N6247824R5046_ATTACHA_SPECIALIZED_EXPERIENCE.docx
DOCX document 72 KB Posted
- Solicitation number
- N62478-24-R-5046
About this file
This document is Attachment (A) Specialized Experience, which is part of the solicitation for an Indefinite Delivery/Indefinite Quantity (ID/IQ) contract for Architect-Engineer (A-E) services for utility projects under the cognizance of the Naval Facilities Engineering Systems Command (NAVFAC), Hawaii.
The solicitation, numbered N62478-24-R-5046, requires the A-E firm to demonstrate specialized experience across 10 example projects in disciplines such as civil, architectural, structural, electrical, fire protection, mechanical, and geotechnical engineering. The projects cover a range of relevant design types including roadways, airfields, water treatment and distribution, electrical systems, sewage collection and treatment, storm drainage, power generation, and telecommunications. The A-E firm must provide details on the project title and location, design and construction years, project role, construction cost, firm name, and whether the work was new construction or repair. The response is due by Thursday, May 9, 2024 at 2:00 PM Hawaii Standard Time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247824R5046_QA_MOD2.pdf | ||
| N6247824R5046SYNOPSIS_MOD2.pdf | ||
| N6247824R5046_SYNOPSIS_MOD1.pdf | ||
| N6247824R5046_ATTACHF_SMALL_BUSINESS_PARTICIPATION_COMMITMENT_DOCUMENT.docx | DOCX document | |
| N6247824R5046_ATTACHE_SMALL BUSINESS SUBCONTRACTING PLAN.docx | DOCX document | |
| N6247824R5046_ATTACHB_KEY_PERSONNEL.docx | DOCX document | |
| N6247824R5046_ATTACHC_PAST_PERFORMANCE_QUESTIONNAIRE.docx | DOCX document | |
| N6247824R5046_ATTACHD_HISTORICAL_SMALL_BUSINESS_UTILIZATION.docx | DOCX document | |
| N6247824R5046SYNOPSIS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT (A)
SPECIALIZED EXPERIENCE
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 1 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
(NOT INCLUDING PCAS)
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
STORM DRAINAGE SYSTEMS
POWER GENERATION
UTILITY SUBSTATIONS
WATERFRONT ELECTRICAL SYSTEMS
UTILITY SWITCHING STATIONS
ALTERNATIVE ENERGY SYSTEMS
TELECOMMUNICATION SYSTEMS FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 2 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
STORM DRAINAGE SYSTEMS
POWER GENERATION
UTILITY SUBSTATIONS
WATERFRONT ELECTRICAL SYSTEMS
UTILITY SWITCHING STATIONS
ALTERNATIVE ENERGY SYSTEMS
TELECOMMUNICATION SYSTEMS FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 3 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
STORM DRAINAGE SYSTEMS
POWER GENERATION
UTILITY SUBSTATIONS
WATERFRONT ELECTRICAL SYSTEMS
UTILITY SWITCHING STATIONS
ALTERNATIVE ENERGY SYSTEMS
TELECOMMUNICATION SYSTEMS FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 4 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
STORM DRAINAGE SYSTEMS
POWER GENERATION
UTILITY SUBSTATIONS
WATERFRONT ELECTRICAL SYSTEMS
UTILITY SWITCHING STATIONS
ALTERNATIVE ENERGY SYSTEMS
TELECOMMUNICATION SYSTEMS FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 5 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
STORM DRAINAGE SYSTEMS
POWER GENERATION
UTILITY SUBSTATIONS
WATERFRONT ELECTRICAL SYSTEMS
UTILITY SWITCHING STATIONS
ALTERNATIVE ENERGY SYSTEMS
TELECOMMUNICATION SYSTEMS FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 6 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
STORM DRAINAGE SYSTEMS
POWER GENERATION
UTILITY SUBSTATIONS
WATERFRONT ELECTRICAL SYSTEMS
UTILITY SWITCHING STATIONS
ALTERNATIVE ENERGY SYSTEMS
TELECOMMUNICATION SYSTEMS FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 7 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
STORM DRAINAGE SYSTEMS
POWER GENERATION
UTILITY SUBSTATIONS
WATERFRONT ELECTRICAL SYSTEMS
UTILITY SWITCHING STATIONS
ALTERNATIVE ENERGY SYSTEMS
TELECOMMUNICATION SYSTEMS FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 8 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
STORM DRAINAGE SYSTEMS
POWER GENERATION
UTILITY SUBSTATIONS
WATERFRONT ELECTRICAL SYSTEMS
UTILITY SWITCHING STATIONS
ALTERNATIVE ENERGY SYSTEMS
TELECOMMUNICATION SYSTEMS FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 9 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
STORM DRAINAGE SYSTEMS
POWER GENERATION
UTILITY SUBSTATIONS
WATERFRONT ELECTRICAL SYSTEMS
UTILITY SWITCHING STATIONS
ALTERNATIVE ENERGY SYSTEMS
TELECOMMUNICATION SYSTEMS FOR FACILITIES
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 10 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
ELECTRICAL SECONDARY DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
STORM DRAINAGE SYSTEMS
POWER GENERATION
UTILITY SUBSTATIONS
WATERFRONT ELECTRICAL SYSTEMS
UTILITY SWITCHING STATIONS
ALTERNATIVE ENERGY SYSTEMS
TELECOMMUNICATION SYSTEMS FOR FACILITIES
File details come from the government source that posted it. Updated .