This document is a detailed engineering design set for a modular platform and inplant office system by Equipto, designed for a facility in Sasebo, Japan. The platform is a raised structural system with a floor height of 12'-2 3/4", supporting an enclosed office space with windows, HVAC, and electrical infrastructure. The design includes specific technical specifications for beam types, post configurations, floor decking, and stair access, with careful attention to seismic design requirements for the Seismic Design Category D region. The platform is engineered to support a 60 pounds per square foot load capacity and includes comprehensive installation instructions, post connection details, and special inspection requirements to ensure structural integrity and compliance with building codes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20251003_134714.jpg | JPG image | |
| 20251003_134828.jpg | JPG image | |
| 20251003_134736.jpg | JPG image | |
| 20251003_134813.jpg | JPG image | |
| Solicitation Amendment - N6264926QE0020001.pdf | ||
| RFIs with Responses Amend 0001.pdf | ||
| 4.03 WHE mezzanine 20220112111152.pdf | ||
| Solicitation - N6264926QE002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DCBA
10'-0" 10'-0" 14'-0" 20'-0"
10 12"
6'-21 2"
- HORIZONTAL
DISTANCE BETWEEN
MOUNTING HOLES
- VERTICAL
DISTANCE BETWEEN
MOUNTING HOLES
1-12" Roof Decking 1-18"Tuff Deck
'-3
/8
'-0
/8
SU
PP
O
R T
H
EI
G H
T
'-2
/4
FL
O O
R H
EI
G
H T
2"
#6424-SASEBO
TUBULAR BRACE
AS REQUIRED
10 12"
1-12" Roof Decking 1-18"Tuff Deck
'-0
/8
'-0
/8
SU
PP
O
R T
H
EI
G H
T
'-2
/4
FL
O O
R H
EI
G
H T
4"
#6424-SASEBO
TUBULAR BRACE
AS REQUIRED
6'-21 2"
- HORIZONTAL
DISTANCE BETWEEN
MOUNTING HOLES
- VERTICAL
DISTANCE BETWEEN
MOUNTING HOLES #6485-SASEBO
TUBULAR BRACE
AS REQUIRED
10 12"
5'-91 2"
- HORIZONTAL
DISTANCE BETWEEN
MOUNTING HOLES
- VERTICAL
DISTANCE BETWEEN
MOUNTING HOLES
10 12"
5'-91 2"
- HORIZONTAL
DISTANCE BETWEEN
MOUNTING HOLES
- VERTICAL
DISTANCE BETWEEN
MOUNTING HOLES
#6485-SASEBO
TUBULAR BRACE
AS REQUIRED
1-12" Roof Decking 1-18"Tuff Deck
'-1
1/
8"
'-0
/8
SU
PP
O
R T
H
EI
G H
T
'-2
/4
FL
O O
R H
EI
G
H T
1'-2"
1-12" Roof Decking 1-18"Tuff Deck
'-8
/8
'-0
/8
SU
PP
O
R T
H
EI
G H
T
'-2
/4
FL
O O
R H
EI
G
H T
1'-4"
BA
10'-0" 10'-0"
10 12"
6'-21 2"
- HORIZONTAL
DISTANCE BETWEEN
MOUNTING HOLES
- VERTICAL
DISTANCE BETWEEN
MOUNTING HOLES
1-12" Roof Decking 1-18"Tuff Deck
'-3
/8
'-0
/8
SU
PP
O
R T
H
EI
G H
T
'-2
/4
FL
O O
R H
EI
G
H T
2"
#6424
TUBULAR BRACE
AS REQUIRED
10 12"
1-12" Roof Decking 1-18"Tuff Deck
'-0
/8
'-0
/8
SU
PP
O
R T
H
EI
G H
T
'-2
/4
FL
O O
R H
EI
G
H T
4"
6'-21 2"
- HORIZONTAL
DISTANCE BETWEEN
MOUNTING HOLES
- VERTICAL
DISTANCE BETWEEN
MOUNTING HOLES
#6424
TUBULAR BRACE
AS REQUIRED
PL
A
TF
O
R M
E
LE
VA
TI
O N
S
PIPES
4" X 8"
VE
N
T
ROOM/POST LAYOUT PLAN
'-3
9' -5
/4
8"
'-3
/4
1/ 2"
8' -1
1"
3'-2" 10'-10" 3'-4 7/16" 25'-4 3/16" 3'-2 3/8"
3' -2
'-2
/2
6' -5
4'
-1 0"
2' -5
/2
"23'-7 5/8"11'-6"8'-5"
49'-7 1/4"
49'-7 1/4"
3'-8 1/4"
1/
2"
2'-3 5/8" 3'-9"
3'-0"
ELECTRICAL PANELS
3'-47 16"
3'-0"
1'-33 4"
4'-7"
3'-0"WALKWAY
10'-11 1/4"
W
AL
KW
AY
UP
3"PIPE 14' OFF THE FLOOR
PLATFORM OUTLINE
PLATFORM POST
VE
N
T
PLATFORM SUPPORT PLAN
= SQUARE POST LOCATIONS
(11) THIS CONFIG.
#9999A
#9
#9
#9
#9
#9
#9
#9999A
#9999A
#9
#9
#9
#9
#9
#9
#9
#9
#9
#9963
#9963
#9
#9
#9
F/
C
#9995
#9
#9
#9999A
#9
#9
#9
#9
#9
#9
#9
#9
F/
C
#9
F/
C #9
F/ C
#9
F/
C #9
F/ C
#9
F/
C #9
F/ C
#9
F/
C #9
F/ C
#9
F/
C
#9995 F/C
#9996
#9996
#9996 #9995 F/C
#9963 #9963
#9
F/
C
#9
F/
C
#9
F/
C
#9963
#9995 F/C
2'-0"
8'-0"
F/C
6'-71 2"
F/C
(7) #7317 BOLTING
ANGLE
#9
#9
#9
#9
#9999A
#840633A
#840633A #840633A
#840633A
#9994A
#9
#9
F/
C #9
F/ C
#9
F/
C #9
F/ C
#9
F/
C #9
F/ C
#9
F/
C #9
F/ C
B
B
B B B B
B
C C
D
D
D
D
D
D
20'-0"
6'-0"8'-0"
4'-8"
F/C
10'-0"
10'-0"
2"
3'-41 2"
4'-0"
14'-0"
4'-8"
10'-0"
2"
10'-0"
5'-1"
34'-0"
2'-71 2"
F/C
F/C
F/CF/C
F/C
F/C
38'-8"
25'-1"
NOTES:
- ALL BEAMS ARE "A" TYPE UNLESS OTHERWISE NOTED.
