The file's text, extracted by GovTribe without its formatting.
SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | | N6264925RA050 | CLIN 0001(20 TGIs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| SHIP NAME: | | USS Blue Ridge (LCC-19) | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| AVAILABILITY: | | 5C1 DSRA Bundle 1 | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total TGIs (Specify Total) | 20 | Total Evaluated Price | ¥0 |
| Growth CLIN % | 24.00% | | |
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | | | | | | | | | |
| No. | TGI No. | DESCRIPTION | Proposed Labor | | | | Material/ODCs | | Proposed Price (JPY) |
| | | In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | |
| 1 | 3819P53301-A01 | F/O - S/A 81167K, ACCOMPLISH HOT POTABLE WATER PLANT WORK | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 3819P53301-T01 | CU PHASE: PERMANENT PADEYE (LOAD TEST), S/A 81167K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 3819P53301-T02 | CU PHASE: POTABLE WATER SYS (T & OP), S/A 81167K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 3819P53301-T03 | CU PHASE: HEATING SYS (T & OP), S/A 81167K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 3819P53301-T04 | CU PHASE: JP-5 SYS (T & OP), S/A 81167K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 3819P53301-T05 | CU PHASE: ANNOUNCING SYS (OP), S/A 81167K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 3819P53301-T07 | CU PHASE: GALLEY EQUIPMENT (T & OP), S/A 81167K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 3819P53301-T08 | CU PHASE: ALARM, SAFETY, AND WARNING SYS (OP), S/A 81167K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 9 | 3819P53301-T09 | CU PHASE: HOT WATER CIRC PUMPS (T & OP), S/A 81167K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 10 | 3819P53301-T10 | CU PHASE: VENT FANS (OP, VOL & BAL), S/A 81167K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 11 | 3819P55101-A01 | F/O S/A 81182K LP AIR COPMRESSOR UPGRADE IN 8-86-0-E | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 12 | 3819P55101-T01 | CU PHASE: LPAC #3 (T & OP), S/A 81182K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 13 | 3819P55101-T02 | CU PHASE: LPAC #2 (T & OP), S/A 81182K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 14 | 3819P55101-T03 | CU PHASE: LPAC #1 (T & OP), S/A 81182K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 15 | 3819P55101-T04 | CU PHASE: AUX SEAWATER SYS (T & OP), S/A 81182K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 16 | 3819P55101-T05 | CU PHASE: POTABLE WATER SYS (T & OP), S/A 81182K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 17 | 3819P55101-T06 | CU PHASE: ALARM, SAFETY, AND WARNING SYS (OP), S/A 81182K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 18 | 3819P55101-T07 | CU PHASE: LOW PRESSURE AIR (T & OP), S/A 81182K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 19 | 3819P55101-T08 | CU PHASE: VENTILATION SYS (VOL & BAL), S/A 81182K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 20 | 3819P55101-T09 | CU PHASE: MAIN CONDENSER & AIR EJECTORS (T & OP), S/A 81182K - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 21 | | | | | | | | | |
| 22 | | | | | | | | | |
| 23 | | | | | | | | | |
| 24 | | | | | | | | | |
| 25 | | | | | | | | | |
| 26 | | | | | | | | | |
| 27 | | | | | | | | | |
| 28 | | | | | | | | | |
| 29 | | | | | | | | | |
| 30 | | | | | | | | | |
| 31 | | | | | | | | | |
| 32 | | | | | | | | | |
| 33 | | | | | | | | | |
| 34 | | | | | | | | | |
| 35 | | | | | | | | | |
| 36 | | | | | | | | | |
| 37 | | | | | | | | | |
| 38 | | | | | | | | | |
| 39 | | | | | | | | | |
| 40 | | | | | | | | | |
| 41 | | | | | | | | | |
| 42 | | | | | | | | | |
| 43 | | | | | | | | | |
| 44 | | | | | | | | | |
| 45 | | | | | | | | | |
| 46 | | | | | | | | | |
| 47 | | | | | | | | | |
| 48 | | | | | | | | | |
| 49 | | | | | | | | | |
| 50 | | | | | | | | | |
| 51 | | | | | | | | | |
| 52 | | | | | | | | | |
| 53 | | | | | | | | | |
| 54 | | | | | | | | | |
| 55 | | | | | | | | | |
| 56 | | | | | | | | | |
| 57 | | | | | | | | | |
| 58 | | | | | | | | | |
| 59 | | | | | | | | | |
| 60 | | | | | | | | | |
| 61 | | | | | | | | | |
| 62 | | | | | | | | | |
| 63 | | | | | | | | | |
| 64 | | | | | | | | | |
| 65 | | | | | | | | | |
| 66 | | | | | | | | | |
| 67 | | | | | | | | | |
| 68 | | | | | | | | | |
| 69 | | | | | | | | | |
| 70 | | | | | | | | | |
| 71 | | | | | | | | | |
| 72 | | | | | | | | | |
| 73 | | | | | | | | | |
| 74 | | | | | | | | | |
| 75 | | | | | | | | | |
| 76 | | | | | | | | | |
| 77 | | | | | | | | | |
| 78 | | | | | | | | | |
| 79 | | | | | | | | | |
| 80 | | | | | | | | | |
| 81 | | | | | | | | | |
