N6264925RA050-0002.pdf
PDF 446 KB Posted
- Solicitation number
- N6264925RA050
About this file
This document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for the USS BLUE RIDGE (LCC-19) maintenance project. Amendment 0002 addresses a Request for Information (RFI) clarifying Government Furnished Material (GFM) provisions for two specific ship alteration (S/A) work items: hot potable water plant work (3819P53301A01) and LP air compressor upgrade (3819P55101A01).
The amendment confirms that for these two technical work items, like other work packages, all Government Furnished Material (GFM) listed in the corresponding S/A drawings will be provided as kitted material. This clarification responds to a contractor's specific question about material provision, ensuring consistent understanding of material supply across different work packages for the ship's maintenance modernization bundle.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264925RA050-0003.pdf | ||
| DWG 804-4563105_A - FIXED WINDOW EOS.pdf | ||
| N6264925RA056-0001.pdf | ||
| N6264925RA050-0001.pdf | ||
| Att IV Request for Information Form.pdf | ||
| Att III GFP Form.xlsx | XLSX spreadsheet | |
| N6264925RA050.pdf | ||
| Att VI Quality Assurance Surveillance Plan (QASP).pdf | ||
| Att V Contract Data Sheet.pdf | ||
| Att VII Warranty Tracking Information.pdf | ||
| Att VIII Source of Repair Instruction.pdf | ||
| Att IV-3 Request for Information Form.docx | DOCX document | |
| Att II Price Proposal Form N6264925RA050.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N62758BLR512
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Name of Ship: USS BLUE RIDGE (LCC-19)
This solicitation amendment 0002 is hereby issued to incorporate the Question and Answ e provided by RFI.
See Continuation Sheet for the details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Jul-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6264925RA050
X 9B. DATED (SEE ITEM 11)
27-May-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Jul-2025
CODE
NAVSUP FLC YOKOSUKA
(CODE 200)
CONTRACTING DEPARTMENT
PSC 473 BOX 11
FPO AP 96349-0011
N62649 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6264925RA050
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
This solicitation amendment has been issued to provide following Question and Answer per Request for Information
(RFI).
Question:
3819P53301A01 S/A 81167K, ACCOMPLISH HOT POTABLE WATER PLANT WORK
3819P55101A01 S/A 81182K LP AIR COPMRESSOR UPGRADE IN 8-86-0-E
For all other SHIALT TGIs, there is indication of “All GFM listed in each S/A drawing will be provided as kitted material” Above TGI does not indicate the statement. Will material be provided as GFM?
Answer
The same statement "All GFM listed in each S/A drawing will be provided as kitted material" applies to those two TGIs as well.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .