ACQR05557165
P-079 DESIGN-BID-BUILD CONSTRUCTION PROJECT FOR POTABLE WATER DISTRIBUTION IMPROVEMENTS AT MARINE CORPS BASE CAMP
PENDLETON, CA.
THIS IS AN UNRESTRICTED FULL AND OPEN COMPETITIVE PROCUREMENT.
The North American Industry Classif ication System (NAICS) code is 237110, Water and Sew er Line and Related Structures Construction, and the annual size standard is $36.5 million.
The range of magnitude for this project is betw een $25,000,000 and $100,000,000.000. Proposals exceeding the range may be rejected.
RAYMOND P GLORIA 619-532-2564
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
24-Jul-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________900 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Aug 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC SOUTHWEST
CAPITAL IMPROVEMENTS CONTRACT CORE
CODE: CIMAR
1220 PACIFIC HIGHWAY
SAN DIEGO CA 92132-5190
N62473
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N6247319R2433 67
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N6247319R2433
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each P079 - Potable Water Distr Improvements
FFP
Potable Water Distribution Improvements at Marine Corps Base Camp Pendleton, CA
FOB: Destination
PURCHASE REQUEST NUMBER: ACQR05557165
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 900 dys. ADC 1 NAVFAC SOUTHWEST
LEILANI J. MURRAY
CAMP PENDLETON FEAD/CODE ROPCN
MARINE CORPS BASE CAMP
PENDLETON
PO BOX 555229 BLDG 22101
CAMP PENDLETON CA 92055-5229
760-725-8692 FOB: Destination
N62473
CLAUSES INCORPORATED BY REFERENCE
52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.236-28 Preparation of Proposals--Construction OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be DX rated order; DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer, Mr. Chad Slade at Chad.A.Slade@navy.mil, by obtaining written and dated acknowledgment of receipt from the assigned Contracting Officer.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
See section 00100 under item “Pre-Proposal Conference and Site Visit”
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ mailto:Chad.A.Slade@navy.mil
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
(End of clause)
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTION TO OFFERORS
RFP PART 1 – CONTRACT FORMS AND DOCUMENTS
1. DESCRIPTION OF WORK
This project is to construct potable water supply pipelines to transport potable water from the 24 Area to the 20 Area potable water storage tanks. The potable water supply pipelines will replace and upgrade the existing 18” supply lines with 24” supply lines to the 20 and 21 Areas. Provide necessary waterline valves, appurtenances, and tie-ins to meet operational needs of the Southern Water System and meet applicable standards and codes.
Demolish the existing elevated steel tank 20815 and replace with a new water storage facility including all associated appurtenances and piping which supplies water to the 20 Area housing neighborhood Wire Mountain II.
Demolish existing booster pump stations (BPS) 20800, 20801, and 20816, and replace with new BPS as required and specified, which supply water to the 20 and 21 Areas. BPS's and water storage facility replacement will be connected to base SCADA and Unity systems via radio transmission.
Restore pavements and surface features to original condition after completion of construction. Perform all work while maintaining water supply to the 20 and 21 Areas. Continuous operations can be accomplished with temporary water high-lines including bypass lines to existing water storage tanks.
Environmental mitigation includes the remediation of natural and cultural resources, including jurisdictional waters of the U.S. and numerous flora and fauna species.
The place of performance is Marine Corps Base Camp Pendleton (MCBCP), California.
The contract completion date is 900 calendar days after task order award (inclusive of 15 calendar days for performance and payment bonds).
BASE ITEM 0001:
The firm fixed price (lump sum) for the Design-Bid-Build project, P-079 Potable Water Distribution Improvements at Marine Corps Base Camp Pendleton, and all related labor, equipment, and materials to provide construction including bond costs, overhead, and profit, complete in accordance with the RFP.
OPTION ITEM 0001:
Open trench construction methodology at Archeological sites.
Note: Option Item 0001 is a deductive item.
The estimated total contract price range, in accordance with DFARS 236.204 is between $25,000,000 and $100,000,000.
2. INQUIRIES
All inquiries concerning any part of this solicitation shall be made to the Naval Facilities Engineering Command Southwest, 1220 Pacific Hwy, Bldg 127, San Diego, CA 92132. Contact Mr. Raymond Gloria at raymond.p.gloria@navy.mil or 619-532-2564.
3. PROPOSAL SUBMISSION REQUIREMENTS
In addition to the submittal requirements under each Factor, proposals submitted in response to this solicitation shall be formatted as follows and furnished in the number of copies stated herein. A cover letter shall accompany the proposal.
The cover letter shall include—
(a) The solicitation number;
(b) The name, address, telephone and facsimile numbers, and email address of the Offeror;
(c) The DUNS Number, CAGE Code, and Tax Identification Number (TIN) of the Offeror;
(d) A statement specifying the extent of agreement with all terms, conditions, and provisions included in
The solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(e) Names, titles, phone and facsimile numbers, and email addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation and;
(f) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
Proposals shall be submitted in three ring binders or bound, with tabs or separators. Page limits, if stipulated, must be adhered to. Proposals shall be submitted on 8.5” X 11” paper, utilizing both sides of the paper.
The offeror shall submit one (1) original and five (5) copies, using the Contract Pricing Schedule provided with the Request for Proposal in a sealed envelope separate from the Technical Proposal.
- Standard Form (SF) 1442 (Solicitation, Offer and Award)
- Offer Schedule
- Bid Bond
Failure to submit a Bid Bond conforming to the requirements of the solicitation may result in an Offeror's proposal being rejected as unacceptable.
Submit price proposals on the Offer Schedule provided for this RFP. Offerors must acknowledge any amendments to the RFP on the Offer Schedule.
Proposal Due Date: Proposals must be submitted no later than 2:00 P.M., local time, on 23 August 2019.
Original signed proposals must be delivered to: Naval Facilities Engineering Command Southwest, 1220 Pacific Hwy, Bldg 128, San Diego, California 92132, Attn: Code RRA30.RG by the proposal due date and time. Proposals shall also include a Bid Bond showing the contractor has the bonding capacity available for this project.
Performance and payment bonds are required within 15 calendar days after contract award. Late proposals will not be accepted.
Travel: This is a firm fixed price contract, therefore, travel will not be reimbursable.
No Assumptions: This is a firm fixed price contract, and any assumptions made by the offeror in its proposal will not be binding on the Government. The offeror will not be entitled to any equitable adjustments based on assumptions made by the offeror in its proposal. If the Scope of Work is not clear, submit your request for clarification as a "Request For Information".
Representations and Certifications, Financial Questionnaires, and Surety Forms will not be rated. However, they will be considered in assessing the Offeror’s responsibility.
Offerors intending to deliver the proposals in person to the facility at the address above are cautioned that this NAVFAC Southwest facility is located in downtown San Diego. An Offeror risks the late receipt and rejection of a proposal where it delays delivering its proposal until the last few minutes before the time set for receipt of proposals. It is recommended that the Offeror allows for delays in driving through downtown San Diego caused by traffic (both freeway and downtown), construction projects, train/trolley crossing, parking at the pay lots/meters near the facility, and gaining access to a secure Government facility. No parking or offloading of proposals is available at the Government facility. Proposals are to be delivered to personnel in the mailroom in Building 128, and reasonable time shall be allowed for the person in the mailroom to receive and time stamp the proposal. The stamp time is determined from the NAVFAC Southwest facility mailroom time stamp and not any other time keeping equipment that the Offeror may own. Immediately upon proposal delivery, the Offeror shall leave the Government facility. An Offeror that does not leave the premises may be requested to leave or escorted by security personnel.
RFP (SPECIFICATIONS/DRAWINGS)
To obtain a copy of the full plans and specifications, e-mail your request to Mr. Raymond Gloria at Raymond.P.Gloria@navy.mil.
The RFP Package will be uploaded to the AMRDEC website at https://safe.amrdec.army.mil/safe/default.aspx.
Offerors interested in submitting a proposal will receive an e-mail from the AMRDEC SAFE website with a link & password to access to the files.
4. PRE-PROPOSAL CONFERENCE AND SITE VISIT
A site visit is scheduled for Thursday, July 25, 2019 at 9:00 a.m. at MCBCP. Personnel will check-in at the Public Works Building 220104T with Ms. Jessica Spurlock.
