AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

GROUNDS AND TREE MAINTENANCE SERVICES AT JOINT BASE PEARL HARBOR-HICKAM (JBPHH), HAWAII

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247819R2474

X 9B. DATED (SEE ITEM 11)

19-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Apr-2019

CODE

NAVFAC HAWAII

SERVICES ACQUISITION DIVISION (PRJ233)

400 MARSHALL ROAD

JBPHH HI 96860-3139

N62478 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247819R2474

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES (REVISED)

ANNEX 0200000

Replace Page 2 with the attached Page 2 (Amendment No. 0001).

Replace Pages 13 through 35 with the attached Pages 13 through 35 (Amendment No. 0001).

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

Replace TOC, Page 1 of 1 with the attached TOC, Page 1 of 1 (Amendment No. 0001).

ATTACHMENT 0200000-07

Replace Pages 1 through 54 with the attached Pages 1 through 56 (Amendment No. 0001).

ATTACHMENT 0200000-08

Replace Pages 1 through 54 with the attached Pages 1 through 56 (Amendment No. 0001).

ATTACHMENT 0200000-09

Replace Pages 1 through 54 with the attached Pages 1 through 56 (Amendment No. 0001).

ATTACHMENT 0200000-10

Replace Pages 1 through 54 with the attached Pages 1 through 56 (Amendment No. 0001).

ATTACHMENT 0200000-11

Replace Pages 1 through 54 with the attached Pages 1 through 56 (Amendment No. 0001).

ATTACHMENT 1503050-05

Insert Pages 1 through 21 (Amendment No. 0001).

ATTACHMENT 1503050-06

Insert Pages 1 through 3 (Amendment No. 0001).

ATTACHMENT 1503050-08

Insert Pages 1 and 2 (Amendment No. 0001).

(End of Summary of Changes)

14-19-2474 0200000, Page 2 of 35 (Amendment No. 0001)

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.1.3.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties

2.7.1.4 Environmental/Energy Manager

2.7.1.5 Arborist

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.1.1 Personnel Performing Arboricultural Work

2.7.2.1.2 Personnel Performing In-Wire Tree Work

2.7.2.1.3 Personnel Performing Work on Backflow Preventers

2.7.2.1.4 Pesticide Applicator

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDS Program

2.8.4.2 DBIDS Credentials

2.8.4.3 DBIDS Paper Passes

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Sensitive Unclassified Information

2.8.9 Access to Navy Marine Corps Intranet (NMCI)

2.8.10 Employee Status

2.9 Contractor Safety Program

2.9.1 Accident Prevention Plan (APP)

2.9.2 Activity Hazard Analysis (AHA)

2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.3.1 Alcohol and Drug Abuse Prevention Plan

2.9.3.2 Chemical Hazard Communication Program

2.9.3.3 Confined space Program

2.9.3.3.1 Emergency Response Plans

2.9.3.4 Critical Lift Plan

2.9.3.5 Fall Prevention and Protection Plan

2.9.3.5.1 Fire Prevention Program

2.9.3.6 Hazardous Energy Control Program

2.9.3.7 Health Hazard Control Program and Hazard Communication Program

2.9.3.8 Respiratory Protection Program

2.9.4 Crane Operations

0200000, Page 13 of 35 (Amendment No. 0001)

0200000 - Management and Administration Spec Item Title Description

2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager or designated alternate that will be on site within during the Government's regular working hours and be available on site within two hours during hours other than the Government’s regular working hours. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager.

The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:

The Quality Manager shall have at least three years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager may be the same person as the SSHO.

2.7.1.3 Site Safety and Health

Officer (SSHO)

The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project.

Provide a safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be on site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1- 1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.

The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:

The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years of experience if he or she possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO may be the same person as the Project Manager but shall have fulfilled the pre-requisite qualification and experience.

The SSHO may be the QM or the PM but shall not be both.

2.7.1.3.1 Additional Site

Safety and Health Officer (SSHO)

The SSHO must have completed a 40 hour contract safety awareness course based on the content and principles of EM 385-1-1, and instructed in accordance with the guidelines of ASSE/SAFE Z490.1, by a trainer meeting the qualifications of paragraph QUALIFIED

0200000, Page 14 of 35 (Amendment No. 0001)

Requirements and Duties

TRAINER REQUIREMENTS. If the SSHO does not have a current certification, certification must be obtained within 60 days, maximum of contract award.

As a minimum this course shall provide the participant with knowledge of the unique EM 385-1-1 U.S. Army Corps of Enigineers Safety and Health requirements. NAVFAC P-307 Management of Wieght Handling Equipment Manual, Hazard Identification, Recommending Hazard Abatement Methods, Properly preparing a site-specific Accident Prevention Plan (APP), Activity Hazard Analysis (AHA), and other skills necessary to effectively manage a safety program for contractors doing business with the US Navy, NAVFAC, US Army Corps of Engineers, and other Government DOD agencies.

The 40 Hour Construction Safety Hazard Awareness Course will include a written examination that will cover the following safety topics as it applies to the requirements identified in the

1) EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual

2) The NAVFAC P-307 Management of Weight Handling

Equipment Manual.

2.7.1.4 Environmental/

Energy Manager The Contractor shall provide an Environmental/Energy Manager whose primary duty and responsibility is to ensure Contractor operations adhere to the goals and policies of the Environmental Management System, the Installation Energy Plan, and other specified Sustainability requirements affecting this contract. The Environmental/Energy Manager shall develop, implement and monitor environmental strategies, policies and programs that promote sustainable development and examine the contract activities to establish where improvements can be made and ensure compliance with environmental legislation and energy policy.

The Environmental/Energy Manager shall have a minimum two years’ experience with environmental procedures similar to those of this contract; familiarity with Environmental Management Systems (EMSs);

and knowledge of environmental regulations and federal energy laws and policy (including energy and water reduction requirements and renewable energy requirements) that are applicable to operations similar to those of this contract.

The Environmental/Energy Manager may be the same person as the Project Manager or SSHO if the pre-requisite qualification and experience for each position is fulfilled.

2.7.1.5 Arborist The Contractor shall provide an Arborist whose primary duty and responsibility is to oversee all arboricultural work associated with this contract. The Arborist shall be a qualified line clearance trained and experienced arborist. At a minimum, line clearance training shall include the successful completion of safety and hazard awareness training for arboricultural work around electrical utility lines and structures. Training shall also include demonstration of ability in the performance of special techniques involved with in-wire tree services.

0200000, Page 15 of 35 (Amendment No. 0001)

Within 15 calendar days after award of the contract, the Contractor shall submit to the KO documentation that supports that the Arborist is experienced and trained as required above, as well as meets the definition of “Arborist”.

Submit updated documentations whenever person is re-certified or requalified.

2.7.2 Employee

Requirements

The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.

Performance of some tasks or duties under this contract requires the use of qualified personnel that are certified and trained to perform such work.

Specific certification and training requirements for those personnel are addressed in the appropriate Annex/Sub-annex, or above in Spec Item

2.7.1 “Key Personnel”. Some examples of personnel requiring specific certifications, licenses, and training include: SSHO, Certified Arborist, Certified Tree Worker, and Certified Applicator/Operator.

2.7.2.1 Employee

Certification and Training

The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 4 hours of request.

2.7.2.1.1 Personnel Performing

Arboricultural Work

Certified Arborists or Certified Tree Workers shall perform arboricultural work, unless otherwise stated in the contract. Qualified Tree Workers and Qualified Tree Worker Trainees, as defined by ANSI A300, may perform tree pruning or removal work only when work is performed under the direct supervision of an Arborist or Certified Tree Worker. The supervising Arborist or Certified Tree Worker shall be present at the work site at all times.

