This is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) issued by the Naval Supply Fleet Logistics Center Yokosuka for amendment number 0003, effective April 10, 2026. The amendment addresses solicitation N6264926RA033, originally dated March 19, 2026, and is issued by code N62649 with contract administration details provided to Josabeth Benattar at the Yokosuka facility (PSC 473 Box 11, FPO AP 96349-1500).

The amendment provides Government responses to three contractor questions regarding a Statement of Work (SOW) related to naval vessel coating and blasting operations. The Government approved the contractor's proposal to price touch-up coating work at 30 square feet of preservation area per void (excluding scaffolding and interference work) based on internal inspection determination. The Government also confirmed acceptance of personnel certifications including MSRA and AMPP Basic Coatings Inspector Certification, along with proven past performance on naval vessels, as meeting requirements for organizations performing blasting operations and critical coating applications per NSI 009-32 Paragraph 3.9.2. Additionally, the Government approved the use of ISO standard abrasive blast materials, consistent with past naval vessel applications, for blast work described in SOW Paragraphs 4.2.4.3 and 4.2.6.3. The amendment was signed by Contracting Officer Peter Jommel S. Arrieta on April 10, 2026, with no extension to offer receipt deadlines.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): The purpose of this amendment is to provide the Government's response to respond to contractor questions received.

Question 1: "For the touch-up coating described in 4.2.7.2 of SOW, we decide that the work scope will be determined after internal inspection, therefore we propose a price for 30SQFT of the preservation area per 1 void (excluding interference work such as scaffolding) in this estimation. Is it estimate acceptable? Or if you have any estimate quantity, please let us know."

Answer 1: "Yes. This is acceptable"

Question 2: "Regarding the requirements for organizations authorized to perform blasting operations or coating application of the critical coating area under Paragraph 3.9.2 of NSI 009-32, would it be possible to consider granting approval based on the organization's MSRA, AMPP Basic Coatings Inspector Certification of its employees, or a proven past performance in navy ships?"

Answer 2: "Yes, based on the MSRA, AMPP certifications and previous work on naval vessels, the work performed will meet requirements."

Question 3: "For the blast work described in Paragraphs 4.2.4.3 and 4.2.6.3 of the SOW, is it acceptable to use ISO standard abrasive blast material, which have been used in the same work on naval vessels in the past availability?"

Answer 3: "Yes, this is acceptable."

N6264926RA0330003

IDCode: J
Page: 1
Pages: 2
AmendNo: 0003
EffDate: 10 Apr 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N62649
AdmCode:
IssuedBy: NAVSUP FLT LOG CTR YOKOSUKA

PSC 473 BOX 11, FPO AP 96349-1500

FPO, AP 96349-1500

UNITED STATES

Josabeth Benattar, Email: josabeth.a.brizuela.civ@us.navy.mil Telephone: 0468165387 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N6264926RA033
SolDate: 19 Mar 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Peter Jommel S. Arrieta
ContDate:
CODate: 10 Apr 2026

File details come from the government source that posted it. Updated .