SEE SHT 3 FOR BEAM DETAILS
- ALL F/C ARE FOR REF. ONLY.
- ALL F/C DIMS TO BE VERIFIED AT TIME OF INSTALL
PRIOR TO CUTTING.
17'-101 4"
#840633A #9964
2'-13 4"14'-0"
3'-21 2"
1'-81 2"
F/C
C C
C
25'-3"
23'-61 2"
#840633A
(19) #6424 TU
BU
LAR
BR
AC
E
(5) #6424-SASEBO
TU
BU
LAR
BR
AC
E
(14) #6485-SASEBO
TUBULAR BRACE
SEE POST NOTE
POST NOTE:
- TOP OF POST WILL BE CONNECTED TOGETHER WITH (3) NUTS AND BOLTS,
- MIDDLE OF POSTS WILL BE CONNECTED TOGETHER WITH (2) BOLTS INTO THE WELDED NUTS
- BOTTOM WILL BE CONNECTED WITH (2) THROUGH BOLTS 6” LONG AND NUTS
(2) LOCATIONS
SEE POST NOTE
C U
ST
O
M
ER
IN
IT
IA
LS
TM
Th is d oc um en t i s th e pr op er ty o f Ta ta m y, P
A
FA
X:
-8
-2
TM
R ep ro du ct io n st ric tly p ro hi bi te d.
M ai n St re et
Te l:
0-
3-ht tp w w w
.e qu ip to
.c om
-0
PL
A
TF
O
R M
L A
YO
U
T10 /2
1/
D
/4
1'
JS
H
JS
H
SA
SA
B
O J
A
PA
N
4/ 5/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
A F
O N
E D
EC
IS
IO
N
I N
FI
N
IT
E
SO
LU
TI
O
N S
JS
H
FI
R
ST
L
O C
AT
IO
N 6/
/1
M
JF
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
B
JS
H 7/
3/
JS
H
IS
SU
ED
A
S
PR
EL
IM
IN
AR
Y C
JS
H
6/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
C
JS
H
TI
M
M A
LO
LE
PS
Y
9/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
D
JS
H
/1 8/
TM
IS
SU
ED
F
O R
A
PP
R O
VA
LS
E
JS
H 3/
/2
JS
H
IS
SU
ED
F O
R A
PP
R
O
VA
LS
F
JS
H
5 N
E
QU
IM
BY
A
VE
, B
EN
D, O
R
EC
LIP
SE
-E
NG
IN
EE
RI
NG
.C
OM
1)
9-
EE
I P R
O
JE
C T
-1 1-
GENERAL NOTES:
1) DESIGN OF LIGHT GAUGE STEEL CROSSOVER PLATFORMS AS SHOWN BY THESE DRAWINGS AND CALCULATIONS ARE IN
COMPLIANCE WITH THE REQUIREMENTS OF THE 2015 IBC AND THE ASCE 7-10
2) STEEL FOR ALL SHAPES IS Fy = 40 KSI (EXCEPT AS NOTED)
3) ALL ANCHORS SHALL BE 1/2''φ x 5'' LONG, MIN., HILTI KWIK HUS-EZ (KH-EZ) (ICC ESR #3027) WITH MIN. EMBEDMENT OF 4-1/4''
OR APPROVED EQUAL (SPECIAL INSPECTION REQUIRED - REFERENCE SCHEDULE AT RIGHT)
4) EXISTING FLOOR CONSTRUCTION = MIN. 6-3/4'' THICK CONCRETE SLAB-ON-GRADE WITH F`c = 2500 PSI AND 500 PSF SOIL
BEARING PRESSURE.
5) ALL CROSSOVER PLATFORM INSTALLATIONS ARE MANUFACTURED IN CONFORMITY WITH THIS STANDARD SHALL DISPLAY
IN ONE OR MORE CONSPICUOUS LOCATIONS A PERMANENT PLAQUE, EACH NOT LESS THAN 50 SQUARE INCHES IN AREA SHOWING THE MAXIMUM PERMISSIBLE FLOOR LOAD OF 125 PSF, MORE THAN THE FLOOR LOAD OF 60 PSF FOR ELEVATED
PLATFORMS NOT INTENDED FOR USE AS STORAGE OR EXIT WAYS
6) THESE CROSSOVER PLATFORMS WILL NOT BE ACCESSIBLE TO THE GENERAL PUBLIC
7) THE CLEAR SPACE BELOW SPRINKLERS SHALL BE A MINIMUM OF 96 INCHES BETWEEN THE TOP OF THE CROSSOVER
PLATFORM AND THE CEILING SPRINKLER DEFLECTORS
SHELVING UNIT'S MAXIMUM "OUT-OF-PLUMBNESS" SHALL BE 0.5 INCH IN 10 FTSTORAGE SHELVING CAPACITIES: REFERENCE SHELVING SCHEDULE ON THIS SHEET FOR ADDITIONAL INFORMATION
STATEMENT OF SPECIAL INSPECTION
VERIFICATION AND
INSPECTION
CONTINUOUS PERIODIC HILTI KWIK HUS-EZ (KH-EZ) INSPECTED
BY
CONFIRM ANCHOR TYPE X HILTI HUS-EZ (KH-EZ), 1/2''φ x 5'' LONG, MIN.
- PER ICC ESR #3027 SECTIONS 4.4 & 5.2, TABLE 1
SPECIAL
INSPECTOR
CONFIRM CONCRETE
COMPRESSIVE STRENGTH X MINIMUM 2500PSI
CONFIRM CONCRETE
THICKNESS X MINIMUM 6-3/4'' THICK SLAB OR MINIMUM 6-3/4'' CONCRETE
SLAB OVER METAL DECKING
HOLE DIAMETER x
MIN. LENGTH X 1/2''φ x 4-5/8'' LONG HOLE IN CONCRETE
- PER ICC ESR #3027 TABLE 2
SPECIAL
INSPECTOR
CLEAN OUT OF HOLE X BULB/BLOW OUT - PER ICC ESR #3027 SECTIONS 4.3 & 4.4 SPECIAL
INSPECTOR
MINIMUM ANCHOR SPACING X 3'' - PER ICC ESR #3027,
SECTIONS 4.4 & 5.7, TABLE 2
SPECIAL
INSPECTOR
MINIMUM EDGE DISTANCE X 1-3/4'' - PER ICC ESR #3027,
SECTIONS 4.4 & 5.7, TABLE 2
SPECIAL
INSPECTOR
NOMINAL ANCHOR
EMBEDMENT X 4-1/4'' - PER ICC ESR #3027,
SECTIONS 4.3, 4.4 & 5.2, TABLES 2 & 3
SPECIAL
INSPECTOR
TIGHTENING TORQUE X 45 FT-LBS - PER ICC ESR #3027,
SECTIONS 4.3 & 4.4, TABLE 21
SPECIAL
INSPECTOR
NOTE: INSPECTION TO BE COMPLETED BY A THIRD PARTY INSPECTOR.