2.7.2.1.2 Personnel Performing

In-Wire Tree Work

Qualified line clearance trained and experienced Arborists or Certified Tree Workers shall perform all in-wire tree services. At a minimum, training shall include the successful completion of safety and hazard awareness training for arboricultural work around electrical utility lines and structures. Training shall also include demonstration of ability in the performance of special techniques involved with in-wire tree services.

2.7.2.1.3 Personnel Performing

Work on Backflow Preventers

A certified backflow-preventer tester shall perform disinfections, repairs, and other work on backflow preventers.

2.7.2.1.4 Pesticide Applicator All personnel who apply pesticides on DoD property shall be State of Hawaii pesticide applicator certified as a Commercial 3 (Ornamental & Turf Pest Control) pesticide applicator, Commercial Category 5 –Aquatic Pest Control pesticide applicator, and Commercial 6 (Right-Of-Way Pest Control) Pesticide Applicator.

2.7.2.2 Employee Appearance The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a

0200000, Page 16 of 35 (Amendment No. 0001) prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.

2.7.2.3 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

2.7.2.4 Identification as

Contractor Employee

Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

2.7.2.5 Removal of

Employees

The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.

2.7.2.6 Proof of Legal

Residency

No employee or representative of the Contractor will be admitted to the site of work unless satisfactory Proof of Legal Residency is furnished per Deliverables, Attachment 0200000-17.

Contractor employees or representatives may be faced with additional restrictions or requirements (e.g. citizenship or additional background checks) dependent upon the Command or location.

2.7.3 Enterprise-wide

Contractor Manpower Reporting Application (eCMRA)

The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil/Default.aspx

Per Deliverables, Attachment 0200000-17, reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September

30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil/Default.aspx.

2.8 Security Requirements The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.

The Contractor shall meet all Security Requirements in Attachment Attachment 0200000-15.

2.8.1 Employee Listing The Contractor shall maintain a current Employee List and submit per Deliverables, Attachment 0200000-17. The list shall include employee’s name, supervisor, company, and level of security clearance.

2.8.2 Vehicles The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code.

Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable. Vehicles and use shall be in accordance with the most current OPNAV INST 5100.12; Navy Traffic Safety Program.

2.8.3 Passes and Badges All Contractor employees shall obtain the required employee and vehicle passes. The Contractor employees must be able to obtain Common Access Cards (CAC) in accordance with security requirements. Each

0200000, Page 17 of 35 (Amendment No. 0001) employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within ten calendar days.

2.8.4 Access to Installation All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS).

The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into

DBIDS

The Contractor shall furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.

2.8.4.1 DBIDS Program DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

The Government performs background screening and credentialing.

Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

2.8.4.2 DBIDS Credentials Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at: https://www.cnic.navy.mil/om/dbids.html.

The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The Commanding Officer will be the final waiver determination authority.

The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:

(1) That an employee has departed the company without having

0200000, Page 18 of 35 (Amendment No. 0001) properly returned or surrendered their DBIDS credentials.

(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.

2.8.4.3 DBIDS Paper Passes In the event that a visitor, vendor, or Contractor employee elects not to participate in DBIDS, the individual will be issued DBIDS paper pass from the Base Pass and Identification Office in order to access to the installation. The time standard for the validity of a pass to access an installation will be not more than thirty (30) days and may be further restricted based on local policy or by Federal, DOD, Navy, and CNIC guidance.

The Government will not be responsible for any cost or lost time associated with obtaining paper passes or added vetting or inspections incurred by non-participants in the DBIDS credentialing process.

2.8.5 Access to Buildings The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties.

The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.

2.8.6 Access Arrangements The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.

2.8.6.1 Escort Arrangement

for Secured Areas

The Contractor shall make arrangements for Government escort into secured areas requiring escort. The KO will provide information on applicable buildings, spaces and the appropriate point of contact.

