Amendment01.pdf
PDF 126 KB Posted
- Solicitation number
- N62473-20-R-0014
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247320R0014RFP.pdf | ||
| Exhibit C - PPQ.docx | DOCX document | |
| General Decision NumberSanBernCounty.pdf | ||
| Exhibit E Financial Questionnaire.docx | DOCX document | |
| Exhibit G Revised RFI Form.docx | DOCX document | |
| UPDATED Exhibit B - Experience - Offeror.docx | DOCX document | |
| Exhibit F Surety Form.docx | DOCX document | |
| EXHIBIT K COEFFICIENT WORKSHEET with profit language 072418.docx | DOCX document | |
| General Decision NumberKern&MonoCounty.pdf | ||
| UPDATED Exhibit D Safety Data 031319.docx | DOCX document | |
| Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx | DOCX document | |
| EXH M ELECTRICAL JOC NAICS 238210 PTO 0001 DESERT.xlsx | XLSX spreadsheet | |
| REVISED Exhibit H GENERIC UFGS Guides for projects.docx | DOCX document | |
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO: N62473-20-R-0014
INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) JOB ORDER CONTRACT
(JOC) WOMAN OWNED SMALL BUSINESS (WOSB) SET-ASIDE UNDER NAICS
238210 FOR ELECTRICAL REPAIRS AT VARIOUS GOVERNMENT
INSTALLATIONS LOCATED WITHIN THE MWTC BRIDGEPORT, MCAGCC
29 PALMS, MCLB BARSTOW, AND NAWS CHINA LAKE, CALIFORNIA
AREA UNDER THE NAVAL FACILITIES ENGINEERING COMMAND
SOUTHWEST (NAVFAC SW) AREA OF RESPONSIBILITY (AOR)
February 20, 2020
This amendment is issued to include the updated Exhibit D Safety Data form.
Please see updated document beginning on page 2.
EXHIBIT “D”
SAFETY DATA SHEET
This form is to be completed by the Offeror. Use this form to provide safety information for the Safety factor. EMR, DART and TRC rates shall not be submitted for subcontractors.
Joint Venture (JV) or Partnership: Complete Blocks 1 through 8 for each contractor who is part of the JV or partnership.
Only one safety narrative (Block 9) is required.
1. Offeror Name:
Name of JV partner providing the information below (if applicable):
Offeror’s Three Previous Complete Calendar Years of Reported Safety Data:
Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.
2. Experience Modification Rate (EMR):
2017 2018 2019
3a. For EMRs greater than 1.0, explain any extenuating circumstances and corrective actions taken:
3b. Explain any negative EMR trends:
3c. If you do not have an EMR for a given year, state so here and explain why:
NOTE: “N/A” or “Not Applicable” is not an acceptable response. If you state your rate is Zero OR your firm does not qualify for an EMR rate, provide supporting documentation from insurance carrier.
4. Insurance Carrier Information:
Insurance Carrier Name:
Agent’s name: Phone No.: Email:
5. U.S. Dept. of Labor, OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate
2017 2018 2019
Instructions for calculating the DART rate can be found at http://www.bls.gov/iif/osheval.htm.
6a. For DART Rates of 3.0 or greater, explain any extenuating circumstances and corrective actions taken:
6b. Explain any negative DART Rate trends:
6c. If you do not have a DART Rate for a given year, state so here and explain why:
NOTE: “N/A” or “Not Applicable” is not an acceptable response. If you state your rate is Zero, provide supporting labor hours and mishap log.
Note: Form may be expanded.
http://www.bls.gov/iif/osheval.htm
EXHIBIT “D” (continuation)
SAFETY NARRATIVE
7. U.S. Dept. of Labor, OSHA Total Recordable Case (TRC) Rate 2017 2018 2019
Instructions for calculating the TRC rate can be found at http://www.bls.gov/iif/osheval.htm.
8a. For TRC Rates of 4.5 or greater, explain any extenuating circumstances and corrective actions taken:
8b. Explain any negative TRC Rate trends:
8c. If you do not have a TRC Rate for a given year, state so here and explain why:
NOTE: “N/A” or “Not Applicable” is not an acceptable response. If your state your rate is Zero, provide supporting labor hours and mishap log.
http://www.bls.gov/iif/osheval.htm
9. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.
Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors:
Describe the safety management system that the Offeror will use to oversee the safety compliance and performance of self-performed and subcontractor performed work:
Note: Form may be expanded up to the page limit specified in the RFP.
9. Technical Approach for Safety (continuation): Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.
Describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed/and or all subcontractor levels:
Describe the methodology that the Offeror will use in order to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps, including a description of your “Good Catch” program:
File details come from the government source that posted it. Updated .