This file is a Proposal Breakdown Form (Attachment II, Form 26RA040.xls) serving as a template for offerors to structure and submit pricing information for the USS DEWEY (DDG-105) ship repair solicitation. The form provides a standardized format for breaking down proposal costs across the seven Task Group Instructions (TGIs) that comprise the overall requirement, enabling consistent evaluation of pricing submissions from competing contractors.
The form is designed to facilitate detailed cost analysis by requiring offerors to itemize labor, materials, equipment, and other direct costs associated with each task group. Proposals must be submitted by March 20, 2026 at 10:00 AM to takayo.shiba.ln@us.navy.mil, with the period of performance running from April 1, 2026 through September 1, 2026 at Commander, Fleet Activities Yokosuka (CFAY) Naval Base, Japan. Offerors must identify hazardous materials in accordance with FAR 52.223-3 and DFARS 252.223-7001, declare any anticipated sea transportation requirements per DFARS 252.247-7022, and acknowledge any RFP amendments in their proposal submissions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| OFFEROR/COMPANY NAME: | |||||||||
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price | |
| SOLICITATION NO: | N6264926RA040 | CLIN 0001(7 TGIs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| SHIP NAME: | USS DEWEY DDG105 | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| AVAILABILITY: | FY26 6C1 SRA(d) BUNDLE#6 | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| Total TGIs (Specify Total) | 7 | Total Evaluated Price | ¥0 | ||||||
| Growth CLIN % | 11.79% | ||||||||
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | |||||||||
| No. | TGI No. | DESCRIPTION | Proposed Labor | Material/ODCs | Proposed Price (JPY) | ||||
| In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | ||||
| 1 | 38K42123CAA01 | Preserve Deck Plating in 4-220-2-T | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 38K4225104A01 | Install and Remove Scaffolding To/From 1A GTM For Ship's Force Work | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 38K4225105A01 | Install and Remove Scaffolding To/From 1B GTM For ship's Force Work | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 38K4258814A01 | Replace Dogging Actuator Foundation of Port Helicopter Hanger Door (HHD) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 38K4258817A01 | Replace Dogging Actuator Foundation of Starboard (Stbd) Helicopter Hnager Door (HHD) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 38K4258818A01 | Replace New Non-Tight Door 1-401-2 and 1-404-2 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 38K4272111A02 | Preserve Top Surface of Forward (Fwd) Mk 41 Mod 15 Vertical Launching System (VLS) | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 9 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 10 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 11 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 12 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 13 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 14 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 15 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 16 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 17 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 18 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 19 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 20 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 21 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 22 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 23 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 24 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 25 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 26 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 27 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 28 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 29 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 30 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 31 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 32 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 33 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 34 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 35 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 36 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 37 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 38 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 39 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 40 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 41 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 42 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 43 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 44 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 45 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 46 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 47 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 48 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 49 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 50 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 51 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 52 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 53 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 54 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 55 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 56 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 57 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 58 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 59 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 60 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 61 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 62 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 63 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 64 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 65 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 66 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 67 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 68 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 69 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 70 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 71 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 72 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 73 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 74 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 75 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 76 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 77 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 78 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 79 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 80 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 81 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 82 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 83 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 84 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 85 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 86 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 87 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 88 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 89 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 90 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 91 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 92 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 93 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 94 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 95 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 96 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 97 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 98 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 99 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 100 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 101 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 102 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 103 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 104 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 105 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 106 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 107 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 108 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 109 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 110 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 111 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 112 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 113 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 114 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 115 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 116 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 117 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 118 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 119 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 120 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 121 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 122 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 123 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 124 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 125 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 126 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 127 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 128 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 129 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 130 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 131 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 132 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 133 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 134 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 135 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 136 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 137 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 138 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 139 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 140 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 141 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 142 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 143 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 144 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 145 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 146 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 147 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 148 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 149 