About this file

This document is Attachment (A) Specialized Experience, which is part of the solicitation for an Indefinite Delivery/Indefinite Quantity (ID/IQ) contract for Architect-Engineer (A-E) services for utility projects under the cognizance of the Naval Facilities Engineering Systems Command (NAVFAC), Hawaii.

The solicitation, numbered N62478-24-R-5046, requires the A-E firm to demonstrate specialized experience across 10 example projects in disciplines such as civil, architectural, structural, electrical, fire protection, mechanical, and geotechnical engineering. The projects cover a range of relevant design types including roadways, airfields, water treatment and distribution, electrical systems, sewage collection and treatment, storm drainage, power generation, and telecommunications. The A-E firm must provide details on the project title and location, design and construction years, project role, construction cost, firm name, and whether the work was new construction or repair. The response is due by Thursday, May 9, 2024 at 2:00 PM Hawaii Standard Time.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT (A)

SPECIALIZED EXPERIENCE

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
1
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

(NOT INCLUDING PCAS)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DD1391

FACD/ CHARRETTE

D-B RFP

DESIGN BID BUILD

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ARCHITECT

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS

AIRFIELDS

WATER TREATMENT AND DISTRIBUTION SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND TREATMENT SYSTEMS

STORM DRAINAGE SYSTEMS

POWER GENERATION

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

TELECOMMUNICATION SYSTEMS FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
2
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DD1391

FACD/ CHARRETTE

D-B RFP

DESIGN BID BUILD

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ARCHITECT

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS

AIRFIELDS

WATER TREATMENT AND DISTRIBUTION SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND TREATMENT SYSTEMS

STORM DRAINAGE SYSTEMS

POWER GENERATION

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

TELECOMMUNICATION SYSTEMS FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
3
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DD1391

FACD/ CHARRETTE

D-B RFP

DESIGN BID BUILD

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ARCHITECT

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS

AIRFIELDS

WATER TREATMENT AND DISTRIBUTION SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND TREATMENT SYSTEMS

STORM DRAINAGE SYSTEMS

POWER GENERATION

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

TELECOMMUNICATION SYSTEMS FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
4
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DD1391

FACD/ CHARRETTE

D-B RFP

DESIGN BID BUILD

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ARCHITECT

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS

AIRFIELDS

WATER TREATMENT AND DISTRIBUTION SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND TREATMENT SYSTEMS

STORM DRAINAGE SYSTEMS

POWER GENERATION

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

TELECOMMUNICATION SYSTEMS FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
5
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DD1391

FACD/ CHARRETTE

D-B RFP

DESIGN BID BUILD

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ARCHITECT

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS

AIRFIELDS

WATER TREATMENT AND DISTRIBUTION SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND TREATMENT SYSTEMS

STORM DRAINAGE SYSTEMS

POWER GENERATION

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

TELECOMMUNICATION SYSTEMS FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
6
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DD1391

FACD/ CHARRETTE

D-B RFP

DESIGN BID BUILD

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ARCHITECT

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS

AIRFIELDS

WATER TREATMENT AND DISTRIBUTION SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND TREATMENT SYSTEMS

STORM DRAINAGE SYSTEMS

POWER GENERATION

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

TELECOMMUNICATION SYSTEMS FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
7
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DD1391

FACD/ CHARRETTE

D-B RFP

DESIGN BID BUILD

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ARCHITECT

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS

AIRFIELDS

WATER TREATMENT AND DISTRIBUTION SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND TREATMENT SYSTEMS

STORM DRAINAGE SYSTEMS

POWER GENERATION

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

TELECOMMUNICATION SYSTEMS FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
8
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DD1391

FACD/ CHARRETTE

D-B RFP

DESIGN BID BUILD

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ARCHITECT

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS

AIRFIELDS

WATER TREATMENT AND DISTRIBUTION SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND TREATMENT SYSTEMS

STORM DRAINAGE SYSTEMS

POWER GENERATION

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

TELECOMMUNICATION SYSTEMS FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
9
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DD1391

FACD/ CHARRETTE

D-B RFP

DESIGN BID BUILD

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ARCHITECT

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS

AIRFIELDS

WATER TREATMENT AND DISTRIBUTION SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND TREATMENT SYSTEMS

STORM DRAINAGE SYSTEMS

POWER GENERATION

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

TELECOMMUNICATION SYSTEMS FOR FACILITIES

(a) SPECIALIZED EXPERIENCE
EXAMPLE PROJECT KEY NUMBER:
10
TITLE AND LOCATION (CITY & STATE)
DESIGN COMPLETED (YR)

EST. CONSTRUCTION COMPLETED (YR)

PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT
CONSTRUCTION COST (NOT AE DESIGN FEE):

AE FIRM NAME OR JV:

NEW CONSTRUCTION (NC) OR REPAIR (R):

PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)

DD1391

FACD/ CHARRETTE

D-B RFP

DESIGN BID BUILD

ENGINEERING STUDIES

DESIGN-BUILD DOR

DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):

CIVIL

ARCHITECT

STRUCTURAL

ELECTRICAL

FIRE PROTECTION

MECHANICAL

GEOTECHNICAL

RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):

ROADWAY/PARKING PAVEMENTS

AIRFIELDS

WATER TREATMENT AND DISTRIBUTION SYSTEMS

ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS

ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS

SEWAGE COLLECTION AND TREATMENT SYSTEMS

STORM DRAINAGE SYSTEMS

POWER GENERATION

UTILITY SUBSTATIONS

WATERFRONT ELECTRICAL SYSTEMS

UTILITY SWITCHING STATIONS

ALTERNATIVE ENERGY SYSTEMS

TELECOMMUNICATION SYSTEMS FOR FACILITIES

File details come from the government source that posted it. Updated .