All prospective Offerors are highly encouraged to attend the site visit and pre-proposal conference. If you do not have base access, follow the attached base access instructions, complete and submit a “REQUEST FOR BUSINESS PASS” letter with completed Base Access Form SECNAV 5512-1 by email NLT July 17, 2019 to Ms. Jessica Spurlock at Jessica.Spurlock@usmc.mil with copy to Mr. Raymond Gloria at Raymond.P.Gloria@navy.mil. Upon approval of your request, Ms. Jessica Spurlock will provide a final signed copy of the letter for you to present to the PASS ID office for your one-day pass.
The submission of written questions will not preclude anyone from posing questions during the pre-proposal conference. Failure of a prospective Offeror to submit any questions or to attend the conference will be construed to mean that the Offeror fully understands all requirements of the solicitation. Prospective Offerors are advised that the pre-proposal conference will be held solely for the purpose of explaining the concepts involved in the project and the specifications, terms, and conditions of this solicitation.
The clauses 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigation and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.
No minutes of the pre-proposal conference / site visit will be issued. All Offerors are advised that the RFP remains unchanged unless it is amended in writing by the Contracting Officer. However, if an amendment is issued, normal procedures relating to acknowledgement and receipt of any such amendment shall be applicable.
Firms are required to notify the contracting officer in writing within 24 hours after participation in the walk through that they do not plan to submit a proposal and decline any further participation. For additional information, please contact, Raymond Gloria at Raymond.P.Gloria@navy.mil or (619) 532-2564.
Requests for Information (RFIs) shall be e-mailed to Raymond Gloria at Raymond.P.Gloria@navy.mil.
RFI’s will not be accepted ten (10) days prior to proposal due date.
5. JOINT VENTURE AGREEMENT
Joint Venture Offerors shall provide a copy of the joint venture agreement. The agreement shall include information that identifies the responsibilities for each entity under this contract, demonstrates the relationship between firms, and identifies contractual relationships and authorities to bind each entity of the joint venture. The joint venture also mailto:Raymond.P.Gloria@navy.mil https://safe.amrdec.army.mil/safe/default.aspx mailto:Jessica.Spurlock@usmc.mil mailto:Raymond.P.Gloria@navy.mil must complete the online representations and certifications for each joint venture member as well as for the joint venture itself.
6. FINANCIAL QUESTIONNAIRE
Offerors shall submit the Financial Questionnaire to their financial institution and request the financial institution complete the questionnaire with regard to the Offeror’s firm. Upon completion of the questionnaire, the financial institution should place the completed questionnaire in a sealed envelope showing the return address of the financial institution and forward it to the Offeror so that the Offeror can include the questionnaire (in the sealed envelope) with the Offeror’s proposal.
If the Offeror is a joint venture, information should be submitted for the joint venture. If there is no information for the joint venture, information should be submitted for each joint venture partner.
7. SYSTEM FOR AWARD MANAGEMENT (SAM)
The System for Award Management (SAM) is combining federal procurement systems and the Catalog of Federal Domestic Assistance into one new system. This consolidation includes the functionality from the following systems:
* Central Contractor Registry (CCR)
* Federal Agency Registration (Fedreg)
* Online Representations and Certifications Application (ORCA)
* Excluded Parties List System (EPLS)
Contractors must be registered in the System for Award Management (SAM) prior to award of a DoD contract. In order to participate on this solicitation, contractors must also complete electronic representations and certifications.
For more information and to complete the electronic Reps & Certs, see the SAM website at http://www.sam.gov. A contract cannot be awarded to a contractor not registered in SAM. Remember to review the NAICS codes listed in your SAM record and make sure that you have listed the NAICS code for this procurement.
Note: FAR Clause 52.209-7 and DFARS Clause 252.209-7999 are not found in the electronic Reps & Certs in SAM; therefore, Offerors shall submit FAR Clause 52.209-7 with paragraph (b) completed to report whether or not they have current active Federal contracts and grants with a total value greater than $10,000,000 and Offerors shall submit DFARS Clause 252.209-7999 with paragraph (b) completed to report whether or not they have any unpaid Federal tax liability or were convicted of a felony criminal violation under a Federal law within the preceding 24 months.
8. FEDERAL CONTRACTOR PROGRAM
In accordance with Federal Acquisition Regulation (FAR) 22.13, any contractor or subcontractor with a contract or subcontract with the Federal Government of $150,000 or more that was entered into on or after October 1, 2015 (or $100,000 or more that was entered prior to October 1, 2015) must take affirmative action to hire and promote qualified covered veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized.
