Attach II Proposal Breakdown Form 26RA040.xls

XLS spreadsheet 276 KB Posted

Attached to
USS DEWEY (DDG 105) 6C1 SRA(d) Bundle# 6
Solicitation number
N6264926RA040
Issued by

About this file

Summary

This file is a Proposal Breakdown Form (Attachment II, Form 26RA040.xls) serving as a template for offerors to structure and submit pricing information for the USS DEWEY (DDG-105) ship repair solicitation. The form provides a standardized format for breaking down proposal costs across the seven Task Group Instructions (TGIs) that comprise the overall requirement, enabling consistent evaluation of pricing submissions from competing contractors.

The form is designed to facilitate detailed cost analysis by requiring offerors to itemize labor, materials, equipment, and other direct costs associated with each task group. Proposals must be submitted by March 20, 2026 at 10:00 AM to takayo.shiba.ln@us.navy.mil, with the period of performance running from April 1, 2026 through September 1, 2026 at Commander, Fleet Activities Yokosuka (CFAY) Naval Base, Japan. Offerors must identify hazardous materials in accordance with FAR 52.223-3 and DFARS 252.223-7001, declare any anticipated sea transportation requirements per DFARS 252.247-7022, and acknowledge any RFP amendments in their proposal submissions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:
TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264926RA040CLIN 0001(7 TGIs)0¥0¥0¥0¥0
SHIP NAME:USS DEWEY DDG105CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
AVAILABILITY:FY26 6C1 SRA(d) BUNDLE#6Total for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)7Total Evaluated Price¥0
Growth CLIN %11.79%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
138K42123CAA01Preserve Deck Plating in 4-220-2-T000¥0¥0¥0¥0
238K4225104A01Install and Remove Scaffolding To/From 1A GTM For Ship's Force Work000¥0¥0¥0¥0
338K4225105A01Install and Remove Scaffolding To/From 1B GTM For ship's Force Work000¥0¥0¥0¥0
438K4258814A01Replace Dogging Actuator Foundation of Port Helicopter Hanger Door (HHD)000¥0¥0¥0¥0
538K4258817A01Replace Dogging Actuator Foundation of Starboard (Stbd) Helicopter Hnager Door (HHD)000¥0¥0¥0¥0
638K4258818A01Replace New Non-Tight Door 1-401-2 and 1-404-2000¥0¥0¥0¥0
738K4272111A02Preserve Top Surface of Forward (Fwd) Mk 41 Mod 15 Vertical Launching System (VLS)000¥0¥0¥0¥0
8000¥0¥0¥0¥0
9000¥0¥0¥0¥0
10000¥0¥0¥0¥0
11000¥0¥0¥0¥0
12000¥0¥0¥0¥0
13000¥0¥0¥0¥0
14000¥0¥0¥0¥0
15000¥0¥0¥0¥0
16000¥0¥0¥0¥0
17000¥0¥0¥0¥0
18000¥0¥0¥0¥0
19000¥0¥0¥0¥0
20000¥0¥0¥0¥0
21000¥0¥0¥0¥0
22000¥0¥0¥0¥0
23000¥0¥0¥0¥0
24000¥0¥0¥0¥0
25000¥0¥0¥0¥0
26000¥0¥0¥0¥0
27000¥0¥0¥0¥0
28000¥0¥0¥0¥0
29000¥0¥0¥0¥0
30000¥0¥0¥0¥0
31000¥0¥0¥0¥0
32000¥0¥0¥0¥0
33000¥0¥0¥0¥0
34000¥0¥0¥0¥0
35000¥0¥0¥0¥0
36000¥0¥0¥0¥0
37000¥0¥0¥0¥0
38000¥0¥0¥0¥0
39000¥0¥0¥0¥0
40000¥0¥0¥0¥0
41000¥0¥0¥0¥0
42000¥0¥0¥0¥0
43000¥0¥0¥0¥0
44000¥0¥0¥0¥0
45000¥0¥0¥0¥0
46000¥0¥0¥0¥0
47000¥0¥0¥0¥0
48000¥0¥0¥0¥0
49000¥0¥0¥0¥0
50000¥0¥0¥0¥0
51000¥0¥0¥0¥0
52000¥0¥0¥0¥0
53000¥0¥0¥0¥0
54000¥0¥0¥0¥0
55000¥0¥0¥0¥0
56000¥0¥0¥0¥0
57000¥0¥0¥0¥0
58000¥0¥0¥0¥0
59000¥0¥0¥0¥0
60000¥0¥0¥0¥0
61000¥0¥0¥0¥0
62000¥0¥0¥0¥0
63000¥0¥0¥0¥0
64000¥0¥0¥0¥0
65000¥0¥0¥0¥0
66000¥0¥0¥0¥0
67000¥0¥0¥0¥0
68000¥0¥0¥0¥0
69000¥0¥0¥0¥0
70000¥0¥0¥0¥0
71000¥0¥0¥0¥0
72000¥0¥0¥0¥0
73000¥0¥0¥0¥0
74000¥0¥0¥0¥0
75000¥0¥0¥0¥0
76000¥0¥0¥0¥0
77000¥0¥0¥0¥0
78000¥0¥0¥0¥0
79000¥0¥0¥0¥0
80000¥0¥0¥0¥0
81000¥0¥0¥0¥0
82000¥0¥0¥0¥0
83000¥0¥0¥0¥0
84000¥0¥0¥0¥0
85000¥0¥0¥0¥0
86000¥0¥0¥0¥0
87000¥0¥0¥0¥0
88000¥0¥0¥0¥0
89000¥0¥0¥0¥0
90000¥0¥0¥0¥0
91000¥0¥0¥0¥0
92000¥0¥0¥0¥0
93000¥0¥0¥0¥0
94000¥0¥0¥0¥0
95000¥0¥0¥0¥0
96000¥0¥0¥0¥0
97000¥0¥0¥0¥0
98000¥0¥0¥0¥0
99000¥0¥0¥0¥0
100000¥0¥0¥0¥0
101000¥0¥0¥0¥0
102000¥0¥0¥0¥0
103000¥0¥0¥0¥0
104000¥0¥0¥0¥0
105000¥0¥0¥0¥0
106000¥0¥0¥0¥0
107000¥0¥0¥0¥0
108000¥0¥0¥0¥0
109000¥0¥0¥0¥0
110000¥0¥0¥0¥0
111000¥0¥0¥0¥0
112000¥0¥0¥0¥0
113000¥0¥0¥0¥0
114000¥0¥0¥0¥0
115000¥0¥0¥0¥0
116000¥0¥0¥0¥0
117000¥0¥0¥0¥0
118000¥0¥0¥0¥0
119000¥0¥0¥0¥0
120000¥0¥0¥0¥0
121000¥0¥0¥0¥0
122000¥0¥0¥0¥0
123000¥0¥0¥0¥0
124000¥0¥0¥0¥0
125000¥0¥0¥0¥0
126000¥0¥0¥0¥0
127000¥0¥0¥0¥0
128000¥0¥0¥0¥0
129000¥0¥0¥0¥0
130000¥0¥0¥0¥0
131000¥0¥0¥0¥0
132000¥0¥0¥0¥0
133000¥0¥0¥0¥0
134000¥0¥0¥0¥0
135000¥0¥0¥0¥0
136000¥0¥0¥0¥0
137000¥0¥0¥0¥0
138000¥0¥0¥0¥0
139000¥0¥0¥0¥0
140000¥0¥0¥0¥0
141000¥0¥0¥0¥0
142000¥0¥0¥0¥0
143000¥0¥0¥0¥0
144000¥0¥0¥0¥0
145000¥0¥0¥0¥0
146000¥0¥0¥0¥0
147000¥0¥0¥0¥0
148000¥0¥0¥0¥0
149000¥0¥0¥0¥0
150000¥0¥0¥0¥0
151000¥0¥0¥0¥0
152000¥0¥0¥0¥0
153000¥0¥0¥0¥0
154000¥0¥0¥0¥0
155000¥0¥0¥0¥0
156000¥0¥0¥0¥0
157000¥0¥0¥0¥0
158000¥0¥0¥0¥0
159000¥0¥0¥0¥0
160000¥0¥0¥0¥0
161000¥0¥0¥0¥0
162000¥0¥0¥0¥0
163000¥0¥0¥0¥0
164000¥0¥0¥0¥0
165000¥0¥0¥0¥0
166000¥0¥0¥0¥0
167000¥0¥0¥0¥0
168000¥0¥0¥0¥0
169000¥0¥0¥0¥0
170000¥0¥0¥0¥0
171000¥0¥0¥0¥0
172000¥0¥0¥0¥0
173000¥0¥0¥0¥0
174000¥0¥0¥0¥0
175000¥0¥0¥0¥0
176000¥0¥0¥0¥0
177000¥0¥0¥0¥0
178000¥0¥0¥0¥0
179000¥0¥0¥0¥0
180000¥0¥0¥0¥0
181000¥0¥0¥0¥0
182000¥0¥0¥0¥0
183000¥0¥0¥0¥0
184000¥0¥0¥0¥0
185000¥0¥0¥0¥0
186000¥0¥0¥0¥0
187000¥0¥0¥0¥0
188000¥0¥0¥0¥0
189000¥0¥0¥0¥0
190000¥0¥0¥0¥0
191000¥0¥0¥0¥0
192000¥0¥0¥0¥0
193000¥0¥0¥0¥0
194000¥0¥0¥0¥0
195000¥0¥0¥0¥0
196000¥0¥0¥0¥0
197000¥0¥0¥0¥0
198000¥0¥0¥0¥0
199000¥0¥0¥0¥0
200000¥0¥0¥0¥0