EARTHQUAKE DESIGN DATA:
a) Seismic Importance Factor: IE = 1
Risk Category II - Not Open to the Public
b) Mapped Spectral Response Accelerations:
Ss = 0.950 S1 = 0.409
c) Site Class = B (Assumed)
d) Spectral Response Coefficients:
Sds = 0.633 Sd1 = 0.273
e) Seismic Design Category = D
f) Basic Seismic-Force-Resisting System(s):
Ordinary Steel Moment Frame
g) Total Design Base Shear, V = 2555 lb
h) Seismic Response Coefficient: Cs (ASD) = 0.127
i) Response Modification Factor: R = 3.5
j) Overstrength Factor: Ωo = 3.0
k) Analysis Procedure per ASCE 7-10, Section 12.2
APR 04, 2023
EXP.: SEP 30, 2024
Please note that the stamp on these plans is for the State of California, not the Nagasaki Prefecture region of Japan.
We did analyze the platform for the appropriate seismic activity as noted by our client's contact for the site.
SS = 0.950 Fa = 1.00 S1 = 0.409 Fv = 1.00 Soil Site Class = "B"
SDS = 0.633 SD1 = 0.273
Seismic Design Category = "D"
VE
N
T
ROOF DECKING / STAIR PLAN
NOTE: F/C, NOTCH, AND OVERLAP ROOFDECKING TO FIT
#1724S16
STAIRWAY
24" TREADS
#78178 COVER PLATE
(1 REQUIRED)
ROOF DECK PANELS
1-1/2" HIGH
24" WIDE ( )
30" WIDE ( )
36" WIDE UNMARKED
13'-35 16"
UP
F/C
8'-0" 6'-0" 8'-0" 12'-0"
1'-73 4"
1'-2"
RUN
F/C 3'-01 2"
2'-0"
OVERALL
TREAD
F/C AND OVERLAP
AS NEEDED
1'-41 2"
VE
N
T
TUFFDECK PLAN
NOTE: F/C AND NOTCH TUFF DECKING TO FIT
#10217 TUFF DECK PANELS
1-1/8" THICK x 48 x 96
D
F /C
3'-0"
3'-71 2"
UP
D04
(1) #9563 CORNER
ANGLE
3'-0"
3'-9"
GEN IV RAILING
2 RAILS & KICKPLATE
(ELEVATION)
4" KICKPLATE
17" CLEAR
17" CLEAR
H
AN
D R
AI
L
H
EI
G H
T
" F R
O M
PL
AT
FO
R
M F
LO
O
R
4" RAILING
POST
#90001P
4" RAILING
POSTS #90001P
SIDE-BEAM MOUNTED
13'-0" MIN.
14'-3" MAX.
STAIR RUN
STAIRWAY
S16 SERIES
SIDE ELEVATION
INSTRUCTION DRAWING # 220ASY
A
B
A - 9 61
64" MIN. 10 11
16" MAX.
TREAD INFO
DEPTH
B - 8 41
64" MAX. 7 3 4" MIN.
R
IS
E
10'-11" MIN.
12'-2" MAX.
STAIR RISE
35 15
16" MAX. HAND RAIL HT.
33 15
32" MIN. HAND RAIL HT.
45 716" MAX. GUARD RAIL HT.
42 516" MIN. GUARD RAIL HT.
40°58' MAX.
35°54' MIN.
2" x 1-17 64"
FORMED RAIL
13 GA. GRADE 40 CRS.
(TYPICAL)
82 13
32" MIN.
87 12" MAX.
C U
ST
O
M
ER
IN
IT
IA
LS
TM
Th is d oc um en t i s th e pr op er ty o f Ta ta m y, P
A
FA
X:
-8
-2
TM
R ep ro du ct io n st ric tly p ro hi bi te d.
M ai n St re et
Te l:
0-
3-ht tp w w w
.e qu ip to
.c om
-0
PL
A
TF
O
R M
L A
YO
U
T10 /2
1/
D
/4
1'
JS
H
JS
H
SA
SA
B
O J
A
PA
N
4/ 5/
JS
H
TI
M
M A
LO
LE
PS
Y
IS
SU
ED
A
S
PR
EL
IM
IN
AR
Y A
O N
E D
EC
IS
IO
N
I N
FI
N
IT
E
SO
LU
TI
O
N S
JS
H
FI
R
ST
L
O C
AT
IO
N 6/
/1
M
JF
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
B
JS
H 7/
3/
JS
H
IS
SU
ED
A
S
PR
EL
IM
IN
AR
Y C
JS
H
6/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
C
JS
H 9/
/2
JS
H
IS
SU
ED
F O
R A
PP
R
O
VA
LS
D
JS
H
/1
8/
TM
IS
SU
ED
F O
R A
PP
R
O
VA
LS
E
F
3/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
F
JS
H
5 N
E
QU
IM
BY
A
VE
, B
EN
D, O
R
EC
LIP
SE
-E
NG
IN
EE
RI
NG
1)
9-
EE
I P R
O
JE
C T
-1 1-
APR 04, 2023
EXP.: SEP 30, 2024
2.750"
TYPE A INTERMEDIATE
BEAM (FLOOR SUPPORT)
2', 4', 6', 7', 8', 9' & 10' BEAM - 16 GA
INSIDE BEND RADIUS = 1/8"
8.
0"
.2
TYPE B SUPPORT BEAM
(INT. BEAM SUPPORT)
7' & 8' BEAM - 14 GA; 9', 10' & 12' - 12 GA
INSIDE BEND RADIUS = 1/8"
BEAM SPLICE ASSEMBLY
INSTRUCTIONS
TYPE C SUPPORT BEAM - SPLICED
(INT. BEAM SUPPORT)
14' & 16' - 11 GA
INSIDE BEND RADIUS = 1/4"
BEAM SPLICE
FOR 14' & 16' (TYPE C)
SPLICED BEAMS
9 GA x 40" LONG
INSIDE BEND RADIUS = 1/4"
TYPE D SUPPORT BEAM - SPLICED
(INT. BEAM SUPPORT)
18' & 20' - 9 GA
INSIDE BEND RADIUS = 1/4"
BEAM SPLICE
FOR 18' & 20' (TYPE D)
SPLICED BEAMS
7 GA x 40" LONG
INSIDE BEND RADIUS = 1/4"
3.500" 3.075"
3.500" 3.075"
.5
.5
GEN IV BEAM CROSS-SECTION DETAILS
3.500"
TUBULAR BRACES
1 7/8" O.D.