If subject to the reporting requirements, companies must file an annual VETS-4212 Report, which shows the number of covered veterans in their workforce and number of new hires, including covered veterans hired during the reporting period. Instructions, information, and follow-up assistance is provided at VETS-4212 Internet site at http://www.dol.gov/vets/vets4212.htm or employers may contact the VETS-4212 customer support at (866) 237- 0275 or e-mail at VETS4212-customersupport@dol.gov.
VETS-4212 Reports must be filed between August 1 and September 30 of each year following a calendar year in which a contractor or subcontractor held a covered contract or subcontract.
Upon the successful submission of a VETS-4212 report, federal contractors will receive an email confirmation of receipt notification for their records. Offerors shall include a copy of their confirmation notification email in their proposal as verification of submission for the current reporting period. DO NOT SUBMIT A COPY OF THE REPORT ITSELF. If this requirement is not applicable to your firm, provide a statement that your firm does not have any contracts subject to this requirement.
A contract cannot be awarded to a contractor that has not submitted a required annual form VETS-4212, Federal Contractor Veterans’ Employment Report (VETS-4212 Report) if subject to the reporting requirements of 38 U.S.C. 4212(d) for that fiscal year.
9. INCURRED EXPENSES
The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.
10. UTILIZATION OF SMALL BUSINESSES
The selected contractor will be responsible for ensuring subcontracting opportunities are made available to responsible small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. Additionally, all large businesses will be required to submit a small business subcontracting plan prior to award that will be incorporated into the contract award, and the awardee (if large business) will be required to submit semi-annual reports to demonstrate compliance with their subcontracting plan.
The subcontracting goals for this procurement are as follows:
Small Business 45% HUBZone 3% Small Disadvantaged Business 5% Small Disadvantage Veteran Owned Small Business 5% Woman Owned Small Business 15%
11. PRE-CONSTRUCTION MEETING
Prior to commencement of work, a meeting will be held with the contractor and the Government representative to discuss matters of mutual interest concerning the contract. The contractor shall contact LTJG Jasmine Andino at jasmine.andino@navy.mil to schedule this meeting.
12. DEFENSE BIOMETRIC IDENTIFICATION SYTEM (DBIDS)
During the duration of this contract base security may implement Defense Biometric Identification System (DBIDS) access procedures. In the event they do the following is provided for your information:
"Identification badges, if required, will be furnished based on the individual installation security procedures.
Contactor is responsible for all costs, if any, associated with obtaining proper credentials, including participation in the Defense Biometric Identification System (DBIDS) program. The Contractor must immediately report instances of lost or stolen badges to the Contracting Officer. Failure of contractor personnel to obtain entry approval will not affect the contract price or time of completion. All Contractor personnel shall become familiar with and obey all Government regulations including fire, traffic, and security regulations. Refer to individual Task Order or Station requirements provided at the preconstruction conference. Contractor personnel will not be admitted to the work site without approval. Access requirements will be as identified in station policy for each location. Some facilities, or areas within some facilities, restrict access to U.S. Citizens only."
13. FAR 52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY
PREPARDENESS, AND ENERGY PROGRAM USE (APR 2008)
mailto:jasmine.andino@navy.mil
Any contract awarded as a result of this solicitation will be DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
(End of provision)
14. FAR 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds --
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
15. NOTICE OF BONDING REQUIREMENTS
Within 15 days after receipt of award, the bidder/Offeror to whom the award is made shall furnish the bonds required by FAR Clause 52.228-16.
Bidders/Offerors are hereby notified that the contract time for purposes of fixing the completion date, default, and liquidated damages will be as stated in FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work, regardless of when performance and payment bonds or deposits in lieu of surety are executed.
(End of NAVFAC language)
16. UTILITIES FOR CONSTRUCTION AND TESTING
The Contractor shall be responsible for obtaining, either from available Government sources or local utility companies, all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used.
(End of NAVFAC language)
17. 252.204-7012 Safeguarding of Unclassified Controlled Technical Information. (NOV 2013).
18. 252.203-7000 Requirements Relating To Compensation Of Former DoD Officials (SEP 2011).
19. 252.251-7000 Ordering From Government Supply Sources.
20. AUTHORITY
1. No person other than the Contracting Officer has authority to bind the Government with respect to this contract.
2. No action or omission of any government employee or representative other than the Contracting Officer shall increase or decrease the scope of this contract or shall otherwise modify the terms and conditions of this contract.
3. In no event shall any of the following be effective or binding on the Government or imputed to the Contracting Officer with respect to this contract:
(a) An understanding or agreement between the Contractor and anyone other than the Contracting Officer;
(b) A purported modification or change order issued by anyone other than the Contracting Officer;
(c) A promise by anyone other than the Contracting Officer to provide additional funding or make payments; or
(d) An order, direction, consent, or permission from anyone other than the Contracting Officer to:
(i) Incur costs in excess of a specified estimated cost, allotment of funds, or other ceiling; or
(ii) Expend hours in excess of a specified level of effort.
(End of NAVFAC language)
24. FAR 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2014)
(a) Definitions. As used in this clause-- “United States'' means the 50 states and the District of Columbia.
“Worker''—
(1) Means any person engaged in performing work on, or in connection with, a contract covered by Executive Order 13658, and
(i) Whose wages under such contract are governed by the Fair Labor Standards Act (29 U.S.C. chapter 8), the Service Contract Labor Standards statute (41 U.S.C. chapter 67), or the Wage Rate Requirements (Construction) statute (40 U.S.C. chapter 31, subchapter IV),
(ii) Other than individuals employed in a bona fide executive, administrative, or professional capacity, as those terms are defined in 29 CFR part 541,
(iii) Regardless of the contractual relationship alleged to exist between the individual and the employer.
(2) Includes workers performing on, or in connection with, the contract whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(c).
(3) Also includes any person working on, or in connection with, the contract and individually registered in a bona fide apprenticeship or training program registered with the Department of Labor's Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship.
(b) Executive Order Minimum Wage rate.
(1) The Contractor shall pay to workers, while performing in the United States, and performing on, or in connection with, this contract, a minimum hourly wage rate of $10.10 per hour beginning January 1, 2015.
(2) The Contractor shall adjust the minimum wage paid, if necessary, beginning January 1, 2016 and annually thereafter, to meet the Secretary of Labor's annual E.O. minimum wage. The Administrator of the Department of Labor's Wage and Hour Division (the Administrator) will publish annual determinations in the Federal Register no later than 90 days before the effective date of the new E.O. minimum wage rate. The Administrator will also publish the applicable E.O. minimum wage on www.wdol.gov (or any successor Web site) and on all wage determinations issued under the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute.
The applicable published E.O. minimum wage is incorporated by reference into this contract.
(3)
(i) The Contractor may request a price adjustment only after the effective date of the new annual E.O. minimum wage determination. Prices will be adjusted only if labor costs increase as a result of an increase in the annual E.O.
minimum wage, and for associated labor costs and relevant subcontract costs. Associated labor costs shall include increases or decreases that result from changes in social security and unemployment taxes and workers' compensation insurance, but will not otherwise include any amount for general and administrative costs, overhead, or profit.
(ii) Subcontractors may be entitled to adjustments due to the new minimum wage, pursuant to paragraph (b)(2).
Contractors shall consider any subcontractor requests for such price adjustment.
(iii) The Contracting Officer will not adjust the contract price under this clause for any costs other than those identified in paragraph (b)(3)(i) of this clause, and will not provide duplicate price adjustments with any price adjustment under clauses implementing the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute.
(4) The Contractor warrants that the prices in this contract do not include allowance for any contingency to cover increased costs for which adjustment is provided under this clause.
(5) A pay period under this clause may not be longer than semi-monthly, but may be shorter to comply with any applicable law or other requirement under this contract establishing a shorter pay period. Workers shall be paid no later than one pay period following the end of the regular pay period in which such wages were earned or accrued.
(6) The Contractor shall pay, unconditionally to each worker, all wages due free and clear without subsequent rebate or kickback. The Contractor may make deductions that reduce a worker's wages below the E.O. minimum wage rate only if done in accordance with 29 CFR 10.23, Deductions.
(7) The Contractor shall not discharge any part of its minimum wage obligation under this clause by furnishing fringe benefits or, with respect to workers whose wages are governed by the Service Contract Labor Standards statute, the cash equivalent thereof.
(8) Nothing in this clause shall excuse the Contractor from compliance with any applicable Federal or State prevailing wage law or any applicable law or municipal ordinance establishing a minimum wage higher than the E.O. minimum wage. However, wage increases under such other laws or municipal ordinances are not subject to price adjustment under this subpart.
