This document is a Task Group Instruction (TGI) for a naval vessel repair project involving the USS SHOUP (DDG-86). The specific work order focuses on replacing deck covering in Passage 02-154-1-L, which includes replacing a union joint of potable water piping (3/8 inch IPS, CU-NI 90-10 material) and installing a 120 square foot chemical-resistant flooring system in Navy blue color with white flake. The work also involves deck plating preparation, covering 137 square feet including vertical structural surfaces.
The task includes several technical requirements, such as disconnecting and reconnecting water piping, conducting chlorination and bacteriological tests, removing existing equipment, and installing new flooring. The project involves specific material specifications, including pipe insulation from K-FLEX ECO brand, adhesives, and sealing compounds. The Naval Supply Systems Command will provide certain services including crane and rigging, utility services, safety inspections, and quality assurance inspections. The work is scheduled for execution in fiscal year 2025, with specific start and completion dates to be determined from the TGI POP (Period of Performance) List.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment III Request for Information Form.doc | DOC document | |
| B-2 CLN-1 38KC164505T01 TGI.pdf | ||
| Attachment II Price Proposal Form N6264925RA039.xlsx | XLSX spreadsheet | |
| N6264925RA039.pdf | ||
| B-2 CLN-1 38KC165405A01 TGI c0v0.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
04-MAR-2025 1059
20.14.15.2.9020 (September 2024) ICN: 38KC164505 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: PASSAGE 02-154-1-L AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 02-154-1-L
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 6
SS023133
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TAKANASHI, TATSUNORI 231A 3152436238 19-FEB-2025
APPROVED BY: CODE: PHONE: DATE:
NAKAMURA, YUUJI 231A 3152436041 04-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
SS02-3133
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
645A1105
1. SCOPE/PURPOSE:
1.1 Title: Deck Covering in 02-154-1-L; replace
1.2 Location of Work:
1.2.1 Passage (02-154-1-L)
1.3 Identification:
1.3.1 Quantity (One EA), Union Joint of Potable Water Piping for Drinking Fountain Located in 1.2.1 Size: 3/8 Inch IPS Material: CU-NI 90-10 Specification: MIL-T-16420 Remarks: See Sheet 6A (Zone 7-F) and 9 (SECTION 7-E) of Ref. No. 3
1.3.2 Quantity (120 SF), Chemical-Resistant Floorings System [Existing]
TGI Short Form
04-MAR-2025 1059
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC164505 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: PASSAGE 02-154-1-L AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 02-154-1-L
FOUO Pg 2 of 6
CU PHASE DESCRIPTION (Cont.)
1.3.3 Quantity (120 SF), Chemical-Resistant Floorings System
Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flake Remarks: Glass beads must be included in final seal coat
1.3.4 Quantity (137 SF), Deck Plating including vertical structural surface up to height of One inch from complete chemical-resistant floorings system level
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor work start date: See TGI POP List
1.7 Contractor work completion date: See TGI POP List
2. PROCEDURE:
2.1 Disconnect mechanically and reconnect each union joint of potable water piping listed in 1.3.1 for supporting of deck covering work, using Ref. No. 3 for guidance.
2.1.1 Accomplish the requirements of 009-87 of Ref. No. One for each potable water piping.
2.1.1.1 Accomplish the requirements of 009-09 of Ref. No. One for chlorination and bacteriological tests. Analysis and testing conducted by a qualified Japanese laboratory (accredited by ISO 17025 or equal) are authorized by the SUPERVISOR.
2.1.1.2 Record results of chlorination and bacteriological tests on a Laboratory Analysis Record(s) and DD Form 686, and submit one legible copy, in hard copy or approved transferrable media, of completed record(s) and form(s) to the
SUPERVISOR.
2.2 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.2 and installation of each new equipment listed in 1.3.3.
2.2.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.4. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.