The Contractor may experience delays while waiting for escorts. The Government estimates the wait period can be up to 15 minutes. The Contractor shall notify the Government Performance Assessment Representative (PAR) and appropriate point of contract if an escort is not available after 15 minutes and access to accomplish the work is denied.

Unscheduled requirements, e.g., trouble calls, may require a longer wait for an escort.

2.8.7 Security Clearances The Contractor shall obtain all required corporate and personnel Security Clearances per Attachment 0200000-15 prior to commencement of work.

The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending.

0200000, Page 19 of 35 (Amendment No. 0001)

2.8.8 Access to Sensitive

Unclassified Information

The Contractor personnel whose work involves access to sensitive unclassified information shall undergo a Tier 3 Investigation to verify their trustworthiness. If the Contractor personnel currently have a favorably adjudicated Tier 3 Investigation the Contractor shall notify the Government Command Security Manager who will validate this in the Joint Personnel Adjudication System (JPAS).

The Contractor shall request from the Government for access to the E- QIP Direct program for the Contractor employees to complete the SF-86 form on line for a Tier 3 Investigation. The Security Manager will determine suitability. Upon a favorable Tier 3 Investigation, the Contractor personnel shall submit the completed original signed release statements, applicant fingerprint card (FD87), and an OF-306 Declaration for Federal Employment to the Security Manager per Attachment 0200000-17. The Contractor shall be responsible for providing the fingerprint card.

The request shall be renewed annually or for the duration of the contract if less than one year.

2.8.9 Access to Navy

Marine Corps Intranet

(NMCI)

The Contractor may be required to access Navy Marine Corps Intranet (NMCI). Prior to being granted access to NMCI, Contractor employees shall obtain a CAC in accordance with security requirements, successfully complete required training, submit a Systems Authorization Access Request (SAAR) Form, and meet all eligibility requirements.

2.8.10 Employee Status The Contractor shall notify the KO of any changes to any employee’s status to include, but not limited to, termination, convictions/arrests, adverse actions taken on the job for any reason or any other documented misbehavior that may affect, or have the potential to affect, security standing in terms of access to federal facilities or IT systems.

2.9 Contractor Safety

Program

The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, UFC 3-560-01 Operation and Maintenance Electrical Safety, and Public Law 91-596, Occupational Safety and Health Act.

Any reference to “USACE" facilities, property, or equipment specified in EM 385-1-1 should be interpreted as Government facilities, property, and equipment.

2.9.1 Accident Prevention

Plan (APP)

The Contractor shall develop and implement a site Accident Prevention Plan (APP). The APP shall be prepared by the Contractor’s SSHO and shall be followed by all Contractor employees, subcontractors, and vendors at each service site.

The APP shall follow the abbreviated format and include, as a minimum, elements addressed in paragraph 3.k. of Appendix A of EM 385-1-1.

The Contractor shall submit an APP for acceptance per Deliverables, Attachment 0200000-17. The Contractor shall review, update, and submit revisions to the APP whenever a change in work conditions, hazards, or

0200000, Page 20 of 35 (Amendment No. 0001) activities occur. Submittal of the APP shall include AHAs and applicable compliance plans, programs, and procedures as specified below.

The Contractor shall not commence work until the APP has been accepted and no activity shall be started on site until the applicable AHAs and compliance plans have been accepted.

Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.

2.9.2 Activity Hazard

Analysis (AHA)

The Contractor shall prepare AHAs for all applicable common recurring work activities performed under this contract. AHAs for recurring work shall be submitted with the APP and shall be updated as work activities or conditions change and additional AHAs prepared as new work activities are required. AHAs for Non-recurring and one-time (e.g., Non-recurring work task orders) work occurrences shall be submitted at least two working days prior to start of work. Specifically;

For contract modifications to recurring work requirements where changes are germane to the original contract, the Contractor shall revise applicable AHAs within 15 calendar days after modification is signed.

For contracts with Non-recurring work ELINs, the Contractor shall submit an AHA on Non-recurring work task orders, with the associated proposal, whenever the service environment or required task is different from the recurring work priced services.

