2.02 Attachment II Price Proposal Form N6264926RA048.xlsx

XLSX spreadsheet 88 KB Posted

Attached to
USS HIGGINS (DDG-76) 6C1 Farm Out Bundle# 4, Yokosuka Japan
Solicitation number
N6264926RA048
Issued by

About this file

This is a Price Proposal Form for a naval ship repair and maintenance solicitation. The form is designed for offerors responding to solicitation N6264926RA048 for USS HIGGINS (DDG-76) 6C1 Farm Out Bundle#4 in Yokosuka, Japan. The proposal template captures pricing for two Contract Line Items (CLINs): CLIN 0001 covering nine Task Group Instructions (TGIs) and CLIN 0002 as a growth CLIN set at 7.87% of the base effort. Offerors must submit proposals by 21 May 2026 at 10:00 AM Japan Standard Time, with performance running from 10 July 2026 through 08 February 2027 at Commander Fleet Activities Yokosuka Naval Base.

The nine TGIs encompass structural steel repairs, system testing and operations support, and piping replacement work on the destroyer. Specific work items include: corrosion hole repair on vent spool plating, vertical stiffener repair on transverse bulkhead, firemain system testing and operations, 02 level deck plate repair, general corrosion repair on 01 level deck plating, structural sheet metal and rigging work under Service Account 95660K, potable water system testing and operations, VCHT piping replacement, and sewage system testing and operations. The form requires offerors to itemize labor costs (separated by in-house and subcontractor man-hours), material costs, and Other Direct Costs (ODCs) in Japanese Yen. This solicitation is restricted to sources authorized to operate and conduct business in Japan per DFARS 225.1103(3), with NAVSUP Fleet Logistics Center Yokosuka as the contracting activity.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA048CLIN 0001(9 TGIs)0¥0¥0¥0¥0
SHIP NAME:USS HIGGINS (DDG 76)CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
AVAILABILITY:6C1 Farm Out Bundle#4Total for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)9Total Evaluated Price¥0
Growth CLIN %7.87%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
138KB312258-A01F/O – REPAIR CORROSION HOLE ON VENT SPOOL PLATING IN 1-378-0-Q000¥0¥0¥0¥0
238KB312259-A01F/O - REPAIR VERTICAL STIFFENER ON TRANSVERSE BULKHEAD FR 174 IN 02-174-0-Q000¥0¥0¥0¥0
338KB312259-T01FIREMAIN SYS (T & OP) – KTR000¥0¥0¥0¥0
438KB312260-A01F/O - REPAIR 02 LEVEL DECK PLATE IN 02-242-0-Q, FR 249 - 254, STBD000¥0¥0¥0¥0
538KB312262-A01F/O - REPAIR GENERAL CORROSION ON 01 LEVEL DECK PLATING IN 01-248-0-Q000¥0¥0¥0¥0
638KB349312-A01F/O - S/A 95660K, ACCOMPLISH STRUCTURAL, SHEET METAL, AND RIGGING WORK000¥0¥0¥0¥0
738KB349312-T01POTABLE WATER SYS (T & OP) – KTR000¥0¥0¥0¥0
838KB359307-A01F/O - REPLACE VCHT PIPING IN 3-97-02-L000¥0¥0¥0¥0
938KB359307-T01SEWAGE SYS (T & OP) – KTR000¥0¥0¥0¥0
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

1_38KB312258-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - 6C1 Farm Out Bundle#4TGI 1_38KB312258-A01 SUMMARY
SOLICITATION #:N6264926RA048
SRF-JRMC TGI #:1_38KB312258-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O – REPAIR CORROSION HOLE ON VENT SPOOL PLATING IN 1-378-0-Q00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

2_38KB312259-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - 6C1 Farm Out Bundle#4TGI 2_38KB312259-A01 SUMMARY
SOLICITATION #:N6264926RA048
SRF-JRMC TGI #:2_38KB312259-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - REPAIR VERTICAL STIFFENER ON TRANSVERSE BULKHEAD FR 174 IN 02-174-0-Q00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

3_38KB312259-T01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - 6C1 Farm Out Bundle#4TGI 3_38KB312259-T01 SUMMARY
SOLICITATION #:N6264926RA048
SRF-JRMC TGI #:3_38KB312259-T01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:FIREMAIN SYS (T & OP) – KTR00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

4_38KB312260-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - 6C1 Farm Out Bundle#4TGI 4_38KB312260-A01 SUMMARY
SOLICITATION #:N6264926RA048
SRF-JRMC TGI #:4_38KB312260-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - REPAIR 02 LEVEL DECK PLATE IN 02-242-0-Q, FR 249 - 254, STBD00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

5_38KB312262-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - 6C1 Farm Out Bundle#4TGI 5_38KB312262-A01 SUMMARY
SOLICITATION #:N6264926RA048
SRF-JRMC TGI #:5_38KB312262-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - REPAIR GENERAL CORROSION ON 01 LEVEL DECK PLATING IN 01-248-0-Q00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

6_38KB349312-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - 6C1 Farm Out Bundle#4TGI 6_38KB349312-A01 SUMMARY
SOLICITATION #:N6264926RA048
SRF-JRMC TGI #:6_38KB349312-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - S/A 95660K, ACCOMPLISH STRUCTURAL, SHEET METAL, AND RIGGING WORK00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

7_38KB349312-T01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - 6C1 Farm Out Bundle#4TGI 7_38KB349312-T01 SUMMARY
SOLICITATION #:N6264926RA048
SRF-JRMC TGI #:7_38KB349312-T01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:POTABLE WATER SYS (T & OP) – KTR00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

8_38KB359307-A01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - 6C1 Farm Out Bundle#4TGI 8_38KB359307-A01 SUMMARY
SOLICITATION #:N6264926RA048
SRF-JRMC TGI #:8_38KB359307-A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/O - REPLACE VCHT PIPING IN 3-97-02-L00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

9_38KB359307-T01

SHIP NAME/AVAILABILITY:USS HIGGINS (DDG 76) - 6C1 Farm Out Bundle#4TGI 9_38KB359307-T01 SUMMARY
SOLICITATION #:N6264926RA048
SRF-JRMC TGI #:9_38KB359307-T01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:SEWAGE SYS (T & OP) – KTR00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .