Exhibit_M_PTO_0001_Worksheet_236220_GenCon.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- N6247318R2286
About this file
This pre-solicitation notice seeks proposals for an indefinite delivery indefinite quantity job order contract for general construction services at various facilities within the Marine Corps Logistics Base Barstow and Marine Corps Air Ground Combat Center Twentynine Palms area of responsibility in California. The contract has an estimated maximum value of $49 million over a five-year period including a two-year base and one three-year option. The North American Industry Classification System code is 236220 for general construction with a small business size standard of $36.5 million. The solicitation will be posted on September 17, 2018 to the Navy Electronic Commerce Online website for women-owned small businesses to provide labor, materials, equipment, testing, supervision, quality control, safety management and other services for task orders ranging from $2,000 to $1 million. Proposals will be evaluated on ability to manage multiple projects simultaneously, experience, past performance, safety, and price based on a sample task order.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibits_A_B_C_D_E_F_G_H_J_K_L.pdf | ||
| N6247318R2286_RFP_Barstow_29Palms.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRE-PRICED ITEM DESCRIPTION | MEANS ITEM # | QTY # | QTY UNIT | MATERIAL (MATL) UNIT COST | MATL TOTAL COST | LABOR UNIT COST | LABOR TOTAL COST | EQUIPMENT (EQUIP) UNIT COST | EQUIP TOTAL COST | OTHER COST | OTHER TOTAL COST |
| Selective demolition, rubbish handling, dumpster, 40 C.Y., 10 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition cost | 024119190840 | 4 | Week | ||||||||
| Selective demolition, rubbish handling, 0'-100' haul, load, haul, dump and return, wheeled, cost to be added to demolition cost | 024119192045 | 80 | C.Y. | ||||||||
| Deconstruction material handling, light fixtures for recycling stack and wrap per pallet | 024210300350 | 4 | Ea. | ||||||||
| Hazardous waste cleanup/pickup/disposal, transportation to disposal site, truckload = 80 drums or 25 C.Y. or 18 tons, maximum | 028120101270 | 35 | Mile | ||||||||
| Bulk asbestos removal, remove cementitious material from flat surface, includes disposable tools & 2 suits & 1 respirator filter/day/worker | 028213433000 | 75 | S.F. | ||||||||
| Doors, specialty, access, standard, stainless steel, 24" x 24" | 083113106650 | 1 | Ea. | ||||||||
| Flooring demolition, resilient, sheet goods | 090505200800 | 305 | S.F. | ||||||||
| Vinyl or rubber cove base, for glued and caulked installation, add to labor | 090505200800 | 1 | |||||||||
| Flooring demolition, vinyl or rubber cove base, straight section | 090505200850 | 87 | L.F. | ||||||||
| Vinyl or rubber cove base, for glued and caulked installation, add to labor | 090505200850 | 1 | |||||||||
| Flooring demolition, vinyl or rubber cove base, molded corner | 090505200860 | 4 | Ea. | ||||||||
| Vinyl or rubber cove base, for glued and caulked installation, add to labor | 090505200860 | 1 | |||||||||
| Walls and partitions demolition, tile, ceramic, on walls, thin set | 090505303760 | 437 | S.F. | ||||||||
| Gypsum wallboard, on walls, water resistant, taped & finished (level 4 finish), 5/8" thick | 092910302250 | 437 | S.F. | ||||||||
| Gypsum wallboard, for finishing corners, inside, add | 092910305350 | 36 | L.F. | ||||||||
| Wall base, rubber, straight or cove, standard colors, 6" high, 1/8" thick | 096513131110 | 87 | L.F. | ||||||||
| Surface preparation, interior, walls, sand, gypsum board and plaster, medium | 099103400670 | 786 | S.F. | ||||||||
| Painting walls, complete, on drywall or plaster, primer and 2 finish coats, with roller, including surface preparation | 099123721670 | 786 | S.F. | ||||||||
| Wall coating, epoxy coatings, Water based | 099656200400 | 786 | S.F. | ||||||||
| Toilet accessories, soap dispenser, chrome, surface mounted, liquid | 102813134600 | 2 | Ea. | ||||||||
| Toilet accessories, towel dispenser, stainless steel, surface mounted | 102813136700 | 2 | Ea. | ||||||||