(9) The Contractor shall pay the E.O. minimum wage rate whenever it is higher than any applicable collective bargaining agreement(s) wage rate.
(10) The Contractor shall follow the policies and procedures in 29 CFR 10.24(b) and 10.28 for treatment of workers engaged in an occupation in which they customarily and regularly receive more than $30 a month in tips.
(c)
(1) This clause applies to workers as defined in paragraph (a). As provided in that definition--
(i) Workers are covered regardless of the contractual relationship alleged to exist between the contractor or subcontractor and the worker;
(ii) Workers with disabilities whose wages are calculated pursuant to special certificates issued under 29 U.S.C.
214(c) are covered; and
(iii) Workers who are registered in a bona fide apprenticeship program or training program registered with the Department of Labor's Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship, are covered.
(2) This clause does not apply to--
(i) Fair Labor Standards Act (FLSA)-covered individuals performing in connection with contracts covered by the E.O., i.e. those individuals who perform duties necessary to the performance of the contract, but who are not directly engaged in performing the specific work called for by the contract, and who spend less than 20 percent of their hours worked in a particular workweek performing in connection with such contracts;
(ii) Individuals exempted from the minimum wage requirements of the FLSA under 29 U.S.C. 213(a) and 214(a) and (b), unless otherwise covered by the Service Contract Labor Standards statute, or the Wage Rate Requirements (Construction) statute. These individuals include but are not limited to--
(A) Learners, apprentices, or messengers whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(a).
(B) Students whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(b).
(C) Those employed in a bona fide executive, administrative, or professional capacity (29 U.S.C. 213(a)(1) and 29 CFR part 541).
(d) Notice. The Contractor shall notify all workers performing work on, or in connection with, this contract of the applicable E.O. minimum wage rate under this clause. With respect to workers covered by the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, the Contractor may meet this requirement by posting, in a prominent and accessible place at the worksite, the applicable wage determination under those statutes. With respect to workers whose wages are governed by the FLSA, the Contractor shall post notice, utilizing the poster provided by the Administrator, which can be obtained at www.dol.gov/whd/govcontracts, in a prominent and accessible place at the worksite. Contractors that customarily post notices to workers electronically may post the notice electronically provided the electronic posting is displayed prominently on any Web site that is maintained by the contractor, whether external or internal, and customarily used for notices to workers about terms and conditions of employment.
(e) Payroll Records.
(1) The Contractor shall make and maintain records, for three years after completion of the work, containing the following information for each worker:
(i) Name, address, and social security number;
(ii) The worker's occupation(s) or classification(s);
(iii) The rate or rates of wages paid;
(iv) The number of daily and weekly hours worked by each worker;
(v) Any deductions made; and
(vi) Total wages paid.
(2) The Contractor shall make records pursuant to paragraph (e)(1) of this clause available for inspection and transcription by authorized representatives of the Administrator. The Contractor shall also make such records available upon request of the Contracting Officer.
(3) The Contractor shall make a copy of the contract available, as applicable, for inspection or transcription by authorized representatives of the Administrator.
(4) Failure to comply with this paragraph (e) shall be a violation of 29 CFR 10.26 and this contract. Upon direction of the Administrator or upon the Contracting Officer's own action, payment shall be withheld until such time as the noncompliance is corrected.
(5) Nothing in this clause limits or otherwise modifies the Contractor's payroll and recordkeeping obligations, if any, under the Service Contract Labor Standards statute, the Wage Rate Requirements (Construction) statute, the Fair Labor Standards Act, or any other applicable law.
(f) Access. The Contractor shall permit authorized representatives of the Administrator to conduct investigations, including interviewing workers at the worksite during normal working hours.
(g) Withholding. The Contracting Officer, upon his or her own action or upon written request of the Administrator, will withhold funds or cause funds to be withheld, from the Contractor under this or any other Federal contract with the same Contractor, sufficient to pay workers the full amount of wages required by this clause.
(h) Disputes. Department of Labor has set forth in 29 CFR 10.51,Disputes concerning contractor compliance, the procedures for resolving disputes concerning a contractor's compliance with Department of Labor regulations at 29 CFR part 10. Such disputes shall be resolved in accordance with those procedures and not the Disputes clause of this contract. These disputes include disputes between the Contractor (or any of its subcontractors) and the contracting agency, the Department of Labor, or the workers or their representatives.