| 82 | | | | | | | | | |
| 83 | | | | | | | | | |
| 84 | | | | | | | | | |
| 85 | | | | | | | | | |
| 86 | | | | | | | | | |
| 87 | | | | | | | | | |
| 88 | | | | | | | | | |
| 89 | | | | | | | | | |
| 90 | | | | | | | | | |
| 91 | | | | | | | | | |
| 92 | | | | | | | | | |
| 93 | | | | | | | | | |
| 94 | | | | | | | | | |
| 95 | | | | | | | | | |
| 96 | | | | | | | | | |
| 97 | | | | | | | | | |
| 98 | | | | | | | | | |
| 99 | | | | | | | | | |
| 100 | | | | | | | | | |
| 101 | | | | | | | | | |
| 102 | | | | | | | | | |
| 103 | | | | | | | | | |
| 104 | | | | | | | | | |
| 105 | | | | | | | | | |
| 106 | | | | | | | | | |
| 107 | | | | | | | | | |
| 108 | | | | | | | | | |
| 109 | | | | | | | | | |
| 110 | | | | | | | | | |
| 111 | | | | | | | | | |
| 112 | | | | | | | | | |
| 113 | | | | | | | | | |
| 114 | | | | | | | | | |
| 115 | | | | | | | | | |
| 116 | | | | | | | | | |
| 117 | | | | | | | | | |
| 118 | | | | | | | | | |
| 119 | | | | | | | | | |
| 120 | | | | | | | | | |
| 121 | | | | | | | | | |
| 122 | | | | | | | | | |
| 123 | | | | | | | | | |
| 124 | | | | | | | | | |
| 125 | | | | | | | | | |
| 126 | | | | | | | | | |
| 127 | | | | | | | | | |
| 128 | | | | | | | | | |
| 129 | | | | | | | | | |
| 130 | | | | | | | | | |
| 131 | | | | | | | | | |
| 132 | | | | | | | | | |
| 133 | | | | | | | | | |
| 134 | | | | | | | | | |
| 135 | | | | | | | | | |
| 136 | | | | | | | | | |
| 137 | | | | | | | | | |
| 138 | | | | | | | | | |
| 139 | | | | | | | | | |
| 140 | | | | | | | | | |
| 141 | | | | | | | | | |
| 142 | | | | | | | | | |
| 143 | | | | | | | | | |
| 144 | | | | | | | | | |
| 145 | | | | | | | | | |
| 146 | | | | | | | | | |
| 147 | | | | | | | | | |
| 148 | | | | | | | | | |
| 149 | | | | | | | | | |
| 150 | | | | | | | | | |
| 151 | | | | | | | | | |
| 152 | | | | | | | | | |
| 153 | | | | | | | | | |
| 154 | | | | | | | | | |
| 155 | | | | | | | | | |
| 156 | | | | | | | | | |
| 157 | | | | | | | | | |
| 158 | | | | | | | | | |
| 159 | | | | | | | | | |
| 160 | | | | | | | | | |
| 161 | | | | | | | | | |
| 162 | | | | | | | | | |
| 163 | | | | | | | | | |
| 164 | | | | | | | | | |
| 165 | | | | | | | | | |
| 166 | | | | | | | | | |
| 167 | | | | | | | | | |
| 168 | | | | | | | | | |
| 169 | | | | | | | | | |
| 170 | | | | | | | | | |
| 171 | | | | | | | | | |
| 172 | | | | | | | | | |
| 173 | | | | | | | | | |
| 174 | | | | | | | | | |
| 175 | | | | | | | | | |
| 176 | | | | | | | | | |
| 177 | | | | | | | | | |
| 178 | | | | | | | | | |
| 179 | | | | | | | | | |
| 180 | | | | | | | | | |
| 181 | | | | | | | | | |
| 182 | | | | | | | | | |
| 183 | | | | | | | | | |
| 184 | | | | | | | | | |
| 185 | | | | | | | | | |
| 186 | | | | | | | | | |
| 187 | | | | | | | | | |
| 188 | | | | | | | | | |
| 189 | | | | | | | | | |
| 190 | | | | | | | | | |
| 191 | | | | | | | | | |
| 192 | | | | | | | | | |
| 193 | | | | | | | | | |
| 194 | | | | | | | | | |
| 195 | | | | | | | | | |
| 196 | | | | | | | | | |
| 197 | | | | | | | | | |
| 198 | | | | | | | | | |
| 199 | | | | | | | | | |
| 200 | | | | | | | | | |
1_3819P53301-A01
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 1_3819P53301-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 1_3819P53301-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - S/A 81167K, ACCOMPLISH HOT POTABLE WATER PLANT WORK | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
HOURS
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_3819P53301-T01
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 2_3819P53301-T01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 2_3819P53301-T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: PERMANENT PADEYE (LOAD TEST), S/A 81167K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_3819P53301-T02
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 3_3819P53301-T02 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 3_3819P53301-T02 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: POTABLE WATER SYS (T & OP), S/A 81167K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_3819P53301-T03
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 4_3819P53301-T03 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 4_3819P53301-T03 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: HEATING SYS (T & OP), S/A 81167K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_3819P53301-T04
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 5_3819P53301-T04 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 5_3819P53301-T04 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: JP-5 SYS (T & OP), S/A 81167K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_3819P53301-T05
