This document is an Industry Day Brief for a federal contract opportunity related to maintenance, repair, and overhaul (MRO) services for U.S. Marine Corps AH-1Z and UH-1Y aircraft.

The key details are:

  • The requiring agency is Fleet Readiness Center Western Pacific (FRC WESTPAC), and the contracting agency is Naval Supply Systems Command Fleet Logistics Center Yokosuka (NAVSUP FLCY).
  • The planned contract is a single-award IDIQ for 1 base year and up to 6 option years to provide scheduled and unscheduled MRO services, including PMI, repetitive maintenance, in-service repairs, and modifications.
  • The Performance Work Statement defines the technical requirements, the USG's roles and responsibilities, and the contractor's responsibilities, including quality control, supply chain management, workforce qualifications, and monitoring program changes.
  • Key performance parameters include turn-around-time for PMI events, which is a critical metric.
  • An industry day will be held on November 7, 2024 at Naval Air Facility Atsugi to allow interested contractors to learn about the requirements and provide feedback. Registration is required by October 9, 2024.
  • The government will use a tradeoff source selection process, with past performance, technical risk, and technical factors being more important than price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H-1 Industry Day

Fleet Readiness Center Western Pacific

(FRC WESTPAC)

07 November 2024

Updated: 22-Nov-24

CUI//FOUO 1

22-Nov-24 // Page

CUI//FOUO 2

Acquisition Department Brief

Disclaimer (Reminder)

22-Nov-24 CUI 3

• The remarks today of USG officials involved in the Repair and Overhaul (MRO) services for U.S. Marine Corps AH-1Z & UH-1Y aircraft should in no way be construed as a guarantee of the USG course of action in proceeding with the acquisition.

• The formal solicitation, when issued, is the ONLY document that declares the USG requirements.

• AH-1Z & UH-1Y Aircraft Maintenance and Repair

• Notice ID N6264924R0050

• F/A-18A-F & E/A-18G Aircraft Maintenance and Repair

• Notice ID N6264924R0053

• MH-60R/MH-60S Aircraft Maintenance and Repair

• Notice ID N6264923Q0029

• C-130 Maintenance & Repair Service

• Notice ID N6264924R0029

• CFT ISR USMC USN IN AUSTRALIA

• Notice ID N6264923R0088

FRC WESTPAC Active/Recent SAM.GOV Postings

FRC WESTPAC goals and intent

22-Nov-24 CUI 5

Goal:

To acquire the capability to provide depot-level aircraft MRO products and services for forward-deployed AH-1Z & UH-1Y Type/Model/Series (T/M/S) aircraft.

Intent:

To award a contract to a highly qualified Contractor possessing the required business practices and technical capabilities in order to increase responsiveness and flexibility in meeting customer needs.

22-Nov-24 CUI 6

Requirements - Fleet to FRC WESTPAC

• Aircraft Maintenance, Repair & Overhaul (MRO)

• Integrated Maintenance Concept (IMC) Integrated Maintenance Plan (IMP)

• AH-1Z & UH-1Y IMP Specifications

• Planned Maintenance Interval (PMI)

• FRC WESTPAC Requirement

THE CONTRACTING PROCESS

7CUI//FOUO 22-Nov-24 // Page

Fleet Readiness Center Western Pacific FRC WESTPAC serves as the requiring agency which includes the authority to write and interpret requirements based on stakeholder needs. FRC WESTPAC provides the Contracting Officer’s Representative, engineering and other technical expertise, all supplies and materials, and serves as the liaison for all other USG stakeholders.

Fleet Logistics Center Yokosuka FLCY serves as the contract agency which includes the authority to obligate the USG to pay for contracted services, and to manage and modify the contract. FLCY provides the Procuring Contracting Officer and the Contract Specialists. FLCY appoints the Contracting Officer’s Representative and the Administrative Contracting Officer.

Defense Contract Management Agency DCMA serves as the contract administrator which includes the authority to issue and administer task orders, provide surveillance of the contractor, and adjudicate invoices. DCMA provides the Administrative Contracting Officer, Quality Assurance specialists, Safety specialists, and other technical expertise.