For combination recurring/non-recurring contracts, the Contractor shall submit an AHA on task orders, with the associated proposal, whenever the service environment or required task is different from the recurring services.

The Contractor shall follow the Risk Management Process for the development of AHA in accordance with paragraph 01.A.14 and Appendix A of EM 385-1-1. A formatted outline of an AHA is provided in Figure 1-2 of EM 385-1-1.

The steps of the service process;

Identify potential hazards that exist as a result of the Contractor’s service process within the environment;

Measures or plans of actions to safely remove potential hazards away from people in and around the service process and environment;

Specific materials and equipment necessary to safely remove potential hazards away from people in and around the service process and environment;

Inspection requirements to assure service activity is safe; and Training of service personnel to be aware of potential hazards and measures or plans of actions to be used to remove hazards from service environment.

During performance of services, the SSHO shall periodically review the AHA at each service site and for each sub-annex to assess the effectiveness of the Contractor’s overall APP. If changes to the AHAs are

0200000, Page 21 of 35 (Amendment No. 0001) required, such changes shall be submitted to the KO for review and acceptance.

2.9.3 Safety and

Occupational Health (SOH) Risks and Compliance Plans

Based on a risk assessment of recurring and non-recurring work requirements and on mandatory OSHA compliance programs, the Contractor shall develop, provide and implement all applicable compliance plans, as necessary for the situation or types of work to be performed under this contract. Compliance plans, programs, and procedures along with their respective references are detailed in Appendix A, paragraph 3.i of EM 385-1-1.

These plans shall be submitted with the APP and shall be updated as situations change. Additional compliance plans, programs, and procedures shall be developed as applicable when new types of work are required under this contract.

The Contractor shall submit the occupational risk and compliance plans for acceptance per Attachment 0200000-17.

2.9.3.1 Alcohol and Drug

Abuse Prevention Plan

The Contractor shall develop an alcohol and drug abuse prevention plan to explain how it will satisfy the drug-free work force requirement and include elements addressed in paragraph 01.C.02 of EM 385-1-1

2.9.3.2 Chemical Hazard

Communication Program

The Contractor shall develop a project-specific chemical hazard communication program to include elements addressed in paragraph 06.B.01 of EM 385-1-1and applicable OSHA requirements in 29 Code of Federal Regulations (CFR) 1910.120 and 29 CFR 1926.59.

2.9.3.3 Confined Space

Program

The Contractor shall develop an activity/site-specific confined space program to include elements addressed in paragraph 34.A of EM 385-1-1 and comply with relevant requirements in 29 CFR 1910, 29 CFR 1915, and 29 CFR 1926, OSHA Directive CPL 2.100 and any other Federal, state and local regulatory standards.

2.9.3.3.1 Emergency Response

Plans

The Contractor shall develop emergency response plans to ensure safe evacuation and personnel safety in the event of fire or other emergency that include elements addressed in paragraphs 01.E, 03.A, 03.D, and 19.A.04 of EM 385-1-1.

2.9.3.4 Critical Lift Plan The Contractor shall develop a critical lift plan to explain how it will conduct lifts for any of the following conditions:

1) Lifts over 75 percent of the capacity of the crane or hoist (or lifts over 50 percent of the capacity of a barge mounted mobile crane's hoists) at any radius of lift;

2) Lifts involving more than one crane, hoist, or LHE

3) Lifts of personnel;

4) Lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks

5) Lifts involving hazardous materials (e.g., explosives, highly volatile substances);

6) Lifts where the center of gravity could change;

7) Lifts without the use of outriggers using rubber tire load charts;

8) Lifts using more than one hoist on the same crane, hoist, or LHE;

9) Lifts involving Multiple Lift Rigging (MLR) Assemblies or other non-routine or technically difficult rigging arrangements;

10) Lifts involving submerged loads. Exception: lifts that were engineered to travel in guided slots throughout the lift and have fixed rigging and/or lifting beams, i.e., intake gates, tailgates/logs);

0200000, Page 22 of 35 (Amendment No. 0001)

11) Lifts out of the operator’s view. (Exception: if hand signals used by a signal person in view of the operator or radio communications are available and in use, load does not exceed two tons AND is determined a routine lift by the lift super.)