DETAIL A - A
14 GA HOT ROLLED
WELDED STEEL TUBE
BEAM NOTES:
1. ALL BEAMS ARE MADE OF 40,000 PSI MIN. YIELD COLD ROLLED STEEL.
2. ACTUAL LENGTH OF BEAMS IS 8-3/4" LESS THAN THEIR NOMINAL LENGTH.
ADD +1/4 DUE TO
TUBULAR BRACES
SQUARE POST DETAIL
RECOMMENDED FLOOR ANCHOR HARDWARE
HILTI KWIK BOLT TZ (ICC-ES ESR-1917)
1/2"DIA x LENGTH ACCORDING TO LOCAL SPECIFICATIONS
1 PER FOOTPLATE - SUPPLIED BY CUSTOMER
TRIANGULAR DETAIL
6"
5"
U N
IT
D
IM
UNIT DIM.
6" 1/2" THICK
9/16" DIA
5"
ADD +1/4 DUE TO
TUBULAR BRACES
6"
6"
5"
1/2" THICK
9/16" DIA
5"
.9
" .9
2.
0"
2.
5" 2.
0"
2.
5"
CODE COMPLIANCE:
GENERAL PLATFORM NOTES
EQUIPTO SHALL FURNISH ALL THE MODULAR
PLATFORM MATERIAL AS SHOWN ON THIS DRAWING,
UNLESS OTHERWISE STATED.
FLOORING IS ROOFDECK/TUFFDCK.
STAIRWAY.
FLOOR HEIGHT IS: 12'-2 3/4"
SUPPORT HEIGHT IS: 12'-0 1/8"
MINIMUM CLEARANCE: 10'-8 1/8" PLATFORM
NOTICE TO THE INSTALLER.
THE ASSEMBLER SHALL VERIFY LOCATIONS OF WALLS,
BUILDING COLUMNS, AND ANY OTHER OBSTRUCTIONS
PRIOR TO ASSEMBLY. EACH MODULAR PLATFORM
COLUMN IS TO BE ANCHORED TO THE FLOOR WITH
HARDWARE FURNISHED BY OTHERS. THERE IS ONE
9/16 DIAMETER HOLE PER POST.
FLOOR CAPACITY - 60 LBS PER SQUARE FOOT
MAXIMUM PARTITION LOAD.
IMPORTANT BEAM INFORMATION
FIELD CUT AND REDRILL ON THE JOB SITE. BEAMS TO SIZE.
BEAMS ARE MANUFACTURED IN 2'-0", 4'-0", 6'-0", 8'-0", 10'-0", 12'-0",
16'-0" 18'-0" AND 20'-0" LENGTHS. 16'-0" 18'-0" AND 20'-0" LENGTHS
BEAMS ARE SPLICED BEAMS WITH SPLICE JOINT IN THE MIDDLE.
THOSE BEAMS SHOWN OTHERWISE ARE TO BE FIELD MODIFIED.
IMPORTANT ROOF DECKING INFORMATION
PANELS ARE MANUFACTURED IN 3'-0", 4'-0", 6'-0", 8'-0", 9'-0", 10'-0"
AND 12'-0" LENGTHS. THOSE PANELS SHOWN OTHERWISE ARE
TO BE FIELD MODIFIED. 24", 30" AND 36" WIDE PANELS AND NOTE
THE WIDTHS CAN TELESCOPE WIDTH AND LENGTH IF DESIRED.
STAIR TREAD
MATERIAL SPEC: - 14 GA (.0785)
GALVANIZED 40,000 PSI MIN. YIELD
COLD ROLLED STEEL
1'-5 3/32"
STAIR RISER PANEL
MATERIAL SPEC: - 13 GA (.0934)
40,000 PSI MIN. YIELD STEEL
STAIR TREAD SUPPORT ANGLE
MATERIAL SPEC: ASTM A653 - 14 Ga. (.0747)
9 3/8" LONG
4'-91 4"
BEAM 4"
F/C DIM
(POST TO POST)
POST
4"
POST
BEAM FIELD CUT (F/C)
DIMENSION EX.
#6424-SASEBO
#6485-SASEBO
2 1/4" O.D.
DETAIL A - A
14 GA HOT ROLLED
WELDED STEEL TUBE
#6424
6'-4"±1/16"
6'-51 2" ±1
16"
6'-101 2" ±1
16"
2 1/4" O.D.
DETAIL A - A
14 GA HOT ROLLED
WELDED STEEL TUBE
5/8" x 2" HEX HEAD BOLT # 991809H
LEFT AND RIGHT BEAMS, ATTACH THE
BOLTS, WASHERS (13102) AND
(#13101) AND (#991809H) HEX HEAD
(3) 16-2" LONG (991809H) BOLTS HAVE
BEEN FURNMISHED FOR FACE TO FACE
INSTALLATION. BALANCE OF BOLTS
ARE 1-1/2" LONG (#13101)
HEX NUTS (#13103) AND TIGHTEN.
RIGHT BEAMS SHOWN.)
ARE ALIGNED WITH THE HOLES IN THE
(2) WHEN HOLES IN THE CENTER BEAM
BEAM TELESCOPES INTO LEFT AND
SHOWN ON PAGE 2. (NOTE: CENTER
(1) SLIDE CENTER BEAM INTO PLACE AS
#13103 HEX NUT (28X)
5/8" SPRING LOCKWASHER
#13102
5/8" HEX NUT
#13103
5/8" x 1-1/2" HEX HEAD BOLT #13101
#13102 LOCKWASHER (28X)
#13101 HEX HD BOLT
#991809H HEX HD BOLT
9999C CENTER BEAM
TELESCOPES INSIDE BEAMS.
FROM UNDERSIDE.
22 BOLTS INSERTED FROM THIS SIDE.
BOTTOM VIEW SHOWING 2 BOLTS (13101) INSERTED
( 4 BOLTS INSERTED FROM THIS SIDE).
WASHERS (13102), AND NUTS (13103) IN PLACE.
