Procurement Sensitive - For Official Use Only
Defense Fuel Support Point San Pedro
Industry Forum
December 5, 2017
Attachment D
2 . Procurement Sensitive - For Official Use Only
INTRODUCTION & WELCOME
Naval Weapons Station Seal Beach Commanding Officer Captain Noel Dahlke
3 . Procurement Sensitive - For Official Use Only
AGENDA & LOGISTICS
Naval Weapons Station Seal Beach Ms. Jazmin Atencia
4 . Procurement Sensitive - For Official Use Only
Time Action Location
7:30 AM Check-In Main Terminal
8:00-
10:00AM
Presentation & Q&A Session Main Terminal
10:20- 12:30PM Site Tour Main Terminal and Marine
Terminal
Plan for the Day
5 . Procurement Sensitive - For Official Use Only
Agenda
Topic
Overview and Department of the Navy (DON) Requirement
Facilities & Environmental Condition
Environmental Condition (Cont.)
Natural Resources
Real Estate
Q&A Session
Site Tour
Presenter
LCDR Rob Paul United States Pacific Fleet
Mr. Todd Williams Defense Logistics Agency
Ms. Brenda Reese Naval Facilities Engineering Command Southwest
Mr. Jeff McGovern Naval Facilities Engineering Command Southwest
Ms. Kimberly Spencer Naval Facilities Engineering Command Southwest
Mr. Patrick Jelsema Naval Facilities Engineering Command Southwest
Mr. Todd Williams Defense Logistics Agency
6 . Procurement Sensitive - For Official Use Only
OVERVIEW & REQUIREMENT
United States Pacific Fleet LCDR Rob Paul
7 . Procurement Sensitive - For Official Use Only
Overview
• The Department of the Navy (DON) desires to retain the capability for its ships to receive dual commodity fuel via the Marine Terminal at Pier 12
• DON is open to considering options other than a long-term ground lease that retain this capability and meet maintenance and management objectives for the available property and facilities that are of commercial interest
• This Industry Forum and corresponding Request for Interest (RFI) seek to ascertain feasibility and industry interest in some or all of the following facilities for renovation, redevelopment, or other utilization:
– 311 acres of fuel depot (Main Terminal)
– 8.3 acres of Marine Terminal (including Pier 12)
– 45 miles of pipeline at Defense Fuel Support Point (DFSP) San Pedro
8 . Procurement Sensitive - For Official Use Only
DON Operational Requirement
DON usage of Pier 12
Normal:
• Maximum of 6 DON customer ships per quarter refueling at Pier 12 during normal operations
─ F-76 and JP-5 fuel types, purchased according to standard DoD procedures ─ No priority in access, DON will coordinate in advance with lessee for specific times and fueling quantities
Contingency:
• During contingency operations DON customer ships will be given priority scheduling
─ An event, series of events, or line of effort that adversely impacts DON strategic sourcing of fuel in the Pacific region
9 . Procurement Sensitive - For Official Use Only
FACILITIES
Defense Logistics Agency Mr. Todd Williams
10 . Procurement Sensitive - For Official Use Only
Site Map
11 . Procurement Sensitive - For Official Use Only
Facility Condition
The 311 acre Main Terminal site and 8.3 acre Marine Terminal include pump houses, truck racks, storage tanks, administration buildings, material storage; built from 1942 to 1988; with a variety of conditions ranging from poor to good. The 45 miles of pipelines traverse from Norwalk, California to San Pedro then to the Port of Long Beach
• Main Terminal- consists of 3 Above Ground Storage Tanks (ASTs), pump house, truck loading rack, 2 Fuel System Icing Inhibitor (FSII) tanks, 2 administrative buildings, guard shack, 8 large bunkers, 7 small bunkers, sewage lift station, fire pump house, fire suppression water tank and 2 buildings that are no longer utilized as well as several structures (conditions run from poor to good)
• Marine Terminal- consists of a 1,060 foot pier with 3 offload/loading stations, 11 ASTs, pump house, 1 FSII tank, multipurpose building, operations building, boat house, 2 dock watch buildings (conditions run from good to very good)
12 . Procurement Sensitive - For Official Use Only
Facility Condition
• Pipelines:
–10” Government pipeline to/from Norwalk to Dominguez Channel- condition unknown
• To/from Dominguez Channel to San Pedro- nitrogen blanket layup-good condition.