1_38K42123CAA01

SHIP NAME/AVAILABILITY:USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6TGI 1_38K42123CAA01 SUMMARY
SOLICITATION #:N6264926RA040
SRF-JRMC TGI #:1_38K42123CAA01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Preserve Deck Plating in 4-220-2-T00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL IN-HOUSE M/Hs0.00.00.00.00.00.00.00.00.00.00.0
KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

000
000
000
000
000
000
000
000
000
000
000
000
000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0

2_38K4225104A01

SHIP NAME/AVAILABILITY:USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6TGI 2_38K4225104A01 SUMMARY
SOLICITATION #:N6264926RA040
SRF-JRMC TGI #:2_38K4225104A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Install and Remove Scaffolding To/From 1A GTM For Ship's Force Work00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL IN-HOUSE M/Hs0.00.00.00.00.00.00.00.00.00.00.0
KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

000
000
000
000
000
000
000
000
000
000
000
000
000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0

3_38K4225105A01

SHIP NAME/AVAILABILITY:USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6TGI 3_38K4225105A01 SUMMARY
SOLICITATION #:N6264926RA040
SRF-JRMC TGI #:3_38K4225105A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Install and Remove Scaffolding To/From 1B GTM For ship's Force Work00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL IN-HOUSE M/Hs0.00.00.00.00.00.00.00.00.00.00.0
KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

000
000
000
000
000
000
000
000
000
000
000
000
000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0

4_38K4258814A01

SHIP NAME/AVAILABILITY:USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6TGI 4_38K4258814A01 SUMMARY
SOLICITATION #:N6264926RA040
SRF-JRMC TGI #:4_38K4258814A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Replace Dogging Actuator Foundation of Port Helicopter Hanger Door (HHD)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL IN-HOUSE M/Hs0.00.00.00.00.00.00.00.00.00.00.0
KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

000
000
000
000
000
000
000
000
000
000
000
000
000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0

5_38K4258817A01

SHIP NAME/AVAILABILITY:USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6TGI 5_38K4258817A01 SUMMARY
SOLICITATION #:N6264926RA040
SRF-JRMC TGI #:5_38K4258817A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Replace Dogging Actuator Foundation of Starboard (Stbd) Helicopter Hnager Door (HHD)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL IN-HOUSE M/Hs0.00.00.00.00.00.00.00.00.00.00.0
KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

000
000
000
000
000
000
000
000
000
000
000
000
000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0

6_38K4258818A01

SHIP NAME/AVAILABILITY:USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6TGI 6_38K4258818A01 SUMMARY
SOLICITATION #:N6264926RA040
SRF-JRMC TGI #:6_38K4258818A01In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Replace New Non-Tight Door 1-401-2 and 1-404-200¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL IN-HOUSE M/Hs0.00.00.00.00.00.00.00.00.00.00.0
KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

000
000
000
000
000
000
000
000
000
000
000
000
000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0

7_38K4272111A02

SHIP NAME/AVAILABILITY:USS DEWEY DDG105 - FY26 6C1 SRA(d) BUNDLE#6TGI 7_38K4272111A02 SUMMARY
SOLICITATION #:N6264926RA040
SRF-JRMC TGI #:7_38K4272111A02In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:Preserve Top Surface of Forward (Fwd) Mk 41 Mod 15 Vertical Launching System (VLS)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTAL IN-HOUSE M/Hs0.00.00.00.00.00.00.00.00.00.00.0
KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

000
000
000
000
000
000
000
000
000
000
000
000
000
TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
¥0
TOTAL (¥)¥0

File details come from the government source that posted it. Updated .