PARTNERSHIP

Fleet Readiness Center Western Pacific

Fleet Logistics Center Yokosuka

Defense Contract Management Agency

• Single Award Contract

• IDIQ Contract for 1 base year and up to 6 Option Years

Planned Contract Overview

22-Nov-24 CUI//FOUO 8

Planned Contract Services – Section B

22-Nov-24 CUI//FOUO 9

• CLIN X001 – Scheduled Maintenance

• SLIN X001AA – UH-1Y PMI-D

• SLIN X001AB – AH-1Z PMI-D

• CLIN X002 – Repetitive Maintenance

• SLIN X002AA – SLIN X002AK (Weight & Balance; Calendar/Hourly Based Special Inspections)

• CLIN X003 – Unscheduled Maintenance

• SLIN X003AA – Over & Above (O&A)

• SLIN X003AB – In-Service Repairs (ISR)

• SLIN X003AC – Customer Service Requests (CSR)

• SLIN X003AD – TD and Aircraft Modifications

• CLIN X004 – Supply Support

• CLIN X005 – CDRL Deliverables

• CLIN X006 – Accelerated Delivery

• CLIN X007 – GFM Handling

• SLIN X007AA – Preserve & Pack

• SLIN X007AB – Ship & Transport

• CLIN X008 – Travel

• SLIN X008AA – Travel

• CLIN X009 – Relocation

• CLIN X010 – Post Award Conference – RESERVED (Minimum Guarantee)

• CLIN X011 – Depot Readiness Initiative (DRI)

• SLIN X011AA – SLIN X011AP (Phases, Calendar/hourly based inspections)

The Performance Work Statement

22-Nov-24 CUI 10

• The Performance Work Statement (PWS) defines the scope and provides the framework of requirements to be performed under the AH-1Z & UH-1Y Integrated Maintenance Plan (IMP) Planned Maintenance Interval (PMI) Indefinite Delivery/Indefinite Quantity Contract (ID/IQC).

• Together with the Specifications and other reference documents, it establishes the work the Contractor is required to perform.

• Establishes the requirement, provides the induction schedule and funds the work

• Provides the aircraft for induction

• Revises and adjusts requirements, schedule and funds as required

• Provides most of the aircraft repairable, replacement parts and consumables required to complete the scheduled PMI event

• Provides Engineering support and guidance to the Contractor Engineers to resolve issues in processes, materials, technical data and other areas as required

• Receives the aircraft to perform Functional Check Flight (FCF) and Acceptance

• Provides most of the required Support Equipment

• Provides most of the consumables, parts, and materials

*This is a general list and does not limit the USG functions and roles of the contract.

USG Functions and Roles

22-Nov-24 CUI 11

• Additional USG’s functions and roles:

Responds to Contractor requests and recommendations for O&A work Performs contract oversight and surveillance Provide Ground Government Flight Representative (GGFR) Performs Quality Assurance on Safety of Flight and other highly critical items Determines whether to perform modifications , and provides modification kits as appropriate Determines level of maintenance action for aircraft repair: squadron level

(O-Level), Intermediate (I-Level), or Depot Level Repair (D-Level).

Determines whether to task the Contractor to perform off-site repairs with

Contractor Field Teams (CFT)

The PWS also describes some of the USG functions and roles in relation to the AH-1Z & UH-1Y IMP program in the FRC WESTPAC Area of Responsibility

(AOR).

* This is a general list and does not limit the USG functions and roles of the contract.

Additional USG’s functions and Roles

22-Nov-24 CUI 12

• Achieve required Turn-Around-Time (TAT) (outlined in the contract)

• Perform inspection and repair as outlined in USG provided technical requirements

• Implement quality control into all aspects that relate to the performance on this contract

• Perform Basic Requirement at FFP

• Manage the Supply Chain

• Responsible for developing the Contractor workforce

• Responsible to monitor program for possible requirements changes

• Provide required data reporting

• Plan/execute for the phase-in/out transition period

• Prepared to achieve nominal to surge workload capability requirements

• Achieve the required performance standards

The Contractor’s Role

22-Nov-24 CUI 13

* This list is not all inclusive.

• The USG will provide the facilities (including electricity and water) for Contractor use during the life of this contract for Scheduled Maintenance as required. The Contractor will not be permitted to make any facility modifications.

• The Contractor shall perform Scheduled Maintenance at Marine Corp Air Station (MCAS) Futenma, Okinawa, Japan.

• The Contractor shall coordinate with the appropriate installation organizations to perform to the requirements and standards of this PWS. These organizations include, but are not limited to:

• Airfield Operations for flight line driving privileges and specific airfield locations not adjacent to the hangar

• Provost Marshall Office to coordinate unescorted installation access and flight line access

• Facilities to coordinate internet connectivity and any other office building requirements

• Logistics for hazardous material and shipping/receiving.

Facilities

• When required by the USG, the Contractor shall support relocation of the H-1 PMI line from one USG facility to another USG facility.

• Any relocation determination will be negotiated prior to issuance of a task order.

• Relocation tasks may include preservation of materials, preparing materials for shipment, HAZMAT relocation, floor mapping of new work zones, etc.

Facilities Relocation Support

Turn-Around-Time

22-Nov-24 CUI 16

• Turn-Around-Time (TAT) is the period of time from aircraft induction (when the aircraft is made available to the Contractor at a designated location in a designated configuration) until the US Government acceptance of the aircraft.

• TAT is a critical element for the US Government to ensure it has the aircraft resources required to perform its missions.

• TAT is a Key Performance Parameter (KPP) by which the Contractor’s performance is measured.

• TAT is measured in Calendar Days (includes weekends and holidays).

• TAT is the primary schedule metric used by the USG.

• The Contractor shall execute AH-1Z & UH-1Y Planned Maintenance Interval (PMI) requirements (in accordance with the most current specification*) within the contract defined Turn-Around-Time (TAT).

PMI Turn-Around-Time

22-Nov-24 CUI//FOUO 17

Aircraft PMI Event PMI TAT (calendar days)

PMI with DRI** TAT (calendar days)

UH-1Y PMI-D 130* 140*

AH-1Z PMI-D 130* 140*

** Depot Readiness Initiative: Phase A, Phase B, 364 Day Inspection, 50 Flight Hour Inspection, 100 Flight Hour Inspection, 200 Flight Hour Inspection

*Current Contract TAT, Follow-on Contract TAT TBD*

* Most current PMI specification identified in the contract PWS.

• Technical Document/Data Sources is a number of documents, drawings and associated documentation that define, specify, guide and control what work will be performed, how the work is performed, what cannot be done, materials and processes used, certifications required and other aspects that the Contractor must use to achieve the program goal for each inducted aircraft.

• The Contractor shall request Technical Document/Data Sources and most associated Government documents from FRC WESTPAC Technical Library POC. Technical Document/Data Sources are regularly revised and updated. FRC WESTPAC monitors updates for relevant changes.

• The Contractor is also responsible to monitor Technical Document/Data Sources changes and inform USG of relevant changes impacting the work.

• The USG will provide Personal Electronic Maintenance Aids (PEMAs) for viewing the technical document/data sources to perform the requirements of this contract.

Technical Document/Data Sources

22-Nov-24 CUI 18

Contractor Quality Control

22-Nov-24 CUI 19

• The Contractor is responsible for implementing Quality Control Program into all aspects of its management, performance, workforce, processes, tools and tooling, material, supply chain, Sub-Contractors and any other aspects of its business that relates to the performance on this contract.

• The Contractor shall comply with ISO 9001:2015 or equivalent requirements applicable to this ID/IQ.

• The DCMA provides oversight, inspection approval, verification of safety of flight, critical safety items, and performs quality assurance surveillance of the Contractor. DCMA will also evaluate the Contractor’s Quality Control Program including an annual assessment of the effectiveness of Contractor’s Quality Control processes.

• A Contracting Officer’s Representative (COR) from FRC WESTPAC will also be assigned to provide overall contract surveillance and coordination functions.

• The NAVAIR AH-1Z/UH-1Y PMI Specifications include requirements for one

(1) PMI event, PMI-D, each with specific requirements.

• The Contractor shall perform PMI-D Scheduled Maintenance for airframe and component inspection, defect/discrepancy correction, preventative maintenance, and technical directive compliance IAW the NAVAIR AH- 1Z/UH-1Y IMP PMI specifications and released DLM SICN(s).

• The IMP PMI activities are generally divided into the following phases:

induction; cleaning/preservation; surface conditioning; disassembly;

inspection/evaluation; maintenance, repair and reassembly; final processing; and USG acceptance.

• The Contractor performs all scheduled maintenances tasks within CLIN X001 at a FFP per each inducted aircraft.

Scheduled Maintenance Requirements

22-Nov-24 CUI 20

Unscheduled Maintenance is further divided into four (4) subcategories:

Over and Above (O&A) In-Service Repairs (ISR) Customer Service Requests (CSR) Depot Technical Directives (TDs)

• When there is Unscheduled Maintenance required, other CLINs may apply, such as CLIN X002 (Repetitive Maintenance) or CLIN X003 (Unscheduled Maintenance). The Contractor may be requested to provide work-hour estimates for performing CLIN X003. The quantity of hours required to perform work under CLIN X003 will be negotiated, typically between the Contractor and DCMA.

Unscheduled Maintenance Requirements

22-Nov-24 CUI 21

• USG provides the majority of the Government Furnished Equipment (GFE) (material, parts, support equipment (SE))required to perform the AH-1Z/UH-1Y PMI process. For those items the USG cannot provide, the Contractor shall provide “Contractor-acquired property” as GFE to perform the contract. All new GFE shall be registered in the Item Unique Identification (IUID) Registry IAW

DFARS 252.211-7003.

• The Contractor is responsible to determine all parts/material are required for each aircraft and initiates the material requisition process in a timely manner.

• FRC WESTPAC and the Contractor must effectively partner in our respective roles in Supply Management to achieve program success.

Supply Management

22-Nov-24 CUI 22

• The USG will provide all required AH-1Z/UH-1Y support equipment (SE) during the performance of this contract

• The Contractor shall inventory, manage, maintain, and repair all GFE provided for the performance of this contract.

• Pauli Systems Paint Booth (included as GFE/SE)

• Required preventative maintenance (such as replacement of filters)

• Required certification and testing of the dry chemical fire suppression system

Government Furnished Equipment/Support Equipment

The Contractor Workforce

22-Nov-24 CUI 24

• The Contractor is fully responsible for developing its workforce knowledge, skills, and abilities, providing appropriately qualified, certified and experienced personnel necessary, and in adequate quantity, to achieve all of the AH-1Z and UH- 1Y PMI program requirements.

• The Contractor shall make every effort to independently acquire training on USG systems and unique AH-1Z and UH-1Y systems. The Contractor may request training on USG systems and unique AH-1Z and UH-1Y systems as required.

• Examples of Contractor qualifications:

* This list is not all inclusive and does not limit the required qualifications in any way.

The Contractor Workforce

22-Nov-24

CUI

Skill Certification Reference/Criteria Aircraft weight and balance In accordance with NAVAIR 01-1B-50 Cadmium plating * Solution Manufacturer’s (SIFCO) certification program or quality control department, performed per

MIL-STD-865/AMS on H-1 aircraft, or equivalent authorized by the H-1 FST.

Annual recertification required.

Certified composite repair, composite sealants/laminating, and bonding adhesives. *

Includes metal to metal bonding, carbon fiber, fiberglass, and Kevlar

Certified IAW LPS CP08-0-X-7063 (minimum of category D) or H-1 FST approved equivalent process.

Annual recertification required.

NDI *

Capable of eddy current, ultrasound, and florescent dye penetrant.

Level 2 in accordance with NA-01-1A-16-1, NA-01-1A-16-0, MIL-HDBK-728/1/2/3/4/5/6 or equivalent authorized by the H-1 FST; NAS410 and ASTM E1742/E1742M or equivalent.

Welding NAVAIR 01-1A-34 Intermediate and Depot Level Maintenance Instructions, Aeronautical Equipment Welding

Aircraft corrosion control and painting N/A Basic airframe repair, including sheet metal repair N/A

Basic corrosion control N/A Cold work processes, installation and removal of Force-Mate bushings and ForceTec nut plates

N/A

Chemical conversion coating N/A Drive train alignment N/A Flight control rigging N/A Hydraulic system test N/A Plastic Media Blast (PMB) N/A Apply copper coating to H-1 composite panels requiring lightning guard N/A

* refers to Contractor having qualified personnel available either at their facility or as an outsourced capability.

Monitor Program Requirements Changes

22-Nov-24 CUI 26

• The Contractor will monitor for changes to documentation, processes, materials, tooling, required skills, training and certifications, and monitor the status of each inducted aircraft and aircraft logbook. Identified changes and trends that are relevant to TAT and quality will be reported to the US Government for investigation. The Contractor’s engineers will support and assist the FRC WESTPAC Engineering Department in assessing such changes and trends.

• The US Government encourages the Contractor to make recommendations that may improve program performance and reduce schedule.

Data Requirements

22-Nov-24 CUI 27

• The PWS includes Contract Data Requirements List (CDRL) reporting items. Many of these reports are required for each inducted aircraft, with due dates at various points or phases of the work completed.

• It is recommended the Contractor enable efficient report generation and timely delivery by automating collection of most of the required data. Exceptions to the required reporting format as defined in the CDRLs must first be approved by the US Government.

• CDRLs are Not Separately Priced (NSP)

Phase-In/Out Transition Period

22-Nov-24 CUI 28

• Phase-In Transition is not required if the awardee is the incumbent Contractor. Phase-in transition shall be executed and completed 180 days or less after contract award.

• A shorter transition period is allowable as long as the Contractor is fully prepared to perform the PMI requirements on the first aircraft inducted.

• The Phase-In transition period shall be completed prior to the first AH-1Z/UH-1Y scheduled PMI induction.

• Phase-Out transition begins 90 calendar days prior to the termination or completion of the contract and will continue as necessary for any task order(s) still in work.

• Phase-In/Phase-Out is included in CLIN X001 FFP

Performance Standards

22-Nov-24 CUI 29

• The PWS provides the Performance Requirement Standards with minimum levels of acceptable performance for the following:

• Delivering aircraft within the prescribed TAT

• Meeting aircraft reporting custodian satisfaction

• Maintaining a Technical Publication Library

• Updating the Technical Publications Library

• Operating in compliance with Safety, Health, and Environmental requirements

• Providing complete, accurate, and timely reports

• Delivering a quality product

Contracting Office Brief

Ground Rules

No information presented during this Industry Day commits the U.S.

Government to any acquisition approach, agreement or contract.

Any future published information or documentation will take precedence over information presented today or in response to questions.

The Government will not publish industry-proprietary questions/comments.

The Government will publish industry-general frequently asked questions (FAQs) with Government prepared responses.

Industry is ENCOURAGED to ask questions

NAVSUP FLCY

Naval Supply Systems Command (NAVSUP) Fleet Logistics Center Yokosuka (FLCY) is the Western Pacific region’s largest U.S. Navy logistics command. From its headquarters off Truman Bay, just 26 miles (41 kilometers) due south of Tokyo, the NAVSUP FLCY enterprise networks more than 20 detachments, sites and fuel terminals from Misawa, Japan, to Sydney, Australia; Diego Garcia in the Indian Ocean to Guam. Together, these detachments and sites provide logistics support to the Navy, Marine Corps, other Department of Defense (DoD) and federal activities within the 7th Fleet Area of Responsibility (AOR).