–12” R- Line pipeline to/from DFSP San Pedro to Wilmington- condition unknown
–8” G-Line pipeline to/from DFSP San Pedro to South side of Phillips 66-nitrogen blanket layup- condition unknown
–2 Cross-country (18”) pipelines to/from DFSP San Pedro to Pier 12 in the Port of Long Beach- nitrogen blanket layup- good condition
13 . Procurement Sensitive - For Official Use Only
Pipeline Map 10” Government
Line/Norwalk Line
14 . Procurement Sensitive - For Official Use Only
Capitalized Fuel Restoration Sites
5 Proposed Operable Units:
─ Aboveground Storage Tanks
(ASTs) - no remedial activities ─ Administration Area ─ North Tank Farm ─ South Tank Farm ─ South Control Area
Petroleum Contaminants: Diesel Fuel Marine (DFM), JP-4, JP-5, JP-8
Capitalized Fuel Restoration Sites
15 . Procurement Sensitive - For Official Use Only
ENV – Land Use Constraints
• Four active capitalized fuel restoration sites at Operable Units (OU):
─ Administration Area ─ North Tank Farm ─ South Tank Farm ─ South Control Area
• No remedial activities at OU AST area, Pier 12 or offsite pipelines
• The anticipated result of cleanup action is restriction of development based on land use controls
• Future lessees/operators will be required to allow the Government’s personnel/contractors to continue to have access to these sites for future environmental work
Environmental Cleanup Factors
16 . Procurement Sensitive - For Official Use Only
Probable ENV Land Use Constraint Areas – Capitalized Fuel Restoration Sites
Note: These proposed areas are presented for discussion purposes only.
17 . Procurement Sensitive - For Official Use Only
ENV – Environmental Condition
• Administration Area ─ Previous Remediation Activities - Light Non-Aqueous Phase Liquid
(LNAPL) recovery/groundwater treatment system; Vapor Extraction and Bioventing systems near Buildings 108 &113 (north control area). Limited source removal near truck rack
─ Current Remediation Strategy - focused around Truck Rack Area;
Additional site investigation required underneath pad
─ Access limited/require coordination during investigative field work ─ Horizontal drilling to get underneath the truck rack; maintaining pad integrity for future use
• South Control Area ─ Previous Remediation Activities - LNAPL recovery/Groundwater treatment system; Vapor Extraction and Bioventing systems ─ Current Remediation Strategy - Continued operation of groundwater treatment system; Soil excavation with on-site treatment ─ Access limited/require coordination during field work
Environmental Condition
18 . Procurement Sensitive - For Official Use Only
ENV – Environmental Condition
• North Tank Farm ─ Previous Remediation Strategies - Site investigation ─ Current Remediation Strategy - Add Soil Vapor Extraction/Air Sparging
(SVE/AS) systems around one tank ─ Access limited/ require coordination during field work
• South Tank Farm
─ Previous Remediation Strategies - Extensive site investigation, focused SVE/AS, limited vapor recovery
─ Current Remediation Strategy - Expand SVE/AS systems, add thermal treatments for selected tanks and ex-situ biotreatment for SE corner;
continue groundwater monitoring
─ Access limited/require coordination during field work; some areas around tank remedial systems will be fenced off during construction/operations
19 . Procurement Sensitive - For Official Use Only
ENVIRONMENTAL CONDITION (CONT.)
Naval Facilities Engineering Command Southwest Ms. Brenda Reese
20 . Procurement Sensitive - For Official Use Only
Installation Restoration Program Sites
21 . Procurement Sensitive - For Official Use Only
Land Use Constraints
• Four active Installation Restoration Program sites at the property:
–Site 6 (South Ravine Misc. Disposal Area) –Site 31 (South Ravine Construction Disposal Area) –Site 32 (Southeast Ravine Construction Disposal Area) –Site 33 (Tar Areas)
• Currently site investigations are ongoing at all four sites
• The site boundaries for Sites 6, 31, and 32 are well defined. The most likely long term land use scenario is to restrict development of these sites under land use controls
• The nature and extent of contamination and the scope of response actions for Site 33 are unknown at this time
• The DON will require future lessees/operators to allow DON’s personnel/contractors to continue to have access to these sites for environmental work
• There is a LUC in place at Pier 12 requiring that the sediments directly below the pier cannot be disturbed.
22 . Procurement Sensitive - For Official Use Only
DON Environmental Restoration Programs •Site 6 (South Ravine Misc. Disposal Area)
– Variety of debris such as concrete, wood, furniture, brush, and vehicle tires have been observed.
– Currently performing a Remedial Investigation (RI) to determine the nature and extent of potential soil and groundwater contamination
– RI fieldwork is currently ongoing
– RI report anticipated in early/mid 2018
– Anticipated remedial approach for the site is Land Use Controls
• Site 31 (South Ravine Construction Disposal Area)
– Variety of debris such as concrete rubble, asphalt, brick, wood, and rebar has been observed.
– Currently performing a Remedial Investigation (RI) to determine the nature and extent of potential soil and groundwater contamination
– RI Work Plans are being developed
– RI fieldwork planned for mid 2018
– RI report anticipated in late 2018
23 . Procurement Sensitive - For Official Use Only
DON Environmental Restoration Programs
• Site 32 (Southeast Ravine Construction Disposal Area)
– Variety of debris such as concrete rubble, asphalt, brick, wood, and rebar has been observed.
