Question Tracker - MCAS Yuma EUL RFP.pdf

PDF 79 KB Posted

Attached to
Request for Proposals # N62473-24-RP-00108 to Lease Properties at MCAS Yuma in support of Energy Resiliency
Solicitation number
N62473-24-RP-00108
Issued by

About this file

This document is a Question Tracker for the MCAS Yuma EUL (Enhanced Use Lease) RFP (Request for Proposals) Solicitation No. N62473-24-RP-00108. The RFP is seeking proposals to lease property at MCAS Yuma in support of implementing critical energy infrastructure resiliency projects.

The key details are:

  • The government has received questions from Ameresco regarding the RFP, including requests for utility drawings, resilience studies, NEPA (National Environmental Policy Act) requirements, and draft NEPA documents.
  • The government has responded that additional information may be provided upon down-selection, that there are no USMC-owned utilities on site, and that the NEPA process will not start until after down-selection.
  • The RFP is being issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCAS Yuma ENERGY EUL RFI: SOLICITATION NO. N62473-24-RP-00108 COMMUNICATION LOG

CURRENT AS OF: 5/14/24

# info@ Date Company Reason for Contact Navy Response 1 5/14/2024 Ameresco Can the government please provide electrical/water/gas or steam single line drawings?

Additional information may be provided upon down selection. For specific utility information please contact servicing utilities since there are no USMC owned utilities on the site.

2 5/14/2024 Ameresco Can the government please provide any studies relating to resilience gaps such as Installation Energy Security Plans (IESP) or any others?

Additional information may be provided upon down selection.

3 5/14/2024 Ameresco What NEPA action is proposed for the related land (EA or EIS)? The NEPA will be based on the size and the scope of the negotiated project which cannot be done until down selection.

4 5/14/2024 Ameresco What is the expected timeframe to address the NEPA action? Refer to answer #3 5 5/14/2024 Ameresco Can the contractor provide the drafted NEPA EA and or EIS documents? No, there is no existing documents. The NEPA process will not start until after down select.

Tracker

File details come from the government source that posted it. Updated .