PART SHOWN WITH BOLTS (13101) AND (991809H),
TO BE 2"LONG
BACK
(991809H)
NOTE:
THESE 4 BOLTS
BACK
FRONT
FRONT
NOTE:
(991809H)
TO BE 2"LONG
THESE 4 BOLTS
BACK
BACK
FRONT
FRONT
SQUARE POST PLATFORM POST CROSS-SECTIONS, GAGES AND WELDS
TRIANGULAR POST PLATFORM POST CROSS-SECTIONS, GAGES AND WELDS
10'-0"6'-0"
4' 4'
'-0
10'-0"6'-0"
2' 2'
'-0
POST CONFIGURATIONS
SINGLE POST SQUARE POST
BI-POST TRI-POST QUAD-POST
SAMPLE FLOOR PLAN
5/8" x 1 1/2"HEX HEAD BOLT (13101), LOCKWASHER (#13102), HEX NUT (#13103).
(2 EA. PER BI-POST REQ'D)
5/8" x 1 1/2"HEX HEAD BOLT (13101), LOCKWASHER (#13102), HEX NUT (#13103).
(4 EA. PER TRI-POST REQ'D.)
5/8" x 1 1/2"HEX HEAD BOLT (13101), LOCKWASHER (#13102), HEX NUT (#13103).
(8 EA. PER QUAD-POST REQ'D.)
POST #5208
4" x 8'-0" (2 PER
BI-POST)
5/8" HEX HEAD BOLT, (#31101)
LOCKWASER, (#13102)
AND NUT, (#13103)
BI-POST SINGLE
POST
SINGLE
POST TRI-POST QUAD-POST
BI-POST SINGLE
POST
POSTS:
8'-0" HIGH = #5208
9'-0" HIGH = #5209
10'-0" HIGH = #5210
12'-0" HIGH = #5212
OPTIONAL SQUARE POSTS:
8'-0" HIGH = #5218
9'-0" HIGH = #5219
10'-0" HIGH = #5220
12'-0" HIGH = #5222
BI-POST ASSEMBLY
BOLT HOLE FOR
ALL BEAMS.
BOLT HOLE
FOR 8 1/2",
14", & 16"
HIGH BEAMS
BOLT HOLE FOR
11 1/4", 14", & 16"
HIGH BEAMS
11 1/4" HIGH BEAM
POSTPOST
8 1/2" HIGH BEAMPOST AND BEAM
ASSEMBLY
5/8" x 1 1/2" HEX HEAD BOLT (13101), LOCKWASHER (13102), AND HEX NUT
(13103). (2 EA. PER END, EXCEPT 3 EA.
PER END ON 14", AND 16" HIGH BEAMS)
8 1/2" HIGH BEAM
POST AND BEAM
ASSEMBLY
BI-POST
EXISTING EXTERNAL
FRAME ASSEMBLY
BI-POST
BI-POST
ADD-ON
BEAM
INTERNAL FLOOR SUPPORT STRUCTURE
1. Consult your installation drawing and your order to determine what beam configuration you have. Beams may be installed on 2' centers or on 4' centers.
NOTE: If you are using extension brackets #9970 or #9971 see pages 14 and 15 before proceeding to insure proper beam configuration.
2. Install all of the beam brackets in their proper positions depending on the beam centers. If you have mezzanines which are back to back install both sets of beam brackets at the same time. (SEE PAGES 11 AND 12)
3. Bolt the ends of the internal beams to the beam brackets. Install in pairs if your beams are on 4' centers.(SEE PAGE 12) Install only one beam if your beams are on 2' centers. For beams on 2' centers locate the position of the floor support angles. Install them where the ends of two pieces of tuffdeck meet. (SEE PAGE 13)
4. On internal beam pairs that are longer than 4' they must be bolted back to back.(SEE PAGE 12) On 16' and 20' span mezzanines that are 6', 8', and 10' wide you must install cross braces on top of the internal beams. (Not required if beams are on 2' centers - SEE PAGE 13)
5. Plum and square all the post and beams at this time. Tighten all hardware on framework, then anchor the post to the floor. NOTE: Floor anchors to be furnished by others.
WARNING: FAILURE TO ANCHOR ALL POSTS TO THE FLOOR WILL RESULT IN AN UNSAFE MEZZANINE.
FLOOR SUPPORT LAYOUT
BEAMS ON 4' CENTERS
FLOOR SUPPORT LAYOUT
BEAMS ON 2' CENTERS
FLOOR SUPPORT
ANGLE LOCATED AT
FLOORING SEAMS11 1/4" HIGH BEAM
(#7664 ARE ALSO USED
ON 8 1/2" HIGH BEAMS)
BEAM BRACKETS
14" HIGH BEAM
(#7665L/R ARE ALSO USED
ON 16" HIGH BEAMS)
BEAM BRACKET
#7664
5 11/16" x 8" (2
PER LOCATION)
5/8" x 1 1/2" HEX HEAD
BOLT, LOCKWASER, AND
HEX NUT. (2 PER #7664
AND 3 PER #7665L/R)
BEAM BRACKET
#7665L/R
5 11/16" x 8" (2
PER LOCATION)
BACK TO BACK BEAMS
11 1/4" HIGH BEAM
(2 BEAMS BACK TO BACK)
5/8"x 1 1/2" HEX HEAD BOLT
(13101), LOCKWASER (13102), AND
HEX NUT (13103).
(4 EA. PER LOCATION)
INTERNAL BEAMS
ON 4' CENTERS
BEAM BRACKET
#7664
5 11/16" x 8"
(4 PER LOCATION
BACK TO BACK)
11 1/4" HIGH BEAM
INTERNAL BEAMS
BOLTED BACK TO BACK
5/8"x 1-1/2" HEX HEAD BOLT (13101), LOCKWASER (13102), AND HEX NUT (13103).
(2 EA. PER END)
3/8"x 3/4" HEX HEAD BOLT (13188), LOCKWASER (13182), AND HEX NUT
(13191). (2 EA. PER PAIR OF 6' OR 8'
BEAMS, 4 EA. PER PAIR 0F 10' BEAMS)
8 1/2" HIGH BEAM
(2 BEAMS BACK TO BACK)
BEAM BOLTING ASSEMBLY
BEAM BOLTING ANGLE #7317
NOTE:
USE THIS ASSEMBLY AS SPECIFIED IN
YOUR MEZZANINE LAYOUT.
5/8" x 1 1/2" HEX HEAD BOLT
(13101), LOCKWASHER (13102),
HEX NUT (13103).
(6 EA. PER BEAM ANGLE)
11 1/4" HIGH BEAM
8 1/2" HIGH BEAM
FLOORING: PERFORATED AND SOLID GRATING
INSTRUCTIONS:
NOTE: ALL GRATING PANELS ARE TO BE INSTALLED
PERPENDICULAR TO THE INTERNAL BEAMS.
1. Fasten an angle clip #9520 inside the top of all the post. Be sure the clips are positioned parallel with the direction of the grating panels.