– Currently planning a Data Gap Investigation to further delineate the nature and extent of potential soil and groundwater contamination
– Data Gap Investigation work plans are being developed
– Data Gap Fieldwork planned for mid 2018
– Data Gap Report anticipated in late 2018
• Site 33 (Tar Areas)
– Newly added site to investigate the presence of a tar-like substance that is day-lighting up through the blacktop primarily near the water tank in the administrative area
– Currently performing a Preliminary Assessment/Site Inspection (PA/SI) to determine the nature of the tar substance and if further investigation is needed
– PA/SI work plans are being developed
– PA/SI Fieldwork planned for mid 2018
– PA/SI Report anticipated in late 2018
• Restoration Advisory Board (RAB) formed in early 1990 to provide community input into DON/DLA Environmental Cleanup Program
24 . Procurement Sensitive - For Official Use Only
Natural Resources
Mr. Jeff McGovern
25 . Procurement Sensitive - For Official Use Only
• DFSP San Pedro is the only known location of the critically endangered Palos Verdes Blue Butterfly (PVBB). The DON works to promote its recovery in cooperation with the USFWS
• A small population of the federally threatened Coastal California Gnatcatcher (CAGN) is found at DFSP San Pedro
• Facilities planning and operations are governed by two Biological Opinions with the U.S. Fish and Wildlife Service, one for maintenance activities and one for closure activities
• A 5-year Habitat Management Plan details the DON’s obligations, which include a PVBB captive rearing program and habitat preservation and enhancement
• The remainder of the DON’s natural resources management obligations are summarized in the Integrated Natural Resources Management Plan (INRMP) –Link to the INRMP can be found in the Request for Interest
26 . Procurement Sensitive - For Official Use Only
Endangered Species
Constraints
Not included in subject property
27 . Procurement Sensitive - For Official Use Only
• A Biological Opinion or BO (FWS-LA-1580317-16F0042) for closure activities at DFSP San Pedro was signed in December 2015. The BO can be found in the Environmental Assessment, linked to in the Request for Interest. A list of impact avoidance, minimization, and mitigation measures is detailed in the BO, and several of those measures relate to post-closure activities in relation to Biological Resources:
─Habitat restoration (for areas disturbed by closure activities) ─Invasive species control ─Captive breeding and surveying for Palos Verdes Blue Butterfly ─Habitat restoration for Palos Verdes Blue Butterfly and Coastal California Gnatcatcher ─Continued operation of on-site plant nursery
28 . Procurement Sensitive - For Official Use Only
REAL ESTATE
Ms. Kimberly Spencer
29 . Procurement Sensitive - For Official Use Only
Real Estate
• Authority to Lease: Title 10 U.S.C. 2667
• Advertisement: If an outlease is the selected course of action, the lease solicitation would be posted to Federal Business Opportunities (FedBizOpps) under classification code X - Lease or Rental of Facilities
• Appraised Value: Would conform to requirements of the Uniform Standards Appraisal Practice (USPAP)
─Offers would need to meet minimum DON Appraised Fair Market Rental Value
30 . Procurement Sensitive - For Official Use Only
Real Estate
• Timeline
–Request for Proposals is anticipated to be released early 2020 –Evaluation of Offers
• Specific Maintenance Projects
–In lieu of cash payment, the Government may elect to collect rent in the form of in-kind consideration. Forms of in-kind consideration include maintenance, protection, alteration, repair, improvement, restoration, and construction
31 . Procurement Sensitive - For Official Use Only
Next Steps
Post-Forum activities will include:
• Publishing the Q&As in FedBizOpps
• RFI responses due by January 15, 2018
• DON analysis of RFI responses and determination for ground lease or other course of action
• Required notifications / approvals
• Issue lease solicitation via FedBizOpps if selected course of action
32 . Procurement Sensitive - For Official Use Only
Mr. Patrick Jelsema
33 . Procurement Sensitive - For Official Use Only
• Some questions may require research/follow up at a later date
• Questions asked during the session will be documented
• All Q&As will be published via FedBizOpps after the Forum
34 . Procurement Sensitive - For Official Use Only
Points of Contact
• NAVAL FACILITIES ENGINEERING COMMAND, SOUTHWEST:
–Ms. Kimberly Spencer, Realty Specialist –(619) 532-3918 | kimberly.spencer@navy.mil
• NAVAL WEAPONS STATION SEAL BEACH:
–Ms. Jazmin Atencia, N5 | Plans, Programs & Readiness Integrator –(562) 666-6806 | jazmin.atencia@navy.mil mailto:kimberly.spencer@navy.mil mailto:jazmin.atencia@navy.mil
| 120517 DFSP San Pedro Industry Forum PPT_pdf.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Overview |
| DON Operational Requirement |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Capitalized Fuel Restoration Sites |
| ENV – Land Use Constraints |
| Probable ENV Land Use Constraint Areas – Capitalized Fuel Restoration Sites |
| ENV – Environmental Condition |
| ENV – Environmental Condition |
| Slide Number 19 |
| Installation Restoration Program Sites |
| Land Use Constraints |
| Environmental Condition |
| Environmental Condition |
| Slide Number 24 |
| Natural Resources |
| Endangered Species Constraints� |
| Natural Resources |
| Slide Number 28 |
| Real Estate |
| Real Estate |
| Next Steps |
| Slide Number 32 |
| Q&A Session |
| Points of Contact |
File details come from the government source that posted it.