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 6_3819P53301-T05 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 6_3819P53301-T05 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: ANNOUNCING SYS (OP), S/A 81167K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_3819P53301-T07
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 7_3819P53301-T07 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 7_3819P53301-T07 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: GALLEY EQUIPMENT (T & OP), S/A 81167K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
8_3819P53301-T08
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 8_3819P53301-T08 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 8_3819P53301-T08 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: ALARM, SAFETY, AND WARNING SYS (OP), S/A 81167K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
9_3819P53301-T09
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 9_3819P53301-T09 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 9_3819P53301-T09 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: HOT WATER CIRC PUMPS (T & OP), S/A 81167K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
10_3819P53301-T10
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 10_3819P53301-T10 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 10_3819P53301-T10 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: VENT FANS (OP, VOL & BAL), S/A 81167K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
11_3819P55101-A01
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 11_3819P55101-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 11_3819P55101-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O S/A 81182K LP AIR COPMRESSOR UPGRADE IN 8-86-0-E | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
12_3819P55101-T01
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 12_3819P55101-T01 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 12_3819P55101-T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: LPAC #3 (T & OP), S/A 81182K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
13_3819P55101-T02
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 13_3819P55101-T02 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 13_3819P55101-T02 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: LPAC #2 (T & OP), S/A 81182K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
14_3819P55101-T03
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 14_3819P55101-T03 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 14_3819P55101-T03 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: LPAC #1 (T & OP), S/A 81182K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
15_3819P55101-T04
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 15_3819P55101-T04 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 15_3819P55101-T04 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: AUX SEAWATER SYS (T & OP), S/A 81182K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
16_3819P55101-T05
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 16_3819P55101-T05 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 16_3819P55101-T05 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: POTABLE WATER SYS (T & OP), S/A 81182K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
17_3819P55101-T06
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 17_3819P55101-T06 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 17_3819P55101-T06 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: ALARM, SAFETY, AND WARNING SYS (OP), S/A 81182K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
18_3819P55101-T07
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 18_3819P55101-T07 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 18_3819P55101-T07 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: LOW PRESSURE AIR (T & OP), S/A 81182K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
19_3819P55101-T08
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 19_3819P55101-T08 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 19_3819P55101-T08 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: VENTILATION SYS (VOL & BAL), S/A 81182K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
20_3819P55101-T09
| SHIP NAME/AVAILABILITY: | USS Blue Ridge (LCC-19) - 5C1 DSRA Bundle 1 | | | | | TGI 20_3819P55101-T09 SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA050 | | | | | | | | | | |
| SRF-JRMC TGI #: | 20_3819P55101-T09 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CU PHASE: MAIN CONDENSER & AIR EJECTORS (T & OP), S/A 81182K - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0