Text version

RFI (pre-award) Form_For KTR

SOLICITATION: N62473-23-Q-4005

RELOCATABLE PAINT BOOTH, MCAS MIRAMAR, SAN DIEGO, CA

DOCUMENT DATE: 18 APRIL 2023

TO BE FILLED OUT BY THE BIDDING KTRTO BE FILLED OUT BY THE GOV'T
RFI #RFQ Part #Chapter or SectionSub-Section #CLARIFICATION REQUESTRFI reason from KTR's PerspectiveComment [fill out if "Other" was chosen, specify reason(s)]RFI Topic most closely relevant to:Government ResponseDATE RECEIVEDDATE TO KTRAmendment Number
1Can a shipping container be used as the enclosure for this portable paint booth? If so, does it have to be an unused/brand new shipping container or can it be a used/refurbished unit outfitted to meet all requirements set forth in the solicitation?As long as the end state is a self-contained paint booth. Self-contained meaning, fire suppression, air filtration, and external structure that is able to be relocated via a crane or forklift. This includes meeting or exceeding all applicable NFPA codes and standard requirements as specified in the solicitation.N/A
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100

Drop Down List

RFI Topic Relevant to:RFP Part #RFI Reason (for QA) - from KTR perspecrive
Architectural-relatedPart 1Outdated Reference
Civil EngineeringPart 2Conflicting Information
ContractingPart 3Attachments are referenced but missing/not provided
Electrical EngineeringPart 4Intent needs clarification
EnvironmentalPart 5Typo
Fire ProtectionPart 6Other; Please specify in the next column
Geotechnical EngineeringIf "Others" - include info under Column E Clarification Request
Interior Design
Landscape
Mechanical Engineering
Structural Engineering
Other/Unsure
SCIF/SAPF
Crane
Elevators
ATFP

File details come from the government source that posted it. Updated .