Yokosuka

San Diego

Puget Sound

Jacksonville

Norfolk/VA. Beach

Philadelphia

Sigonella

NAVSUP is a Fleet-Focused Organization with Global Reach

Mechanicsburg

USPACOM

NAVSUP

Weapon Systems

Support

(WSS)

NAVSUP

Fleet Logistics Centers

(FLC)

NAVSUP

Business Systems Center

(BSC)

Navy Exchange Service Command

(NEXCOM)

Naval Supply Systems Command

Pearl Harbor

USSOUTHCOM

USPACOM

USEUCOM

USAFRICOM

Bahrain

USCENTCOM

USNORTHCOM

NAVSUP SPAN

NAVSUP FLCY’s Mission

NAVSUP FLC Yokosuka's mission is to serve the Asia Pacific Region's forward deployed maritime warfighter with 24/7 operational logistics support integrating an extensive service provider network to deliver fuel, material, mail and supply chain services across the U.S.

Navy’s largest geographical area of operations.

NAVSUP FLCY’s Role

FLCY will serve as the contracting authority for AH-1Z & UH-1Y Contract.

FLCY will provide the Procurement Contracting Officer (KO) and Contract Specialist (CS) in support of this requirement.

FLCY will conduct the Source Selection process.

FLCY will handle all communications between requirements owner and industry.

Source Selection Process

AwardSelection of Source

NegotiationEvaluationSolicitation

Solicitation Phase: FLCY will issue the Request for Proposals through the SAM.gov website for 90 days under Solicitation number N6264925R0010.

Evaluation Phase: Conducted by FRC WESTPAC and FLCY.

FLCY will perform the price evaluation and FRC WESTPAC will perform the technical evaluation. The length of the evaluation phase will depend on the numbers of Offerors.

Negotiation Phase: If award not made on initials, FLCY will conduct negotiations with input from FRC WESTPAC.

The Government will seek the Best Value for the contracted services, and will apply a Tradeoff Source Selection process.

The evaluation factors for this solicitation, in descending order of importance:

Past Performance Technical Risk Technical Price

Past Performance is more important than Technical Risk, which is more important than Technical, which is more important than Price.

Together, Past Performance, Technical Risk, and Technical are significantly more important than Price.

Adequate Price Competition (FAR 15.403-1(c)(1)

Price Analysis based on Comparison of Offers (FAR 15.403-1(c)(1)(ii)(2)(b)

Only One Offer Received (DFARS 215.371)

Certified Cost or Pricing Data (DFARS 215.371-3(b)

DCMA Field Pricing Assistance (DFARS PGI 215.404-2(a))

DCAA Audit Assistance (DFARS PGI 215.404-2(c))

Price Evaluation

FLCY Points of Contact

Sara Robinson Email: sara.e.robinson19.civ@us.navy.mil Phone: 046-816-8412

Jonathan Groeschel Email: jonathan.j.groeschel.civ@us.navy.mil Phone: 046-816-1724

Dale Crawford (Division Director) Email: dale.a.crawford.civ@us.navy.mil Phone: 046-816-1697 mailto:sara.e.robinson19.civ@us.navy.mil mailto:jonathan.j.groeschel.civ@us.navy.mil mailto:dale.a.crawford.civ@us.navy.mil

Questions?

H-1 Industry Day Acquisition Brief
H-1 Industry Day
Slide Number 2
Disclaimer (Reminder)
FRC WESTPAC Active/Recent SAM.GOV Postings
FRC WESTPAC goals and intent
Slide Number 6
THE CONTRACTING PROCESS
Planned Contract Overview
Planned Contract Services – Section B
The Performance Work Statement
USG Functions and Roles
Additional USG’s functions and Roles
The Contractor’s Role
Facilities
Facilities Relocation Support
Turn-Around-Time
PMI Turn-Around-Time
Technical Document/Data Sources
Contractor Quality Control
Scheduled Maintenance Requirements
Unscheduled Maintenance Requirements
Supply Management
Government Furnished Equipment/Support Equipment
The Contractor Workforce
The Contractor Workforce
Monitor Program Requirements Changes
Data Requirements
Phase-In/Out Transition Period
Performance Standards
H-1 Industry Day FLCY Contracts Brief
Contracting Office Brief
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11

File details come from the government source that posted it. Updated .