2. Beginning on an outer edge of the mezzanine framework, position grating panel and bolt the ends to the top of the prepunched beam and the angle clip in the corners. After all the panels are in place tighten all hardware.
MEZZANINE
FRAMEWORK
INTERNAL
BEAMS
ANGLE CLIP
#9520DIRECTION
OF GRATING
5/8" x 1 1/2" HEX HEAD BOLT
(13101), LOCKWASHER (13102),
AND HEX NUT (13103).
(1 EA. PER CLIP)
PERFORATED
OR
SOLID GRATING
PANEL
MEZZANINE POST
8 1/2" HIGH BEAM
MEZZANINE POST
5/16" x 5/8" HEX HEAD BOLT, (13152, AND HEX NUT (13051).
(4 EA. PER PANEL)
C U
ST
O
M
ER
IN
IT
IA
LS
G
EN
IV
P
LA
TF
O R
M D
ET
A
IL
S
TM
Th is d oc um en t i s th e pr op er ty o f Ta ta m y, P
A
FA
X:
-8
-2
TM
R ep ro du ct io n st ric tly p ro hi bi te d.
M ai n St re et
Te l:
0-
3-ht tp w w w
.e qu ip to
.c om
-0
/2
1/
D
/4
1'
JS
H
JS
H
SA
SA
B
O J
A
PA
N
4/ 5/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
A
O N
E D
EC
IS
IO
N
I N
FI
N
IT
E
SO
LU
TI
O
N S
JS
H
6/
/1
M
JF
IS
SU
ED
A
S
PR
EL
IM
IN
AR
Y B
JS
H
7/ 3/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
C
JS
H 6/
/2
JS
H
IS
SU
ED
F O
R A
PP
R
O
VA
LS
C
JS
H
TI
M
M A
LO
LE
PS
Y
9/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
D
JS
H
/2 1/
IS
SU
ED
F O
R A
PP
R
O
VA
LS
E
TM
F
3/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
F
JS
H
5 N
E
QU
IM
BY
A
VE
, B
EN
D, O
R
EC
LIP
SE
-E
NG
IN
EE
RI
NG
1)
9-
EE
I P R
O
JE
C T
-1 1-
W
IN
D O W
W
IN
D O W
WINDOW WINDOWWINDOW
A C T
IVE
D O O R
4'-2 1/4" 4'-0" 4'-0" 4'-0"
1'-7 7/8"
3'-11"4'-0"4'-0"
34'-2"
3' -1
0" 4'
-0
6' -6
/8
4' -2
/4
4'
-0
2' -3
/1
6"
1'-9 3/4"4'-0"4'-0"4'-0"4'-0"2'-4 1/4"1'-9"2'-6"1'-9"3'-9 3/4"4'-2 1/4"
4' -0
4'
-0
1' -1
1"
16'-1 31/32"
34'-0"
'-4
/2
SA
F E T Y
G A T E
1'-3"
FC
RELOCATE
WINDOW
4' -0
3'
-4
1' -1
0"
FC 3'-9"
'-1
FC 2'-10"
FC 1'-9" PANEL
FC 1'-9" PANEL
FC 3'-9"
FC 3'-9"
2'-2 25/32" 1'-10 19/32"
4' -0
17'-101 4"
C U
ST
O
M
ER
IN
IT
IA
LS
TM
Th is d oc um en t i s th e pr op er ty o f Ta ta m y, P
A
FA
X:
-8
-2
TM
R ep ro du ct io n st ric tly p ro hi bi te d.
M ai n St re et
Te l:
0-
3-ht tp w w w
.e qu ip to
.c om
-0
PL
A N
T O
FF
IC
E R
EV
IS
ED
L
A
YO
U T10
/2 1/
D
/2
1'
TM JS
H
SA
SA
B O
J A
PA
N
4/ 5/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
A
O N
E D
EC
IS
IO
N
I N
FI
N
IT
E
SO
LU
TI
O
N S
JS
H
6/
/1
M
JF
IS
SU
ED
A
S
PR
EL
IM
IN
AR
Y B
JS
H
7/ 3/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
C
JS
H 6/
/2
JS
H
IS
SU
ED
F O
R A
PP
R
O
VA
LS
C
JS
H
TI
M
M A
LO
LE
PS
Y
9/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
D
JS
H
/1 8/
TM
IS
SU
ED
F
O R
A
PP
R O
VA
LS
E
INPLANT WALL LAYOUT
F
3/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
F
JS
H
5 N
E
QU
IM
BY
A
VE
, B
EN
D, O
R
EC
LIP
SE
-E
NG
IN
EE
RI
NG
1)
9-
EE
I P R
O
JE
C T
-1 1-
THE WALLS SURROUNDING THE MEZZANINE FLOOR OFFICE SPACE WERE
PROVIDED BY OTHERS (INPLANT) AND ARE A SELF-SUPPORTING SUPER
STRUCTURE THAT ARE FASTENED TO THE DECKING OF THE PLATFORM WITH THE
FOLLOWING REQUIREMENTS...
1. (2) 1/4"φ SHEET METAL SCREWS PER SIDE OF EACH CORNER,
2. (2) 1/4"φ SHEET METAL SCREWS PER SIDE OF EACH TRACK JOINT,
3. (2) 1/4"φ SHEET METAL SCREWS PER EITHER SIDE OF OPENINGS (DOORS), &
4. (1) 1/4"φ SHEET METAL SCREW AT A MAXIMUM SPACING OF 36" BETWEEN.
WE UPGRADED SOME BEAMS AND BRACES FOR THE PLATFORM TO BETTER
SUPPORT THE OFFICE SPACE FRAMING ABOVE, BOTH VERTICALLY AND LATERALLY.
AGAIN THE OFFICE WALLS AND THEIR ATTACHMENTS WERE PROVIDED BY THE
SUPPLIER OF THE SYSTEM, INPLANT OFFICES INC.
FOR ANY QUESTIONS REGARDING THEIR SYSTEM, PLEASE CONTACT THEM
DIRECTLY. THEIR INFORMATION IS SHOWN BELOW.