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 150 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 151 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 152 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 153 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 154 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 155 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 156 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 157 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 158 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 159 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 160 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 161 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 162 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 163 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 164 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 165 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 166 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 167 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 168 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 169 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 170 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 171 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 172 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 173 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 174 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 175 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 176 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 177 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 178 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 179 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 180 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 181 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 182 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 183 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 184 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 185 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 186 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 187 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 188 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 189 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 190 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 191 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 192 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 193 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 194 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 195 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 196 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 197 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 198 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 199 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||
| 200 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
1_38K42123CAA01
| SHIP NAME/AVAILABILITY: | USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6 | TGI 1_38K42123CAA01 SUMMARY | ||||||||||
| SOLICITATION #: | N6264926RA040 | |||||||||||
| SRF-JRMC TGI #: | 1_38K42123CAA01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | |||||
| DESCRIPTION: | Preserve Deck Plating in 4-220-2-T | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | ||||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | ||||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | |
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| TOTAL IN-HOUSE M/Hs | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | |||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | |||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | |||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | ||||||||
| MATERIAL COST BREAKDOWN | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 | |||||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | ||||||||
| OTHER DIRECT COST (ODC) (IF ANY) | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 |
2_38K4225104A01
| SHIP NAME/AVAILABILITY: | USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6 | TGI 2_38K4225104A01 SUMMARY | ||||||||||
| SOLICITATION #: | N6264926RA040 | |||||||||||
| SRF-JRMC TGI #: | 2_38K4225104A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | |||||
| DESCRIPTION: | Install and Remove Scaffolding To/From 1A GTM For Ship's Force Work | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | ||||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | ||||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | |
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| TOTAL IN-HOUSE M/Hs | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | |||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | |||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | |||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | ||||||||
| MATERIAL COST BREAKDOWN | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 | |||||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | ||||||||
| OTHER DIRECT COST (ODC) (IF ANY) | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 |
3_38K4225105A01
| SHIP NAME/AVAILABILITY: | USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6 | TGI 3_38K4225105A01 SUMMARY | ||||||||||
| SOLICITATION #: | N6264926RA040 | |||||||||||
| SRF-JRMC TGI #: | 3_38K4225105A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | |||||
| DESCRIPTION: | Install and Remove Scaffolding To/From 1B GTM For ship's Force Work | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | ||||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | ||||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | |
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| TOTAL IN-HOUSE M/Hs | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | |||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | |||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | |||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | ||||||||
| MATERIAL COST BREAKDOWN | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 | |||||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | ||||||||
| OTHER DIRECT COST (ODC) (IF ANY) | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 |
4_38K4258814A01
| SHIP NAME/AVAILABILITY: | USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6 | TGI 4_38K4258814A01 SUMMARY | ||||||||||
| SOLICITATION #: | N6264926RA040 | |||||||||||
| SRF-JRMC TGI #: | 4_38K4258814A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | |||||
| DESCRIPTION: | Replace Dogging Actuator Foundation of Port Helicopter Hanger Door (HHD) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | ||||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | ||||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | |
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| TOTAL IN-HOUSE M/Hs | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | |||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | |||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | |||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | ||||||||
| MATERIAL COST BREAKDOWN | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 | |||||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | ||||||||
| OTHER DIRECT COST (ODC) (IF ANY) | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 |
5_38K4258817A01
| SHIP NAME/AVAILABILITY: | USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6 | TGI 5_38K4258817A01 SUMMARY | ||||||||||
| SOLICITATION #: | N6264926RA040 | |||||||||||
| SRF-JRMC TGI #: | 5_38K4258817A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | |||||
| DESCRIPTION: | Replace Dogging Actuator Foundation of Starboard (Stbd) Helicopter Hnager Door (HHD) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | ||||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | ||||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | |
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| TOTAL IN-HOUSE M/Hs | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | |||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | |||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | |||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | ||||||||
| MATERIAL COST BREAKDOWN | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 | |||||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | ||||||||
| OTHER DIRECT COST (ODC) (IF ANY) | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 |
6_38K4258818A01
| SHIP NAME/AVAILABILITY: | USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6 | TGI 6_38K4258818A01 SUMMARY | ||||||||||
| SOLICITATION #: | N6264926RA040 | |||||||||||
| SRF-JRMC TGI #: | 6_38K4258818A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | |||||
| DESCRIPTION: | Replace New Non-Tight Door 1-401-2 and 1-404-2 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | ||||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | ||||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | |
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| TOTAL IN-HOUSE M/Hs | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | |||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | |||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | |||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | ||||||||
| MATERIAL COST BREAKDOWN | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 | |||||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | ||||||||
| OTHER DIRECT COST (ODC) (IF ANY) | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 |
7_38K4272111A02
| SHIP NAME/AVAILABILITY: | USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6 | TGI 7_38K4272111A02 SUMMARY | ||||||||||
| SOLICITATION #: | N6264926RA040 | |||||||||||
| SRF-JRMC TGI #: | 7_38K4272111A02 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | |||||
| DESCRIPTION: | Preserve Top Surface of Forward (Fwd) Mk 41 Mod 15 Vertical Launching System (VLS) | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | ||||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | ||||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL | |
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| 0.0 | ||||||||||||
| TOTAL IN-HOUSE M/Hs | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | ||||||
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | |||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | |||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | |||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | ||||||||
| MATERIAL COST BREAKDOWN | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 | |||||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | ||||||||
| OTHER DIRECT COST (ODC) (IF ANY) | ||||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | |||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| ¥0 | ||||||||
| TOTAL (¥) | ¥0 |