The critical lift plan shall include elements addressed in paragraph 16.H of EM 385-1-1, paragraph 1.7.2 of NAVFAC P-307, and comply with requirements in ASME B30.22, ASME B30.3; ASME B30.5, and ASME B30.8.

The Contractor shall complete and maintain a copy of the Crane Operating Checklist For Critical Lifts, provided within the Forms in Attachment 0200000-05, for each lift.

2.9.3.5 Fall Prevention and

Protection Plan

The Contractor shall develop a site specific fall prevention and protection plan to protect and prevent its service workers from falling from heights of 1.8m (6 feet) or more. This plan shall include elements addressed in paragraph 21.D of EM 385-1-1 and ANSI A10.32, ANSI Z359.1, and ANSI/ASSE A10.34. The fall prevention and protection plan shall include a Rescue and Evacuation Plan in accordance with EM 385-1-1, Section 21.N. A competent person for fall protection shall prepare and sign the plan.

2.9.3.5.1 Fire Prevention

Program

The Contractor shall develop a fire prevention program to include a fire prevention plan and annual survey to include elements addressed in NFPA 1 with Navy Amendments, NFPA 10, NFPA 241, NFPA 51B, NFPA 70, and NFPA 70E.

2.9.3.6 Hazardous Energy

Control Program

The Contractor shall develop a hazardous energy control program to include elements addressed in paragraph 12.A.12 of EM 385-1-1.

2.9.3.7 Health Hazard Control

Program and Hazard Communication Program

The Contractor shall develop a project-specific health hazard control program and chemical hazard communication program to include elements addressed in paragraphs 06.A and 06.B of EM 385-1-1 and 29 Code of Federal Regulations (CFR) 1910.120 or 1926.59 requirements.

2.9.3.8 Respiratory Protection

Program

The Contractor shall develop a respiratory protection program to include elements addressed in paragraph 05.G of EM 385-1-1 and the OSHA’s respiratory protection standard specified in 29 CFR 1910.134.

2.9.4 Crane Operations All operations of Cranes, Multi-Purpose Machines and Material Handling Equipment shall comply with EM 385-1-1, NAVFAC P-307, 29 CFR Part 1910, and 29 CFR Part 1926.

The Contractor shall comply with paragraph 1.7.2 of NAVFAC P-307 and notify the Contracting Officer at least 24 hours prior to bringing any crane (including delivery vehicles with crane boom attachments), multi-purpose machines, material handling equipment, or construction equipment that may be used in a crane-like application to lift suspended loads on board a Navy Installation. Written documentation of the last weight test of the crane and all related weight handling equipment (e.g.

attachments, rigging gear, etc.) shall be maintained on site.

A joint verification with the Government representative must be performed to ensure that a legible and indelible completed copy of Appendix P, Figure P-1 of NAVFAC P-307 is maintained on the crane, multi-purpose machine, and material handling equipment or construction equipment used in a crane-like application to lift suspended loads. The

0200000, Page 23 of 35 (Amendment No. 0001) following certification and testing documentation shall be on site prior to entry and use on any Navy Installation:

1) Crane, multi-purpose machine, material handling equipment or construction equipment used in a crane-like application to lift suspended load certification

2) Load testing

3) Yearly, monthly and daily inspection logs

4) Rope/sling certifications

5) Operator certifications/designations

6) Designation of person performing log inspections

7) Cranes that are permanently located on a Navy Installation shall have a quarterly joint verification.