MANUFACTURING FACILITY:
436 Bussen Underground Road, Saint Louis, MO 63129 toll free (800) 356-3199 | (314) 892-5800 fax (314) 892-4070 | www.InPlant.com
A C T
IVE
D O O R
4'-2 1/4" 4'-0" 4'-0" 4'-0"
1'-7 7/8"
3'-11"4'-0"4'-0"
34'-2"
3' -1
0" 4'
-0
6' -6
/8
4' -2
/4
4'
-0
2' -3
/1
6"
1'-9 3/4"4'-0"4'-0"4'-0"4'-0"2'-4 1/4"1'-9"2'-6"1'-9"3'-9 3/4"4'-2 1/4"
4' -0
4'
-0
1' -1
1" 16'-1 31/32"
34'-0"
'-4
/2
SA
F E T Y
G A T E
1'-3"
FC
4' -0
3'
-4
1' -1
0"
'-1
2'-2 25/32" 1'-10 19/32"
4' -0
W x1
W x1
W x1
W x1
NOTCH DECKING, PC TYP
17'-101 4"
C U
ST
O
M
ER
IN
IT
IA
LS
TM
Th is d oc um en t i s th e pr op er ty o f Ta ta m y, P
A
FA
X:
-8
-2
TM
R ep ro du ct io n st ric tly p ro hi bi te d.
M ai n St re et
Te l:
0-
3-ht tp w w w
.e qu ip to
.c om
-0
/2
1/
D
/2
1'
TM JS
H
SA
SA
B
O J
A
PA
N
4/ 5/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
A
O N
E D
EC
IS
IO
N
I N
FI
N
IT
E
SO
LU
TI
O
N S
JS
H
6/
/1
M
JF
IS
SU
ED
A
S
PR
EL
IM
IN
AR
Y B
JS
H
7/ 3/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
C
JS
H 6/
/2
JS
H
IS
SU
ED
F O
R A
PP
R
O
VA
LS
C
JS
H
TI
M
M A
LO
LE
PS
Y
9/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
D
JS
H
/1 8/
TM
IS
SU
ED
F
O R
A
PP
R O
VA
LS
E
IN
PL
A
N T
O
FF
IC
E
R
EV
IS
ED
L A
YO
U
T
INPLANT ROOF DECKING
F
3/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
F
JS
H
5 N
E
QU
IM
BY
A
VE
, B
EN
D, O
R
EC
LIP
SE
-E
NG
IN
EE
RI
NG
1)
9-
EE
I P R
O
JE
C T
-1 1-
THE CEILING ABOVE THE MEZZANINE FLOOR OFFICE SPACE WAS PROVIDED BY
OTHERS (INPLANT) AND IS A SELF-SUPPORTING SUPER STRUCTURE WHERE THE
SYSTEM'S WALLS ARE FASTENED TO THE DECKING OF THE SUPPORTING
PLATFORM. WE UPGRADED SOME BEAMS AND BRACES FOR THE PLATFORM TO
BETTER SUPPORT THE OFFICE SPACE FRAMING ABOVE, BOTH VERTICALLY AND
LATERALLY. AGAIN THE OFFICE WALLS AND THEIR ATTACHMENTS WERE
PROVIDED BY THE SUPPLIER OF THE SYSTEM, INPLANT OFFICES INC.
FOR ANY QUESTIONS REGARDING THEIR SYSTEM, PLEASE CONTACT THEM
DIRECTLY. THEIR INFORMATION IS SHOWN BELOW.
MANUFACTURING FACILITY:
436 Bussen Underground Road, Saint Louis, MO 63129 toll free (800) 356-3199 | (314) 892-5800 fax (314) 892-4070 | www.InPlant.com
D O W
W
IN
D O W
WINDOW WINDOWWINDOW
A C T
IVE
D O O R
4'-2 1/4" 4'-0" 4'-0" 4'-0"
1'-7 7/8"
3'-11"4'-0"4'-0"
34'-2"
3' -1
0" 4'
-0
6' -6
/8
4' -2
/4
4'
-0
2' -3
/1
6"
1'-9 3/4"4'-0"4'-0"4'-0"4'-0"2'-4 1/4"1'-9"2'-6"1'-9"3'-9 3/4"4'-2 1/4"
4' -0
4'
-0
1' -1
1" 16'-1 31/32"
34'-0"
'-4
/2
SA
F E T Y
G A T E
1'-3"
FC
S
S 4'
-0
3' -4
1'
-1 0"
'-1
2'-2 25/32" 1'-10 19/32"
4' -0
17'-101 4"
C U
ST
O
M
ER
IN
IT
IA
LS
TM
Th is d oc um en t i s th e pr op er ty o f Ta ta m y, P
A
FA
X:
-8
-2
TM
R ep ro du ct io n st ric tly p ro hi bi te d.
M ai n St re et
Te l:
0-
3-ht tp w w w
.e qu ip to
.c om
-0
/2
1/
D
/2
1'
TM JS
H
SA
SA
B
O J
A
PA
N
4/ 5/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
A
O N
E D
EC
IS
IO
N
I N
FI
N
IT
E
SO
LU
TI
O
N S
JS
H
6/
/1
M
JF
IS
SU
ED
A
S
PR
EL
IM
IN
AR
Y B
JS
H
7/ 3/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
C
JS
H 6/
/2
JS
H
IS
SU
ED
F O
R A
PP
R
O
VA
LS
C
JS
H
TI
M
M A
LO
LE
PS
Y
9/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
D
JS
H
/1 8/
TM
IS
SU
ED
F
O R
A
PP
R O
VA
LS
E
IN
PL
A
N T
O
FF
IC
E
R
EV
IS
ED
L A
YO
U
T
INPLANT LIGHTING AND CEILING
F
3/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
F
JS
H
5 N
E
QU
IM
BY
A
VE
, B
EN
D, O
R
EC
LIP
SE
-E
NG
IN
EE
RI
NG
1)
9-
EE
I P R
O
JE
C T
-1 1-
MANUFACTURING FACILITY:
436 Bussen Underground Road, Saint Louis, MO 63129 toll free (800) 356-3199 | (314) 892-5800 fax (314) 892-4070 | www.InPlant.com
THE CEILING ABOVE THE MEZZANINE FLOOR OFFICE SPACE WAS PROVIDED BY
OTHERS (INPLANT) AND IS A SELF-SUPPORTING SUPER STRUCTURE WHERE THE
SYSTEM'S WALLS ARE FASTENED TO THE DECKING OF THE SUPPORTING
PLATFORM. WE UPGRADED SOME BEAMS AND BRACES FOR THE PLATFORM TO
BETTER SUPPORT THE OFFICE SPACE FRAMING ABOVE, BOTH VERTICALLY AND
LATERALLY. AGAIN THE OFFICE WALLS AND THEIR ATTACHMENTS WERE
PROVIDED BY THE SUPPLIER OF THE SYSTEM, INPLANT OFFICES INC.
FOR ANY QUESTIONS REGARDING THEIR SYSTEM, PLEASE CONTACT THEM
DIRECTLY. THEIR INFORMATION IS SHOWN BELOW.