| Dental equipment, chair, electric or hydraulic, selective demolition | 110505107400 | 6 | Ea. | ||||||||
| Selective demolition, casework, metal base cabinets | 120505103100 | 25 | L.F. | ||||||||
| Selective demolition, countertop, stainless steel or acid proof | 120505103120 | 25 | L.F. | ||||||||
| Laboratory casework, wall cabinets, metal, open, 12-1/2" deep | 123553131300 | 10 | L.F. | ||||||||
| Laboratory casework, wall cabinets, with doors, 12" x 31" | 123553131500 | 25 | L.F. | ||||||||
| Casework, base cabinets, hospital, stainless steel | 123570131000 | 25 | L.F. | ||||||||
| Laboratory casework, counter tops, stainless steel, excl. base cabinets | 123653100040 | 25 | S.F. | ||||||||
| Sprinkler system component, sprinkler heads, dry, pendent, 1/2" orifice, 3/4" or 1" NPT, 39-1/4" to 42" length, excludes supply piping | 211316502790 | 5 | Ea. | ||||||||
| Fixture, sink, single compartment, selective demolition | 220505101300 | 2 | Ea. | ||||||||
| Faucets/fittings, medical, faucet, gooseneck spout, wrist handles, grid drain | 224339102900 | 2 | Ea. | ||||||||
| Faucets/fittings, medical, mixing valve, knee action, screwdriver stops | 224339102940 | 1 | Ea. | ||||||||
| Industrial safety fixture, eyewash station, stainless steel, pedestal mounted, excludes rough-in | 224516102000 | 1 | Ea. | ||||||||
| Ductwork, metal; steel and stainless steel, fabricated, selective demolition | 230505101570 | 100 | Lb. | ||||||||
| Exhaust system, weld fume hood, selective demolition | 230505101770 | 2 | Ea. | ||||||||
| Balancing, air conditioning equipment, supply, return, exhaust, registers and diffusers, laboratory fume hood, (Subcontractor's quote including material & labor) | 230593103600 | 1 | Ea. | ||||||||
| Metal ductwork, fabricated rectangular, galvanized steel, 200 to 500 lb., incl fittings, joints, supports & allow for a flexible connections field sketches, excludes as-built drawings and insulation | 233113130520 | 100 | Lb. | ||||||||
| Metal ductwork, elevated installation of prefabricated (purchased) ductwork, 10' to 15' high, add to labor | 233113130520 | 1 | |||||||||
| Fluorescent fixtures, interior, 2 lamp, 2' x 4', electrical demolition, remove, recessed drop-in, to 15' high, including supports & whips | 260505102120 | 4 | Ea. | ||||||||
| Outlet boxes, cast, switch cover, 1 gang, FS | 260533161510 | 20 | Ea. | ||||||||
| Interior LED fixtures, troffer, recess mounted, 6,400 lumens, 2' x 4', replaces four T8 lamp, incl lamps, mounting hardware and connections | 265113551020 | 4 | Ea. | ||||||||
| TOTALS | $ - 0 | $ - 0 | $ - 0 |
| NON PRE-PRICED ITEM DESCRIPTION | QTY # | QTY UNIT | MATERIAL (MATL) UNIT COST | MATL TOTAL COST | LABOR UNIT COST | LABOR TOTAL COST | EQUIPMENT (EQUIP) UNIT COST | EQUIP TOTAL COST | OTHER COST | OTHER TOTAL COST |
| OFFICE SYSTEMS FURNITURE | 1 | LS | $ 20,000.00 | $ 20,000.00 | ||||||
| PREPRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER) | ||||||||||
| CITY COST INDEX _____ (____________ WEIGHTED AVERAGE)_ | ||||||||||
| SUBTOTAL (PREPRICED LINE TOTALS + CCI) | ||||||||||
| APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _________ | ||||||||||
| SUBTOTAL (PREPRICED LINE ITEMS + CCI + SALES TAX) | ||||||||||
| PRE-PRICED COEFFICIENT _______ (FROM EXHIBIT K WORKSHEET) | ||||||||||
| TOTAL (PRE-PRICED LINE ITEMS + CCI + SALES TAX, LINE 52) + PRE-PRICED COEFFICIENT ADUSTMENT (LINE 52 x LINE 53) |
| NON PRE-PRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER) |
| APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT __________ |
| SUBTOTAL |
| NON PRE-PRICED COEFFICIENT _____ (FROM EXHIBIT K WORKSHEET) |
| TOTAL (NON PRE-PRICED LINE ITEMS + SALES TAX, LINE 58) + NON PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 58 x LINE 59) |
| TOTAL TASK ORDER PRICE (LINE 54 + LINE 60) |
| NOTE: USE OF THIS FORM IS MANDATORY. ANY MODIFICATION OF THIS FORM BY THE OFFEROR WILL RESULT IN THE OFFER BEING REJECTED AS NON-RESPONSIVE. |
File details come from the government source that posted it. Updated .