2.9.4.1 Crane Inspections The Contractor shall ensure all inspections are performed in accordance with EM 385-1-1, NAVFAC P-307, 29 CFR Part 1910, and 29 CFR Part 1926 (daily, monthly, quarterly, yearly), and retain the current documentation of inspections. Documents shall be kept on site.

Daily pre-use inspections and testing shall be performed on all load hoisting and lowering mechanisms, boom hoisting and lowering mechanisms, swinging mechanisms, travel mechanisms (if to be used that day), and safety devices. Cranes that have to be re-rated shall be in accordance with SAE Recommended Practices, Crane Load Stability Test Code J765 and documentation maintained on site. The Contractor shall have an operational anti-two block device or a two-block damage prevention feature for all points of two blocking and a boom hoist disconnect, shutoff, or hydraulic relief to automatically stop the boom hoist when the boom reaches a predetermined high angle.

2.9.4.2 Rigging Gear The Contractor shall ensure rigging gear and below the hook lifting devices and personnel comply with the following requirements:

1) Personnel performing rigging shall have an understanding of all signs, notices, and operating instructions, and be familiar with the applicable hand signals prescribed by the ASME B30 standard for the type of crane in use.

2) Personnel performing rigging shall be familiar with the rigging requirements in EM 385-1-1, NAVFAC P-307, 29 CFR Part 1910, and 29 CFR Part 1926.

3) The Contractor shall inspect rigging gear in accordance with EM 385- 1-1, NAVFAC P-307, 29 CFR Part 1910, and 29 CFR Part 1926 and paragraph 1.7.2 of NAVFAC P-307. Certification records shall be made available for review upon request.

2.9.4.3 Crane Operators Crane operators shall meet the personnel qualifications requirements in paragraph 16.B of EM 385-1-1 and paragraph 1.7.2 of NAVFAC P-307.

For mobile cranes with Original Equipment Manufacturer (OEM) rated capacitates of 2,000 pounds or greater, designate crane operators as qualified by a source that qualifies crane operators (i.e., union, a government agency, or an organization that tests and qualifies crane operators).

2.9.5

Accident and Damage Reporting

The Contractor shall notify the Contracting Officer as soon as practical, but no more than four hours after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, property damage equal to or greater than $2,000, or any Weight Handling Equipment (WHE) accident. Notification shall also be provided for any mishap occurring in any of the following high hazard areas: electrical (to include Arc Flash, electrical shock, etc.); uncontrolled release of

0200000, Page 24 of 35 (Amendment No. 0001) hazardous energy (includes electrical and non-electrical); weight or load handling equipment (LHE) or rigging; fall-from-height (any level other than same surface); and underwater diving. These mishaps shall be investigated in depth to identify all causes and to recommend hazard control measures.

Within notification include Contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on site and Government investigation is conducted.

An Initial Accident Reporting Notification Report shall be developed by the Contractor and provided to the KO immediately after that an accident, or near miss, has occurred.

The Contractor may not have all the facts and information regarding the actual incident or near miss at the time of the initial report. However, it is the Government’s desire to receive notification of all mishap situations as early as possible.

The Contractor shall develop a Follow-on Accident Reporting Notification Report and shall and provide a copy to the KO by close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning.

Follow-on reports shall be required daily until the Contractor can send a final, conclusive report of the nature, cause, and outcome of the accident.

The Contractor shall provide a Final Accident Reporting Notification Report of the accident to the KO within 24 hours after completing the investigation of the accident.

The Contractor shall conduct an accident investigation for recordable injuries and illnesses, for accidents requiring Medical Treatment, property damage accidents resulting in at least $20,000 in damages, and near misses as defined in EM 385-1-1, to establish the root cause(s) of the accident. The Contractor shall complete the applicable NAVFAC Contractor Incident Reporting System (CIRS), and electronically submit via the NAVFAC Enterprise Safety Applications Management System (ESAMS) per Attachment 0200000-17. Required or special forms are provided within the forms in Attachment 0200000-05.