2.3 Accomplish the requirements of 009-32 of Ref. One for each new and disturbed surface.
2.4 Notes:
2.4.1 Planner: Code 231A T. Takanashi, 243-6238
Planner: Code 234 R. Saeki, 243-1109
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.4.3 JCN SS02-3133 is related to this TGI.
04-MAR-2025 1059
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC164505 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: PASSAGE 02-154-1-L AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 02-154-1-L
FOUO Pg 3 of 6
CU PHASE DESCRIPTION (Cont.)
2.5 Government Furnished Material (GFM):
2.5.1 SRF-JRMC will provide GFM linted in the Material List.
2.6 SRF-JRMC will provide the following service work: (TGI No. 38KC164505S02)
2.6.1 [C740] Crane and crane rigging service.
2.6.2 [X99E] Utility service, electrical.
2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C133] QA inspection for (G) symbol(s).
04-MAR-2025 1059
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC164505 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: PASSAGE 02-154-1-L AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 02-154-1-L
FOUO Pg 4 of 6
OTHER SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II.
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 533-7059667 FRESH WATER SYSTEMS
ZONE 4220
E Y 6A, MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38KC164505 KEY OP: A01
04-MAR-2025 1059
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC164505 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: PASSAGE 02-154-1-L AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 02-154-1-L
FOUO Pg 5 of 6
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
401 M INSL, 3/8" IPS, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 3/8" IPS,
SIZE: 5/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT (ONE
CONTINUOUS LENGTH
REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE ITEM**
30EA/BOX. *MUST BE
ORDERED IN MULTIPLES OF
30EA*
*MSM AVAILABLE*
9B 5640 LL9607841 NA 4 N 50467549 1/EA
402 M INSL, 1-1/4" IPS, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 1-1/4" IPS,
SIZE: 1-5/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT (ONE
CONTINUOUS LENGTH
REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE ITEM**
12EA/BOX. *MUST BE
ORDERED IN MULTIPLES OF
12EA*
*MSM AVAILABLE*
9B 5640 LL4783095 NA 4 N 50467555 1/EA
403 M INSL, 1-1/2" IPS, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 2-1/8" OD TUBE,
SIZE: 2-1/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT (ONE
CONTINUOUS LENGTH
REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE ITEM**
10EA/BOX. *MUST BE
ORDERED IN MULTIPLES OF
10EA*
*MSM AVAILABLE*
9B 5640 LL9607843 NA 4 N 50467556 1/EA
04-MAR-2025 1059
20.14.15.2.9020 (September 2024) (Continued) ICN: 38KC164505 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: PASSAGE 02-154-1-L AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-86 USS SHOUP KC1
CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 02-154-1-L
FOUO Pg 6 of 6
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
404 M INSL, 2-1/2" IPS, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 2-1/2" IPS,
SIZE: 2-7/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT (ONE
CONTINUOUS LENGTH
REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE ITEM**
7EA/BOX. *MUST BE ORDERED
IN MULTIPLES OF 7EA*
*MSM AVAILABLE*
9B 5640 LL9607845 NA 4 N 50467557 1/EA
405 M INSL, 4" IPS, INSULATION,
PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 4" IPS,
SIZE: 4-1/2" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT (ONE
CONTINUOUS LENGTH
REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE
AVAILABLE**
3EA/BOX. *MUST BE ORDERED
IN MULTIPLES OF 3EA*
*MSM AVAILABLE*
9B 5640 LL9607848 NA 4 N 50467558 1/EA
406 M ADH FOR PLASTIC TUBE,
ADHESIVE FOR PLASTIC TUBE
9B 8040 008419773 NA 4 Y 50465099 2/PT
407 M ADH FOR CLOTH, ADHESIVE
FOR CLOTH
9B 8040 002738708 NA 4 Y 50465105 1/GL
408 M SEALING COMPOUND, VAPOR
BARRIER COATING FOR
INSULATED REFRIGERANT
AND CHILLED WATER LINES
9B 8030 001742588 NA 4 Y 50465117 1/GL