N6247319R2452_Sources_Sought_Information_Form.docx

DOCX document 29 KB Posted

Attached to
FY20 MCON Funded Project P-1090 I MEF Consolidated Information Center, Marine Corps Base Camp Pendleton
Solicitation number
N6247319R2452
Issued by

About this file

This document contains a sources sought notice and project data forms for a design-build construction project. The United States Department of the Navy, Naval Facilities Engineering Command is soliciting information from contractors for Project P-1090, a new consolidated information center to be built at Marine Corps Base Camp Pendleton in Oceanside, California. The project scope includes design and construction of a multi-story secure facility for intelligence operations and academic functions, with a budget between $25-100 million. Using the provided forms, contractors should submit their DUNS, CAGE code, bonding capacity, and up to five relevant past project examples within certain page limits by the response deadline. Details on project size, dates, owners, and the contractor and subcontractor's roles are required for each example. This pre-solicitation sources sought notice is gathering contractor information and qualifications in advance of a potential design-build solicitation for the new information center.

Sources Sought Contractor Information and Construction Experience Project Data Form

View the file

Other files

File Type Posted
Sources_Sought_P1090.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – CONTRACTOR INFORMATION FORM

for P-1090 1ST MARINE EXPEDITIONARY FORCE CONSOLIDATED INFORMATION CENTER MARINE CORPS BASE CAMP PENDLETON, OCEANSIDE, CALIFORNIA

Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.

1. Contractor Information:
DUNS:
CAGE Code:
Firm Name:
Address:
Name of POC for firm:
Phone Number of POC:
Email of POC:

2. Type of Business: (check all that apply)

|_| SBA certified 8(a) firm
|_| SBA certified HUBZone Small Business
|_| Service-Disabled Veteran-Owned Small Business
|_| Small Business

|_| Women-Owned Small Business

3. Bonding Capacity:

Surety Name:
Maximum bonding capacity per project:
$
Aggregate maximum bonding capacity:
$

4. This space may be used to provide any additional information to clarify the above items only:

Please DO NOT change content of the form.

(Rev. 03/15)

SOURCES SOUGHT – CONSTRUCTION EXPERIENCE PROJECT DATA FORM

for P-1090 1ST MARINE EXPEDITIONARY FORCE CONSOLIDATED INFORMATION CENTER MARINE CORPS BASE CAMP PENDLETON, OCEANSIDE, CALIFORNIA

Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.

1.
Contractor Name:
2.
Project No. (check one):
|_| - 1|_| - 2|_| - 3|_| - 4|_| - 5
3.
Contract Number:
Delivery/Task Order No.:
Project Number:
Title:
Location:
4.
Award Date (mm/dd/yy):
5.
Final Contract Price:
$
Completion Date (mm/dd/yy):
(includes all options and mods)
Project is % complete (as of submission due date)
This is the |_| total project |_| subcontract price.
6.
Type of work:
|_| New Construction|_| Repair|_| Renovation
7.
Customer/Owner Name:
Point of Contact Name/Title: (person with project knowledge)
POC Phone Number:
POC Email Address:
8.
Were you the Prime contractor for this project?
|_| Yes|_| No
Were you a subcontractor for this project?
|_| Yes|_| No
If subcontractor, who was the Prime contractor?
9.
Type of Contract (check all that apply):

|_| Design-Build |_| Design-Bid-Build (fully designed project)

|_| Other (explain):
If Design-Build, provide the following information:
|_| Design accomplished in-house
Lead design firm name:
Years working together:
Address:

10. Provide a detailed description of the project and how the project is relevant to this project:

11. Percentage of work you self-performed on this project: %.

Provide a detailed description of the work your firm self-performed on this project:

Form may be expanded. Please DO NOT change content of the form.