For a near miss, the Contractor shall complete the applicable documentation in NAVFAC Contractor Incident Reporting System (CIRS), and electronically submit via the NAVFAC Enterprise Safety Applications Management System (ESAMS) per Attachment 0200000- 17.

2.9.5.1 Accident Reporting

and Notification Criteria

The following criteria and definitions apply to the accident reporting requirements specified above:

Recordable Injuries or Illnesses. Any work-related injury or illness that results in:

0200000, Page 25 of 35 (Amendment No. 0001)

1) Death, regardless of the time between the injury and death, or the length of the illness;

2) Days away from work (any time lost after day of injury/illness onset);

3) Restricted work;

4) Transfer to another job;

5) Medical Treatment beyond first aid;

6) Loss of consciousness; or

7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.

High Visibility Accident. Any mishap which may generate publicity or high visibility.

Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical Treatment does not include first aid treatment even though provided by a physician or registered personnel.

WHE Accident. A WHE accident occurs when any one or more of the eight elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load;

derailment; two-blocking; overload; or collision, including unplanned contact between the load, crane, or other objects. A dropped load, derailment, two-blocking, overload and collision are considered accidents even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, roll over, etc.)

2.9.6 Fire Protection The Contractor shall know where fire alarms are located and how to activate them. The Contractor shall handle and store all combustible supplies, materials, waste and trash in a manner that prevents fire or hazards to persons, facilities, and materials.

2.9.7 Monthly On Site

Labor Report

The Contractor shall submit a Monthly On Site Labor Report per Attachment 0200000-17. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractor.

2.9.8 OSHA Citations and

Violations

The Contractor shall correct violations and citations promptly and provide a copy of each OSHA citation and OSHA report with written OSHA Citations and Violations Corrective Action Report per Attachment 0200000-17.

2.9.9 Safety Inspections and

Monitoring

The Contractor shall conduct inspections of its work areas, job sites, and work crews every day work is being performed to ensure that all Contractor operations are being conducted safely. These inspections shall ensure:

The site is safe and free of job-site hazards Proper PPE is being utilized and worn.

Safe work practices and processes are being followed.

Workers are familiar with the hazards covered in the respective

AHA for that work activity.

0200000, Page 26 of 35 (Amendment No. 0001)

All equipment and tools are in good condition and being used safely.

The Government reserves the right to inspect and monitor Contractor operations for safety compliance. In general, the Government approach will be to conduct performance assessment on the quality and effectiveness of the Contractor’s safety program. The Government reserves the right to stop any work activity when it deems danger is imminent. Contractor personnel shall work in a safe manner and comply with all applicable safety regulations. The Contractor shall be subject to safety inspections of its work sites by the Government. Contractor safety records shall be available to the KO upon request.

Whenever the KO becomes aware of any safety noncompliance or any condition which poses a serious or imminent danger or hazard to the health or safety of the public or government personnel, the KO will notify the Contractor orally, with written confirmation, and request immediate corrective action. This notice, when delivered to the Contractor’s representative or SSHO, shall be deemed sufficient notice of noncompliance and that corrective action is required. After receiving this notice, the Contractor shall immediately take corrective action. If the Contractor fails, delays, or refuses to promptly take corrective action, the KO may issue a stop work order for all or part of the services or work until satisfactory corrective action has been taken. Whenever such a stop work order has been issued, the Contractor shall waive all equitable adjustments to the contract related to the stop work ordered issued. The Contractor shall include this requirement in all of its subcontracts and vendor contracts in support of contract safety.

2.9.10 Safety Certification The Contractor shall submit copies of all the required Federal, state, county, city and industry Safety Certifications for work performed under this contract per Attachment 0200000-17. These certifications shall be kept up to date by the Contractor. The Contractor shall submit new versions of certifications as the old certifications expire. No work, that requires a certification, shall start without a valid and approved certification.

2.9.11 Safety Apparel on

Jobsites

The Contractor personnel shall wear appropriate high visibility safety apparel (garment, vest, or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.