(i) Antiretaliation. The Contractor shall not discharge or in any other manner discriminate against any worker because such worker has filed any complaint or instituted or caused to be instituted any proceeding under or related to compliance with the E.O. or this clause, or has testified or is about to testify in any such proceeding.
(j) Subcontractor compliance. The Contractor is responsible for subcontractor compliance with the requirements of this clause and may be held liable for unpaid wages due subcontractor workers.
(k) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (k) in all subcontracts, regardless of dollar value, that are subject to the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, and are to be performed in whole or in part in the United States.
EVALUATION
A. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range. The non-price factors (technical proposals) of the three (3) lowest priced proposals will be evaluated by the Source Selection Evaluation Board (SSEB) in accordance with the criteria of acceptability set forth in the solicitation. However, at the Contracting Officer’s sole discretion, the right is reserved to increase the number of proposals it will review under this methodology. If at least one (1) of those proposals is found to be technically acceptable, the Government will make an award to the Offeror with the lowest price, if the price is found to be fair and reasonable in the price evaluation. If none of these proposals are found technically acceptable, groups of three (3) proposals will continue to be evaluated in the order of lowest price to highest price until an offer is found to be technically acceptable.
Accordingly, under this methodology, the non-price factors of some proposals may not be evaluated. If discussions are deemed necessary by the Contracting Officer, all proposals will be evaluated (both non-price and price) for the purpose of establishing a competitive range. Proposals shall be provided to the evaluators without any identification of prices or any rank order of prices.
2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The LPTA process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.
4. An overall non-price factors rating must be at least “ACCEPTABLE” in order to be eligible for award.
An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.
B. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-price factors.
Factor 1 – Corporate Experience Factor 2 – Safety Factor 3 – Project Approach Narrative Factor 4 – Past Performance
The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Price:
(1) Solicitation Submittal Requirements:
The offeror shall submit one original, using the Contract Pricing Schedule provided with the Request for Proposal in a sealed envelope separate from the Technical Proposal.
- Standard Form (SF) 1442 (Solicitation, Offer and Award)
- Offer Schedule
- Bid Bond
Failure to submit a Bid Bond conforming to the requirements of the solicitation may result in an Offeror's proposal being rejected as unacceptable.
(2) Basis of Evaluation:
The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217-5, Evaluation of Options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
Note 1: A price that is found to be unreasonably high in relation to the proposed work may be indicative of an inherent lack of understanding of the solicitation requirements and may result in the overall proposal being considered unacceptable.
Note 2: The estimated total contract price range, in accordance with DFARS 236.204 is between $25,000,000 and $100,000,000. Price proposals greater than the estimated range may be rejected.
(b) Technical Factors:
(1) Factor 1, Corporate Experience:
(i) Solicitation Submittal Requirements:
Submit Exhibit “A” (Construction Experience Project Data Sheet) under Tab “1.”
Submit a minimum of two (2) and a maximum of five (5) relevant construction projects for the Offeror that best demonstrate your experience as a prime contractor on projects that are similar in size, scope, and complexity to the RFP. Each project does not have to contain all elements identified below, however all elements identified below must be represented in the experience factor or the proposal will be determined unacceptable.
For purposes of this evaluation, relevant projects are further defined as:
Similar in size: Construction project with construction cost of $25 million or more.
Similar in scope: New construction of pipelines with similar sizes and pressure ratings of the requested work, pump stations and work in environmentally sensitive areas including archeological sites.
Similar in complexity: Pipelines replacement projects where the system must stay operational, stringent NEPA requirements and high volume pump stations.
In addition, the Offeror shall meet the following requirements:
Experience in construction of potable water pipe transmission mains with a minimum 18” diameter and a minimum length of one (1) mile.
Experience in construction of Water pump stations with a minimum flow of three (3) Million Gallons Per Day
(MGD).
At least one (1) project shall demonstrate experience in successfully managing multiple work sites under a single project.
Exhibit “A” must clearly address how the project meets the above requirements.
Projects submitted for the Offeror shall be 100% complete (see definition) within the past five (5) years of the date of issuance of this RFP.
100% COMPLETE: For construction projects: The facility is completely constructed and ready for…