Amendment0003_N6247320R0054.pdf
PDF 30 KB Posted
- Solicitation number
- N6247320R0054
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment B Price Proposal Spreadsheet (ELIN) Rev28JUL20.xlsx | XLSX spreadsheet | |
| Amendment0002_N6247320R0054.pdf | ||
| Amendment0001_N6247320R0054.pdf | ||
| Attachment B Price Proposal Spreadsheet (ELIN).xlsx | XLSX spreadsheet | |
| N6247316D2403.pdf | ||
| MERKEL.pdf | ||
| Attachment A NAVFAC Past Performance Questionnaire (Form PPQ).doc | DOC document | |
| N6247320R0054_Solicitation.pdf | ||
| Attachment_C_PROJECT_DATA_SHEET.doc | DOC document | |
| TIERRA_DATA.pdf | ||
| N6247316D2402.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5644804
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
MARINE HABITAT SERVICES
This amendment makes changes to the PWS (Section C) and Attachment B (Section J), and updates the proposal due date (SF33, Block 9).
Offerers must use the Revised Price Proposal Spreadsheet (Attachment B) w hen submitting their proposals for consideration. Offerors do have the option to send in revisions to proposals that may have already been mailed; all revisions must clearly be marked “Revised” and dated for control purposes. How ever, all proposals and revisions must be received by the due date for the Solicitation, as revised herein.
See Continuation Pages.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247320R0054
X 9B. DATED (SEE ITEM 11)
05-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jul-2020
CODE
NAVFAC SOUTHWEST
ENVIRONMENTAL CONTRACTS CORE
CODE ECOMP
937 NORTH HARBOR DRIVE
SAN DIEGO CA 92132-5190
N62473 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247320R0054
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
1. Updates are made to the Requirements of “General Marine Biology Support”; the Performance Objective and Performance Standards are unchanged by this amendment. Section C, Annex 1800000, Spec Item 4.1.5 (Pg. 48 of 107) is changed as follows:
“D. The Contractor shall provide all basic field/laboratory apparel required unless otherwise indicated in the TO. Marine biology field support shall be provided at the following levels:
1) Principal Investigator (PI) support – PI support is defined as a person with a PhD degree from an accredited university in marine biology or a directly related field or equivalent experience if approved by the COR. Note: ELIN units represent an 8 hour quantity.
2) Scientific Investigator (SI) support – SI support is defined as a person with a Master’s degree from an accredited university in marine biology or a directly related field or equivalent experience if approved by the COR. Note: ELIN units represent an 8 hour quantity.
3) Scientific Technician support – Technician support is defined as a person with a Bachelor’s degree from an accredited university in marine biology or a directly related field or equivalent experience if approved by the COR. Note: ELIN units represent an 8 hour quantity.
4) Vessel Operator Support - Vessel Operator shall hold either the appropriate USCG license (depending on the size of the vessel) or are Navy certified as a vessel operator. An active USCG deck license or U.S. Merchant Marine Able-Bodied Seaman rating is acceptable. Note: ELIN units represent an 8 hour quantity.
5) Large Vessel Support – A large vessel is defined as being suitable for marine species surveys including visual and passive acoustics and be capable of minimum 3 day endurance in the open ocean.
Facilities for collecting oceanographic and biological data are also required. Vessel should have an observation platform or flying bridge capable of providing good field of view and visual range for multiple observers. Must be capable of deploying a towed passive acoustic array. Note: ELIN units represent an 8 hour quantity.
6) Small Vessel Support – A small vessel is defined as being suitable for marine species surveys in coastal and offshore waters within roughly 3 nautical miles of the coast. Vessels must be able to accommodate scientific crew of 3-5 personnel (minimum). May be capable of single overnights on station. Vessel should have an observation platform or flying bridge capable of providing good field of view and visual range for multiple observers. Must be capable of deploying a towed passive acoustic array. Note: ELIN units represent an 8 hour quantity.”
2. Updates are made to the Requirements of “Eelgrass Transplanting”; the Performance Objective and
Performance Standards are unchanged by this amendment. Section C, Annex 1800000, Spec Item 4.2.1 (Pg. 55 of
107) is changed as follows:
“J. The surveys shall be conducted at one of the following levels…
6. Extra large transplants - Extra large transplants are those planting areas are defined as greater than 30,000 m2. This site will require greater than 31,500 bundles, but is limited to 50,000 bundles.”
3. Updates are made to the Requirements of “Sediment Characterization for Dredging Operations”; the
Performance Objective and Performance Standards are unchanged by this amendment. Section C, Annex 1800000, Spec Item 4.2.2 (Pg. 56 of 107) is changed as follows:
“Requirements A. Sediment characterization shall be performed at one of the following project sizes or a combination of project sizes:
1) Very small project – a very small project is defined as a project with a total proposed dredge volume of 10,000 cy or less.
a. No stratified samples (Deleted)
b. Including two stratified samples (Deleted)
2) Small Project – a small project is defined as a project with a total proposed dredge volume of 25,000 cy or less.
a. No stratified samples (Deleted)
b. Including two stratified samples (Deleted)
3) Medium Project – a medium project is defined as a project with a total proposed dredge volume of 50,000 cy or less.
a. No stratified samples (Deleted)
b. Including two stratified samples (Deleted)
4) Large project - a large project is defined as a project with a total proposed dredge volume of 100,000 cy or less.
a. No stratified samples (Deleted)
b. Including two stratified samples (Deleted)
5) Extra Large project – an extra-large project is defined as a project with a total proposed dredge volume of 200,000 cy or less.
a. No stratified samples (Deleted)
b. Including two stratified samples (Deleted)
Note: the additive ELIN for Leave or “Z” Layer Sampling or (Tier II Analysis), and the additive ELIN for Stratified Sampling (Tier III), shall be equivalent to the size and effort of a very small project.”
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 30-Jul-2020 04:30 PM to 05-Aug-2020 04:30 PM.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment A NAVFAC Past
Performance Questionnaire (Form
PPQ)
Attachment B Price Proposal Spreadsheet (ELIN)
Attachment C Project Data Sheet 1 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment A NAVFAC Past
Performance Questionnaire (Form
PPQ)
Attachment B Attachment B Price Proposal Spreadsheet (Revised)
5 28-JUL-2020
Attachment C Project Data Sheet 1
(End of Summary of Changes)
File details come from the government source that posted it. Updated .