing date. Offerors that take exception to the Government's technical requirements without prior resolution with the Contracting Officer will not be considered for award. The Offeror is advised that the Government may incorporate any portions of the Offeror's proposal into the resulting contract.

B. Questions: Offerors may submit questions in writing via email to the following points of contact listed above.

All questions shall be submitted using Attachment (III) Request for Information (RFI) provided with this solicitation.

Questions shall be submitted no later than Japan Standard Time (JST), to ensure the 15 MAY 2026 12:00 PM Government is able to adequately address and respond to questions submitted.

C. Proposal Validity: Offerors shall fill in block 12 in front page of Standard Form 33 (SF 33) with 90 days. If an offeror fails to fill in block 12, the proposal will be presumed to be valid for 90 days.

D. Amendments: The Government may revise the solicitation at any time by means of an Amendment. Any solicitation amendments and all related documents will be released electronically via email.

E. Subcontracting: Offerors are reminded of the requirements associated with subcontracting with contractors that are debarred, suspended or proposed for debarment contained at FAR 52.209-6. As with all FAR requirements, please ensure you are familiar with those requirements prior to submitting your proposal.

F. If any Long Lead Time Material (LLTM) is identified by the offeror during this period, the offeror shall notify the Government through an RFI.

G. Offerors shall include all anticipated testing work/T-Phase, to include testing work for anticipated standard interference work in your proposal.

H. The Government intends to award without discussions but reserves the right to conduct discussions if necessary. Therefore, offerors are encouraged to submit their best offer from a price standpoint.

I. Ship Check: To schedule a ship check, offerors shall email a request for a ship check to the POC listed above. Participants will be provided additional information to the ship check and will be subject to security, safety, and other applicable regulations established by CFAY Naval base, SRF-JRMC, and the Commanding Officer of the Ship.

N6264926RA0480005

https://safe.apps.mil/help/dod-safe-help.xml

J. In accordance with and DFARS PGI 246-710-70, Offerors will be required to complete and submit ATTACHMENT (IV) listed in Section J as part of their proposal package and ATTACHMENT (V) shall be completed no later than when the warranted items are presented for receipt and/or acceptance.

K. Growth CLIN: The price for CLIN 0002 and CLIN 0004, Growth Work will be derived from the proposed price for CLIN 0001 and CLIN 0003 in accordance with the formula contained in Attachment II Proposal Breakdown Form. The average of the labor rate the successful offeror provides in the Price Proposal Breakdown Sheet will be inserted into H-Clause: Growth CLIN paragraph (e) (1) upon contract award as the fully loaded ship repair labor rate and will be utilized for the purpose of calculating total level of effort to completion under the negotiated Growth Work during the entirety of the contract. The average will be determined by dividing the sum of the total labor costs all CLIN by sum of the total man hours across all CLIN. Additionally, the estimated man-hours and material costs will be inserted into H-Clause: Growth CLIN paragraph (a) upon contract award.

These amounts will be based upon the successful offeror's proposal in the Attachment (II) Proposal Breakdown Form, CLIN 0002 and CLIN 0004.

L-2.0 SUBMISSION OF PROPOSALS

A. Proposal Due Date: All copies of proposals shall be received by the Government no later than the date specified in SF33 block 9 (Front Page) of the Solicitation.

B. Electronic Submission: Offerors are instructed to submit their proposal electronically via email to the personnel serving as POC for this procurement. Other submission methods WILL NOT be accepted. In the event that it is impossible to submit the proposal via email due to file size limitations, offerors are instructed to request a drop-off from the POC and submit the proposal via DoD SAFE.

C. Proposal Format: For electronic copies, the files shall be in the format that is compatible with and capable of being opened with Microsoft Office Suite 2016 or Adobe Acrobat Reader 2017. The entire content of the proposal shall be in English. If any required document is written in a language other than English (e.g. Japanese), the offerer shall make effort to provide an English translation.

L-3.0 PROPOSAL CONTENT

The offeror is required to submit the following:

A. Solicitation (SF 33): The Offeror shall submit one copy of the completed SF33 with blocks 12 through 18 completed as well as all sections (e.g. Section K) with applicable fill-ins. Submission of a signed offer to the Government constitutes agreement and acceptance of the solicited terms and conditions.

B. Solicitation Amendment (SF 30): If applicable, the Offeror shall submit one copy of all acknowledged SF30 by completing and signing block 15.

C. Price Summary: Offerors shall submit the fully completed price proposal utilizing Attachment (II) "Proposal Breakdown Form" of Section J. Offerors shall also submit vendor associated with Attachment (II).quotes

D. Current MSRA or ABR Certification: Offerors who do not possess a current NAVSUP FLCY MSRA/ABR Agreement will be required to submit a copy of an approved/active U.S. Navy MSRA/ABR Agreement as a Prime Contractor as part of the proposal package.

E. This solicitation is intended only for sources duly authorized to operate and do business in Japan, as prescribed by DFARS 252.225-7042. Contractors outside Japan must submit documentation that unambiguously demonstrates the Offeror's compliance with DFARS 252.225-7042 (e.g., proof of incorporation) as part of their proposal.

IDCode: J
Page: 1
Pages: 16
AmendNo: 0005
EffDate: 15 Jun 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N62649
AdmCode:
IssuedBy: NAVSUP FLT LOG CTR YOKOSUKA

PSC 473 BOX 11, FPO AP 96349-1500

FPO, AP 96349-1500

UNITED STATES

Kumi Matsumoto, Email: kumi.matsumoto.ln@us.navy.mil Telephone: 816-243-6804 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N6264926RA048
SolDate: 21 Apr 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Peter Jommel S. Arrieta
ContDate:
CODate: 15 Jun 2026

File details come from the government source that posted it. Updated .