D O W
W
IN
D O W
WINDOW WINDOWWINDOW
A C T
IVE
D O O R
4'-2 1/4" 4'-0" 4'-0" 4'-0"
1'-7 7/8"
3'-11"4'-0"4'-0"
34'-2"
3' -1
0" 4'
-0
6' -6
/8
4' -2
/4
4'
-0
2' -3
/1
6"
1'-9 3/4"4'-0"4'-0"4'-0"4'-0"2'-4 1/4"1'-9"2'-6"1'-9"3'-9 3/4"4'-2 1/4"
4' -0
4'
-0
1' -1
1"
16'-1 31/32"
34'-0"
'-4
/2
SA
F E T Y
G A T E
1'-3"
FC
4' -0
3'
-4
1' -1
0"
'-1
2'-2 25/32" 1'-10 19/32"
4' -0
HVAC DEFLECTOR, TYP
HVAC AIR INLET WITH FILTER
CEILING LIGHT, TYP
CEILING PANEL IN DROP
T-BAR
12" INSULATED FLEX PIPE
WITH PENETRATION
THROUGH ROOF DECK FOR
AIR DEFLECTORS
12" INSULATED FLEX
PIPE WITH
PENETRATION
THROUGH ROOF FOR
AIR RETURN
UNISTRUT
UNISTRUT
17'-101 4"
C U
ST
O
M
ER
IN
IT
IA
LS
TM
Th is d oc um en t i s th e pr op er ty o f Ta ta m y, P
A
FA
X:
-8
-2
TM
R ep ro du ct io n st ric tly p ro hi bi te d.
M ai n St re et
Te l:
0-
3-ht tp w w w
.e qu ip to
.c om
-0
/2
1/
D
/2
1'
TM JS
H
SA
SA
B
O J
A
PA
N
4/ 5/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
A
O N
E D
EC
IS
IO
N
I N
FI
N
IT
E
SO
LU
TI
O
N S
JS
H
6/
/1
M
JF
IS
SU
ED
A
S
PR
EL
IM
IN
AR
Y B
JS
H
7/ 3/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
C
JS
H 6/
/2
JS
H
IS
SU
ED
F O
R A
PP
R
O
VA
LS
C
JS
H
TI
M
M A
LO
LE
PS
Y
9/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
D
JS
H
/1 8/
TM
IS
SU
ED
F
O R
A
PP
R O
VA
LS
E
IN
PL
A
N T
O
FF
IC
E
R
EV
IS
ED
L A
YO
U
T
INPLANT HVAC
F
3/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
F
JS
H
5 N
E
QU
IM
BY
A
VE
, B
EN
D, O
R
EC
LIP
SE
-E
NG
IN
EE
RI
NG
1)
9-
EE
I P R
O
JE
C T
-1 1-
MANUFACTURING FACILITY:
436 Bussen Underground Road, Saint Louis, MO 63129 toll free (800) 356-3199 | (314) 892-5800 fax (314) 892-4070 | www.InPlant.com
THE HVAC SYSTEM ABOVE THE OFFICE SPACE'S CEILING WAS PROVIDED BY
OTHERS AND IS SUPPORTED BY THE INPLANT OFFICE CEILING AND WALL SYSTEM
PLEASE REFERNCE THE EARLIER PAGES FOR INFOMRATION REGARDING THESE
SYSTEMS. WE UPGRADED SOME BEAMS AND BRACES FOR THE PLATFORM TO
BETTER SUPPORT THE OFFICE SPACE FRAMING ABOVE, BOTH VERTICALLY AND
LATERALLY. AGAIN THE OFFICE WALLS AND THEIR ATTACHMENTS WERE
PROVIDED BY THE SUPPLIER OF THE SYSTEM, INPLANT OFFICES INC.
FOR ANY QUESTIONS REGARDING THEIR SYSTEM, PLEASE CONTACT THEM
DIRECTLY. THEIR INFORMATION IS SHOWN BELOW.
VE
N
T
= SQUARE POST LOCATIONS
(11) THIS CONFIG.
(19) #6424 TU
BU
LAR
BR
AC
E
(5) #6424-SASEBO
TU
BU
LAR
BR
AC
E
(14) #6485-SASEBO
TUBULAR BRACE
C U
ST
O
M
ER
IN
IT
IA
LS
TM
Th is d oc um en t i s th e pr op er ty o f Ta ta m y, P
A
FA
X:
-8
-2
TM
R ep ro du ct io n st ric tly p ro hi bi te d.
M ai n St re et
Te l:
0-
3-ht tp w w w
.e qu ip to
.c om
-0
PR
EL
IM
IN
A R
Y
FI
R E
SP
R
IN
K
LE
R
PL
A
N
/2
1/
D
/2
1'
JS
H
JS
H
SA
SA
B
O J
A
PA
N
4/ 5/
JS
H
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
A
O N
E D
EC
IS
IO
N
I N
FI
N
IT
E
SO
LU
TI
O
N S
JS
H
FI
R
ST
L
O C
AT
IO
N 6/
/1
M
JF
IS
SU
ED
A S
PR
EL
IM
IN
AR
Y
B
JS
H 7/
3/
JS
H
IS
SU
ED
A
S
PR
EL
IM
IN
AR
Y C
JS
H
6/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
C
JS
H
TI
M
M A
LO
LE
PS
Y
9/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
D
JS
H
/1 8/
TM
IS
SU
ED
F
O R
A
PP
R O
VA
LS
E
F
3/
/2
JS
H
IS
SU
ED
F
O R
A
PP
R O
VA
LS
F
JS
H
5 N
E
QU
IM
BY
A
VE
, B
EN
D, O
R
EC
LIP
SE
-E
NG
IN
EE
RI
NG
1)
9-
EE
I P R
O
JE
C T
-1 1-
| Sheets and Views |
| Equipto Support Plan |
| 19-060F_OD CAD-Equipto Decking Plan.pdf |
| Sheets and Views |
| Equipto Decking Plan |
| 19-060F_OD CAD-Platform Details.pdf |
| Sheets and Views |
| Platform Details |
| 19-060F_OD CAD-Inplant Walls.pdf |
| Sheets and Views |
| Inplant Walls |
| 19-060F_OD CAD-Inplant Roof Deck.pdf |
| Sheets and Views |
| Inplant Roof Deck |
| 19-060F_OD CAD-Inplant Lighting Plan.pdf |
| Sheets and Views |
| Inplant Lighting Plan |
| 19-060F_OD CAD-Inplant HVAC Plan.pdf |
| Sheets and Views |
| Inplant HVAC Plan |
| 19-060F_OD CAD-Support Plat for Fire Sprinklers.pdf |
| Sheets and Views |
| Support Plat for Fire Sprinklers |
File details come from the government source that posted it. Updated .